Académique Documents
Professionnel Documents
Culture Documents
All around the world, living and working spaces, infrastructure and industrial buildings as well as cultural
sites are being created which improve the quality of life along with adding value. For their realization and
maintenance, workers on the construction sites are often exposed to the most difficult conditions.
At the same time, they bear a huge responsibility for the reliability, quality and safety during the exe-
cution.
PERI Systems and Services 30
It is thanks to their experience and hard work that projects are realized under considerable time and
cost pressures in accordance with the requirements of the clients. We at PERI support them on the
construction site globally and individually.
2
Your benefit is our aspiration
You can count on it
The Management Board of PERI GmbH: Alexander Schwrer, Christian Schwrer and Dr.-Ing. Ekkehard Gericke
Dear Readers,
The world of business is moving faster and faster all the time with both decision and execution times
becoming even shorter, resulting in more complex requirements from our customers. We take this
into account: for example, through the founding of new companies in numerous countries for even
more proximity to the customer, with modernized and expanded production facilities for the best
technology or investment in efficiently run rental parks in order to ensure good material availability at
short notice.
These organizational aspects and constantly changing requirements of our customers drive us for-
ward, to continuously develop new systems or system enhancements as well as relevant services
with the aim of further optimizing all of our formwork and scaffolding processes. In the process, we
always strive to provide the best solution that gives real added value for our customers - with PERI
you can rely on this at all times.
A PERI solution is always the result of three factors combined: product, concept and execution. We
use our experience gained from successful global projects with diverse requirements to support our
customers from the development of the technical solution, with the most suitable system equip-
ment through cost-effective and safe execution, to the final return of materials.
Examples of our product and service portfolio, as well as a number of outstanding reference projects,
can be found in this handbook. Naturally, we are not able to show everything. You may be curious to
learn even more about our competence in terms of solutions. Your personal PERI Sales Engineer is
on hand at any time to provide you with expert advice. He will familiarize you with our company and
services, and will collaborate with you with great commitment and energy on your projects and on a
long-term, reliable partnership.
We look forward to having you on board, to your questions and suggestions. Anywhere and at
any time: at trade fairs, at one of our branch offices near you or at the company headquarters in
Weissenhorn you are always welcome!
2 3
Content
PERI - The Company PERI - Systems and Services PERI - Reference Projects
6 Our services for your projects 32 Wall Formwork 90 Access 160 Housing & Multi-Storey Projects 206 Cultural Buildings 268 Water Retaining Structures
34 MAXIMO Panel Formwork 92 PERI UP Rosett Staircase Alu 64 162 Residential and Office Building, 208 2012 European Championships 270 Panama Canal Lock Installations,
8 PERI in Weissenhorn 36 TRIO Panel Formwork 94 PERI UP Rosett Flex Staircase Alu 75 Vienna, Austria Football Stadiums, Poland / Ukraine Panama
38 DOMINO Panel Formwork 96 PERI UP Rosett Flex Staircase 164 Detached House in Dulingen, 210 Parco della Musica e della Cultura, 272 PPL Holtwood Hydroelectric Station,
10 Continuous further development 40 LIWA Panel Formwork Steel 100 / 125 Germany Florence, Italy Holtwood, USA
since the founding of the company 41 HANDSET Panel Formwork 98 PERI UP Stairs Public 166 Banco Ciudad Administration Building, 212 Desert Learning Centre, Al Ain, 274 Vianden Pumped Storage Power Plant,
42 VARIO GT 24 Wall Formwork Buenos Aires, Argentina United Arab Emirates Luxembourg
12 PERI today 44 RUNDFLEX Circular Wall Formwork 00 Safety Scaffold
1 168 Los Portones de Linares Housing 214 Centro Civico del Bicentenario, 276 Cooling Water Tank, Gas-Fired Power
46 RUNDFLEX Plus Circular Formwork 102 PERI UP Rosett Flex LGS Weather Development, Chile Cordoba, Argentina Station, Putrajaya, Malaysia
14 Our goal: 47 GRV Articulated Waler Circular Protection Roof 170 Secondary School Technology Centre, 216 The Artic Ring, Copenhagen Zoo,
performance leadership Formwork 104 Project-Specific Safety Scaffold Falkenberg, Sweden Denmark 278 Industrial Structures
48 SB Brace Frame 172 Ocean Plaza Business Centre, Kiev, 218 John Paul II Church Centre, 280 Westfalen Power Plant, Hamm,
16 Products and systems 49 RS Push-Pull Props, PERI Tie Technology 06 Climbing Systems
1 Ukraine Krakow, Poland Germany
108 FB 180 Folding Platform System 174 Jaber Al Ahmad Al Sabah Clinic, 220 Haute-Garonne Media Library, Toulouse 282 Biocel Pulp Mill, Paskov, Czech Republic
18 System equipment plus engineering 50 Column Formwork 109 ASG 70-100 Bracket Platform Kuwait City, Kuwait Labge, France 284 Waste Incineration Plant, Klaipeda,
52 QUATTRO Column Formwork 110 CB 240 / CB 160 Climbing Systems 176 Prosta Tower, Warsaw, Poland 222 Caixa Forum, Saragossa, Spain Lithuania
20 Responsibility for results 53 RAPID Column Formwork 111 BR Shaft Platform 224 Prez Art Museum Miami, USA 286 Grain Silo near Parma, Italy
54 LICO Column Formwork 112 SCS Single-Sided Climbing System 178 Skyscrapers and Towers 226 Aquatics Centre, London, 288 Refuse Derived Heating and Power
22 Quality is our promise 55 VARIO GT 24 Column Formwork 114 LPS Screen 180 De Rotterdam, Rotterdam, Netherlands Great Britain Station, Spremberg, Germany
VARIO QUATTRO Column Formwork 116 RCS Rail Climbing System 182 Bosco Verticale, Milan, Italy
24 Sustainability as a main principle 56 TRIO Column Formwork 118 ACS Self-Climbing System 184 The Bow, Calgary, Canada 228 Transport Engineering 290 Building Redevelopment
57 SRS Circular Column Formwork 186 Central Bank of Nigeria Administration 230 Waldschlsschen Bridge, Dresden, 292 Tallinn Oceanographic Museum,
26 Training and specialist exchange of 20 Civil Engineering Technology
1 Building, Lagos, Nigeria Germany Estonia
views and information 58 Slab Formwork 122 VARIOKIT Concept 188 Donau City Tower 1, Vienna, Austria 232 Puente Baluarte, Mexico 294 Modernization of Motorway
60 SKYDECK Aluminium Panelized 123 VARIOKIT Framework Constructions 190 300 Front Street Condos, Toronto, 234 Lekki Ikoyi Bridge, Lagos, Nigeria Underpass, Gstrow, Germany
28 Competence with perspective Slab Formwork 124 VARIOKIT for Tunnel Construction Canada 236 Motorway Bridge T4 Paradisia-Tsakona, 296 Main Station Roof Renovation,
62 GRIDFLEX Grid Element Slab Formwork 126 VARIOKIT for Bridge Construction 192 Evolution Tower, Moscow, Russia Greece Wiesbaden, Germany
64 MULTIFLEX Girder Slab Formwork 194 3 World Trade Center, New York, USA 238 Vistula Bridge, Kwidzyn, Poland 298 Eaton Centre, Toronto, Canada
66 VARIODECK Steel Waler Slab Table 28 Special Formwork
1 196 Torre Isla Cartuja, Seville, Spain 240 Puente Ejrcito, Lima, Peru 300 Restoration of St. Vitus Cathedral,
67 Table Module VT Slab Table 130 UNO - for the monolithic construction 198 Vila Olimpia Administration Building 242 Chachenka Bridge, Moscow, Russia Prague, Czech Republic
68 SKYTABLE Slab Table method (VIOL), So Paulo, Brazil 244 Bridge over the Danube near Beka,
69 Accessories for Slab Tables 132 3D Formwork Units 200 Meier-on-Rothschild Apartment Serbia
Building, Tel Aviv, Israel 246 Bridge over the Golden Horn,
70 Shoring Systems 34 System-Independent Accessories
1 202 Asia Square Tower 2, Singapore Istanbul, Turkey
72 PEP / PEP Ergo Slab Props 136 GT 24 Formwork Girder 204 Administration Centre Da Nang, 248 Trans-Rhumel Bridge, Constantine,
73 MULTIPROP Slab Props 137 VT 20 Formwork Girder Vietnam Algeria
74 ST 100 Stacking Tower 138 PROKIT Safety Systems 250 Motorway Bridge V12 over the
75 PD 8 Slab Table, Shoring and Stair Tower 140 FTF Facade Formwork Rio Sordo, Vila Real, Portugal
76 PERI UP Rosett Flex Shoring 141 Pallets and Crate Pallets 252 Bridge over the Dunajec, Tarnow,
78 HD 200 Heavy-Duty Props 142 Construction Site Equipment Poland
79 VARIOKIT Heavy-Duty Shoring Tower 144 Plywood Formlining, Release Agent 254 Dalsfjord Bridge, Norway
256 Pfnder Tunnel, Bregenz, Austria
80 Working Scaffold 46 Services
1 258 Hallandsas Tunnel, Sweden
82 PERI UP T 72 / T 104 Frame Scaffolding 148 Technical Processing 260 Hongkong-Zhuhai-Macao Bridge
84 PERI UP Rosett R 72 / R 104 150 PERI ELPOS (HZMB), China
Modular Scaffolding 151 PERI CAD 262 Strasswalchen West Ring Road,
86 PERI UP Rosett Scaffold Units 152 3D Planning Salzburg, Austria
88 PERI UP Rosett Flex Modular 153 Field Service 264 Wild Animal Underpass RN 88 near
Scaffolding 154 Rental Parks and Distribution Albi/Rodez, France
155 myPERI Online Portal 266 Wankdorfkreisel, Bern, Switzerland Addresses
156 Formwork Assembly 302 PERI International
157 Cleaning and Repairs
4 5
Our services for your projects
Formwork, scaffolding and engineering from one source
Formwork gives the fresh concrete its Scaffolds are temporarily-used, reusable Engineering, on the one hand, is focused
shape up to the time it has hardened thus constructions which are utilized as working on basic research and, on the other, is also
forming the negative of the concrete struc- platforms, shoring for formwork or assem- applied science. The greatest added value
ture and also characterizes, in many instanc- bly work, access means as well as safety lies in the practical use of the knowledge
es, the subsequent visibly remaining surfac- scaffold. for the realization of technical products or
es of a building. procedures.
For every concrete structure and compo- PERI scaffolding can be used for a very For PERI, engineering not only means
nent, PERI provides the most suitable wide range of applications. Regardless product development and technical plan-
formwork system. The portfolio fully whether it is frame or modular scaffold, ning. In particular, PERI engineering
meets the global requirements of differ- the great flexibility leads to a high level stands for the detailed examination and
ent construction methods and boundary of material utilization. optimization of integral processes in the
conditions. areas of formwork and scaffolding.
All PERI developments, including those
As is still the case, formwork operations in the scaffolding sector, take into PERI customers are therefore continu-
are a decisive cost factor in the realiza- account the greatest possible safety ously supported throughout the entire
tion of the buildings shell. Therefore, the standards not only for the scaffolder course of the project, in particular with
PERI engineers and experts make every himself but also the users. Dangerous versatile and valuable services for sup-
effort in order to further streamline situations, usually at great heights, are porting all work processes. In addition,
working procedures as well as increasing eliminated due to design-related safety along with continually improving the
user safety. The versatile application details. And last but not least, it must be solutions, PERI carries out basic research,
possibilities and the high quality of the noted that safe working conditions are e.g. for new production processes of
system components make PERI form- more efficient and also save time. new materials.
work systems so intrinsically valuable.
6 7
PERI in Weissenhorn
Headquarters, development and production site since 1969
In Weissenhorn, located in the German state of Bavaria, we are continually investing in efficient production facilities and bundling our development activities.
8 9
PERI continuous development since the founding of the company
Innovation. Internationalization. A very successful story.
6,500
6,500
6,000
5,800
5,500 5,400 5,500 5,700
5,385
5,000
4,500 4,700
4,200
4,000 3,850
3,500 3,600
3,345 3,500
3,000 2,950
2,500 2,500
2,000 2,150
1,900
1,650 1,700
1,500 1,350 1,500
1,000
500
Year 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12
International
PERI can now look back on more than employees around the world who are char-
1,200
1,220 40years of experience in the industry. The acterized by a high level of motivation and
1,100 1,110
1,052
great innovative force of the company and team spirit.
1,000
900 920
977 early internationalization are the corner-
873
800
760
825
stones of our global success and continu- Dealing with each other is managed
700
600 615 ous growth. through a Compliance Management Sys-
500
430
496 526 535
tem. This defines the principles of good cor-
400
300 276 299
353 The high level of customer orientation, porate governance in all relevant areas such
246 252 252
200 206
superior quality systems and great exper- as anti-trust legislation, protection of busi-
100
tise have created the trust that has made ness secrets and innovation, product safety,
Year 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 the company a leading global brand. occupational safety, export control, data
protection and much more. This applies to
All of this would not have been possible the company headquarters as well as all the
without the performance of the many PERI PERI subsidiaries.
10 11
PERI today
Family-run. In the second generation. On-site worldwide.
1969 - 1979 1980 - 1990 1991 - 1992 1993 1994 - 1995 1996 1997 - 1999 2000 - 2002 2003 - 2005 2006 - 2007 2008 - 2011 2012 - 2013
Germany, 1969 USA, 1982 Malaysia, 1991 Sweden, 1993 Korea, 1994 Brazil, 1996 Australia, 1997 Ukraine, 2000 Mexico, 2003 Russia, 2006 Panama, 2008 Colombia, 2012
PERI GmbH PERI Formwork PERI Formwork PERIform Sverige AB PERI Korea Ltd. PERI Formas e PERI Australia Pty. Ltd. PERI Ukraina PERI Cimbras y OOO PERI Russia PERI Panam Inc. PERI S.A.S.
Systems Inc. Malaysia Sdn. Bhd. Excoramentos Ltda. Andamios S.A. de C.V.
France, 1974 Italy, 1983 Singapore, 1991 Norway, 1993 Portugal, 1994 Argentina, 1996 United Arab Emirates Bulgaria, 2000 Latvia, 2003 India, 2007 Peru, 2008 Algeria, 2012
PERI S.A.S. PERI S.p.A. PERI ASIA Pte. Ltd. PERI Norge AS PERIcofragens, Lda. PERI S.A. 1997 PERI Bulgaria EOOD PERI SIA PERI (India) Pvt. Ltd. PERI Peruana S.A.C. SARL PERI
PERI (L.L.C.)
Switzerland, 1974 United Kingdom, 1989 Austria, 1992 Poland, 1993 Canada, 1995 Chile, 1996 Israel, 1999 Estonia, 2002 Serbia-Montenegro, Kazakhstan, 2007 Albania, 2010 Saudi Arabia, 2013
PERI AG PERI Ltd. PERI Ges. mbH PERI Polska Sp. z o.o. PERI Formwork PERI Chile Ltda. PERI Formwork and PERI AS 2003 TOO PERI Kazakhstan PERI Formwork and PERI Saudi Arabia
Systems Inc. Engineering Ltd. PERI Oplate d.o.o. Scaffolding Sh. p. k. Company Ltd.
Spain, 1975 Turkey, 1990 Czech Republic, 1992 Denmark, 1993 Romania, 1996 Greece, 1999 Lithuania, 2002 Croatia, 2004 Qatar, 2007 South Africa, 2011 Kuwait, 2013
PERI S.A.U. PERI Kalip ve Iskeleleri PERI spol. s r.o. PERI Danmark A/S PERI Romnia SRL PERI Hellas Solely PERI UAB PERI Oplate i skele PERI Qatar LLC PERI (Pty) Ltd. PERI Kuwait
Sanayi ve Ticaret Ltd. Owned Ltd. d.o.o. Company Ltd.
Belgium, 1979 Hungary, 1990 Finland, 1993 Slovakia, 1996 Japan, 2005 Belorussia, 2007
PERI S.A. PERI Kft. PERI Suomi Ltd. Oy PERI spol. s r.o. PERI Japan K.K. IOOO PERI Belarus
Netherlands, 1979
PERI Holding B.V.
12 13
Our goal: performance leadership
Best products. Best concepts. Best realization.
The consistent orientation to the needs of of the project. The personal exchange of
our customers lies at the heart of our entire information along with the close proximity
business operations. We successfully meet to our customers this is especially impor-
time and cost-saving requirements through tant to us.
the development of innovative products and
continuous development of the PERI systems.
14 15
PERI Products and Systems
Well thought-out in every detail. Efficient. Proven.
