Académique Documents
Professionnel Documents
Culture Documents
02.02.00 NIVELACION INTERIOR Y APISONADO MANUAL M2 1.00 8.50 19.48 165.58 165.58
04.02.00 COLUMNAS
04.02.01 CONCRETO EN COLUMNAS FC=210KG/CM2 (PRIMER PISO) M3 7.70
C-1 14.00 0.60 0.20 3.20 5.38
C-2 5.00 0.25 0.25 3.40 1.06
C-3 9.00 0.20 0.15 3.10 0.84
C-4 2.00 0.25 0.25 3.40 0.43
04.03.00 VIGAS
04.03.01 CONCRETO EN VIGAS FC=210 KG/CM2 M3 6.56
VIGA V-101 2.00 12.55 0.25 0.40 2.51
VIGA V-102 3.00 7.50 0.25 0.25 1.41
VIGA V-103 2.00 7.50 0.25 0.25 0.94
HOJA DE METRADOS (total)
SECTOR : GOBIERNO LOCALES Lugar : TINTE
PLIEGO : MUNICIPALIDAD DISTRITAL DE TAMBILLO Distrito : TAMBILLO
UNID. EJEC. : MUNICIPALIDAD DISTRITAL DE TAMBILLO Provincia : HUAMANGA
FUNCIN : 09 EDUCACIN Y CULTURA Depart. : AYACUCHO
PROGR. : 061 INFRAESTRUCTURA EDUCATIVA Fecha : Julio 2007
SUB PROG. : 0174 EDIFICACIONES ESCOLARES
ACT/PROY. : 2-05230 CONSTRUCCIN DE CENTROS EDUCATIVOS
COMPON. : 2-04547 CONSTRUCCIN DE CENTROS EDUCATIVOS
META : 10159 CONSTRUCCIN DE AULAS I. E. P. 38114/Mx-P TINTE ( I Planta)
N
TEM DESCRIPCIN PARTIDAS UND VECE L (m) a (m) h (m) Parcial Total
S
ESTRUCTURAS
VIGA V-105 3.00 3.20 0.25 0.40 0.96
VIGA V-106 2.00 7.50 0.25 0.20 0.75
04.03.02 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS KG (VER HOJA DE METRADO DEL ACERO) 946.15
04.04.01 CONCRETO EN LOSA ALIGERADA FC=210KG/CM2 M3 4.00 3.12 7.00 0.05 4.37 9.13
VIGUETAS 29.00 7.00 0.10 0.20 4.06
LOSA ESCALERA 1.00 3.20 1.15 0.05 0.18
1.00 3.20 1.50 0.05 0.24
VIGUETAS ESCALERA 7.00 2.65 0.10 0.15 0.28
04.04.02 ACERO ESTRUCTURAL TRABAJADO PARA LOSA LIGERADA KG (VER HOJA DE METRADO DEL ACERO) 981.58 670.31
04.04.03 ENCOFRADO Y DESENCOFRADO M2 97.31
LOSA AULAS 2.00 6.20 5.50 68.20
1.00 13.75 1.50 20.63
LOSA ESCALERA 1.00 2.65 3.20 8.48
04.04.04 LADRILLO TECHO 30x30x20 UND 1.00 8.40 91.27 766.67 766.67
04.04.05 LADRILLO TECHO 30x30x15 UND 1.00 8.40 8.48 71.23 71.23
04.05.00 ESCALERA
04.05.01 CONCRETO EN ESCALERA FC=210 KG/CM2 M3 REA 3.47
PRIMER TRAMO 1.00 1.55 1.32 2.05
SEGUNDO TRAMO 1.00 1.55 0.92 1.43
ARQUITECTURA
05.00.00 ALBAILERA
05.01.00 MURO DE CABEZA LADRILLO CORRIENTE CON C:A M2 48.34
EJE A-A, C-C, E-E 3.00 2.68 2.65 21.31
EJE E-E y F-F 2.00 5.10 2.65 27.03
MUROS EXTERIORES
EJE A-A 1.00 5.35 2.85 15.25
EJE F-F 1.00 5.10 2.85 14.54
EJE 1-1 1.00 9.95 1.10 10.95
MURO EN LA ESCALERA EJE 1-1 1.00 2.30 1.85 4.26
EJE 3-3 1.00 7.95 1.70 13.52
MOCHETA 1.00 1.10 2.70 2.97
12.00.00 CERRAJERA
12.01.00 CERRADURA FORTE 226 TRES GOLPES EN PUERTAS UND 3.00 3.00 3.00
12.02.00 BISAGRA CAPUCHINA 3.5"x3.5" UND 9.00 9.00 9.00
12.03.00 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 3.00 3.00 3.00
14.00.00 PINTURA
14.01.00 PINTURA LTEX EN MUROS INTERIORES M2 208.06
SUPERFICIE TARRAJEADA 1.00 REA 162.34 162.34
MAS 1/2 DE COLUMNAS TARRAJEADS 1.00 REA 33.47 33.47
MAS 1/2 DE VIGAS TARRAJEADAS 1.00 REA 12.25 12.25
MUROS EXTERIORES
EJE A-A 1.00 5.35 2.85 15.25
