Balloki to Sidhnai
14 Protecting LBDC from river action opposite RD 12+000 to 4.200 1982-83
13+500
16 Diverting river Ravi upstream Mari Pattan bridge on Okara 9.230 1980-81
Faisalabad Road
17 Straightening river Ravi opposite Mauza Killah Hamza in 1.077 1980-81
Sahiwal District
18 Protecting Barala Branch opposite RD 440+448 by digging 2.390 1981-82
cunnette
19 River Training works for protection of Mohammad Shah 4.500 1979-80
Wala Bund
PUNJAB PROVINCE
13. Flood embankment (FE) along right bank of western feeder 13,000
RD 2.0 to 15.0
14. Flood embankment along Shahpur branch RD 30 to RD 35 5,000
Taunsa-Guddu Reach
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
1. Construction of Guide Head Spur at RD 165+000 Link No.1 51.489 2008-09
2. Constructing River Training/Protection works along right side 128.984
of River Indus (Downstream Ghazi Ghat Bridge to Ganda
Jakhar Imam Shah) District D.G. Khan
3. Constructing J-Head Spur # 2 of Pir Adil Minor & I-L Disty of 137.376 2008-09
Link No.1
4. Constructing J-Head Spur No.1 of Pir Adil Minor 97.147 2007-08
5. Protecting measures to save Smoka village and irrigation 48.560 2007-08
infrastructure opposite RD 200+000 Minchin Bund
6. Protection of Minchan bund from RD-226-2565 Punchnad 151.634 1996-97
canal system and Chachran town for erosion of river Indus
7. Constructing J-Head spur opposite village Malkani 51.840 1996-97
8. Constructing J-Head spur opposite village Qasmani 30.840 1996-97
9. Constructing two guide spurs to project I-R Minor and Jatoi 56.14 1994-95
branch irrigation system from River Indus erosion in district
Muzaffargarh
10. Construction J-Head spur for protection of Jatoi branch 19.660 1989-90-
irrigation system, Suleman & Khanwah flood bund from river 1991-92
Indus, construction of J-Head spur No. 4&5.
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
11. Construction of J-Head spur at RD-25000 Magasson branch 23.430 1996-97
canal
12. Constructing J-Head spur 1&1a for protection of Jatoi branch 35.430 1991-92
irrigation system Suleman & Khanwah flood bund from river
Indus.
13. Constructing J-Head spur for protecting Jatoi branch irrigation 17.4 FPSP-I
system, Suleman and Khanwah flood bund spur No. 6
14. Constructing J-Head spur for protection of Jatoi branch 31.45 FPSP-I
irrigation system, Suleman and Khanwah flood bund from
Indus river (Spur No. 1&1A)
15. Constructing J-Head spur for protection of Jatoi branch 13.60 FPSP-I
irrigation system, Suleman and Khanwah flood bund from
Indus river (Spur No. 2)
16. Constructing J-Head spur for protection of Jatoi branch 12.24 FPSP-I
irrigation system, Suleman and Khanwah flood bund from
Indus river (Spur No. 3)
17. Constructing J-Head spur for protection of village Bait Angra 23.18 FPSP-I
and agricultural land against erosion of River Indus
18. Constructing J-Head spur for checking erosion to protect 21.76 FPSP-I
Parhar Gharbi and Muggasun branch irrigation system
19. Constructing J-Head spur to protect Banuhan Distributary 8.03 FPSP-I
Jhok and Jhakhar Imam villages
20. Constructing 2 No. spurs for protection of Kala and nearby 20.95 FPSP-I
villages (Kala and Shah Sadar Din)
21. Constructing J-Head spur at RD 170+275 of link No. 1 (New 24.24 FPSP-I
Diversion)
22. Constructing J-Head spur on Link No. 1 opposite Mahtam 15.00 FPSP-I
Rest House
23. Restoration of flood damages to spur on link No. 1 opposite 24.07 FPSP-I
Mahtam Rest House
24. Extending J-Head spur at RD 180+000 link No. 1 23.70 FPSP-I
25. Constructing J-Head spur at RD 17+500 Kasturi flood bund to 29.32 FPSP-I
safeguard Ghazi Ghat bridge complex.