1969 - 1979 1980 - 1994 1995 - 2004 2005 - 2009 2010 - 2012 2013
GRV Articulated Waler SKS Single-Sided VT MAXIMO VARIOKIT PEP Ergo Slab Prop
for Circular Structures Climbing Formwork Table Module Panel Formwork Parapet Track For use up to Load Class E
KGF 240 Climbing and TRIO FB 180 VARIOKIT Engineering VARIOKIT Heavy-Duty LPS
Travelling Formwork Panel Formwork Folding Platform Construction Kit Shoring Tower Screen
STERA PLUS CB TRIO PERI UP Rosett Flex MAXIMO MXSE VARIOKIT Balance
Panel Formwork Climbing Scaffold Shaft Element Industrial Scaffolding Shaft Element Cantilever Equipment
The innovative MX tie technology, with ties installed at one side, significantly reduces the time and expense for the forming of walls.
In addition, lost parts such as spacer tubes are no longer required.
We develop new products for applications with which we see rationalization potential Our engineers take into consideration the PERI products are characterized through A clear indicator of this is that we have
total cost of materials and working hours in their innovative design, intelligent mechani- always been able to set standards in the
with a real future. In this way, efficient system equipment with convincing and practical every product development - we call this cal features and practical details manufac- industry with numerous innovations, and
details is developed which maintain a strong position in the market over many years. the performance price. Result: the great- tured with high quality standards and thus that the vast majority of PERI systems have
est possible reduction in effort and working ideally suited for dealing with the tough firmly established themselves in the market.
time. everyday use on the construction site. Easy
handling, maximum flexibility and, at the
same time, safe application prove convinc-
ing in the long-term.
16 17
PERI system equipment plus engineering
Optimized planning. For all requirements. Worldwide.
18 19
PERI responsible for results
Expert and qualified support. Services with added value.
Efficient execution.
Basic requirements
Materials requirements on the construction site during the course of the project Time
Also for the implementation of the plan- But we also think of the business manage-
ning, we provide the very best support: ment responsibility of our customers and
from the start of construction right through support their controlling processes with
to the last return delivery. Our close-knit performance-related invoicing and high
network of logistics sites ensures fast avail- transparency often online and around the
ability of materials for every project. In clock. For large projects, project managers
many markets, our system equipment is help to match the quantities of material to
also available to rent as a cost-effective the actual requirements, and thus further
option for peak demands or less frequent optimize on-site material requirements and
tasks. And our sales engineers and supervi- costs.
sors provide active on-site support thus
enabling users to efficiently utilize PERI
system equipment right from the start.
The service we provide simply does not end with the delivery. With PERI services, in particu-
lar, we accompany and support our clients throughout the entire project and thus make a
decisive contribution in ensuring an effective, safe and cost-effective realization.
20 21
PERI quality is a promise to our customers
Durable. Proven. A worthwhile investment.
PERI quality assurance already begins in the incoming The PERI systems are thoroughly tested through individ- In the girder production, the timber strength is tested by
goods operations. At this point, it is ensured that the ual test setups regarding their suitability for use in tough means of an X-ray scanner. The non-destructive testing
raw materials correspond to the predefined PERI jobsite conditions, e.g. the MAXIMO tie point. method leads to reliable conclusions about the quality of
requirements. the sawn timber.
The high quality of the PERI systems guar- The entire process is subject to continuous
antees a worthwhile investment. It is the quality assurance which is clearly defined
basis for long product life cycles with high and has been repeatedly certified, from pur-
utilization rates. At PERI, quality begins chase through to delivery. Fully galvanized
with the careful selection of materials. components and powder coating for com-
Products are manufactured using real prehensive corrosion protection are exam-
craftsmanship by our highly trained work- ples of how we guarantee the long service
force who are supported by the availability life of our formwork and scaffolding sys-
of the most modern production facilities: tems. As a result, PERI systems can stand
Quality made by PERI. up to the tough everyday operations on the
jobsite frequently over decades.
22 23
Sustainability as a basic principle:
from the development to transportation
Resource-saving. Environmentally sound.
Long-term ecological viability.
The T 70 formwork girder is a good example of the lon- The design of the MULTIPROP prop serves as an exam- PERI systems have been designed to ensure a long ser-
gevity of PERI Products. These girders were still being ple for optimized material utilization. The carefully vice life. With panel formwork for example, even badly
used in many rental parks long after the GT 24 had been thought-out form provides the prop with a high load- damaged elements can be used again for countless
launched as a further development. bearing capacity and offers the best connection possibil- other applications after repairs have been carried out
ities for accessories. and with new formlining. Closed circuits: the biomass power station at the
Weissenhorn production site is a symbol for sustain-
able action at PERI. From wood shavings a waste
product from the girder production power and heat
are generated in the power plant which contributes
a significant part of the used energy mix at the pro-
duction facilities.
The issue of sustainability has a firm place New technologies and efficient production
in our business processes. Product devel- processes ensure the best quality and long
opment is already focused on the best utili- service life of PERI system equipment
zation of materials and thus the most eco- which, in turn, has a positive effect on the
nomical use. Raw material selection and consumption of resources. Delivery and
procurement is carried out in terms of eco- construction site logistics are also opti-
logical sustainability with timber, for exam- mized regarding shipping volumes and
ple, coming mainly from certified growing transportation routes. Strategically-posi-
regions. tioned sites guarantee short delivery dis-
tances whereby transportation is also con-
tinuously optimized through an intelligent
logistics network.
chafaudages
chafaudages
chafaudages
24 Reg.Nr. QM 950015
25
zer
tifi
em
er
st
zi
te
sQ tsy
ualit en
tsmanagem
PERI training and regular specialist exchanges
Informative. Practice-oriented. Valuable.
PERI experts know every detail about the products and, in many training centres around the
world, we are always extremely pleased to pass on this know-how to our customers. At our
events, we also offer practical knowledge concerning regulations, standards and other current
industry issues.
26 27
PERI competence with perspective
Know-how. Creativity. Foresight.
Dubai Tower, Turning Torso, Kao Ping Hsi Bridge, Trump Tower, Puente Baluarte, Viaduc de Millau, Sea Towers, Al Hamra Tower, Plot 12, World One Tower,
Dubai, UAE Malm, Sweden Taipei, Taiwan Chicago, USA Mexico France Gdynia, Poland Kuwait City, Kuwait Moscow, Russia Mumbai, India
440 m 190 m 184 m 415 m 168 m 245 m 138 m 412 m 345 m 442 m
The PERI experience is as diverse as the To this end, we concern ourselves with Architectural concrete is
an extremely popular
international world of construction and the innovations in a range of different areas: design element. We pro-
maintenance. For high-rise buildings with with new materials for our systems, mod- vide practical help for the
complex shapes, for challenging bridge and ern concrete technology as well as with the realization of architectural
concrete structures tai-
tunnel structures, for the implementation of very latest manufacturing processes and lored to fully conform to
the highest architectural concrete require- raw materials for our production. Or with the architectural specifica-
ments as well as for ambitious scaffolding 5D planning or very special requirements, tions.
tasks we promise to provide you with the e.g. the shaping of gravity foundations for
fullest possible support and the best solu- offshore installations. We will therefore
tions also in the future. continue providing you with the best solu-
tions in the future.
The construction of bridges and tunnels combines high PERI specialists are valuable consultants and planners
demands on the supporting structure design and the of climbing formwork solutions for high-rise buildings. With the experience gained from countless global scaf-
shaping. PERI provides formwork and scaffolding tech- With their experience and knowledge, they can find the folding projects, our scaffold experts enable our custom-
nology from a single source for infrastructure projects of most cost-effective solutions for a wide range of con- ers to realize projects with PERI UP scaffolding con-
any type. struction tasks. structions both economically and safely.
28 29
Systems and Services
32 Wall Formwork
50 Column Formwork
58 Slab Formwork
70 Shoring Systems
80 Working Scaffold
90 Access
146 Services
30 31
Wall Formwork
Originally, timbered wall formwork was The further reduction of the individual com- Selection criteria for wall formwork
comprised of boards and squared timbers. ponents resulted in wall formwork with systems
This has resulted in modular systems for welded frames made of steel or aluminium.
a range of different requirements. Based Fixed panel sizes including formlining, sys- Dimensions of the vertical structural
on the respective construction, a distinc- tem components for connections and wall elements to be shuttered
tion is made between girder wall form- connections, as well as other site-compliant Necessary adjustments in order to
work and panel formwork. detailed solutions, facilitate fast forming of match ground plans
large areas. Available crane capacity
The girder wall formwork consists of timber Applied fresh concrete pressure
and/or steel girders connected to each With the afore-mentioned systems, not Concrete surface and tie position
other that form the support surface for the only can walls, beams and columns be arrangement requirements
formlining. The optimization of individual realized. They are also used for vertical Required construction time
elements and the development of a wide structures in civil engineering as well as,
range of accessories for connections and with appropriate support structures, for
attachments still makes girder wall formwork single-sided constructions.
cost-effective in spite of the relatively high
number of components. A major advantage
is the flexibility in order to be able to adapt
to complex shapes and high loads. In partic-
ular, architectural concrete structures with
special requirements for surfaces and
anchor patterns can often only be efficiently
realized with girder wall formwork.
32 33
MAXIMO Panel Formwork Wall Formwork
The special MX tie is installed from one side only and is The MX shaft corner allows complete sets of shaft The defined arrangement of individual MAXIMO panels
used without spacer tubes and cones. As a result, both formwork to be moved quickly. Attaching and releasing allows the visually appealing design of concrete surfac-
material requirements and costs are reduced as well as is easily done from a safe position on the working level. es with a clean concrete finish without any impressions
saving time. due to unused tie holes or the occurance of concrete
bleeding through non-sealed tie points.
Depending on the fresh concrete pressure or wall thickness, the MX 15 MX 15 and The BFD coupler provides a flush, aligned and tight
or MX 18 tie is used whilst a removable sealing allows quick adaptation MX 18 Wingnut connection in one simple operation. For standard
to accommodate the two tie sizes. panel joints, filler timber compensations up to 10 cm,
extensions, external and internal corners as well as
articulated corners.
34 35
TRIO Panel Formwork Wall Formwork
Few different components and, in particular, the univer- Equipped with platform systems, TRIO provides maxi- The TRIO shaft element for quickly moving complete Wall heights up to 3.30 m can be formed with TRIO 330
sal BFD alignment coupler which can be operated with mum safety for the construction team. Complete large- sets of shaft internal formwork: by pulling the shaft The TRIO aluminium is the lightweight version with without any height extensions and with only two tie
one hand, ensure quick and easy forming operations area moveable units with working platforms, access corners, this results in a striking clearance of 30 mm, yellow powder coating. It is compatible with the steel positions. The 3.30 m high panel can also be combined
with TRIO. ladders and guardrails are moved from cycle to cycle. and the unit can be moved in one crane lift. variant and can be used with the same accessories. with the 2.70 m version.
36 37
DOMINO Panel Formwork Wall Formwork
Lightweight
Low dead weight and only 4 panel widths
Practical
1 component for all connections the
DRS alignment coupler The small-sized, easy to handle panels from PERI DOMINO in
use for a low sub-basement.
Simple
Inset tie points, extensive range of
accessories
0.75 m
1.25 m
DOMINO elements are also highly suitable for forming foundations.
In particular, the 1.25 m high panels complete with inset tie points are
an advantage here, as they can be used very flexibly.
38 39
LIWA Panel Formwork Wall Formwork
Where previously timber, boards and nails dominated shuttering operations, in extreme
cases only one man works by hand but nevertheless with system. In particular, small
surfaces can be realized in an extremely effective way.
Systemized
A minimum of panel widths ensure a high level of utilization
Clever
With the LIWA multi panels, columns from Only one connecting part is used for all panel connections the HANDSET clip
15 x 15 cm up to 55 x 55 cm can be formed in Functional
The brackets allow fast installation of concreting scaffold 5 cm increments. The columns are anchored
Continuous adaptability of the panels through the Nonius grid pattern
and provide a very high level of safety for the user. with corner connectors and standard DW 15.
Forming by hand due to the low weight Forming by hand thanks to the low weight
Can also be used for columns through multi-purpose panels without requiring any The clip creates flush connections and closes very tightly
special panels Extensions in 30 cm increments
Standard panel joints with wedge connector, compensations up to 5 cm with the No drilling of additional tie holes required due to the pactical tie point arrangements
wedge clamp compensation and length compensation up to 25 cm with compen- in the panels
sation waler are executable Maximum permissible fresh concrete pressure 40 kN/m
Internal corners and T-junctions with corner panels High utilization rate due to few panel sizes
Scaffold brackets, push-pull prop connections, crane suspension and wall thickness Push-pull prop connections and scaffold brackets are available
compensator are available
Maximum permissible fresh concrete pressure 50 kN/m
Used with the DW 5 tie system
Powder coating of the elements ensures easy cleaning
40 41
VARIO GT 24 Wall Formwork Wall Formwork
With the continuously adjustable panel con- Cost-effective VARIO GT 24 standard panels are available Girderlength and spacing
nections, VARIO GT 24 allows the forming Variable arrangement of formwork girders and walers already pre-assembled in various sizes. The Waler position, profile and length
of all designs and applications. It can be Adaptable inexpensive standard panels are designed Type and size of the formlining
used as formwork project for industrial and Tie positioning and joint pattern design according to planning requirements for a permissible fresh concrete pressure of Formlining fixings
residential construction, bridge abutments Well thought-out 60 kN/m and concrete surfaces without Panel widths and heights, position of a possible extension or panel removal
or retaining walls, for each ground plan and Elongated hole in walers and couplings allow continuous compensation; requirements. The technical characteristics Permissible fresh concrete pressure
all heights. Formlining, girder spacing as the panel connection is flush, aligned and tight correspond to those of the VARIO GT 24 Horizontal and vertical tie arrangement
The project-specific constructed 14 m high VARIO The VARIO GT 24 formwork with defined formlining joint In addition to walls in building construction, VARIO GT 24
elements were designed for a fresh concrete pressure formation and tie positioning was specially-designed elements find many applications in civil engineering, e.g.
of 150 kN/m and fitted with large-sized Fin-Ply Maxi to meet the project requirements and resulted in an for a bridge pier as shown here.
formlining sheets. excellent architectural concrete finish.
Flexible panel widths according to the length of the SRZ / SRU steel walers
Flexibilityregarding the height of the panels which is determined by the
GT 24 girder length (standard lengths 0.90 m to 6.00 m in 30 cm increments;
special lengths up to 17.80 m)
Project-related planning and mounted with regard to the required fresh concrete
pressure
Use of the rigid GT 24 formwork girder leads to a minimization of the number
of waler lines and tie points
Elongated holes in the steel walers and panel couplings allow 100 % tension
and compression-proof panel connections resulting in tight panel joints
Tie positions can be adjusted according to project requirements
42 43
RUNDFLEX Circular Wall Formwork Wall Formwork
3.60 m high RUNDFLEX formwork for construction of a Spindles are adjusted using the combi ratchet spanner A radius template is used to check that the curvature is
sewage treatment plant with a radius of 13.76 m. SW24. as specified.
44 45
RUNDFLEX Plus Circular Formwork GRV Articulated Waler Circular Formwork Wall Formwork
With its adjustable standard panels, GRV realizes both large and small radii via a
RUNDFLEX Plus avoids cost-intensive closed formwork ring without any tie points
reassembly or special formwork modifica- and thus facilitates significant savings even
tions. The result, even for large radii: with special formwork, e.g. for vaults or
perfectly formed curvatures without any arched bridges.
additional measures.
Cost-effective
User-friendly Closed formwork ring without ties
Low number of ties: only 0.54 per m wall Continuously adjustable
Very efficient Can be adjusted for minimum inside
Low number of spindles, easy radii adjust- concrete radii of 0,90 m
ment Versatile
Cost-effective Can be used for all possible arched
Anchoring above the top edge of the panel structures
saves one tie installation in the concrete
For the GRV circular formwork, there are four different The GRV circular formwork is used for the construction
The working platforms can be securely mounted to A complete working and concreting scaffold programme With RUNDFLEX Plus, the formlining is screwed on at PERI GRV articulated waler is frequently used in combi- articulated walers that allow the realization of different of circular structures without the use of ties. The exter-
the horizontally-positioned panels. The pre-assembled with platforms, guardrails and access ladders ensure the rear. This results in high-quality concrete surfaces nation with GT 24 lattice girders for a wide range of arc radii down to a minimum of 0.90 m for the articu- nal as well as internal tensile ring forces are accommo-
platforms suit all radii. safe working conditions with the RUNDFLEX Plus. without any screw or rivet impressions. bridges and arched formwork. lated waler with a length of 300 mm. dated via the closed ring of walers.
Maximum permissible fresh concrete pressure 60 kN/m 4 different articulated walers allow a range of inside concrete radii from
5 panel heights (1.20 m / 1.80 m / 2.40 m / 3.00 m / 3.60 m) and 2 panel widths (external: 2.50 m / 1.25m) 0.90 m to 2.10 m
Can be adapted to suit changing radii from 2.50 m onwards without any panel alterations Cost-effective alternative without ties for watertight tanks
Supplied already pre-assembled ready to use Can also be used for arched bridge construction
Formlining is screwed on at the rear Simple and fast adjustment of the GRV articulated waler
Easy and simple radii adjustment by means of spindles and a template Tensile ring forces up to 300 kN can be accomodated
Panel connections and compensations with the BFD coupler
Specified tie points and push-pull prop connections
Working and concreting scaffold as well as components for extensions and support are available
46 47
SB Brace Frame RS Push-Pull Props Wall Formwork
Extremely quick
Rough adjustment in 10 cm increments
within seconds, fine adjustment with just a
few turns
Durable
Galvanized to ensure a very long service life
Safe
All length extensions are carried out safely
on the installation area
SB brace frames transfer the fresh concrete Variable
pressure into the sub-structure and founda- Push-pull prop adapter and quick connector
tions during single-sided concreting of com- head allow safe assembly also on prefabri-
ponents. This is a big advantage when using cated concrete elements
both vertical formwork as well as horizontal
platforms.
