Project Manager/Site Electrical Engineer shall make sure the implementation of the
following procedures in order to connect the Main Power Supply to the Project
Substation:
NOTE: Structure works; internal lighting, A/C and finishing works for the substation
should be finalized and handed over to the Kahramaa Civil Engineer at least
three months before Project completion date to allow other procedures to be
completed without delaying the project
2. a. Contractor.
2. b. Consultant.
2. c. Civil Engineer from Kahramaa.
SET 1:
Service Requisition Form with owner's signature with select one of the
following options (Attachment # 02):
B.1. First Yellow Card (Meter Card) in case of many meters will be
used in the same project.
B.2. Kahramaa Building Permit (Attachment No. 03).
B.3. Municipality Building Permit (Attachment No. 04).
B.4. Land Deed
(Attachment No. 05).
B.5. B.S. Thermal Insulation
Agreement.
B.6. Kahramaa approved drawing (S.L.D.).
B.7. Remaining Yellow Card (Meter Card) in case of using many
meters in the same project.
SET 2:
SET 3:
A.
A. Kahramma Building Permit.
B. Municipality Building Permit.
C. Policy Plan.
SET 4:
10. For Electrical Meter installation the Contractor should submit the
following: