1. Pit Pump & LPB Earthing to be done by 2 runs of 8 SWG Wire.
2. In RCC Floor the Fu chain conveyor dressing to be done and tray upto LPB and
extend upto Chain conveyor. Earthing to be done by 2 runs of 8 SWG Wire.
3. All LPB Earthing to done into 2 Runs of 8 SWG Wire.
4. IN RCC Floor IBD & CBD Movs earthing to be done by 2 runs of 8 SWG Wire.
5. In RCC Floor two Temporary cable 3C x 2.5Sq.mm should be removed.
6. In feedwater line Movs single run of 8 SWG Wire is done. We need another one
more run of 8 SWG Wire.
7. In RCC Floor DJB gland plate hole to be closed.
8. In all Hammering motor Earthing to be done by 2 runs of 8 SWG Wire.
9. Lighting JBs are fixed one side bolt & another side armour. Armour to be changed
into bolt and nuts.
10.Outlet Damper Movs Earthing to be done by 2 runs of 8 SWG Wire.
11.Inlet damper LPB (8 SWG Wire) not connected to tray. And put blot and Net.
Earthing falt not in that tray.
12.Welding DB termination is pending. Remove another one Welding DB in RCC Floor.
13.Hammering motor -3 dressing to be done.
14.One Pair cable without Tray run through the hand rail and termination
pending.provide tray and completion of termination.
15. In AJB-2 Earthing to be done and gland Plate holes to be closed.
16.In startup vent Psition Feedback cable (damaged) and termination pending.
Earthing to be done by 2 runs of 8 SWG Wire.
17.MSSV Main & bybass mov earthing to be done by 2 runs of 8 SWG Wire.
18.Painting to be done for lighting support in drum floor area.
19.Rotary Airlock (RAL) Earthing to be done by 2 runs of 8 SWG wire.
SP-1
1. MSSV Main & Bybass MOV earthing to be done by 2 runs of 8 SWG Wire.
2. In startup vent MOVS earthing to be done by 2 runs of 8 SWG Wire.
3. Below the Drum floor 100 TB AJB gland Plate hole to be closed & cable tag to be
provided.
4. In all Hammering motor & LPB Earthing to be done by 2 runs of 8 SWG Wire.
5. Lighting cable to be dressed in all the floor of Hammering Motor side.
6. Remove excess Welding DB in the 4th floor of the SP-1 Boiler.
7. In frist floor lighting JB Termination to be done properly and dressing to be done.
8. Pit pump & LPB Earthing to be done by 2 runs of 8 SWG Wire.
9. In SP-1 MCC Room SLDB Earthing to be done.
10.Inlet, outlet & Bypass Damper Movs & LPB Earthing to be done by 2 runs of 8 SWG
Wire.
11.In feedwater line Movs & LPBs single run of 8 SWG Wire is done. We need another
one more run of 8 SWG Wire.
12.In RCC Floor the all JBS & LPBs Cable tag is not provide. The gland plate holes to be
closed.
13.Rotary Airlock (RAL) & chain conveyor Earthing to be done by 2 runs of 8 SWG wire.
14.In RCC Floor IBD & CBD Movs & LPB earthing to be done by 2 runs of 8 SWG Wire.
AQC1
1.HP line feed control mov earthing done but cabletray earthing pending
2.LP MSSV mov LPB earthing done but cabletray earthing pending.
5.Steam Line crossing nearby cable should be properly dressed inside the cable tray
.
6. Cable dressing in 0mtr near the main tray rise and in main vertical tray near the
3 the cable is not tied
7. HP and LP line Startup vent mov earthing done but cabletray earthing pending.
11.Inlet,outlet,bypass damper lpb earthing done but cable tray earthing pending
and all motor earthing pending
12.Pit Pump earthing done but cable tray earthing pending, LPB earthing to
replaced GI Wire.
15.FU Chain conveyor-2 (below rcc floor), motor and lpb earthing pending.
AQC-2
1.FU Chain conveyor-2 (Below RCC Floor). Cable to be dressed in cable tray.
4.IBD,CDB LPB & Motor earthing done but cable tray earthing pending.
6.RCC Floor cable dressing and some hanging cable to be dressed in cable tray.
8.LP Feed control valve mov earthing complete but cable tray earthing missing
9.Staircase first floor cable hanging near the transmitter.cable tray required.
10. JB and welding box earthing done but cable tray earthing not completed
11.Inlet,outlet,bypass damper lpb earthing done but cable tray earthing pending
and all motor earthing pending.
AQC-3:
1.HP and LP Startup mov single earthing done. Double earthing to be done
2.LP Startup mov cable tray jointing , earth flat in cable tray, cable dressing to be
done
4. .Inlet,outlet,bypass damper lpb earthing done but cable tray earthing pending
and all motor earthing pending.
6.3rd floor feed water line cable tray required for rtd cable.