Compatible
Can be combined with MAXIMO, VARIO,
TRIO, DOMINO, RUNDFLEX and
RUNDFLEX Plus
PERI Tie Technology
Fast
All required connection parts are already
For all wall formwork
mounted on the brace frame
Mobile The DK and SK tie systems serve to ensure subsequent, reliable sealing of tie points.
All individual components have been The tie points are sealed with concrete cones using a specially-developed sealing
designed for ideal truck and container compound.
loading
Guaranteed leak-proof
Waterproof and gas impermeable, fire-resistant, soundproof and diffusion-proof as well
as approved for drinking water
Appropriate availability
Cones and spacer tubes for a range of tie diameters are available
The DK sealing cone system is: The SK tie cone system is:
waterproof waterproof
gas impermeable gas impermeable
fire-resistant fire-resistant
soundproof soundproof
suitable for architectural concrete suitable for strongrooms and architectural
concrete
The choice of the most Used for attractively Against pressing water, for
suitable anchoring system designed visible concrete walls with a soundproofing
is determined by the ten- surfaces. function as well as walls
sile force applied on the with Fire Resistance Class
brace frame. F90.
48 49
Column Formwork
Fast concreting with comparatively small The quick and easy adjustment of the Key criteria when selecting a column
column cross-sections leads to a high cross-section and height with the least formwork
fresh concrete pressure on the formwork. possible number of system components
Therefore, the joints in particular are to is an important criterion for the versatility Dimensions and cross-section of the
be formed very carefully in order to avoid of a column formwork. Furthermore, high column to be formed
leakage problems. demands are often placed on the concrete Resulting fresh concrete pressure
surface. As conventional fixing of the form- Requirements on the concrete surface
Column formwork is comprised of panel work results in impressions of screws and Required construction time
formwork elements or based on individual nails being left in the concrete, systems Available crane capacities
formwork girders. In addition, for particularly were also developed that allow flawless
high demands on the pouring rate, even- surfaces to be realized.
ness and concrete surfaces, steel formwork
is also available.
50 51
QUATTRO Column Formwork RAPID Column Formwork Column Formwork
The column formwork which can be moved as a complete unit Perfect concrete surfaces for
highly demanding requirements
without any nail or screw impressions
For contractors, PERI QUATTRO means PERI RAPID for continuous column cross-
enormous time-savings when using the sections up to 60 cm x 60 cm, square-
crane because the complete column shaped or rectangular. Through the unique
including the push-pull props and concret- patented clamping principle, the formlining
ing platform is moved in only one crane lift. is simply clamped to the frame.
With PERI transportation wheels if
necessary even by hand. Fast
3 frame heights provide ideal height
Time-saving adjustments, the plywood is cut-to-size
Moveable as a complete unit, can be and clamped in position
opened and closed with the minimum of Crane-independent
effort Basic assembly by hand with site-compliant,
Variable lightweight aluminium elements
Regardless whether square or rectangular, Neat and tidy
cross-sections from 20 cm x 20 cm to Freely-selectable formlining for the highest
60 cm x 60 cm, in 5 cm increments architectural concrete requirements without
Safe any imprints of nails or screws, neat joint
Concreting platform with integrated access and tie arrangement
ladder and ladder safety cage
For square or rectangular cross-sections in 5 cm increments with edge lengths Lightweight column frame made of aluminium
ranging from 20 cm to 60 cm Continuous square-shaped or rectangular cross-sections up to 60 cm edge length
4 different element heights (0.50 m / 1.25 m / 2.75 m / 3.50 m) (58 cm for sharp edges), oversized cross-sections from 85 cm to 135 cm with an
Height adjustments in 25 cm increments up to 4.50 m additional anchor
Maximum permissible fresh concrete pressure 80 kN/m Cut-to-size formlining sheets for architectural concrete results, for extensions
Also moveable by hand using transportation wheels above the joints
For architectural concrete surfaces thanks to the formlining being screwed Maximum permissible fresh concrete pressure 120 kN/m
on at the rear For sharp edges or broken edges with chamfer strip
Access ladder and concreting platforms available Powder-coated frame makes cleaning easier
Powder-coated frame makes cleaning easier
52 53
LICO Column Formwork VARIO GT 24 Column Formwork Kapitel Formwork
Column
Lightweight column formwork for cost-effective All heights, all cross-sections, regardless
forming by hand whether square or rectangular-shaped
With its low individual element weights, PERI LICO is ideal for assembling With the PERI VARIO GT 24 column form-
and dismantling by hand, and ensures that crane non-availability is not work, a very wide range of cross-section Rectangular and square cross-sections,
a problem at all. dimensions and concreting heights can be continuously adjustable up to
shuttered without any time-consuming 80 cm x 120 cm
Practice-oriented adjustment work. Permissible fresh concrete pressure
Practical details simplify the use and reduce shuttering times 100 kN/m
Flexible Continuously variable Construction with VARIO standard
Only 3 different element heights cover all required concreting heights Column cross-sections up to 80 x 120 cm components as well as wedges and tie
Combinable Standardized yokes
Cross-sections in 5 cm increments up to 60 cm x 60 cm, square or Only 2 ties per waler position from the Free choice of formlining
rectangular-shaped VARIO programme
Robust
Designed for fresh concrete pressure
100 kN/m, adaptable to suit higher
concrete pressures
54 55
TRIO Column Formwork SRS Circular Column Formwork Column Formwork
Elements for walls and columns, High production quality for ensuring
cross-sections up to 75 cm x 75 cm perfect concrete surfaces
The PERI TRIO column formwork complements the TRIO wall form- PERI SRS as formwork for circular columns prevents the freshly-
work system, panels with 90 cm widths can also be used in the wall poured concrete from escaping thanks to the special design of
formwork. Height increments in this case are 30 cm. the panel joints which results in the realization of perfect concrete
surfaces.
Versatile
Cross-sections up to 75 cm x 75 cm in 5 cm increments, square or Variable
rectangular-shaped Column diameters in 5 cm increments from 25 cm to 70 cm, also
Clever special dimensions
No nailing of chamfer strips thanks to the specially-designed PERI Two-piece
chamfer strip and clamping mechanism Fast assembly with only two column halves and integrated spanner
Useful Extendable
Concreting platform is continuously adjustable, integrated ladder for 4 panel heights allow height adjustments in 30 cm increments
safe access
For square or rectangular cross-sections in 5 cm increments with edge lengths Crane-independent steel circular column formwork
from 20 cm to 75 cm Standard diameters from 25 cm to 70 cm in 5 cm increments; special sizes
3 different panel heights (0.60 m / 1.20 m / 2.70 m) up to 120 cm diameters available
Height adjustments in 30 cm increments up to 8.10 m with the BFD alignment Panel heights up to 8.40 m dependent on diameter, extendable in 30 cm
coupler increments
Maximum permissible fresh concrete pressure 100 kN/m Maximum permissible fresh concrete pressure 150 kN/m
Column panels can also be used as 90 cm wide wall panels Easy and simple closing of the two formwork halves
Sharp edges or chamfered edges with the chamfer strip can be realized Connecting possibilities for push-pull props and concreting platforms
Through the use of special nuts, the formwork panels can easily be connected Tie yoke with self-cleaning hexagonal thread, permanently attached to the panel
using one hand Powder-coated frames keep the cleaning process to a minimum
Powder-coated frames keep the cleaning process to a minimum
56 57
Slab Formwork
Essential elements for slab formwork are Slab tables are also produced based on the Selection criteria for a slab formwork
the horizontal load-bearing structure and same design principle, which includes the system
the support system. The horizontal con- provision of a load-bearing system available
struction supports the formlining and in standard sizes or a project-related Geometry such as the spatial dimensions
safely transfers the forces into the shor- approach is taken with customized ele- (narrow, spacious), lateral limitations
ing which in turn carries the loads into ments. However, slab tables are only used (open, closed) and the form of the slab
the ground or components that have in a larger-scale, open design form of con- surface (rectangular, polygonal, curved)
already been completed. Scaffolding struction as they have to be moved to a cra- Required slab thickness and floor height
and platforms form working levels and neable position after being used underneath Requirements on the slab soffit
protect the user against falling or from the slab. Crane capacity and possibilities for
Crosswise-mounted individual wooden or developed featuring panels or girder grids. Required adjustments, e.g. to beams,
aluminium girders used as slab formwork The recurring assembly sequence facilitates offsets, cantilever slabs, infill areas or
have proven their worth over many years extremely fast shuttering times whilst the building supports
now. This construction with main and sec- aluminium and steel materials used ensure
ondary beams allows the use of any form- a long service life for the system compo-
lining and also provides a high degree of nents.
flexibility regarding geometric adjustments
that have to be carried out. Through the
continuous optimization of the individual
parts, girder formwork is still cost-effective
today in spite of the high number of compo-
nents involved.
58 59
SKYDECK Aluminium Panelized Slab Formwork Slab Formwork
60mm
Shuttered: the panels and cover strips Drophead lowered: the cover strips and
form the soffit of the concrete. dropheads remain in position while the
panels and beams are struck.
SKYDECK is easy and safe to install. The panels clip With SKYDECK edge beams (75 cm and 150 cm
onto the outward projecting teeth and are immovably lengths), shuttering of columns is a simple procedure. Safety also at slab edges: the SKYDECK platform serves
fixed in position. Handling is quickly mastered, even by The infill areas are closed by means of 21 mm thick as working and safety scaffold, and saves the installation
personnel unfamiliar with this system. formlining. of additional safety platforms or netting.
F
PR Z
ER
BG-
T
Bau
98051
geprfte
Sicherheit
60 61
GRIDFLEX Grid Element Slab Formwork Slab Formwork
Safe
Absolutely safe installation in all assembly phases
Uncomplicated
Few system components: prop head, one standard and two filler elements
Variable
Fast adaptation to any structural form
Compatible
Free choice of formlining corresponding to customers request and project
requirements
62 63
MULTIFLEX Girder Slab Formwork Slab Formwork
Load-bearing
Large spans result in a reduction in the
number of components
Utilization benefits
Fewer girders and props (depending on slab
thickness)
Adaptable
Can be adapted to suit every ground plan
due to overlapping of the girders MULTIFLEX can be adapted to suit all ground plans.
The telescoping of the slab girders or the change in the
Freely selectable direction of the main beams ensure maximum flexibility.
Choice of formlining according to needs
and requirements
Can be optimized for realizing all slab thicknesses and shapes through the selection
of girder and girder combination
Cost-effective due to inexpensive and reusable components
Free choice of formlining
Infill areas are easily shuttered through the use of girders
64 65
VARIODECK Steel Waler Slab Table Table Module VT Slab Table Slab Formwork
The consistent further development for large formwork areas The completely pre-assembled,
and heavy pre-fabricated parts immediately ready-for-use standard table
for a low number of re-uses
VARIODECK moves large formwork areas Table modules have been specially
with one crane lift extremely quickly, and designed for projects with a low number of
can be used for slabs up to 50 cm thick re-uses. They are completely pre-assembled
with only 4 slab props for table sizes of and are ready-to-use when delivered to the
around 16 m. If required, thicker slabs can construction site. Four standard sizes are
also be concreted with the addition of more available with guardrails being securely
support. mounted for cantilevered modules.
Push-pull props or bracing can be mounted on the table The TK table head is the inexpensive alternative. It
swivel head. securely connects props and slab table to each other.
Pre-assembled slab tables with lengths of 4.00 m and 6.00 m along with 2.15 m or 2.65 m widths
Up to 50 cm slab thicknesses with only 4 slab props through the use of the high load-bearing MULTIPROP props, thicker slabs
possible with additional props
Can also be used with the MULTIPROP system or PERI UP Rosett Flex shoring
Simple width compensation of up to 50 cm
Fast moving from storey to storey with the table lifting fork
Easy horizontal transportation throughout the storey by means of the table trolley, table lift or transportation wheel on the shoring
Pre-assembled slab table with lengths of 4.00 m and 5.00 m, with widths of 2.15 m or 2.65 m
Up to 50 cm slab thicknesses using only 4 props with thicker slabs possible with additional support
Can be used for floor heights of up to 5.00 m
With bracing can also be used as cantilevered edge table
Fast moving from storey to storey in a horizontal position with the table lifting fork
Easy moving procedure using the table trolley, table lift or transportation wheel on the shoring
Can be used with the swivel head or alternatively with the more inexpensive, immovable TK table head
One VARIODECK table provides a formwork area of up The lifting fork moves the table in one lift onto the next Being able to divide the table swivel head has several
to 15.90 m. The longitudinal steel walers (U 120 pro- floor. The slab props can be folded and easily mounted advantages: the head can also be used with another top
files) allow large cantilevers as well as accommodating and dismantled thanks to the table swivel head. part for radial girder arrangements whilst the lower part
higher loads. can be pre-mounted on the slab prop.
66 67
SKYTABLE Slab Table Slab Formwork
150 m slab table moved quickly and safely with one crane lift
Fast
150 m with only one crane lift, easy lower-
ing without effort and a large lowering
range
Safe
Remote-controlled moving procedure with
personnel always working from a safe and
secure position at the slab edge
Adaptable
The table is flown out of the building by crane with help The truss girders can be connected to one another Different floor heights, large heights with With an electric drive and hydraulic lifting device, the The transportation forks are always in a horizontal posi-
of the lifting mechanism and the single roller. The mov- resulting in tables up to 24.40 m long. With a width of PERI table lift provides an effortless and convenient way tion when not in use and when transporting a slab table.
ing procedure is very safe as workers are not required to 6.10 m, almost 150 m can be formed with one table.
shoring towers of moving slab tables.
stand on the slab table at any time.
68 69
Shoring Systems
Shoring consists of temporary structural Enormous flexibility is offered through the Selection criteria for the creation of
elements that can be set up and disman- use of modular scaffolding, ranging from a shoring systems
tled at their point of use. They support simple shoring tower through to complex
the formwork for concrete support struc- spatial shoring, and can be adapted to suit Required height of the shoring
tures until sufficient hardening has taken virtually any geometry as well as different Loads to be transferred
place or transfer loads from components loads. Boundary conditions such as the contact
and equipment during the construction, area and other spatial conditions for the
maintenance or demolition of structural assembly
works. Load-bearing elements are props, Possibilities for assembly and disman-
shoring towers or modular scaffolding. tling, e.g. use of crane and accessibility
Required working and storage areas as
Apart from tubular steel props, aluminium well as access possibilities
props are used which can be connected
by means of frames and also utilized as a
shoring tower or formwork table. Shoring
towers can also be realized using frame
supports by means of connectors. For
very high loads, e.g. in bridge construction,
heavy-duty props are frequently used.
70 71
PEP/PEP Ergo Slab Props MULTIPROP Post Shores Shoring Systems
Made of galvanized steel with high load-bearing capacity Used as a cost-saving lightweight
and low weight individual prop and cost-effective
shoring tower
Galvanized tubular steel props with numer- MULTIPROP post shores are made of alu-
ous practical features for fast and safe minium which means they are very light, MULTIPROP post shores fully comply
handling. The complete galvanization of e.g. the MP 350 weighs only 19.40 kg and with Load Classes T 25, R 35, D 45
all surfaces guarantees a long service life. has an extension length of up to 3.50 m. and D 60 according to DIN EN 1065
The low weight whilst maintaining a high Ingeniously designed details ensure a long Leg loads up to 91 kg in accordance
load-bearing capacity makes it extremely service life. with the type test
cost-effective. Available in lengths of 1.20 m, 2.50 m,
High load-bearing 3.50 m, 4.80 m and 6,25 m
Robust Up to 91 kN in accordance with the type Building authority approved
PEP props can carry up up to 50 kN test Provides 36 mm of adjustment with
Trend-setting Well thought-out every turn
Adjusting nut with lowering nib and captive Self-cleaning thread and robust, free-run- The powder coating makes the prop
handgrip ning collar insensitive to concrete deposits
Well thought-out Practical Continuously adjustable, i.e. without
Prop heads can be mounted on the inner The integrated measuring tape on the any re-positioning of pins
and outer tubes inner tube shows the complete length of Can be erected as square or rectan-
the prop gular towers through the use of
Expandable frames
With MULTIPROP frames, can also be
used as a shoring tower
PEP props / PEP Ergo props fully The shape of the lowering nut shows the direction In addition to the tripod, the PRK frame can be The integrated measuring tape allows exact prop 19.50 m high MULTIPROP towers as shoring with
for lowering when under load and allows damage- used as an assembly aid. adjustment without any time-consuming measuring SKYDECK slab formwork for a cantilevered slab.
comply with Load Class B, D, E of free and gentle lowering of materials. and unnecessary lengthy re-adjustments.