26. Constructing spur for protection of Rojhan town (phase-I) by 11.11 FPSP-I
construction J-Head spur opposite Rojhan town
27. Constructing J-Head spur No. R-63 near Badli village 17.41 FPSP-I
28. Constructing J-Head spur No. R-64 near Badli village 19.82 FPSP-I
29. Remodelling Minchin bund from RD 6+700 to RD 122+000 12.81 FPSP-I
30. Remodeling of Minchin bund from RD 122+000 to RD 16.16 FPSP-I
243+000
31. Constructing link bund for protection of Chachran town 3.80 FPSP-I
32. Remodeling of Minchin bund RD 243+000 to RD 315+500 4.61 FPSP-I
33. Construction of Guide Head spur opposite Qasmani Village. 38.875 FPSP-II
34. Remodeling of Minchin Bund RD 122-243 in Rahimyar Khan 52.162 FPSP-II
Division
35. Construction of J-Head Spur at RD 12500 Chachran link Bund 56.330 FPSP-II
PUNJAB PROVINCE
INVENTORY OF FLOOD WORKS
RIVER CHENAB (INVENTORY-III)
U/s Marala
1. Construction of Dohlak Flood Protection Bund and Drain in 32.180 2008-09
the vicinity of International Boundary on left side of river
Tawi
2. PC-I for Construction of Sewaraj Flood Protection Bund and 19.130 2008-09
Drain in the vicinity of International Boundary on left side of
river Tawi
3. PC-I for Construction of Marchola Flood Protection Bund and 36.443 2008-09
Drain in the vicinity of International Boundary on left side of
river Tawi
4. Protecting Sharkpur flood bund against river action by 9.961 1990-91
constructing J-Head spur RD-25500
Trimmu-Punjnad Reach
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
1. Construction J-Head at RD 50+000 of Shehr Sultan flood 124.798 2005-06-
bund 2006-07
2. Protecting Rangpur Canal from R.D. 320-322 against River 3.450 1993-94-
erosion, Muzaffar Garh. 2000-01
3. Constructing flood embankment from Tail Khangrah flood 23.85 FPSP-I
bund to Tail RMB of Panjnad headworks
4. Constructing J-Head spur at Khangarh flood bund RD 66+700 9.10 FPSP-I
with mole head at RD 54+500 & RD 64+000
5. Extending Chandar Ban flood bund to Sitpur RD 30+000 to 9.14 FPSP-I
RD 92+000
6. Raising and strengthening Rohari flood bund RD 0-23+400 3.43 FPSP-I
7. Training Chenab River opposite RD 320+000 Rangpur Canal 15.48 FPSP-I
by constructing J-Head spur
8. 1 No. J-Head spur No. 2 & one Mole Head No. 1 at Rangpur 18.17 FPSP-I
canal
9. Checking embankment of Chenab river by constructing J- 15.48 FPSP-I
Head spur at RD 105+000 to RD 110+000 Khangarh flood
bund
10. Constructing J-Head spur at RD 123+000 to RD 128+000 to 16.55 FPSP-I
protect Khangarh flood bund against river erosion
11. Remodeling Jalalpur Khaki bund with 6-0 free board above 6.34 FPSP-I
HFL 1973
12. Flood protection of Multan city by constructing guide bank 20.42 FPSP-I
spur No. 1
13. Remodeling Nangi-Dhundoo and Gardezpur flood bund 9.51 FPSP-I
14. Protecting Multan city against erosion of River Chenab by 11.80 FPSP-I
constructing J-Head spur No. 2 opposite RD 140+900 of
Akbar flood bund
15. Protecting Multan city against erosion of River Chenab by 10.05 FPSP-I
constructing J-Head spur No. 3 at RD 248+000
16. Protecting Multan city against erosion of River Chenab by 10.11 FPSP-I
constructing J-Head spur No. 4 opposite RD 263+000 of
Shujabad branch
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
17. Constructing 1 No. sloping spur opposite RD 10+000 of 2.72 FPSP-I
Balochwah flood bund to protect Shahpur Lamma
18. Constructing 3 No. stone studs at RD 157+750, RD 158+050 3.17 FPSP-I
& 158+350 of Chenab flood bund instead of at RD 1154+125
RD 154+438 & RD 154+813 to protect Chenab flood bund
19. Recouping of 6 Nos. sloping spurs between RD 153+400 and 3.82 FPSP-I
RD 158+000 of Chenab River
20. Checking erosion against river action opposite RD 252+000 of 28.49 FPSP-I
Shujabad branch for protection of Multan city
21. Providing protection to village Makori against erosive action 13.69 FPSP-I
of Chenab River d/s Trimmu Barrage
22. Constructing J-Head spur at RD 9+250 of LMB for changing 15.18 FPSP-I
approach of River Chenab from left to right side u/s Panjnad
headworks
23. Checking river action at RD 45+000 RMB u/s (stage-I) 4.90 FPSP-I
damages during construction
24. Checking river action at RMB u/s Panjnad headworks by 64.83 FPSP-I
constructing J-Head spurs at RD 45+400, 40+900 & 36+700
25. Constructing two spurs on River Chenab near Khan Garh in 40.00
district Muzaffargarh
26. Constructing J-Head Spur at R.D. 96,000 Khangarh Flood 17.850 1994-95
Bund (D.G. Khan Irrigation Zone) Chenab River Costing Rs.