EJE F-F 1.00 5.10 2.85 14.54
EJE 1-1 1.00 9.95 1.10 10.95
MURO EN LA ESCALERA EJE 1-1 1.00 2.30 1.85 4.26
EJE 3-3 1.00 7.95 1.70 13.52
MOCHETA 1.00 1.10 2.70 2.97
ESTRUCTURAS
01.00.00 OBRAS PRELIMINARES
01.01.01 CARTEL DE IDENTIFICACIN DE LA OBRA DE3.60x2.40 M. INC. COLOC. UND 1.00 500.00 500.00 0.78 - - - - 1.00 500.00 - -
01.01.02 LIMPIEZA GENERAL DE OBRA M2 165.54 0.20 33.11 0.05 - - - - 165.54 33.11 - -
01.01.03 TRAZO Y REPLANTEO M2 165.54 0.17 28.14 0.04 - - - - 165.54 28.14 - -
02.00.00 MOVIMIENTO DE TIERRA
02.01.00 CORTE SUPERFICIAL EN TERRENO COMPACTO M3 25.32 5.16 130.65 0.20 - - - - 25.32 130.65 - -
02.02.00 NIVELACIN INTERIOR Y APISONADO MANUAL M2 165.54 0.39 64.56 0.10 - - - - 165.54 64.56 - -
02.03.00 EXCAVACIN PARA ZAPATAS HASTA 1.20 M. M3 28.35 5.11 144.87 0.23 - - - - 28.35 144.87 - -
02.04.00 EXCAVACIN PARA CIMIENTOS HASTA 1.00 M. M3 24.04 5.26 126.45 0.20 - - - - 24.04 126.45 - -
02.05.00 ACARREO DE MATERIAL EXCEDENTE DE LA EXCAVACIN. M3 68.11 3.84 261.54 0.41 - - - - 68.11 261.54 - -
02.06.00 AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES M2 153.51 6.66 1,022.38 1.60 - - - - 153.51 1,022.38 - -
03.00.00 CONCRETO SIMPLE
03.01.00 CONCRETO 1:12 C:H PARA SOLADO Y/O SUB BASE M3 21.81 157.30 3,430.71 5.36 - - - - 21.81 3,430.71 - -
03.02.00 CONCRETO 1:10 C:H + 30% PG. PARA CIMIENTO CORRIDO M3 23.49 125.92 2,957.86 4.62 - - - - 23.49 2,957.86 - -
03.03.00 CONCRETO 1:8 + 25% PM EN SOBRECIMIENTO M3 5.86 150.34 880.99 1.38 - - - - 5.86 880.99 -
03.04.00 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO DE 0.4 M. M2 57.05 16.59 946.46 1.48 - - - - 57.05 946.46 - -
04.00.00 CONCRETO ARMADO
04.01.00 CONCRETO FC=175 KG/CM2 PARA ZAPATAS M3 13.08 297.83 3,895.62 6.09 - - - - 13.08 3,895.62 - -
04.02.00 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS KG 282.23 3.51 990.63 1.55 - - - - 282.23 990.63 - -
04.03.00 CONCRETO EN COLUMNAS FC=210 KG./CM2 M3 7.70 335.75 2,585.28 4.04 - - - - 7.70 2,585.28 - -
04.04.00 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS KG 1,596.27 3.56 5,682.72 8.88 - - - - 1,596.27 5,682.72 - -
04.05.00 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 87.98 26.60 2,340.27 3.66 - - - - 87.98 2,340.27 - -
04.06.00 CONCRETO EN VIGAS FC=210 KG./CM2 M3 6.56 351.87 2,308.27 3.61 - - - - 6.56 2,308.27 - -
04.07.00 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES KG 946.15 3.57 3,377.76 5.28 - - - - 946.15 3,377.76 - -
04.08.00 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 42.66 29.74 1,268.71 1.98 - - - - 42.66 1,268.71 - -
04.09.00 CONCRETO LOSA ALIGERADA FC=210 KG./CM2 M3 9.13 328.29 2,997.29 4.68 - - - - 9.13 2,997.29 - -
04.10.00 ACERO ESTRUCTURAL TRABAJADO PARA LOSA ALIGERADA KG 670.31 3.66 2,453.33 3.83 - - - - 670.31 2,453.33 - -
04.11.00 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA LIGERADA M2 97.31 19.90 1,936.47 3.03 - - - - 97.31 1,936.47 - -