DIN EN 1065
Available in lengths of 1.50 m,
2.50 m, 3.00 m, 3.50 m, 4.00 m For erection of a
tower, MULTIPROP
and 5.00 m frames are mounted
Generous 12 cm adjustment range using the captive
Anti-crush device with a safety wedge. Frames can be
attached to both the
clearance of 10 cm provides pro outer and inner tubes
tection against injury without requiring
Long service life through complete changes to be made
to the ground plan.
galvanization
Tripods or frames available as instal-
lation aids
72 73
ST 100 Stacking Tower PD 8 Slab Table, Shoring and Stair Tower Shoring Systems
The efficient shoring system consisting of framed supports The proven shoring system for large loads
with few system components
PERI ST 100 has been designed for fast Fast assembly PERI PD 8 stands for the solution with large
assembly and dismantling. The individual By simply fitting the components together units and high clearances. With the help
components are simply fitted together with no pins and connectors of flexibly used system components, the
without tools and make utilization also at Quickly planned application as shoring or stair tower as
low heights very cost-effective. Every working height is simple to plan well as slab table is very economical.
without the need of combination tables
Quickly explained Simple
Only 5 system components for any height Standard connecting parts, same frame
Huge
Used as slab table for high clearances and
in large movable units
High load-bearing capacity
As shoring tower for heights over 20 m
and loads more than 60 kN
High
As stair tower up to 100 m high
The ST 100 also safely and reliably transfers loads from The stacking frame weighs less than 7 kg which A trolley and winch unit facilitates fast moving of Through the installation of the horizontal additional ledg-
great heights. facilitates ergonomic and fast assembly. the PD 8 scaffold constructions. ers, horizontal loads in the system can be transferred.
74 75
PERI UP Rosett Flex Shoring Shoring Systems
76 77
HD 200 Heavy-Duty Prop VARIOKIT Heavy-Duty Tower Shoring Systems
Reliably strong
280 t per standard tower up to 10.50 m
high
Cost-effective
Designed on the basis of the VARIOKIT
engineering construction kit with rentable
system components
VARIOKIT is compatible with the PERI UP scaffold sys- The heavy shoring tower can also be easily raised and Flexible
tem. As a result, this allows the required access points lowered when loaded thanks to the head spindle and
As tower, tower with legs, shoring tower
and working platforms to be quickly and safely erected. mobile hydraulics.
frame or main beam frame
Safe
Use as individual prop or in the system as a main beam tract Access means with PERI UP system
Prop sections made of aluminium (l = 30 cm, 90 cm, 270 cm) and steel (l = 90 cm and 210 cm) for a components
wide range of assembly heights and load-bearing capacities
Assembly height up to 12.20 m without any intermediate support
Permissible prop load up to 200 kN
Prop sections with integrated chord couplers for easy and simple assembly without tools
Head spindle with head plate that can be tilted up to 3
Lowering device with 10 cm lowering range for easy lowering when fully loaded
78 79
Working Scaffold
Working scaffolds are temporary struc- On construction sites, mainly reinforcement Selection criteria for a system for
tures which serve to create higher-posi- scaffolding along with working platforms erecting working scaffolds
tioned working areas for construction are used whilst narrow facade scaffolds
site activities, on buildings or at an find use on the front of buildings. Industry Area of application and required
industrial facility. In addition, the scaf- scaffolding serves as access and working working area
folding must ensure that all working platforms in plant construction. Required load-bearing capacity
areas can be safely reached. Boundary conditions, e.g. assembly
area, spatial conditions or possibilities
Originally characterized by timber and rope of crane use
connections, the scaffolding sector has Required geometry, also including
been dominated for many years now by the openings and passages for material
use of modular systems made of metallic transport
materials. They provide shorter installation Available time window for assembly,
times, flexibility for geometrical adjust- dismantling and use
ments as well as a high load-bearing capaci- Safety requirements regarding assem-
ty and safety for both operators and users. bly and dismantling as well as scaffold
utilization
Country-specific standards and laws con-
cerning occupational health and safety
regulate the requirements placed on the
scaffolding regarding safer erection, brac-
ing, anchoring and sufficient load-bearing
capacity depending on the application.
80 81
PERI UP T 72 / T 104 Frame Scaffolding Working Scaffold
The PERI UP scaffolding with T-frames ideally The design with the
open frame construction
combine safety and cost-effectiveness. The provides lightweight and
scaffolder can work safely and quickly with easy-to-handle individual
the help of the integrated collective fall components for fast and
fatigue-free working
protection on each assembly level without operations.
rope protection: the guardrail for the next
scaffold bay is mounted without any addi-
tional parts with the T- frame.
PERI UP T 72
System width 72 cm
Decking area width 64 cm
Load Classes 1 to 4
PERI UP T 104
System width 104 cm
Decking area width 96 cm
Load Classes 1 to 6
Safe
Collective fall protection without additional
components through the system-related
assembly method with the guardrail in
advance
Lightweight The PERI UP facade scaffolding with the T-frame:
for safe erection of working scaffolds in everyday
Easy to handle components: the T 72 facade scaffolding assembly.
T-frame weighs, for example, only 14 kg
Secure
After the deck has been placed and moved
sideways, the integrated lock against lift off
is immediately secured
Protective
Reliable side protection - inside and outside
82 83
PERI UP Rosett R 72 / R 104 Modular Scaffold Working Scaffold
Practically unlimited
Optimal adjustment possibilities regarding
height, width and length
Extremely easy to assemble
Fast and safe assembly with the Gravity Lock
Reassuringly safe
Without any additional components due to
the integrated lock against lift off
The PERI UP Rosett facade scaffolding can be optimally PERI UP Rosett allows scaffolding operations
adapted to virtually any building form such as the with standard components. The Rosett nodes
double-buckled facade shown here. Working areas can at spacings of 50 cm provide connection
be safely reached. possibilities in all directions.
The Gravity Lock facilitates fast assembly of the modular The rosette on the standard allows for connections up
scaffolding: by inserting the wedge head into the rosette, to 45. The nodes at spacings of 50 cm also provide
the wedge drops by force of gravity into the hole and connection possibilities in all directions.
then locks.
84 85
PERI UP Rosett Scaffold Units Working Scaffold
and with a length of up to 9.00 m (3 bays). access decks in the intermediate levels. high
Crane-movable units
Planned in advance to 300 cm x 300 cm easy to extend assembly workplaces, also at great
Fast calculation of material requirements thanks to the kit principle heights
thanks to the modular design principle Cost-effective Maximum load-bearing capacity
Quick and efficient Full width platforms are only installed 6.00 kN/m
Complete units can be moved due to the at heights where work is actually being
extremely tight connections carried out
Movable
Movable by crane thanks to the tension-
proof connection of the legs, can also be
moved by hand using castors
Used as working scaffold in Scaffold Groups 1-3 according to DIN 4420-1 or Work scaffolding, such as reinforcement
Load Classes 1-3 according to EN 12811-1 (0.75 2.00 kN/m) scaffold and platforms, can be assembled
Fulfils wind load requirements according to DIN EN 1004 and DIN EN 12811 using the deck-ledger variant UDS-UHD
System widths 72 cm and 104 cm or the deck-ledger system UDI-UH.
Base width 150 cm or 250 cm An overall view of all the application
Maximum standing height 6.60 m (with base width 150 cm) or 10.80 m (base possibilities of the two variants along with
width 250 cm) numerous references are featured in the
Crane-moveable units through extremely tight connections PERI scaffolding technology handbook.
High load-bearing capacity as well as fast and The modular structure and the 25 cm grid dimen-
easy assembly characterize the UDS steel sions of the PERI UP Rosett Flex system with the
decking which, after being mounted and pushed UDI decking provide even more flexibility. The indi-
into position, is secured immediately against vidual deck is secured against lifting immediately
lifting through the decking transom profile. after being installed.
86 87
PERI UP Rosett Flex Modular Scaffolding Working Scaffold
Maximum adaptability, high level of safety and fast Decking areas can be completely covered, plant Toe boards with lengths in the modular dimensions limit
assembly all this makes PERI UP Rosett Flex the ideal elements as well as other constructions can be built the decking areas.
system for use in industry. around using system components.
PERI UP Rosett Flex is a highly flexible sys- Safe working conditions PERI UP Rosett Flex has a grid system of
tem scaffold that leaves almost no request Working platforms are completely covered without any gaps and simple 25 cm and 50 cm. The wide range of ledgers
unfulfilled especially for industrial applica- conversions are made to accommodate any obstructions with lengths starting from 25 cm allow deck-
tions. This allows almost any adjustments Non-slip ing to change direction during installation
to be made to suit local site conditions The perforated surface of the decking provides a high level of safety and therefore ensure maximum adaptability
and also fulfils the highest requirements Easy to install to suit project-specific geometries.
regarding occupational safety for the work- Quickly and safely mounted with the gravity lock and self-locking decks
ing areas to be realized. High load-bearing capacity
Due to the special node rigidity and enormous loadability of the connection
88 89
Access
System scaffolding also provides solu- Accordingly, specific requirements for flight Selection criteria for a system for
tions for temporary access to working widths, the execution of intermediate land- realizing the means of access
levels at different heights. The range of ings and the safety equipment among
applications extends from stairs with other things are to be taken into consider- Circle of users
only a few steps through to stair towers ation. Requirements on flight width, load and
over 90 m high. intermediate landings
Required height of the access
The intended use of an access determines Available time frame for assembly and
90 91
PERI UP Rosett Staircase Alu 64 Access
92 93
PERI UP Rosett Flex Staircase Alu 75 Kapitel
Access
Adjustments in 25 cm increments
Stair tower with twin staircase units for the construction Standard stair configuration for a 2.75 m floor
of a liquid gas tank. Guardrails mounted on the outer height with clear dimensions between the walls
and middle stringers provide safe passage. of 2.10 m x 2.20 m.
94 95
PERI UP Rosett Flex Site Staircase Steel 100/125 Kapitel
Access
Site personnel meeting on the Site Staircase Steel 100 The lightweight individual steps are quickly installed: The perforated decking is slip-resistant also when
can easily pass each other. they interlock during assembly and secure automatically. walked on with oil-smeared shoes.
96 97
PERI UP Public with Steel Decking Access
For major public events, access facilities have to be PERI Public as stair tower inside a church which serves
provided for large crowds. For this, linked continuous as an emergency stairway in case the electrically-oper-
98 staircases with separate access points through inner ated elevator breaks down.
99
guardrails are used.
Protection Scaffold
Protection scaffold is not used as work Detailed requirements, such as the geo Selection criteria for a system for
scaffold or platforms but rather as an metry, load-bearing capacity or roof area erecting protection scaffolds
accompanying measure. It secures con- inclination, are normally defined in corre-
struction personnel against falling as sponding occupational health and safety Purpose of the protection scaffold
well as unfavourable weather conditions. legislation and standards. Current standards and regulations for
Furthermore, protection scaffold is fre- fulfilling the required protective function
quently installed in order to protect site Required areas for site personnel and
workers underneath or the flow of traffic material storage
from falling components or objects. Boundary conditions, e.g. assembly area,
spatial restrictions and possibilities of
In accordance with the different potential crane use
risks and dangers, there are a range of Available time window for assembly,
options available, for example, protection dismantling and utilization
fans or protective nets. Safety requirements for assembly and
dismantling as well as use of scaffolding
100 101
PERI UP Rosett Flex LGS Weather Protection Roof Protection Scaffold
102 103
Project-Specific Protection Scaffold Protection Scaffold
For the renewal of cables in power lines, safety nets are often installed at intersection points. These load-carrying
scaffolds for tensioning the safety nets are based on system components taken from the PERI UP Rosett Flex
modular scaffolding.
0,675
2.00 7,335 2.50 16,625 1.50
During the renovation of approx. 10,000 m roof area, For the refurbishment of the glass roofs of this station, As if on rails, the construction team shunted the
passers-by could safely use the open space situated platforms comprised of VARIOKIT system components platforms from one track section to the next. Moving in
underneath thanks to a protection scaffold based on served as a protective roof which could be moved into a longitudinal direction takes place by means of a trolley
PERI UP Rosett scaffolding. the next hall by hand. from the VARIOKIT engineering construction kit.
104 105
Climbing Systems
For the construction of wall sections at If a hydraulic climbing device gradually lifts Criteria for selecting the most suitable
great heights, platforms are required the units to the next storey, then this is climbing technology
which support the wall formwork as called a self-climbing formwork. With this
load-bearing scaffold. In addition to crane-independent variant, the climbing Building geometry such as the buildings
easy-to-assemble folding platforms, unit is also guided by means of rails and height and the height of the section to be
there are climbing system variants that anchored to the building using suitable concreted
rapidly shift the formwork upwards as climbing shoes. A difference is made Crane capacities and where the crane is
large-sized units using different moving between purely self-climbing systems with positioned
procedures in part crane-independently. integrated hydraulics and crane-independ- Deadlines, total construction time as well
ent rail-climbed systems that are retrofitted as influences due to the seasons and
In contrast to scaffold platforms, climbing with mobile self-climbing devices. weather conditions
systems are securely mounted units con- Requirements regarding the dimensional
sisting of brackets, platforms and wall form- For different building shapes and tasks, accuracy and quality of the concrete
work which are lifted as one unit to the next special system versions have been devel- surfaces
concreting section after striking has taken oped: crane-climbed and self-climbing Special features of the construction, e.g.
place. With the traditional crane-climbed formwork for facade areas, building cores required reinforcement and mounting
formwork, units are moved by crane and and shafts, for bridge pylons as well as parts
attached to climbing anchors which had climbing protection panels as wind shield Construction site environment and on-site
been concreted in advance. Modern rail- and anti-fall protection. conditions
climbed systems are guided up the build- Wind loads that are to be taken into
ing itself during the lifting operation which consideration
makes the climbing procedure wind-inde- Mounting possibilties for the anchoring
pendent, fast and safe.
106 107
FB 180 Folding Platform System Climbing Systems
108 109
CB 240 / CB 160 Climbing Systems Climbing Systems
Strong
High loading capacity of the brackets allows
the formation of large scaffold units
Time-saving
Platform including formwork movable in
only one crane lift
Safe
Completely free of tripping hazards in front
of and behind the formwork
110 111
SCS Single-Sided Climbing System Climbing Systems
The SCS climbing system in use on inclined concrete For this 280 m long, arch-shaped dam crest with variable The use of large climbing units facilitates cost-effective
components for the expansion of the Panama Canal. inclinations, the climbing brackets carry the heavy loads. construction of the massive lock components for the
expansion of the Panama Canal.
System M30x130-10.9 Scaffold Mounting Climbing Cone-2 Tie Rod DW 20 Threaded Anchor
M30 Ring M30 M30/DW20 Plate 20
System M36x130-10.9 Scaffold Mounting Climbing Cone-2 Tie Rod DW 26 Threaded Anchor
M36 Ring M36 M36/DW26 Plate 26
With PERI SCS, the loads from the fresh SCS 190 Optimized
concrete pressure are transferred without Bracket width approx. 1.90 m Large climbing units thanks to the particu- As falsework for supporting non-tied, single-sided wall formwork in accordance with DIN EN 12812
formwork ties through the brackets into the with adjusting unit for tilting the formwork larly high load-bearing capacity of the brack- Crane-movable climbing units comprised of a platform unit and VARIO GT 24 girder wall formwork (standard use)
climbing anchors of the previous concreting ets with good utilization of the anchoring Optimized for vertical applications with a 3.00 m concreting height as well as forward-inclined use at 30 with a 2.50 m
section. SCS stands out through a high SCS 250 Well thought-out concreting height
degree of cost-effectiveness. Optimum Bracket width approx. 2.50 m Same formwork and components for the Addition of a finishing platform possible
adaptation to suit the respective require- with formwork carriage (up to 63 cm starter and subsequent standard cycles Separate working platform can be adapted for use on inclined structures; concreting and finishing platforms can be
ments and geometries can be carried out retraction distance depending on the Adaptable tilted by 15 and 30.
very flexibly thanks to the modular concept formwork system) Inclinable platforms ensure that working Starter brace frame with strongbacks, spindles and an additional starter waler for the first concreting section, with
with multi-part brackets. and access areas are safe diagonal anchors fixed in the ground
Building authority approved tie system
112 113
LPS Screen Climbing Systems
LPS as a straight continuous protection panel without The close-meshed panels provide a safe and secure enclosure which nevertheless is still
working platforms. light-transmissive. Advantage and very convenient to carry out working operations in the
building in daylight conditions especially when striking the slabs.
The mesh panels are telescopically arranged and can be The clamp connector for fixing to the climbing rails can No crane is required for installing the lightweight mesh
easily adjusted to suit the respective ground plan. be quickly and easily mounted. enclosure as the panels can be moved by hand.