17.850 million.
27. Constructing L-Head Spur at R.D. 116700 Khangarh Flood 4.218 1994-95
Bund (D.G. Khan Irrigation Zone) Chenab River Costing Rs.
4. 218 million
28. Constructing J-Head Spur at R.D. 142000 Khangarh Flood 16.100 1994-95
Bund (D.G. Khan Irrigation Zone) Chenab River Costing Rs.
16.100 million.
29. Raising and Strengthening R.M.B & L.M.B U/S Panjnad 25.263
Headworks.
30. Raising and strengthening of Ahmadpur Flood Bund RD 3000 28.213
to 96000 in Ahmadpur Canal Division. (Revised)
31. Protecting Shujabad Branch Branch & infrastructure by 47.490 FPSP-II
executing guide bank head type spur No.3-B at RD 252000 of
Shujaabad Branch
32. Constructing flood protecting works at Chenab flood bund 98.520 FPSP-II
reach RD 10000-55000
PUNJAB PROVINCE
INVENTORY OF FLOOD WORKS
RIVER RAVI (INVENTORY-III)
Kot Nainan-Balloki Reach
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
1. Remodeling of Jalala flood protection bund 5.82 FPSP-I
2. Construction of Tie Bund between Hajipur Gujran bund to 11.09 FPSP-I
Bheco Chak bund
3. Protecting village abadi of Puranwala against flood damage of 4.56 FPSP-I
Basantar nullah
4. Training Ravi River near Faizpur village opposite RD 65+000 36.00 FPSP-I
left Rayya protection bund
5. Training Ravi River RD 89+000 of Rayya flood bund 40.73 FPSP-I
6. Training Ravi River opposite spur at RD 215+000 of BRBD 23.29 FPSP-I
canal
7. Constructing J-Head spur in River Ravi at RD 39000/L of 17.59 FPSP-I
Shahdara distributary bund near village Babakwal
8. Constructing J-Head spur at RD 17+000 of Faizpur Minor 26.44 FPSP-I
9. Protection of agricultural lands and abadi of Nawan Kot 53.00 FPSP-I
village
10. Protection of Shahdara town Deleted FPSP-I
11. Raising of left marginal bund right marginal bund, left guide 52.317 FPSP-II
bund and right guide bund U/S Balloki head works
12. Constructing J-Head Spur at tail of Q.B. Link Canal to protect 67.981 FPSP-II
outfall structure (Revised)
Baloki-Sidhnai Reach
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
1. Providing protective measures Muhammad Shahwala Flood 48.925 2008-09
Bund and Burala Branch against erosion by River Ravi (Guide
Spur at RD 419+000 of Burala Branch)
2. Restoring Tie Flood Bund along Ravi River in Tehsil 32.145 2005-06-
Shakargarh District Narowal 2006-07
3. Flood Protecting bunds along Deg Nullah for protection of 79.331 2003-04
villages in Tehsil Pasrur District Sialkot
4. Protection of village Nanu Dogar, Khanke Jhugian and Allied 26.330 1993-94-
abadies from severe action of River Ravi, Lahore & 2000-01
Sheikhupura.
5. Training River Ravi by constructing cunnettes and diversion 34.050 1993-94-
bunds opposite village Saad and Toria Bara, Sheikhupura 2000-01
6. Protecting villages Khannah and Saidpur against erosion of 19.58 1999-00
Bien Nullah in district Narowal (u/s Balloki)
7. Checking erosion of River Ravi to protect BRBD Link and 110.11 1998-99
Ravi Syphon (u/s Balloki)
8. Construction J-Head spur at RD-288500 to protect BRBD link 8.076 1989-90-
(u/s Balloki) 1991-92
9. Training river Ravi opposite spur RD-215 left BRBD link 14.280 1991-92
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
10. Constructing J-Head spur guide bund near Khund Qasim Shah 23.15 FPSP-I
and Khund Rehm Shah to protect abadies & land
11. Constructing J-Head guide bank spur near old syedwala to 23.16 FPSP-I
protect abadies and land
12. Construction J-Head spur near Jandraka town to protect 27.13 FPSP-I
abadies and land
13. Constructing J-Head spur near Kund Bohar to protect abadies 29.64 FPSP-I
& land
14. Constructing J-Head spur near Dadra Bala to protect from 31.88 FPSP-I
erosion of River Ravi and restoration of flood damages
15. Raising Mohammad Shah Wala flood bund and spur at RD 5.90 FPSP-I
424+430 to protect the area from Ravi River spills
16. Constructing J-Head guide bank to protect Kalera bund RD 26.24 FPSP-I
10+000-RD 200+000
17. Constructing J-Head spur near Ara Tullah to protect from 26.86 FPSP-I
erosion of Ravi River
18. Protecting Bussi Irrigation System Disty. RD 38+000 25.41 FPSP-I
19. Constructing J-Head guide bank spur to protect abadies, land 26.28 FPSP-I
and RMB 99+500 u/s Sidhnai Barrage
20. Constructing J-Head guide bank spur near Miran Shah to 22.58 FPSP-I
protect from erosion of Ravi River
21. Protecting LMB in reach RD 20+000 to 30+000 u/s Sidhnai 29.89 FPSP-I
Barrage against erosive action of River Ravi
22. Constructing J-Head guide bank spur near Mullah Hamza to 28.04 FPSP-I
protect from erosion of Ravi River & restoration
23. Restoration of flood damages to Sayyed Wala 4.33 FPSP-I
24. Training river rain opposite spur RD-215 left BRBD link
25. Constructing stone Pitched Earthern Spur R.D. 28-32 of Fateh 19.75 1994-95
Muhammad Distributary to save the Distributary & Chack-
Bank Erosion (Sutlej River) Costing Rs. 19.75 million.