04.12.00 LADRILLO HUECO DE ARCILLA 30x30x15 CM. PARA TECHO ALIGERADA UND 71.23 2.39 170.24 0.27 - - - - 71.23 170.24 - -
04.13.00 LADRILLO HUECO DE ARCILLA 20x30x30 CM. PARA TECHO ALIGERADA UND 766.67 2.75 2,108.34 3.29 - - - - 766.67 2,108.34 - -
04.14.00 CONCRETO EN ESCALERA FC=210 KG./CM2 M3 3.46 335.75 1,161.70 1.81 - - - - 3.46 1,161.70 - -
04.15.00 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA M2 16.24 30.49 495.16 0.77 - - - - 16.24 495.16 - -
04.16.00 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERA KG 217.17 3.62 786.16 1.23 - - - - 217.17 786.16 - -
AVANCE FSICO FINANCIERO MES DE AGOSTO (Total)
UNID. EJEC.: MUNICIPALIDAD DISTRITAL DE TAMBILLO
META : CONSTRUCCIN DE AULAS I. E. P. YANAMILLA "PRIMERA PLANTA"
MOD. EJEC. : ADMINISTRACIN DIRECTA
FECHA : TAMBILLO , AGOSTO DEL 2007
05.00.00 ALBAILERA
05.01.00 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO-ARENA. M2 48.34 37.50 1,812.75 2.83 - - - - 48.34 1,812.75 - -
05.02.00 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO-ARENA. M2 30.82 24.23 746.77 1.17 - - - - 30.82 746.77 - -
05.03.00 ACERO EN MURO DE SOGA DE ALBAILERA ARMADA. KG 22.11 5.35 118.29 0.18 - - - - 22.11 118.29 - -
06.00.00 REVOQUES ENLUCIDOS Y MOLDURAS
06.01.00 TARRAJEO EN COLUMNAS CON CEMENTO- ARENA M2 66.93 6.94 464.49 0.73 - - - - 66.93 464.49 - -
06.02.00 TARRAJEO EN VIGAS CON CEMENTO-ARENA M2 24.49 7.51 183.92 0.29 - - - - 24.49 183.92 - -
06.03.00 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON C:A M2 223.80 6.48 1,450.22 2.27 - - - - 223.80 1,450.22 - -
06.04.00 CIELORRASOS CON MEZCLA DE CEMENTO - ARENA M2 97.68 18.29 1,786.57 2.79 - - - - 97.68 1,786.57 - -
06.05.00 TARRAJEO EN FONDO DE ESCALERAS CEMENTO-ARENA 1:5 E=1.5 CM. M2 13.69 6.94 95.01 0.15 - - - - 13.69 95.01 - -
06.06.00 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS ML 93.67 2.76 258.53 0.40 - - - - 93.67 258.53 - -
06.07.00 BRUAS ML 176.35 1.04 183.40 0.29 - - - - 176.35 183.40 - -
07.00.00 PISOS Y PAVIMENTOS
07.01.00 FALSO PISO DE 4" DE CONCRETO 1:8 M2 92.02 16.63 1,530.29 2.39 - - - - 92.02 1,530.29 - -
07.02.00 PISO DE 2" CONCRETO FC=140 KG/CM2 DE CEM. PULIDO Y BRUA S/C M2 92.02 17.48 1,608.51 2.51 - - - - 92.02 1,608.51 - -
07.04.0 VEREDA DE CONCRETO DE 4" M2 65.69 41.46 2,723.51 4.25 - - - - 65.69 2,723.51 - -
07.05.00 ENCOFRADO DE VEREDAS M2 8.39 13.78 115.61 0.18 - - - - 8.39 115.61 - -
08.00.00 ZCALO Y CONTRA ZCALO
08.01.00 CONTRA ZCALO DE CEMENTO S/COLOREAR H=20 CM. ML 56.45 2.22 125.32 0.20 - - - - 56.45 125.32 - -
08.02.00 ZCALO SIMPLE MEZCLA CEMENTO - ARENA SIN COLOREAR H=0.30 M. ML 30.45 5.29 161.08 0.25 - - - - 30.45 161.08 - -
09.00.00 REVESTIMIENTO DE GRADAS Y ESCALERAS
REVEST. DE GRADAS C/ MORTERO 1:4 x2 CM. CON CEMENTO PULIDO -BRUADO PASO Y
09.01.00 M 8.83 10.94 96.60 0.15
CONTRAPASO - - - - 8.83 96.60 - -
10.00.00 CARPINTERA DE MADERA
PUERTA DE MADERA APANELADA CON TABLEROS REBAJADOS DE TORNILLOINC.