Fast
Assembly without a crane in a very short
time; alternatively, can also be delivered
pre-assembled
Permeable surface
Mesh panels with a permeable structure Lightweight enclosure with mesh panels, usable as a continuous straight assembly or alternatively with working platforms
provide little contact surface for the wind to Rail-guided,safe climbing with crane or optional self-climbing with mobile hydraulics
gain a hold Fast assembly by hand due to the low weight and simple clamping connection
Variable Lightweight construction reduces the load on the structure
Used as a protection panel or with supple- Adjustable slab shoe for mounting on the slab with variable cantilevers and extendable platforms
mentary working platform Lightweight mesh panels with expanded metal, also with telescoping function for easy adjustment to accommodate
complicated building shapes
As an option, can also be delivered pre-assembled
114 115
RCS Rail Climbing System Climbing Systems
TRIO panel formwork can also be used with the RCS The formwork is securely mounted on the carriage and Both system variants formwork scaffolding and climb-
climbing system. can be retracted by 90 cm without the use of the crane. ing protection panel can also be climbed by means of
Due to the roller bearings, it is easy to operate as well mobile hydraulic units, and thus crane-independent.
as being jerk-free.
Articulated climbing
Foldable runners allow the The RCS climbing rail can shoe support in the
lateral dismantling of the be inclined 4 in forward RCS wall shoe, can be
climbing shoe and simplify as well as reverse direc- pivoted during use on
the initial assembly. tions. circular buildings.
116 117
ACS Self-Climbing System Climbing Systems
Crane-independent
Shuttering, striking and hydraulic
climbing in a very fast work rhythm
Weather-independent
Comfortably-designed platforms, also
protected against wind and weather if
required
Load-independent
Working platforms can accommodate
high loads, e.g. arising from material
storage or placing boom mast ACS P the solution for advancing cores of high-rise The ACS self-climbing versions can also be combined. ACS V can be adjusted to accommodate forward and
buildings and tower-like structures combined with Three variants are formed here combined with the reversed-inclined piers and pylons. Regardless of the
ACS G. Both formwork sides are movably attached to VARIO GT 24 girder wall formwork and the TRIO panel angle of inclination, the working platforms are always in
the cantilevered platform beams. formwork crane-independent climbing units. a horizontal position.
Self-Climbing System ACS R The PERI climbing mechanism is at the heart of The high load capacity of the building authority Climbing device with 100 kN lifting
all ACS variants. The positively-driven pawl system approved PERI climbing anchors allows climbing
standard system with carriage and open formwork at the power
operates automatically and safely with a lifting to take place shortly after concreting. The optimal
top for easy installation of the reinforcement speed of 0.5 m/min. climbing shoe and anchor type are determined for Positively-driven and jerk-free climbing
Platform System ACS P each individual project. 0.5 m/min lifting speed, 0.3 m/min
for high-rise building cores constructed in advance and effective climbing speed
tower-like structures with generously-sized storage and Climbing can take place outside of
structures; both formwork sides are attached to the enclosed working platforms
cantilevered gallows Climbing shoes and anchor types
Adjustable Version ACS V optimized for project-specific factors
for inclined structures such as bridge pylons or piers, with such as building structure, load, wall
platforms always in a horizontal position thickness and required concrete strength
Shaft Formwork ACS S
for stairways or small elevator shafts, aranged in the centre
each time
118 119
Civil Engineering Technology
Formwork for bridge and tunnel construc- For tunnel construction, a distinction is Selection criteria for formwork solutions
tion is complex and usually features a made between realization in an open exca- in tunnel or bridge structures
combination of (heavy) shoring and vation pit and underground using mining
project-specific formwork. The planning techniques. The tunnel tubes can be con- Construction procedure, method and
must include the entire construction tructed monolithically, semi-monolithically sequence
process which is particularly influenced or with separately cast cross-sections. Structure geometries and dimensions
by the construction method and proce- The length of the tunnel and the geological Boundary conditions, e.g. building
dure as well as structural dimensions. conditions significantly determine the ground and dimensions of the excava-
choice of construction procedure. Each tion, assembly possibilities for shoring
For bridges, the geographical constraints formwork carriage is planned according Possibilities of crane use for shuttering
and construction procedure significantly to the respective project requirements and and striking, moving of formwork units
determine the formwork solution. It is the user can choose between mechanically Operation requirements (mechanical or
possible that realization of the superstruc- and hydraulically-operated solutions. with hydraulic/electrical support)
ture can be carried out using falsework, Number of cycles and construction time
the incremental launching method, with a For improving the cost-effectiveness of requirements
mobile falsework, steel composite method the individual formwork solutions in civil
or the balanced cantilever method. For engineering projects, modular construction
all variants, system solutions have been systems have been developed that aim to
developed which are in essence adapted achieve the highest possible number of
to suit the geometrical boundary conditions uses of the system components and the
of a bridge. minimization of special parts.
120 121
The VARIOKIT Concept The VARIOKIT Engineering Construction Kit Civil Engineering Technology
Supporting structures cost-effectively erected with system Solutions for framework constructions
with materials and expertise from a single source
122 123
The VARIOKIT Engineering Construction Kit Civil Engineering Technology
The diagonal strut is installed using standard connec- The walls and slabs of this tunnel are constructed one ... four tunnel slab carriages follow. Dispensing with the
tions in the slab beam. The regular hole pattern in all after the other. A wall formwork carriage moves on use of hydraulic elements was the most economical
system components provides many connecting possibili- ahead, ... solution for this project.
ties and therefore a high level of flexibility.
The lifting and lowering device allows the tunnel slab The PERI concrete pump connector is compatible to the Suppliers, e.g. for vibration equipment, provide
carriage to be hydraulically lifted into the concreting TRIO and MAXIMO panel formwork systems as well as matching accessories for the required connections to
position and then subsequently lowered. the VARIO GT 24 girder wall formwork. the widespread VARIOKIT solutions.
VARIOKIT allows customized tunnel form- Tunnel formwork carriage for the
work carriages with standardized compo- cut-and-cover method Standardized system components in a
nents for each tunnel construction method Solutions for the monolithic, semi-mono- range of lengths for project-specific form-
and every cross-section. Additional compo- lithic and separate casting methods work carriage solutions
nents, e.g. for lifting, lowering and moving Tunnel formwork carriage when using VARIOKIT struts for continuously-adjusta-
are likewise available as well as required mining techniques ble use from 4.00 m to 9.00 m
technical accessories such as a concrete Solutions for the monolithic and seperate Small number of type-tested connections
pump connection. casting methods and standardized loads per connection
type
Continuously adjustable Fast, site-compliant assembly
Height adjustments and gridless assembly Simple modification procedure for all
variants for a wide range of tunnel cross- required adjustments to match the tunnel
sections cross-section
User-friendly Few anchors required in wall areas due to
Optional with hydraulic support for shuttering system walers up to UU 200
and striking as well as lifting and lowering Optionally available hydraulic support for
Economical shuttering and striking as well as lifting
Fewer anchors in the wall areas due to high and lowering
load-bearing system walers Electrically-driven or mechanically-operated
solutions for moving
124 125
The VARIOKIT Engineering Construction Kit Civil Engineering Technology
126 127
Special Formwork
Occasionally, there are requirements For multiple use of formwork, e.g. the
placed on formwork solutions which monolithic construction of walls and slabs,
cannot be fulfilled with system formwork solutions are also available which are used
on the jobsite. The reasons for this could for high number of repeat uses with
be particularly complex forms or special pre-assembly according to project require-
construction methods. In these cases, ments only required once.
project-specific prefabrication facilitates
cost-effective on-site implementation.
128 129
UNO for the Monolithic Construction Method Special Formwork
The UNO system has been designed to accommodate a hydrostatic fresh concrete pressure of 80 kN/m.
This facilitates rapid concreting operations.
Connecting the pre-fabricated wall elements is carried out The unique tie technology allows installation to take The striking procedure is quick: It begins with the removal
with the UNO wall wedge coupler. The wedge is quickly place from one side. Only when tightening the tie is a of the wall panels and wall/slab transition element and is
and easily fixed in position with one blow of a hammer. wrench (SW 19) needed. completed with the dismantling of the slab panels.
130 131
3D Formwork Units Special Formwork
Precision-made for
an individual design
Custom manufactured
On the basis of a 3D model, precision man-
ufactured under optimum conditions in the
stationary PERI formwork construction
Cost-effective realization
Extremely economical with a high propor-
tion of system components from the PERI
product portfolio
Fast assembly
Easy and simple assembly of prefabricated
formwork elements on the construction site
similar to a system formwork
For virtually all building shapes that can only be realized with a project-specific
formwork
Formlining screwed on at the rear for architectural concrete requirements
Designed for a permissible fresh concrete pressure in accordance with project
requirements
Designed while also taking into account site-specific boundary conditions for the
assembly
Cost-effective realization with a maximum proportion of common, rentable sys-
tem components
Thanks to the assembly under stationary conditions of high production quality
Complex shapes, architectural concrete surface require- On the construction site, the prefabricated formwork During the planning phase, the use of system compo- The 3D formwork units are built on VARIO basic ele- These inclined reinforced concrete towers with different The south side of this building extends in the form of a
ments with economically feasible prefabricated form- units can be assembled in a similar way as for system nents, e.g. GT 24 girders or VARIOKIT steel walers, is ments. The individual components can be used for other cross-sections and varying radii were realized with cus- radius; at the same time, the reinforced concrete wall
work units. formwork. maximized. applications after being dismantled. tomized VARIO GT 24 elements. on the ground floor inclines up to 35 on the inside.
132 133
System-Independent Accessories
Numerous smaller items of construction by the fact that there is often an unsatisfac-
equipment ensure that a wide range of tory execution result.
supporting formwork and scaffolding
work on the construction site can be car- Formwork girders, safety systems and con-
ried out easier and quicker. Proven struction equipment are also being con-
wooden formwork girders and stopend stantly optimized and adapted to meet
systems are just two examples of prod- changing requirements. This results in
ucts that are used almost on a daily numerous clever detailed solutions with
basis but are rarely in the spotlight. The functionalities that accelerate working oper-
creation of safe working areas is also ations and avoid improvisations often
often considered as a sideline activity. being very reliable over many years.
Often overlooked or viewed as unimportant, Therefore, the quality of the materials used
system-independent accessories play an along with the production processes are of
important role in every project. If the equip- great importance during the development
ment is not available, then makeshift meas- and manufacture. New materials and pro-
ures are implemented with all the disad- duction methods likewise lead to further
vantages, e.g. very time-consuming as well developments such as innovative ideas for
as the risk of injury. This is often aggravated even easier handling during day-to-day oper-
ations on the construction site.
134 135
GT 24 Formwork Girder VT 20K Formwork Girder System-Independent Accessories
The versatile lattice girder with high load-bearing capacity The cost-effective solid web girder
The struts penetrate the chords along the whole The girder nodes with mini-dovetail jointing guarantee For applications with the GT 24, fewer girders, steel Robust steel caps on the chord ends provide reliable The girder with a 20 cm overall height was developed MULTIFLEX slab formwork with VT 20K girders. The use
cross-section. There are practically no cavities which the durability of the GT 24 lattice girder. waling or slab props are required. This results in material protection against damage. Securing of the steel cap specially for slab formwork operations where it is used as main and secondary beams simplifies material
could collect and hold moisture. and labour cost savings. has been intentionally done in the unstressed area of as a secondary and main beam. requirements and planning.
the web.
The GT 24 formwork girder provides a high The PERI VT 20K is the cost-effective,
load-bearing capacity and rigidity. During Universal wooden formwork girder The certificate of conform- 20 cm high solid web girder. Robust steel Universal wooden formwork girder The certificate of con-
ity shows that the GT 24 formity shows that the
use in wall, column and slab formwork with a 24 cm overall height for wall, girder corresponds to the
caps on the ends of the chords along with with a 20 cm overall height, opti- VT 20K girder corre-
systems or with special formwork, material column and slab formwork, for set- technical rules of the concave web end provide reliable pro- mized for use in slab formwork sponds to the technical
usage and workload can therefore be ting of stopend formwork on slab DIN EN 13377 and that tection against damage. The 8 cm wide operations, cost-effective use also rules of DIN EN 13377
continuous production and that continuous
reduced with the girder. edges and special applications monitoring is guaranteed.
chords also provide sufficient width for for special solutions production monitoring is
18 standard lengths from 0.90 m to plywood joints. 11 lengths from 1.45 m to 5.90 m guaranteed. In connecion
High load-bearing 6.00 m in 30 cm increments, extra- Weight: 5.90 kg/m with the PERI user infor-
mation, building authority
As lattice girder with a 24 cm overall height long lengths up to 17.85 m on Robust Permissible bearing force: 11.00 kN
approval is no longer
for heavy loads and wide spans request With steel caps on the chord ends and Permissible bending moment: required.
Durable Weight: 5.90 kg/m concave web ends 5.00 kNm
Robust design, girder nodes with mini- Permissible bearing force: 28.00 kN Dimensionally stable Bending stiffness:
dovetail jointing, no trapped pockets of Permissible bending moment: With chords made of high-quality softwood EIx = 460 kNm
The GT 24 lattice girder
moisture 7.00 kNm has been approved by the and highly compressed web board with a Ix = 4.181 cm4
Compatible Bending stiffness: German Institute for Building authority high proportion of synthetic resin
Building Technology (DIBt). approval
Easy connection of site accessories through EIx = 887 kNm Universal
the latticework construction Ix = 8.064 cm4 Used cost-effectively for many applications
136 137
PROKIT EP 110 System-Independent Accessories
138 139
FTF Facade Formwork Pallets and Crate Pallets System-Independent Accessories
Versatile construction for the realization of building facades For safe transportation and optimized
with prefabricated components storage
PERI FTF is used for the construction of PERI offers reusable transport containers
building facades with prefabricated compo- for fast, safe and economical materials
nents for either fixing the elements while transportation. These include system-free
work is carried out on the slab or for simul- pallets, large-sized pallets, stacking devices
taneously concreting an in-situ column as well as wire crates and hardware boxes.
which connects the two prefabricated parts. All containers provide orderly material stor-
Most of the components are taken from the age, space-saving stacking, rapid access to
VARIO and SRU systems; FTF requires only materials and the safe transport with a fork-
few additional components. lift and/or crane.
Variable
Easily adaptable to a wide range of building
geometries, and is used with or without
column formwork
Strong
Accommodates standard prefabricated
component dimensions without any inter-
mediate supports
Safe
Special system components save time for
the assembly of working platforms and
guardrails
140 141
Construction Site Equipment System-Independent Accessories
Slab Stopend Bar 105 Formwork Bracket-2 PERI Wall Clamps 55, 75, 105
For shuttering of up to 50 cm thick For forming cantilevers up to 50 cm For forming of up to 90 cm wide
slabs flush with the wall and vertical stopends up to 30 cm strip foundations and small beams
Parallel alignment to the wall by With the self-cleaning, robust
means of the adjustable spindle square-shaped thread on the
Safe lateral protection in combination clamping arm
with the PERI guardrail posts Friction-locked fine adjustment with
the quick jack nut without wedges
50 cm
max.
30 cm
max.
max.
48 cm
max. 14 cm
142 143
Plywood Formlining System-Independent Accessories
The surface quality for slab formwork varies according to Here, the architect provided the specifications for the The PERI plywood programme includes many other
systemic-dependent frame impressions as well as the plywood format and tie arrangement. VARIO GT 24 types of plywood and formlining sheets for a wide range
quality of the plywood format used and its arrangement. customized elements were used with the plywood of requirements, including lightweight formliners or
being screwed on at the rear. inexpensive shuttering plywood.
144 145
Services
In order to use formwork and scaffolding return delivery of materials, any required
systems in a targeted and efficient way, briefings for the users and the continuous
different requirements have to be ful- monitoring of material requirements all of
filled. This includes, among other things, which is continually adapted to suit the
project-specific work preparation, provi- actual construction process, often with
sion of ideally-suited equipment or con- many changes. And with the completion of
tinuous monitoring of the material quan- the project, all materials have to be cleaned
tities used. or possibly repaired ready for the next use.
At the beginning of every project, an analy- There are therefore a wide range of tasks
sis is carried out regarding the requirements which require not only extensive knowledge
of the formwork and scaffolding solution. and experience, but also trained experts,
At the same time, the planning must not corresponding machinery and work space
only fulfil project-specific boundary condi- as well as software solutions. If such
tions but also take into consideration the accompanying activities are carried out
individual demands of the execution. Cost- carefully and on time, the economic effi-
effectiveness as well as safe and site-com- ciency of the project implementation can
pliant application must likewise be included. be further increased.
146 147
Technical processing for formwork and scaffolding projects Services
For planning scaffold structures, there are a range of PERI provides comprehensive solutions for every build- Where necessary, test structures are designed prior to PERI engineers also support the realization on the con-
requirements to be fulfilled, e.g. as with this complex ing. The first step is planning a solution with PERI CAD. the delivery of the materials in order, for example, to struction site so that the planned solution is efficiently
suspended scaffold. test the functionalities of a tunnel formwork carriage. implemented under everyday jobsite conditions.
