78 CEIG Raw Water MCC Room Panels Body Earth Pit-1 RW-PA-BEP-1
79 CEIG Raw Water MCC Room Panels Body Earth Pit-2 RW-PA-BEP-2
80 CEIG Raw Water MCC Room Panels Electronic Earth Pit-1 RW-PA-EEP-1
81 CEIG Raw Water MCC Room Panels Electronic Earth Pit-2 RW-PA-EEP-2
82 CEIG Raw Water MCC Room Lightening Protection Earth Pit-1 RW-LA-EP-1
83 CEIG Raw Water MCC Room Lightening Protection Earth Pit-2 RW-LA-EP-2
84 CEIG Cooling Tower MCC Room Panels Body Earth Pit-1 CT-PA-BEP-1
85 CEIG Cooling Tower MCC Room Panels Body Earth Pit-2 CT-PA-BEP-2
86 CEIG Cooling Tower MCC Room Panels Electronic Earth Pit-1 CT-PA-EEP-1
87 CEIG Cooling Tower Motor Body Earth Pit-1 CT-MO-BEP-1
88 CEIG Cooling Tower Motor Body Earth Pit-2 CT-MO-BEP-2
89 CEIG Cooling Tower Lightening Protection Earth Pit-1 CT-LA-EP-1
90 CEIG Cooling Tower Lightening Protection Earth Pit-2 CT-LA-EP-2
1.3 3.3
1.3 2.9
1.5 1.5
1.4 1.4
1.3 1.2
1.4 1.4
1.3 1.6
1.3 1.5
1.2 3.6
1.2 Not
Phisically 1.6
Available But
CEIG List These
Pits are Included.
1.3 2.6
1.1 2.9
1.4 3.0
1.0 2.9
1.2 2.8
1.4 Not
Phisically 2.2
Available But
CEIG List These
Pits are Included.
1.2 1.6
1.3 1.0
1.4 1.4
1.4 1.6
Phisically Not
Available But
CEIG List These
Pits are Included.
1.4 1.0
1.3 1.2
1.1 15.2
1.1 20
1.3 1.8
1.0 1.9
1.2 15.3
1.3 1.5
1.2 1.4
1.4 1.3
1.2 1.2
1.0 20
1.1 1.4
1.2 1.3
1.3 1.8
0.8 1.6
0.5 Not
Phisically 1.7
0.8 But
Available 1.6
CEIG List These
Pits are Included.
0.5 1.2
0.8 1.4
1.3 2.7
1.5 7.5
1.4 1.4
1.2 1.4
1.5 1.5
1.2 1.4
1.2 1.5
1.4 Not
Phisically 1.3
Available But
CEIG List These
Pits are Included.
0.8 1.3
0.8 1.6
0.8 1.2
0.9 2
1.0
1.3 Not
Phisically
Available But
CEIG List These
Pits are Included.
0.7
0.6
1.0
1.3
0.6
0.8
0.8
Phisically Not
Available But
CEIG List These
Pits are Included.
Phisically Not
Available But
CEIG List These
Pits are Included.
1.4
1.2
0.8
1
1.2
1.0
Phisically Not
Available But
CEIG List These
Pits are Included.
1.5 1.4
1.0
1.4 1.7
1.4
1.4 5.5
1.1 4.5
1.2 1.4
1.1 1.4
1.5
1.3
1.3
1.3
1.2
1.5
1.2
1.4
1.5
1.3
1.3
1.4
60MW CAPTIVE POWER PLANT
MY HOME INDUSTRIES LIMITED, MELLACHERUV
19.12.2013 TO 10.01.2014 SHUT DOWN MAINTENANCE PROTO
S.No Description
SW-MHILFDR-LAEP-1
SW-MHILFDR-LAEP-2
SW-MHILFDR-LAEP-3
CT-PA-BEP-1
CT-PA-BEP-2 1.5 1.4 10.01.14
CT-PA-EEP-1 1.0 10.01.14
CT-MO-BEP-1 1.4 1.7 10.01.14
CT-MO-BEP-2 1.4 10.01.14
CT-LA-EP-1 1.4 5.5 10.01.14
CT-LA-EP-2 1.1 4.5 10.01.14
60MW CAPTIVE POWER PLANT
MY HOME INDUSTRIES LIMITED, MELLACHERUVU
SCHEDULE OF WATERING FOR ALL EARTH PITS IN CPP-2
S.No Description No.of Earth Pits DAY
1 GT, ST, UAT, and Switch yard Earth Pits 31 MON,FRI
2 TG Building Surounding area 30 TUE,SAT
3 ESP Area 8 WED,SUN
4 AHP EARTH PIT 1
5 BOILER AREA 2
6 CHIMMNEY 2
7 CONSTRUCTION T/R AREA 6