10.01.00 M2 7.28 150.00 1,092.00 1.71
COLOC. Y PINT - - - - 7.28 1,092.00 - -
11.00.00 CARPINTERA METLICA
11.01.00 VENTANA DE FIERRO C/PERFIL DE 1"X1/82 +HOJA BLAST."L 3/4" + COLOC. Y PINT. M2 25.51 90.00 2,295.90 3.59
- 25.51 2,295.90 25.51 2,295.90 - - 3.59 3.59
12.00.00 CERRAJERA
12.01.00 CERRADURA PARA PUERTAS PRINCIPALES TRES GOLPES PZA 3.00 69.57 208.71 0.33 - - - - 3.00 208.71 - -
12.02.00 BISAGRA CAPUCHINA DE 3 1/2"x3 1/2" UND 9.00 6.52 58.68 0.09 - - - - 9.00 58.68 - -
12.03.00 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 3.00 5.00 15.00 0.02 - - - - 3.00 15.00 - -
13.00.00 VIDRIOS, CRISTALES Y SIMILARES
13.01.00 VIDRIOS SEMIDOBLES PROV. Y COLOC. EN VENTANAS DE FIERRO Y PUERTAS P2 285.62 2.54 725.47 1.13 - - - - 285.62 725.47 - -
AVANCE FSICO FINANCIERO MES DE AGOSTO (Total)
UNID. EJEC.: MUNICIPALIDAD DISTRITAL DE TAMBILLO
META : CONSTRUCCIN DE AULAS I. E. P. YANAMILLA "PRIMERA PLANTA"
MOD. EJEC. : ADMINISTRACIN DIRECTA
FECHA : TAMBILLO , AGOSTO DEL 2007
14.00.00 PINTURA
14.01.00 PINTADO DE MURO INTERIOR C/LTEX VINILICO (VINILATEX O SIMILAR) M2 208.05 2.14 445.23 0.70 - - - - 208.05 445.23 - -
14.02.00 PINTADO DE MURO EXTERIOR C/LTEX VINILICO (VINILATEX O SIMILAR) M2 107.18 2.14 229.37 0.36 - - - - 107.18 229.37 - -
14.03.00 PINTADO DE CIELORRASO C/LTEX VINILICO (VINILATEX O SIMILAR) M2 111.37 2.93 326.31 0.51 - - - - 111.37 326.31 - -
14.04.00 PINTURA DE ZCALO Y CONTRA ZCALO C/ESMALTE ECONMICO. M2 86.90 0.65 56.49 0.09 - - - - 86.90 56.49 - -
14.05.00 PINTURA DE PIZARRAS CON LEO M 9.60 0.88 8.45 0.01 - - - - 9.60 8.45 - -
COSTO DIRECTO 64,008.13 100.00 - 2,295.90 2,295.90 61,712.23 3.59 3.59
AVANCE FSICO FINANCIERO MES DE AGOSTO (meta)
UNID. EJEC.: MUNICIPALIDAD DISTRITAL DE TAMBILLO
META : CONSTRUCCIN DE AULAS I. E. P. TINTE "PRIMERA PLANTA"
MOD. EJEC. : ADMINISTRACIN DIRECTA
FECHA : TAMBILLO , AGOSTO DEL 2007
11.01.00 VENTANA DE FIERRO C/PERFIL DE 1"X1/82 +HOJA BLAST."L 3/4" + COLOC. Y PINT. M2 25.51 90.00 2,295.90 13.36
- 25.51 2,295.90 25.51 2,295.90 - - 13.36 13.36
12.00.00 CERRAJERA
12.01.00 CERRADURA PARA PUERTAS PRINCIPALES TRES GOLPES PZA 3.00 69.57 208.71 1.21 - - - - 3.00 208.71 - -