148 149
PERI ELPOS PERI CAD Services
The fast and easy software for standard applications The professional program for
experienced CAD users
Fast and easy planning aid for daily For professional formwork and
work preparation with PERI form- scaffolding planning
work and scaffolding systems AutoCAD Architecture-based
Users only need basic computer application
skills With diverse PERI tools for the
Automatic support for PERI standard planning of PERI formwork and
systems and basic functions for scaffolding systems
manual adjustments
Simple icons and intuitive operation characterize the ELPOS software. The design is very simple and fast for every PERI CAD also delivers professional formwork plans and plan drawings for elaborate details and structures.
user even those with no CAD experience.
With ELPOS, the use of PERI formwork and Less time required PERI CAD is the ideal tool for experienced Detailed planning
scaffolding systems can be planned quickly With automatism and an electronic component catalogue CAD users and is used for a very wide Also for complex structures
and easily without any CAD knowledge, Optimized material utilization range of tasks from planning simple Clear presentation
ranging from simple basements to multi- Through project-related adaption of material requirements to match cycle implementation ground plans with standard systems to Clear and detailed plans thanks to 3D-elaborations and visualizations
storey buildings. The results of the planning Safe execution developing solutions for the most compli- Reduced costs
are practical drawings and project-related With easy-to-understand plans cated engineering works. PERI CAD Through the accurate planning of quantities and optimized construction sequences
parts lists which optimize and accelerate requires the Autodesk Architecture soft-
the execution on the construction site. ware.
16 17 18 19 20 21 22
835 20,25
1,50 1,50 1,50 75 1,50 16 60 19 1,50 1,50 75 1,50 16 60 23 1,50 1,50 1,50 75 1,50 14525
30
2,93
1000
+7,79 m
+7,55 m +7,55 m +7,55 m
1200
1100
Arbeitsebene/ Bohlenbelag bauseits! Arbeitsebene/ Bohlenbelag bauseits! Arbeitsebene/ Bohlenbelag bauseits!
1200
285
700
+7,49 m
1972
6906,7
+4,39 m
- Betonierrichtung -
+4,09 m
7,465
Diagonale Diagonale Diagonale Diagonale Diagonale Diagonale Diagonale Diagonale Diagonale Diagonale Diagonale
www.peri.de
D PE RI 1
"A13" "A13" "A13" "A13" "A13" "A13" "A13" "A13" "A13" "A13" "A13"
-0,20 m -0,20 m
1,50 1,50 1,50 75 1,20 31 90 34 1,20 1,50 75 1,20 31 90 38 1,20 1,50 1,50 75 1,50 145 25
1,01
150 151
3D Planning Field Service Services
152 153
Rental Parks and Distribution myPERI Online Portal Services
The best material in the right quantity, Faster and easier access to project data
at the right time, in the right place around the clock
Through the renting of material, not only The online portal provides PERI customers
are peak requirements cost-effectively cov- with comprehensive product information on
ered. Also for out-of-the-ordinary applica- all PERI systems as well as specific project
tions, renting the appropriate system equip- data of PERI construction sites. For every
ment is the most suitable option. PERI has project, a wide range of data and analyses
more than 110 logistics locations world- is available around the clock. Detailed
wide, and reliably delivers to the respective records of delivered quantities as well as
construction site. Through an organized return deliveries provide information about
exchange of materials, very large material current inventory levels. In addition, the
quantities can also be made available for portal contains many other useful functions,
exceptional orders. PERI reduces the capac- e.g. the creation of illustrated return deliv-
ity utilization risk for the customer and also ery notes.
ensures consistent quality of formwork and
scaffolding systems. myPERI project access
Access to all data of a construction site
Optimal stock availability myPERI customer access
Through a large rental equipment park with Access to information on all ongoing
numerous locations around the world building projects at customer level
Safe transportation
Thanks to optimized standard packaging Provides an overview
with cranable pallets and crane pallets Project data, material and costs with the
Uninterrupted construction sequences help of clearly presented reports at a glance
Due to flexible reaction times of the PERI Simplifies work processes
rental park Helpful support through useful work aids
and templates in all phases of the construc-
tion progress
Regularly updated
Information is always up-to-date and the
numerous evaluation options per mouse
click also saves time Construction sites, materials and costs at a glance per mouse click
Clearly presented reports and invoices
Useful templates, e.g. illustrated return delivery notes
Visual support of the construction progress
Product brochures, instructions for assembly and use in many languages
Individually configurable access authorization
In myPERI, all technical documents are available - as a The use of myPERI also facilitates return deliveries. components on the return delivery notes, the elements
PDF file for download, for every user in many languages. Through the additional graphic drawings of the system to be returned can be quickly and correctly identified.
154 155
Formwork Assembly Cleaning and Repairs Services
From plywood cut-to-size through to complex 3D elements A special service for special systems
customized to suit all project requirements
PERI produces cut-to-size plywood panels Perfectly assembled Due to the high demands placed on form-
and special formwork of all kinds - from Adapted to match the component or structural shape work materials, regular maintenance is
simple formats and box outs to 3D form- With high quality essential for ensuring good execution
work units for once-only applications. All Best quality finish due to stationary prefabrication using state-of-the-art plant engineering results. PERI provides professional cleaning
customized elements are produced in the and well-trained, experienced personnel and repair services at many locations world-
required quality and suitable for the planned Produced just-in-time wide and thus safeguards the upkeep of the
number of uses. Assembled on-time according to construction progress and delivered to the construction customers stock of materials over a long
site period.
Individually coordinated
Definition of the required services accord-
ing to the state of the materials with the
The CAD planning data is sent directly to the CNC PERI experts Smaller areas of damage to the formlining, mostly The bearing surfaces of the frame are cleaned and
caused by concrete vibrators, are repaired if required straightened before the new formlining is installed.
machine. Here, individual panel cuts as well as the indi- Professional repair service with repair veneers. These are permanently glued and
vidual components for more complex formwork units
With the very latest plant technology and sit flush with the surface.
are created.
PERI specialist personnel
Fast processing
Formwork units made of panel materials according to customer requirements Rapid processing and return deliveries RS Cleaning Service scope of service: mechanical cleaning, removing concrete
CNC panel cuts in any geometrical shape thanks to PERIs network of service centres from plugged tie points and other holes, repairs to the plywood
VARIO special formwork, straight or curved RK "Small" Repair Service scope of service: individual coordination of the scope
Assembly and dismantling of PERI system formwork of service, exchange of plywood, cleaning of the bearing surfaces, installation of
Wall, slab and bottom slab recess units plywood with permanent elastic joints
2D or 3D additional infill spaces as well as complex formwork units according to "Large" Repair Service scope of service: "Small" repair service as well as addi-
individual requirements regarding shape, type of formlining and planned number of tional frame repairs, sandblasting, application of original PERI powder coating
uses
156 157
Reference Projects
158 159
Housing and Multi-Storey Projects
160 161
Residential and Office Complex at the Nordbahnhof, Housing and Multi-Storey Projects
Vienna, Austria
Saving time with MAXIMO and SKYDECK
The one-sided tie installation procedure of the MAXIMO The SKYDECK construction with main beams and panels
panel formwork reduced shuttering times as well as provides a systematic assembly sequence and creates
ensuring that a neat joint and tie arrangement was space under the formwork.
achieved.
Contractor
Universale Hochbau, Trumau
Field Service
PERI Ges. mbH Austria, Nussdorf ob der Traisen Office
Jrgen Pischof
Site Manager
162 163
Detached House, Dusslingen, Germany Housing and Multi-Storey Projects
Faster MAXIMO use planned with ELPOS: as a result, Forming can be carried out much quicker due to the anchor technology The combination of tension and
element arrangement and material requirements could with ties installed from one side, the saving of spacer tubes and compression brace together with
then be optimised. reduced number of tie points. centrally-positioned tie points replaces
the bottom row of anchors for founda
tions, parapets and downstand beams.
Flexibility and time advantages influenced reduced formwork requirements on the of working steps and tie points will have an
the decision to invest in the MAXIMO jobsite. In addition, the MX tie technology even greater effect. Furthermore, the central
panel formwork; in addition, the concrete with ties installed from one side and the arrangement of the tie points means that
surfaces can also be provided with a better use of proven BFD alignment couplers saved foundations, parapets and beams no longer
design through the neat joint and tie valuable time. For subsequent projects espe have to be anchored in the bottom, often
arrangement. cially with high wall sections, the reduction heavily reinforced area.
164 165
Administration Building, Banco Ciudad de Buenos Aires, Housing & Multi-Storey Projects
Argentina
Large undulating roof efficiently formed
20.40
Construction of the 94 m wide undulating slab was car
16.00
13.00
ried out longitudinally using six sections, each with 16 m
concreting cycle lengths.
96.50
166 167
Housing Development, Los Portones de Linares, Chile Housing & Multi-Storey Projects
Contractor
Galilea S.A. Ingeniera y Construccin, Talca
Field Service
PERI Chile Ltda.
Completion of the 350 houses was carried out in regular 2-day cycles.
With the help of the UNO formwork, were required for the complete shuttering
350 residential buildings could be mono- work including cleaning and transport to the
lithically constructed in 2-day cycles, next place of operations. As the walls are
while the walls and slabs of an entire struck before the slabs in the UNO system,
floor were concreted in one pour. time-consuming temporary storage for the
slab panels was not required.
The new housing estate on the outskirts of
the Chilean city of Linares is comprised of For each building, 237 m and 205 m of
350 homes. The ground floors were com wall and slab areas respectively were to be Pedro Letelier
pleted using a monolithic in-situ concrete formed. The walls were formed after the Project Manager
construction and the top floors realized as reinforcement was in place and the electri
timber frame constructions. Due to eco cal and sanitary installations had been pre The market for concrete-designed
nomic considerations, there are only two pared. The small number of anchors houses will grow enormously in the
floor plan versions. reduced the work involved for cutting the coming years and with the UNO,
reinforcement and, with tubes not being PERI is optimally equipped. We took a
For monolithic forming, the construction required due to the conical tie design, time close look at a number of systems and
team used the lightweight aluminium UNO and material costs could also be saved. At chose PERI because of the simplicity
system which allowed the walls and slabs the same time as the slabs were shuttered, and speed. The results are excellent
to be constructed in one pour. For this, the slab reinforcement and installations also thanks to the individual support
PERI Chile delivered two sets of formwork were being supplemented. we received.
with project-related prefabricated system
elements. In order to be able to concrete an
entire house every second day, only 4 men
168 169
Technology Centre, Falkenberg School, Sweden Housing & Multi-Storey Projects
Kjell Andersson
Site Manager
Contractor
Tage & Sner, Halmstad
Field Service
PERIform Sverige AB, Halmstad
PERI GmbH Germany, Weissenhorn Office
26.70
Due to the flexible adaptability of the the facade and roof whilst the extensive area: wide access points on the longitudinal
PERI UP modular scaffolding in combina- thermal protection measures also demanded sides allowed easy truck deliveries, RCS PERI engineers took into account the integration of a The PERI complete housing construction was 51 m
The weather protection roof on the basis of the LGS gantry crane with a 10 t lifting capacity in their scaffold long, 34 m wide and 26 m high for high quality of
tion with system components taken from the highest quality of construction work. climbing rails served here as bridging girders.
lattice girder system had a span of 26.70 m. concept. execution of all constructional measures.
the PERI programme, all requirements
regarding the enclosure, accommodating With the help of the LGS weather protec Accommodating and transferring the loads
the gantry crane and working scaffold tion roof and the enclosure on the basis of from the crane track into the scaffold was
for the insulation work could be fulfilled the PERI UP Rosett Flex modular scaffold carried out via
SRU steel walers. In order to
with only one scaffold construction. ing system, construction work throughout adapt the load-bearing system to handle the
was provided with full protection against load concentrations, legs were bundled by
The four-story NTC building (NTC = Natur external weather conditions. In addition, an means of 25 cm ledgers. RS 1400 push-pull
vetenskapligt och Tekniskt Centrum) has an important element of the PERI solution was props from the PERI product portfolio stabi
area of 3,500 m, and was designed and the integration of a gantry crane in the scaf lized the scaffold construction at spacings
constructed as a passive house. Maximum fold construction. Furthermore, the entire of 6 m.
use is made of solar and wind energy on material transport took place in the protected
170 171
Ocean Plaza Business Centre, Kiev, Ukraine Housing and Multi-Storey Projects
The right system equipment, optimized on-site material requirements and comprehensive support For transferring loads over several floors, PERI UP shoring
accelerated the construction progress of the modern, four-storey complex in downtown Kiev. towers were assembled and used as a spatial load-bearing
structure up to 13.80 m high.
172 173
Jaber Al Ahmad Al Sabah Clinic, Kuwait City, Kuwait Housing and Multi-Storey Projects
Serry Sulayman
Assistant to Chairman
Project Director
For one of the largest construction With 1,168 beds, the Jaber Al Ahmed Al to take into account the complex geometries time for the construction of the up to 65 m Contractor
Arab Contractor Osman Ahmed Osman & Company
projects in the Middle East, by exactly Sabah Clinic in Kuwait City is one of the along with high demands placed on the high core walls of the hospital ward build Field Service
matching project requirements along largest and most modern hospitals in the concrete surface qualities. Reliable, stable ings. Through crane-independent shuttering, PERI Kuwait
with the availability of large quantities Gulf Region. The seven-storey main building system components ensured a consistent striking and climbing, on-site working oper
of materials, this ensured that the is surrounded by five hospital wards quality and continuous construction progress ations could be significantly accelerated.
extremely short construction schedule arranged in the shape of a star which have without any interruptions.
could be maintained. up to 14 floors and are almost 65 m high.
In addition, the clinic complex has three Using the easy-to-install TRIO panel form
underground parking levels with a total of work, for example, short shuttering and With or without the crane: the TRIO column formwork
Five 14-storey hospital ward buildings are arranged 7,000 parking spaces as well as several striking times could be realized for the core With very few individual components and only one could be used for columns and walls, whilst forming
around the central main building which also features three connecting means, the TRIO panel formwork ensured could be done manually with LICO if the crane was Due to the large room heights of up to 5 m, the slab
outbuildings and one technical building. and stairway walls in particular as well as
underground parking levels for 7,000 parking spaces. fast forming of the internal walls. unavailable. tables were supported by means of PEP 20-500 props.
For the entire construction project, around realizing fast moving operations. External
650,000 m of concrete had to be formed walls with variable dimensions and curved
on schedule and cost-effectively. shapes were economically constructed with
the VARIO GT 24 girder wall formwork.
In order to maintain the tight construction For forming the rectangular columns, LICO
schedule in spite of the extraordinary column formwork and TRIO columns were
dimensions, large quantities of formwork used with lightweight individual compo
materials were required. The PERI project nents and fast concreting cycles even
solution included optimum system use each without any crane support.
time coupled with matching on-site material
requirements to suit the construction The use of ACS self-climbing formwork
schedule. Furthermore, PERI engineers had resulted in a significant reduction of crane
174 175
Prosta Tower, Warsaw, Poland Housing and Multi-Storey Projects
Rafat Rusek
Project Manager
176 177
Skyscrapers and Towers
178 179
De Rotterdam, Rotterdam, Netherlands Skyscrapers and Towers
The Rotterdam-based architect, Rem beam heights in the West Tower, transferring The construction team only required eight
Koolhas, gave his high-rise ensemble the large loads from the 8.88 m cantilevers days for one complete standard floor. For
a huge jolt this resulted in placing for two complete floors of the building and the floors in the base section, a high degree
high demands on the construction work. the low 3.52 m height of the storey below of safety was ensured using cantilevered
Therefore, the supporting structure had to be taken into consideration. For the SLT 375 main beams and SKYDECK plat-
concept for realizing the cantilevers at a Central and East Towers, a double-storey forms, also at the slab edges. For the large
height of 86 m was an essential part of could be used for this purpose here, the supporting heights reaching over several
the comprehensive PERI overall solution. supporting formwork solution also served floors, the construction crew combined
as a supporting structure between the SKYDECK with the MULTIPROP load-bear-
The largest building in the Netherlands is floors. Extensive know-how was also used ing scaffold.
situated in the immediate vicinity to other to good effect in the beam extensions
architectural highlights such as the Erasmus after the inherent load-bearing capacity
Bridge by Van Berkel & Bos, the inclined of the building had been reached. For this
high-rise building by Renzo Piano and the purpose, the construction site crew used
World Port Center by Sir Norman Foster. the PERI lifting carriage taken from the
3.02
The 150 m high multi-storey ensemble SKYDECK large slab table system. By
consists of three complex-designed office, means of a crane lift, a special chain block
hotel and residential towers standing side system and rear carriage, the shear frames
by side and connected to each other. At the were pulled horizontally from the building.
halfway point, the structure is characterized
by a huge jolt in the form of a horizontal With the RCS P climbing protection panel,
offset to the west and north. Thus, at a site personnel were prevented from falling
height of 86 m, the 24th and 26th floors at all times and protected from strong
respectively along with the remaining winds at great heights this meant forming
3.24
upper storeys cantilever outwards in part operations were accelerated along with an
almost 9 m. enhanced work performance. With SKYDECK,
floor slabs could be formed without the 8.97
In particular, the PERI supporting formwork need of a crane; in particular, with striking
solution for realizing the cantilevered sec- being carried out manually as well as the
tions was an important component of the systematic assembly sequence, construction
overall concept. The shear frames were processes were accelerated. In addition,
based on the VARIOKIT engineering con- through the use of the drophead and the
struction kit with rentable system compo- possibility of early striking, the amount of
nents, supplemented by project-specific panels and main beams required on site
construction bracing. For dimensioning the was reduced.
