Siteworks inspection
Area of application
This document applies to: International
Mechanical Induction Installation Update Precast concrete tower Installation
Electrical Rotor blade Grid connection Concrete repair Precast concrete tower Prestressing
Document details
Document ID TD-esc-03-de-en-12-020 Rev003 Siteworks inspection
Confidentiality INTERNAL
1 General information
Siteworks is one principal aspect of work preparation and includes the setting up of facilities and workplaces
on the construction site.
This is important to ensure health and safety for construction site workers.
If an inspection criterion cannot be met, immediately notify the responsible coordinator to determine how to
proceed.
The measures determined with the coordinator have to be entered in section 4 "Description of
measures in case of inspection criteria that have not been met".
After the siteworks have been set up, the report has to be posted in the staff room container while work is
being carried out on the WBS (PSP) element.
As soon as assembly is finished and work is no longer being carried out on the WBS (PSP) element, the
report may be disposed of.
2 Project details
Project name W no. / WBS
(PSP)
Location Date
Team leader Assistant Team
leader
3 Site facilities
Not
Check item Inspection criteria OK Note
OK
General construction Special safety and environmental require-
site details ments (e.g. beacon system of tower/WEC,
water protection restrictions)
Construction site Access road to WBS (PSP) element blocked
signs/barriers with current construction site sign
Hygiene Waste container and mobile toilet available
Crane contractor / Construction site regulations, health and safe-
4 Description of measures in case of inspection criteria that have not been met
5 Approval of siteworks
Date Signature