12.02.00 BISAGRA CAPUCHINA DE 3 1/2"x3 1/2" UND 9.00 6.52 58.68 0.34 - - - - 9.00 58.68 - -
12.03.00 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 3.00 5.00 15.00 0.09 - - - - 3.00 15.00 - -
13.00.00 VIDRIOS, CRISTALES Y SIMILARES
13.01.00 VIDRIOS SEMIDOBLES PROV. Y COLOC. EN VENTANAS DE FIERRO Y PUERTAS P2 285.62 2.54 725.47 4.22 - - - - 285.62 725.47 - -
14.00.00 PINTURA
14.01.00 PINTADO DE MURO INTERIOR C/LTEX VINILICO (VINILATEX O SIMILAR) M2 208.05 2.14 445.23 2.59 - - - - 208.05 445.23 - -
14.02.00 PINTADO DE MURO EXTERIOR C/LTEX VINILICO (VINILATEX O SIMILAR) M2 107.18 2.14 229.37 1.33 - - - - 107.18 229.37 - -
14.03.00 PINTADO DE CIELORRASO C/LTEX VINILICO (VINILATEX O SIMILAR) M2 111.37 2.93 326.31 1.90 - - - - 111.37 326.31 - -
14.04.00 PINTURA DE ZCALO Y CONTRA ZCALO C/ESMALTE ECONMICO. M2 86.90 0.65 56.49 0.33 - - - - 86.90 56.49 - -
14.05.00 PINTURA DE PIZARRAS CON LEO M 9.60 0.88 8.45 0.05 - - - - 9.60 8.45 - -
15.00.00 INSTALACIONES ELCTRICAS
AVANCE FSICO FINANCIERO MES DE AGOSTO (meta)
UNID. EJEC.: MUNICIPALIDAD DISTRITAL DE TAMBILLO
META : CONSTRUCCIN DE AULAS I. E. P. TINTE "PRIMERA PLANTA"
MOD. EJEC. : ADMINISTRACIN DIRECTA
FECHA : TAMBILLO , AGOSTO DEL 2007
SALIDA DE TECHO C/CABLE AWG TW 2.5 MM(14) +D PVC SEL 19 MM (3/4)(CENTRO DE LUZ) PTO 14.00 17.47 244.58
15.01.00 1.42 - - - - 14.00 244.58 - -
15.02.00 SALIDA TOMACORRIENTE C/AWG TW 2.5 MM (14) +D PVC SEL 16 MM (5/8) PTO 5.00 11.64 58.20 0.34 - - - - 5.00 58.20 - -
15.03.00 POZO CONEXIN A TIERRA UND 1.00 266.98 266.98 1.55 - - - - 1.00 266.98 - -
17.00.00 TABLERO Y CUCHILLAS 0.00 - - - - - - - - -
17.01.00 TABLERO ELECTRICO METALICO PDISTRIBUCION DE CIRCUITOS UND 1.00 1.90 1.90 0.01 - - - - 1.00 1.90 - -
17.02.00 INTERRUPTOR THERMOMAGNTICO MONOFASICA 2x50 A UND 3.00 3.86 11.58 0.07 - - - - 3.00 11.58 - -
18.00.00 ARTEFACTOS ELECTRICOS 0.00 - - - - - - - - -
18.01.00 ARTEFACTO PARA 02 FLUORESCENTES, INCL. LAMPARAS UND 8.00 55.17 441.36 2.57 - - - - 8.00 441.36 - -
18.02.00 LAMPARAS 100 W EN PASADIZOS UND 6.00 17.66 105.96 0.62 - - - - 6.00 105.96 - -
COSTO DIRECTO 17,183.63 100.00 - 12,771.75 12,771.75 4,411.88 74.33 74.33