180 181
Bosco Verticale, Milan, Italy Skyscrapers and Towers
The irregular-positioned cantilevered, Regarding environmental and climate pro- direct sunlight whilst additionally reducing
reinforced concrete balconies of the tection, Italian architect Stefano Boeri, went carbon dioxide levels and simultaneously
Milan office and residential complex are his own way with his concept of an ecologi- producing oxygen.
planted with numerous trees and shrubs. cal high-rise building aligned with nature:
With the help of the PERI formwork and he designed the two 87 m and 119 m high In order to be able to realize the building
scaffolding solution, the floors could be residential structures with massive balco- ensemble whilst maintaining a very tight
realized with extremely fast concreting nies and subsequently planted these with construction schedule, PERI developed a
cycle sequences in spite of the unique- 664 trees as well as over 4,000 shrubs and customized formwork and scaffolding con-
ness of the architecture. bushes a vertical forest in the middle of cept in particular for the cantilevered bal-
Milan. These provide protection against conies on all four sides and the floor slabs.
noise, dust and wind as well as against The project solution, which was based on
Massive reinforced concrete balconies cantilever out- PERI engineers combined rentable construction kit sys- VARIOKIT framework units, consisting of system
wards for 3.35 m in an irregular fashion on all four sides tems to create a customized formwork and scaffolding components, carried the fresh concrete loads from
of the building. solution. the balconies and accommodated the RCS protection
panel construction for the upper floors.
Ferdinand Platter
Technical Director
0.28
Together with PERI engineers, we developed a very
effective and efficient solution for this unique project.
4.00
In addition, PERI supported us with the organization
and implementation of safety training. This contributed
to increased productivity and a higher level of safety
for the construction crew.
3.35
Contractor
ZH General Construction Company SPA, Sand in Taufers
Field Service
PERI S.p.A. Italy, Basiano
RCS rail climbing technology and the addition, PERI engineers combined the often had to be transferred over the height
PERI UP scaffold system as well as the framework with the RCS protection panel of several floors, especially on the corners
integration of customers own SKYDECK construction. This served as a secure enclo- of the structures. For this purpose, PERI UP
panel slab formwork, resulted in extremely sure and protection against falling for each Rosett shoring towers were flexibly adapted
fast concreting cycles: only 10 days were of the top two floors under construction. to the different supporting heights which
required for each floor. With the help of the project-specific moving reached heights of over 20 m. On the inter-
procedure using a crane and electric cable mediate floors, RCS landing platforms were
The massive, 28 cm thick reinforced con- winch, units can be pulled from the build- utilized for moving building materials with
crete balconies with 1.30 m high parapets, ing. As a result, an entire floor comprising help of the crane. These cantilever 6.35 m
cantilever outwards to a length of 3.35 m. 18 framework units could be moved within beyond the buildings edge.
VARIOKIT framework units from rentable only half a day, followed by the shaft plat-
PERI system components carried the fresh forms and shoring towers. Due to the irreg-
concrete loads from the balconies; in ular arrangement of the balconies, the loads
182 183
The Bow, Calgary, Canada Skyscrapers and Towers
The direction of the decks can be changed within a The staircase meets high load and accessibility require- The rosettes allow connections of up to 45 so that High level of safety for all work carried out by the
scaffold bay at any point which increases the flexibility ments with permissible load of 3.0 kN/m and 1.00 m the scaffolding can be optimally adjusted to match the sub-contractors: with PERI UP Rosett Flex, working
of the system. wide stairways. crescent-shaped atrium. platforms could be adapted to suit to the complex,
curved steel structure.
63.40
The 236 m high office tower, The Bow, at distances of 2.50 m over the entire
is shaped like a crescent and the most height of the building was requested.
striking feature of the building is the One of the most important requirements
diagonal arrangement of the steel sup- to be fulfilled for all sub-contractors was
port structure. A sophisticated PERI UP to ensure that the working platforms were
scaffolding concept provided secure as close as possible to the complex steel
access and spacious working platforms structure. Here, the main beams ascended
for all subsequent sub-contracting work at an angle of 76 whilst the front of the
following the completion of the build- building is curved like a crescent. Duncan McMillan
ings shell. Senior Construction Manager
PERI UP Rosett Flex scaffolding could
22.70
The Bow is the headquarters of the be used extremely versatilely. The metric PERI UP has met all the strict require
EnCana Corporation, a company operating grid dimensions along with the 25 cm and ments of the project for access, safety
in the oil and gas industry. Not only does 37.5 cm decking widths provided maximum and efficiency. We are very pleased
the office tower feature an extraordinary flexibility and the Rosett nodes allowed with PERI teams support in the Bow
design but also the building concept which connecting possibilities in all directions. This project.
23.20
was tailored to meet the needs of the flexibility and high load-bearing capacity
employees. Shape and orientation of the with only a small number of diagonals made
building have also been ideally adapted to the scaffold solution quick and cost-effec-
suit the local climatic conditions: a glass tive. For work on the steel construction,
atrium extends in a south-westerly direction the diagonally-positioned profiles had to be
236.00
over the entire building height whilst an accessible from all sides. With bracket can-
23.20
intelligent energy concept ensures optimum tilevers and the use of corner plates for the
utilization of solar energy and minimum inside corners, the working areas could be
energy consumption. adapted with maximum effect to the steel Contractor
Ledcor Construction Company, Calgary
components. In addition, adapting to the Architect
For painting as well as mounting of the fire complex structure was achieved by changing Foster & Partner, London
protection cladding, insulation and installation the direction of the decking: the span direc- Field Service
PERI Formwork Systems, Inc. Canada, Calgary Office
of the piping system, the PERI UP scaffold tion of the decks could be changed within a
solution fulfilled a wide range of require- scaffold bay at any point several times if
ments regarding working area dimensions required.
22.50
184 185
Administration Building, Central Bank of Nigeria, Lagos, Nigeria Skyscrapers and Towers
For the construction of the Nigerian cantilevers with wall returns. The climbing
Central Bank, the formwork units climbed formwork units were dimensioned to ensure
hydraulically with the help of the RCS that they could be used almost unchanged
self-climbing technology; for reasons of over the complete height of the building
space, only three cranes were available. without additional assembly work in spite
Following on from the rapid pace of work, of the geometrical changes in the structure.
the building shell facade was scaffolded For the, in part, only 2.50 m wide shafts,
with PERI UP. the VARIO internal elements climbed all
Rouven Wetzel, Site Manager four walls on only one RCS platform up to
Markus Kalkwski, Project Manager The new administration building of the Cen- the next floor.
tral bank of Nigeria (CBN) is 100 m high and
With the PERI climbing solution, we a facade consisting of aluminium, glass and For installing the natural stone, the facade
have achieved enormous savings in natural stone gives the complex an individu- scaffolding was optimally adapted to per-
crane time which has allowed us to al and distinctive face. The formwork and fectly suit to the complex geometry of the
maintain the very tight schedule whilst scaffolding concept was developed together building on the basis of PERI UP Rosett
only having three cranes on site. with the site management and took into Flex modular scaffold. The scaffold planning
Furthermore, the system used is easy consideration the extreme space constraints was created with the help of PERI CAD
to understand, very versatile and can and limited crane capacity for the shell and software and took into account the varying
be adapted to meet all requirements. finishing work. ground plans featuring numerous projec-
tions and recesses as well as the three
Therefore, the engineers combined the crane towers. Planning work and proof of
VARIO GT 24 girder wall formwork with the stability went hand-in-hand here: this
RCS climbing system to create project- ensured planning reliability and optimum
specific climbing formwork units for realizing material utilization especially for scaffold
the centrally-positioned main core. These sections 100 m high. The standard bay
could be moved without a crane by means lengths featured 1.00 m working widths and
of mobile self-climbing aggregates and 2.50 m long scaffolding bays, whilst
designed for a standard storey height of required length, width and height adjust-
Contractor 4.20 m. In particular, the PERI concept took ments were carried out in 25 or 50 cm
Julius Berger Nigeria PLC
Planning Operations
into account the changing ground plans increments.
Julius Berger International GmbH, Wiesbaden with tapered wall thicknesses and bracket
Field Service
PERI Export Division Nigeria, Frankfurt and
PERI GmbH Germany, Weissenhorn Office
The combination of two climbing systems perfectly matched the on-site requirements: Mobile RCS hydraulic aggregates The 1.00 m wide PERI UP Rosett Flex
RCS self-climbing formwork for the main core and crane-climbed CB 240 for the three reduced the costs incurred for facade scaffold was covered with
stairwell satellite cores. crane-independent climbing. protective netting.
186 187
Donau City Tower 1, Vienna, Austria Skyscrapers and Towers
188 189
300 Front Street Condos, Toronto, Canada Skyscrapers and Towers
The SKYTABLE tables were individually of the quick release device. This allowed for system facilitated flexible adjustments to
adapted to the floor plan geometry with the tables to be pulled out of the building match site-specific requirements: PERI
widths between 2.10 m and 6.00 m as well using the lifting carriage and rear carriage, engineers integrated landing platforms at
as lengths up to 13.70 m. For the dimen- in order to transport them into the next different levels into their protection panel
sioning of the total of 22 tables, the PERI level. No workers were required to walk on concept. One particular feature was that
planning took into consideration all breaks the tables at any time. most of the climbing protection panel units
on the internal walls thereby minimizing were designed so that the upper part could
time-consuming additional formworking The RCS climbing protection panel com- be opened and re-closed for moving the
measures. With only one crane lift, up to pletely enclosed the building edges of the SKYTABLE tables. The folding mechanism
80 m of slab formwork was moved each uppermost floors still under construction. and crane-independent climbing was based
time during this project. After the concrete This safeguarded personnel and passers-by on the mobile RCS climbing hydraulics.
had hardened, relieving the load on the alike and also ensured a higher operational
MULTIPROP props was achieved by means performance. The RCS modular construction
190 191
Evolution Tower, Moscow, Russia Skyscrapers and Towers
With an elegant 150-degree rotation, the Through the spiral-shaped design of the dis- as a climbing protection panel and thus part The units climbed the twisting form of the
Evolution Tower twists its way upwards tinctive rectangular columns on the building of the building enclosure. building in an inclined position also crane-
into the Moscow sky reaching a height corners, the rotational effect is even more independent with the help of the mobile
of almost 250 m. For this, PERI engineers striking. The project-specific PERI self- Core walls and floor slabs were concreted in climbing hydraulics. Likewise, the RCS land-
developed a crane-independent form- climbing formwork concept for the inclined one pour formed with VARIO GT 24 girder ing platforms moved steadily upwards on
work concept based on the RCS and ACS and twisted corner columns was based on wall formwork and customized UNIPORTAL the sides of the building in inclined posi-
self-climbing technology. ACS and RCS system components whilst a slab tables. In order to reach the required tions without any crane support. These
special gallows construction accelerated weekly cycle, the ACS self-climbing system could be easily moved to suit the changing
the shuttering and striking procedures. In facilitated crane-independent working positions by means of adaptable forward
the area of the building
corners, the exter- operations and ensured high productivity. and reverse inclinations.
nal formwork served as slab edge formwork In addition, the three top floors under con-
when forming the floor slabs; in addition, struction were always tightly enclosed with Due to the geometric features of the
the RCS formwork scaffold unit also acted the RCS climbing protection panel. Evolution Tower, with the combined climbing
formwork utilization for the core walls and
corner supports in connection with the
obliquely climbed protection panel and land-
Contractor ing platform, a test set-up was an important
CJSC Renaissance Construction, Moscow
Mehmet Bahadir Ontepeli Field Service
part of the PERI overall solution. This meant
Project Manager OOO PERI Russia, Noginsk/Moscow that the applicability under construction
PERI GmbH Germany, Weissenhorn Office site conditions could be demonstrated and
The good construction result is proof that we selected the right further optimized through fine-tuning adjust-
formwork provider for this unique project. Whether self-climbing ments.
technology for twisted corner columns, diagonally-climbed RCS
climbing protection panel, ACS for core walls, SRS circular col-
umn formwork or the slab table solution for the floors we could
trust and rely on the experience of PERI for all formwork tasks.
192 193
3 World Trade Center, New York, USA Skyscrapers and Towers
4.10
With the ACS self-climbing technology, the placing For the external walls of the 47 m x 43 m building core,
boom and suspended stair towers can also be moved the ACS R variant provides the optimum solution.
upwards without any crane assistance.
In order to achieve an optimal work flow a massive reinforced concrete core with an ate walls to be realized up to the 15th floor,
at Ground Zero, PERI engineers combined innovative safety concept for the elevators crane-climbed CB platforms complement
three ACS self-climbing variants to create and stairwells. With outer dimensions the climbing concept; in addition, the walls
a customized, crane-independent project of 47 m x 43 m, the core of the building and cast in-situ intermediate slabs can also
solution. features very impressive dimensions. be concreted in one pour with the help of
the combined ACS self-climbing technology.
Five years after the terrorist attacks on The project solution of the PERI engineers
11 September 2001, reconstruction work includes a total of 600 running metres of For an optimized and cost-effective planning
began at Ground Zero in Manhattan, New ACS self-climbing working platforms in implementation, three ACS self-climbing
York. Situated around the 9/11 Memorial on order to raise almost 2,500 m of VARIO variants worked smoothly side-by-side:
6.5 hectares, four new skyscrapers are being girder wall formwork from cycle to cycle. ACS R (R = regular), ACS G (G = gallows)
developed: Tower 3, the so-called Three The planned working sequences are hydrau- and ACS P (P = platform). Even the two
World Trade Center, will eventually be 380 m lically driven without requiring a crane and placing booms can be climbed with the
and 80 storeys high. At the centre of the shuttering, striking and climbing can be car- ACS system; steel constructions ensure
office tower with its striking glass facade is ried out in all weathers. For the intermedi- the safe transfer of loads into the building.
Contractor
Sorbara Construction, Lynbrook
Field Service The massive reinforced concrete core of Tower 3 is
PERI Formwork Systems Inc. USA, Chicago and New York Offices steadily gaining in height located right next to the
PERI GmbH Germany, Weissenhorn Office New York 9/11 Memorial.
Albert DeRoss
Project Superintendent
194 195
Torre Isla Cartuja, Seville, Spain Skyscrapers and Towers
Due to the special geometry of the The up to 12 m long customized slab tables were pulled The slab tables with foldable internal formwork could The internal and external formwork were connected to
horizontally out of the building using the SKYTABLE lift- already be positioned while the core walls were still the internally-climbed ACS system to form crane-inde-
building and the tight deadlines, we ing carriage. shuttered. pendent, self-climbing units.
decided in favour of the PERI systems
and engineering. Together with the
PERI engineers, we were able to
develop the right solutions for faultless
and problem-free construction work.
For the elliptically-shaped and tapered
multi-storey building, PERI Spain provided
an ideal mix of cost-effective system
application, a project-specific customized
4.20
special solution and logistical services.
As a result, the respective optimal form-
Contractor work and scaffolding technology was
U.T.E. Torre Isla Cartuja, Seville
FCC Construccion S.A.; Instalaciones Inabensa S.A.
available for the construction team at
Architect the requested time and in the required 30.50
Pelli Clarke Pelli Architects quantities.
Field Service
PERI S.A. Spain, Seville Office
The 178 m high skyscraper on the Isla
Cartuja is the new landmark in Seville and
the tallest building in Andalusia. It is
With the help of the PERI solution, the core walls and designed by the architect Csar Pelli and
floor slabs could be realized one after the other without
provides stunning views of the Andalusian
any delays.
capital.The elliptical tower ground plan
tapers upwards with the 37 floors being
arranged around a central, likewise elliptically-
shaped, reinforced concrete core.
196 197
Vila Olmpia (VIOL) Administration Building, So Paulo, Brazil Skyscrapers and Towers
Enrico Capecci
Site Manager
198 199
Meier-on-Rothschild Apartment Building, Tel Aviv, Israel Skyscrapers and Towers
3.60
The ACS P (P = platform) self-climbing formwork
was a compact and complete forming machine
for the centrally-arranged high-rise building core.
200 201
Asia Square Tower 2, Singapore Skyscrapers and Towers
The RCS climbing protection panel serves as anti-fall protection and The columns could be safely and quickly The enclosure with perforated trapezoidal sheeting
protects against falling objects; thus, work on the facade could also be shuttered in the protection of the RCS ensured a large amount of daylight entered the floors
subsequently completed very quickly. enclosure with VARIO. and reduced the wind load.