26. Constructing Diversion Embankment at R.D. 7-8 Kanda 19. 934 1994-95
Minor to Divert River Sutlej to Pre-1995 Course and Protect
the village and Land From Erosion Downstream (Sutlej River)
Costing Rs. 10. 034 million.
27. Constructing Two Nos. Solid Stone Dikes Near Attare Village 19. 650 1994-95
for the Protection of village Abadi Land & irrigation System
of lalugudar and Fateh Muhammad (Sutlej River) Costing Rs.
19.650 million.
28. Checking erosion of River Ravi to protect BRBD Link and 88.886
Ravi Syphon.
29. Protecting outfalls of B.S.Link Canal No.1 & II 65.138 FPSP-II
PUNJAB PROVINCE
INVENTORY OF FLOOD WORKS
RIVER JHELUM (INVENTORY-III)
Mangla-Rasul Reach
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
1. Constructing guide wall and sloping spur for protection of 70.133 2006-07
village Megha Kadhi against erosive action of river Jhelum
2. Protection of village abadies and agricultural land of village 128.32 2008
Chak Sikandar, Kharka, Gurha Jattan, Bhalwal Gharbi and
Paharwal against erosion of river Jhelum in district Gujrat
3. Protection of village abadies and allied infrastructure of Jhura 96.804 2005-06-
Kalan and Thatti Kalak Bhan from erosive action of River 2006-07
Jhelum
4. Protection of Tibba Qaim Din by Providing river Training 17.410 1996-97
works on Right side of the River Jhelum in Distt. Jhelum.
5. Protection of Village Abadies and Agricultural Land of Village 14.53 1995-96
Narowal, Khaderiala and Kharka Against Erosion of River
Jhelum in Jhelum District
6. Protection of village abadies and Agricultural Land of village 14.45 1995-96
Shah Maddar, Barand and Chak Nazar against Erosion of
River Jhelum in Disst. Jhelum
7. Protection Land and Abadies of Jhelum Cantonment Against 8.25 1994-95
Floods in River Jhelum.
8. Protection of Village and Agricultural Land of Village Narial, 13.83 1994-95
Paharwal and Malo Daulo Against Erosion of River Jhelum in
Jhelum district.
9. Protecting land & abadies of Jhelum cantonment against flood 5.960 1991-92
in River Jhelum construction of flood protection bund on R/
Jhelum, (u/s Rasul)
Rasul-Trimu Reach
Sr. Name of Scheme Cost Completion
No (Rs. in million) year
1. Protecting of Tibba Qaim Din by providing river training 30.765 2003-04
works on right side of river Jhelum in District Khushab
2. Balance fund requirement for the scheme titled Protection of 99.470 2000-01-
C.J. Link out fall structure and village Shergarh from erosive 2002-03
action of River Jhelum
3. Constructing of Stone Pitching and Apron for the Protection of 48.360 FPSP-II
Shahpur Disty Flood Bund from RD. 44+850 To RD 51+850
against Erosion of River Jhelum Opposite Village Kandan
(Core Subproject).
4. Protection of Upper Jhelum Canal near RD 33+000 from 22.856 FPSP-II
Erosion of River Jhelum.
5. Protection of village Joya & Hamoka from erosive action of 12.301 FPSP-II
River Jhelum.
PUNJAB PROVINCE
INVENTORY OF FLOOD WORKS
RIVER SUTLEJ (INVENTORY-III)