8 DM Plant Area 5 THU,SUN
9 RAW WATER AREA 6
10 COOLING TOWER AREA 7
11 CHP Area 7
TOTAL 105
12.5MW WHR POWER P
MY HOME INDUSTRIES PRIVATE LIMIT
INDIVIDUAL EARTH PITS RESISTANCE VALU
S.No Description
1 Generator NGR Earth Pit-1
2 Generator NGR Earth Pit-2
3 TG Building Panels Body Earth Pit-1
4 TG Building Lightning Protection Earth Pits-1
5 TG Building IO Panel Body Earth Pit-1
6 Electronic Earth Pit for TCP Panel
7 Electronic Earth Pit for DCS EP-1
8 Electronic Earth Pit for DCS EP-2
9 TG Building Panels Body Earth Pit-2
10 TG Building Panels Body Earth Pit-3
11 Unit Auxiliary Transformer 1 Body Earth Pit-1
12 Unit Auxiliary Transformer 1 Body Earth Pit-2
13 Unit Auxiliary Transformer 1 LV Neutral Earth Pit -1
14 Unit Auxiliary Transformer 1LV Neutral Earth Pit -2
15 Unit Auxiliary Transformer 2 Body Earth Pit-1
16 Unit Auxiliary Transformer 2 Body Earth Pit-2
17 Unit Auxiliary Transformer 2 LV Neutral Earth Pit -1
18 TG Building Panels Body Earth Pit-4
19 TG Building Panels Body Earth Pit-5
20 SP1 Panel Body Earth Pit-1
21 SP1 Panel Body Earth Pit-2
22 Electronic Earth Pit for RIO Panel -1
23 Electronic Earth Pit for RIO Panel -1
24 SP2 Panel Body Earth Pit-1
25 SP2 Panel Body Earth Pit-2
26 Electronic Earth Pit for RIO Panel -2
27 Electronic Earth Pit for RIO Panel -2
28 SP3 Panel Body Earth Pit-1
29 SP3 Panel Body Earth Pit-2
30 Electronic Earth Pit for RIO Panel -3
31 Electronic Earth Pit for RIO Panel -3
32 AQC1 Panel Body Earth Pit-1
33 AQC1 Panel Body Earth Pit-2
34 Electronic Earth Pit for RIO Panel -4
35 Electronic Earth Pit for RIO Panel -4
36 AQC2 Panel Body Earth Pit-1
37 AQC2 Panel Body Earth Pit-2
38 Electronic Earth Pit for RIO Panel -5
39 Electronic Earth Pit for RIO Panel -5
40 AQC3 Panel Body Earth Pit-1
41 AQC3 Panel Body Earth Pit-2
42 Electronic Earth Pit for RIO Panel -6
43 Electronic Earth Pit for RIO Panel -6
44 ACT Building Body Earth Pit-1
45 ACT Building Body Earth Pit-1
12.5MW WHR POWER PLANT
USTRIES PRIVATE LIMITED, MELLACHERUVU
PITS RESISTANCE VALUES FOR THE MONTHE OF
Individual Pit
Tag No Resistance For
DATE
TG-GEN-NGR-EP-1
TG-GEN-NGR-EP-2
TG-PA-BEP-1
TG-LA-EP-1
TG-IO-BEP-1
TG-TCP-EEP-1
TG-DCS-EEP-1
TG-DCS-EEP-2
TG-PA-BEP-2
TG-PA-BEP-3
SW-UAT-1-BEP-1
SW-UAT-1-BEP-2
SW-UAT-1-LVNEP-1
SW-UAT-1-LVNEP-2
SW-UAT-2-BEP-1
SW-UAT-2-BEP-2
SW-UAT-2-LVNEP-1
TG-PA-BEP-4
TG-PA-BEP-5
SP1-PA-BEP-1
SP1-PA-BEP-2
SP1-RIO-1-EEP-1
SP1-RIO-1-EEP-2
SP2-PA-BEP-1
SP2-PA-BEP-2
SP2-RIO-1-EEP-1
SP2-RIO-1-EEP-2
SP3-PA-BEP-1
SP3-PA-BEP-2
SP3-RIO-3-EEP-1
SP3-RIO-3-EEP-2
AQC1-PA-BEP-1
AQC1-PA-BEP-2
AQC1-RIO-4-EEP-1
AQC1-RIO-4-EEP-2
AQC2-PA-BEP-1
AQC2-PA-BEP-2
AQC2-RIO-5-EEP-1
AQC2-RIO-5-EEP-2
AQC3-PA-BEP-1
AQC3-PA-BEP-2
AQC3-RIO-6-EEP-1
AQC3-RIO-6-EEP-2
ACT-BEP-1
ACT-BEP-2