The ACS and RCS self-climbing systems, Main components of the PERI concept formwork systems kept pace with the fast
in connection with a system application were the crane-independently climbed core working speed. Thus, the construction crew
which had been optimally adapted to formwork and the protection panel enclo- used large-sized VARIODECK slab tables
meet the project-specific requirements, sure on the slab edge. For this, PERI engi- for forming the floor slabs, supported by
ensured that construction of the storeys neers combined the ACS and RCS self- the MULTIPROP system comprised of
was carried out in regular 5-day cycles climbing technology to create a customized lightweight aluminium props. In addition,
resulting in a clear reduction in the con- hand-in-hand working project solution. supporting heights up to 21.60 m could be
struction schedule. The placing boom was also lifted together efficiently realized with the PERI shoring
with the ACS platform variants from solution.
The Asia Square high-rise complex on the section-to-section without requiring a crane.
Marina Bay is over 220 m high. Occupying
the 46 storeys are exclusive office workplaces In order to be able to realize the floors
along with a 5-star hotel with 300 rooms on using 4.50 concreting cycle heights in
the uppermost floors. regular 4-day cycles, PERI wall and slab
Contractor
Hyundai Engineering & Construction Co., Ltd. To the right of Asia Square 2 is the already completed
Field Service Asia Square 1 also realized with PERI suport whose
PERI ASIA Pte. Ltd., Singapore 47 floors reach a height of 230 m.
Kim Ju-Han
Senior Construction Manager
202 203
Administration Center Da Nang, Vietnam Skyscrapers and Towers
PERI supplemented the formwork and The 166 m high office tower characterizes which go round a central reinforced con-
scaffolding solution with on-site support the skyline of Da Nang, a city with 900,000 crete core that features varying diameters
measures and ensured optimal system inhabitants in central Vietnam. Above the between 33 m and 43 m. As a result, the
use due to the technical and logistical ground-floor section, the 34 storeys feature glass facade winds its way upwards like a
support. sawtooth-shaped floor plan cross-sections spiral.
Contractor
Tan Ky Construction Corp. (TAKCO)
Field Service
PERI ASIA Pte. Ltd., Singapore and Ho-Chi-Minh-City/
Vietnam
204 205
Cultural Buildings
206 207
Football Stadiums, 2012 European Championships, Poland/Ukraine Cultural Buildings
208 209
Parco della Musica e della Cultura, Florence, Italy Cultural Buildings
The complicated architecture required transfer of loads. Interface problems were Here, PERI UP Rosett modular scaffolding
achieving an optimal combination of the kept to an absolute minimum, errors in the was used as working scaffold and shoring
formwork and scaffolding to be used. execution were avoided and productivity with metric grid dimensions. In addition,
Through the compatibility of the system, was maximized. Furthermore, the formal the use of 25 cm long ledgers allowed bay
load transfer is optimized, building work way for the building contractor was far widths and depths to be sub-divided as
simplified as well as accelerating the more simple as PERI engineers also coordi- required. Furthermore, the massive, up to
construction progress. nated and provided the static for both the 1.20 m thick structural components of the
shoring and formwork. stage tower 15 m above the centrally
The music and cultural park features an positioned stage resulted in very high
opera house with 1,800 seats, a concert The implementation was technically temporarily loads, combined with high
hall for 1,100 music lovers and a theatre for extremely challenging. For example, the demands placed on the load-carrying con-
audiences up to 2,000. Generously-sized entrance foyer of the large opera house struction regarding the geometrical adapta-
free areas and boulevards as well as an cantilevered for more than 16 m at a height tion. For this, PERI UP shoring was com-
underground car park with 700 parking bays of 20 m over a total length of 46 m. bined with the MULTIPROP system.
supplement the unique building ensemble.
The short construction period for the con-
crete shell of only 18 months required a
high level of commitment from the person-
nel: a team of around 300 workers worked
in multiple shifts which often included
nights. For this, the construction team
required large quantities of materials that
were delivered to the jobsite just-in-time
from the PERI rental park.
22.40
the complete solution from one source was
decisive in ensuring successful implemen-
tation of the project. The shoring solutions
were completely compatible with the form-
work systems which facilitated an optimized
Contractor
Societ Consortile Parco della Musica a.r.l.
Field Service
Mauro Mezzaroma
PERI S.p.A. Italy, Basiano Office Technical Director
210 211
Desert Learning Centre, Al Ain, United Arab Emirates Cultural Buildings
Dirk Leitzig
Project Manager
Contractor
Ed. Zblin AG, Abu Dhabi Subsidiary
Field Service
PERI L.L.C. Abu Dhabi, United Arab Emirates
For the realization of this freely-accessi- concreting. VARIO GT 24 girder wall form-
ble walk-in sculpture, PERI developed a work was used, flexibly adapted to suit
formwork solution using formwork units these boundary conditions as well as all
based on proven products. The constant geometries and a fresh concrete pressure
change in curvature and inclination of more than 100 kN/m. As a quick and
meant that 3D formwork planning was safe solution for the single-sided transfer
required. of loads, SB brace frames were utilized for
wall heights up to 3.60 m.
The Sheikh Zayed Desert Learning Centre is
a mixture of museums, galleries and natural Due to the complexity, three-dimensional
history exhibitions. It symbolizes a change planning and visualization was required
of course by the Emirates in the direction of which was an essential part of the PERI
more emphasis on sustainability and dem- overall solution. This made the formwork
onstrates the preservation of its landscape solution clear and understandable to all
and culture. Externally, the building is char- those involved and created a sound basis
acterized however by its unique design, the for efficient construction work. In addition,
particularly high demands placed on the detailed plans supported the assembly of
construction work especially regarding the the three-dimensional formwork elements Push-pull props and brace frames from the PERI Each formwork unit was unique and very time-consuming The walk-in sculpture winds its way around a courtyard
product programme served as temporary support The complexity with different inclinations and to produce. The basis throughout was formed by and provides views of the safari park and a nearby
formwork and temporary support struc- on the jobsite. Design and construction pro-
for the inclined walls. curvatures required a customized formwork solution. VARIO GT 24 basic elements. mountain ridge.
tures. When planning the formwork solu- cesses also had an effect on the formwork
tion, the maxim was to accommodate the planning: the building twists upwards like a
complex geometry by means of different tunnel resulting in the fact that load transfer
component dimensions. No inclination, cur- is centred in only a few places. As a conse-
vature and arching featured in the compo- quence, a large part of the formwork had to
nents is repeated as an individual plan of remain in position after being installed until
execution was compiled for each wall form- these areas had been completed. Thus, a
work element. very close eye had to be kept on all form-
work and support elements during installa-
Furthermore, the large component dimen- tion and dismantling a big challenge when
sions with up to 3 m high beams and 2 m considering the immense amount of form-
thick walls resulted in high loads during work, and support structures involved.
212 213
Centro Cvico del Bicentenario, Crdoba, Argentina Cultural Buildings
Felipe Lascano
Project Manager
77
16.40
77
214 215
The Arctic Ring, Copenhagen Zoo, Denmark Cultural Buildings
7.48
Niels Thorsund
Project Manager
With a 3D planning service and the deliv- The Copenhagen Zoo has delighted animal at first hand on an area totalling 3,200 m. solution and delivered ready-to-use prefabri- at the PERI formwork assembly facility. As scaffold units, as well as MULTIFLEX girder
ery of prefabricated formwork elements, lovers and architecture enthusiasts alike. cated formwork elements to the construc- a result, no rivet or screw impressions can slab formwork, supplemented the PERI
the high requirements regarding the With the Hippopotamus House from the The central component is an elliptical- tion site. Before this, in close cooperation be seen on the concrete surface. concept to provide a comprehensive form-
challenging architectural concrete finish Danish architects Dall & Lindhardtsen and shaped structure with a covered indoor area with the team of architects, a regular tie work and scaffolding solution. For ensuring
and shaping could be fulfilled. In addi- the Elephant House designed by British star and a spiral ramp that provides visitors with arrangement was determined, carried out During the planning phase, PERI engineers a successful completion of the project,
tion, the use of rentable system compo- architect, Sir Norman Foster, the spacious new, interesting insights and views time if necessary with blind anchors. In order to additionally took into consideration the coni- along with the planning and assembly
nents as basic elements made the PERI complex features two architectural high- and time again. For the frequently executed align the joint pattern with a uniform length cal 10 inclined design of the outer ring, as service, the competent on-site support and
solution very cost-effective. lights. Since February 2013, The Arctic reinforced concrete walls in the form of classification to the inclination of the ramp, well as the partly double-shell design, due briefings by a PERI supervisor also made a
Ring has been opened for visitors to expe- ellipses using high architectural concrete the parallelogram-shaped formlining was to the time-consuming insulation measures. valuable contribution.
rience the polar bears, seals and penguins quality, PERI designed a 3D formwork individually cut and then carefully bonded PERI UP falsework and reinforcement
Precisely defined tie points and formlining joints were The internal reinforced concrete ring was to be realized The formwork units on the basis of the VARIO GT 24 The formwork elements were up to 10 m high and were The PERI supervisor briefs the construction crew on the
part of the overall visual concept that PERI engineers as an axially symmetric four-centred arch with four wall formwork system with bonded formlining sheets lifted by crane between the reinforcement and PERI UP exact and very tight element connection achieved by
agreed on in advance with the architect. different radii ranging between 6 m and 14 m. were delivered ready-to-use to the construction site. scaffold. using the articulated coupling.
Contractor
Jorton A/S, Aarhus
Architect
Dall & Lindhardtsen A/S, Helsingor
Field Service
PERI Denmark A/S, Greve Office
PERI GmbH Germany, Weissenhorn Office
216 217
John Paul II Church Centre, Krakow, Poland Cultural Buildings
Andrzej Mirek
Site Manager
An essential element of the PERI form- The geometrical complexity of the building During peak times, four Polish PERI assem-
work and scaffolding solution was the components to be cast in-situ as well as the bly halls were entrusted with the formwork
precision-made prefabricated formwork exceptionally high quality standards assembly due to the very tight schedule
elements with which excellent concrete required the close cooperation of PERIs genuine teamwork at its best. The high
results could be achieved on-site. Polish engineers with the site management accuracy of fit achieved as a result, was
already during the planning phase. Basis of reflected, on the one hand, in the precise
With a very impressive church centre in the jointly-developed concept was preci- shaping with straight edges. On the other,
Krakow, the Polish nation has honoured sion-made prefabricated formwork units valuable time could be saved on the jobsite
Pope John Paul II who died in 2005. based on VARIO GT 24 basic elements. By during forming operations because the
The 13,000 m complex includes a church, means of CNC-machined timber formers, elements were handled similar to that of
pilgrim centre, museum, library, hotel and moulds could be formed which were three- a system formwork.
research institute. The central structure is dimensional in part. The formlining, a PERI
the 17 m high chapel with columns, walls Birch formwork panel, was screwed on at
and vaulted ceiling comprised of white-col- the rear this meant that the concrete
oured concrete realized using
the highest surfaces were free of any rivet and screw
architectural concrete quality with a impressions.
smooth, pore-free surface.
The PERI formwork assembly team accurately set up The V-shaped column elements with complex cross-sec- Also the arch formwork was an integral part of the PERI
the moulds on the basis of the VARIO GT 24 girder wall tions were further accentuated by means of horizontal solution with complicated intersections of the vertical,
formwork system. chamfer strips. horizontal and circular components.
218 219
Haute-Garonne Media Library, Toulouse Labge, France Cultural Buildings
Contractor
GBMP, Tournefeuille
Field Service
PERI SAS France, Agence Sud-Ouest
The PERI formwork solution developed look, also on the outside. Along the 86 m the entire concrete facade. Furthermore,
by PERIs French project engineers ful- length, numerous, irregularly arranged the joint pattern precisely matched the
filled the high architectural requirements recesses allow light to enter the inside of requirements of the architect.
at a maximum level of safety. This the building.
resulted in the best architectural con- With only six VARIO formwork elements,
crete surfaces without tie points and The PERI formwork solution fulfils a num- each 5 m wide and 10 m high, the wall
also accelerated construction progress. ber of tasks at the same time. With the sections could also be realized extremely
VARIO GT 24 girder wall formwork system, cost-effectively. Through the combination
The media library in the southern French the tie pattern as well as formlining size and with the SVC system and the customized Jean-Marc Avogadro
dpartement of Haute-Garonne is a modern arrangement can be selected almost freely. platform systems for the VARIO formwork General Foreman
information and communication centre. Thus, PERIs French engineers placed the specially tailored to the needs of French
The two longitudinal architectural concrete tie positions in the area of the
recesses so construction site requirements architec- With the VARIO formwork and the
facades give the building a very modern that no tie points are visible anywhere on tural demands could be fully met as well as new safety platform, our team was
maintaining consistent compliance with the able to realize the architectural
strict French safety regulations. concrete facades according to the
required quality and within the very
tight construction schedule in
entirely safe conditions for good
measure.
9.93
220 221
CaixaForum Saragossa, Spain Cultural Buildings
4.80
14.90
CB 240 framework brackets were connected with The angular arranged shear walls are up to 37 m high Raised formwork units and shoring as well as the
TRIO panel formwork to form large-sized climbing and are obliquely-cut in part in the bottom third of the working scaffold were gradually extended and, for the
formwork units. structure. subsequent cycles, TRIO climbed on CB 240 brackets.
For the sculpture-like CaixaForum, ide- ing sections, PERI UP shoring was installed
ally combined systems formed the basis underneath and to the rear in a step-like
for efficient and cost-effective construc- arrangement. With the help of short ledg-
tion work. In so doing, PERI engineers ers, the legs could be bundled together to
tailored their formwork and scaffolding ensure optimum load adjustment.
solution to precisely match the project
requirements which featured complex As slab formwork for the reinforced con-
building architecture along with high crete slabs in the auditorium, SKYDECK
quality and safety requirements. was used. Due to the large slab thickness Aurelio Pueyo Torres
of 60 cm, prop spacing was reduced from Supervisor
The modern cultural and event centre serves 2.25 m to 1.50 m with help of the 150-cm
as a central cultural meeting place offering main beams. All adjustments required in Regarding the architecture and
a wide range of exhibitions, concerts and the edge areas were carried out using construction work, this project was
educational workshops. The architecture MULTIFLEX girder slab formwork. The form- extremely complicated. With the
featuring a spectacular building structure work and scaffolding systems were perfect- CB 240 climbing formwork, PERI UP
resembling the shape of a sculpture is ly matched to each other and could be ide- Rosett shoring as well as SKYDECK
unique. The four-storey building extends ally combined: PERI UP Rosett was used as and MULTIFLEX for the slabs, PERI
majestically upwards, supported by angularly a spatial shoring construction with grid solved all the tasks very successfully
arranged, up to 37 m high shear walls. dimensions of 150 cm x 150 cm. The modu- in compliance with all technical, safety
Some of the walls in the bottom third of the lar structure allowed height adjustments to and quality requirements.
structure are obliquely constructed with be made to accommodate the inclined and
50-degree angles, resulting in upper floor stepped assembly areas whilst length and
cantilevers of up to 15 m above the ground. width adjustments were carried out using
50-cm long ledgers. For all formworking and
The reinforced concrete walls were con- scaffolding work, system steel decks served
structed using 4.80 m concreting cycle as safe assembly and working levels.
heights. TRIO panel formwork was selected
for use as the wall formwork mounted on
PERI UP working scaffold in the lower sec- Contractor
Dragados S.A., Madrid
tions. The loads arising from the cantile- Architect
vered reversed-angled shear walls were Estudio Carme Pins, Barcelona
transferred via a raised formwork construc- Field Service
PERI S.A. Espaa, Barcelona and Algete/Madrid Offices
tion comprised of VARIO and VARIOKIT sys-
tem components into the ground. For the
two almost 15 m high subsequent concret-
222 223
Prez Art Museum Miami, USA Cultural Buildings
RCS climbing rails brace the 6 m high VARIO GT 24 wall Through the delivery of pre-assembled large scale wall MULTIFLEX served for the construction of the cast-in- The Prez Art Museum in Miami offers
formwork thereby only two tie positions were required formwork elements, time and space on the jobsite could place beams with the PEP props connected by means altogether 18,000 m of exhibition space
for the entire height. be saved. of PRK frames. situated directly on Biscayne Bay.
The art museum stands out through of large-sized Fin-Ply Maxi plywood sheets,
its exceptional location directly on the even concrete surfaces could be achieved
Atlantic coast and through the clear without any evidence of horizontal formlin-
architecture designed by the renowned ing joints. In order to save time, the VARIO
Swiss architects Herzog & de Meuron. elements were prefabricated at the PERI
PERI supported the ambitious construc- formwork assembly facility and delivered
tion project with system solutions for the ready-to-use to the construction site.
walls and slabs, as well as the delivery of As it was, storage and assembly space
large-size prefabricated wall formwork availability was limited.
elements.
The MULTIFLEX and BEAMDECK slab form-
The new Prez Art Museum is located work systems for realizing the reinforced
directly on Biscayne Bay in Miami. The concrete slabs, as well as the network
3-storey building complex is positioned on a structure comprised of massive beams,
protruding base and is dominated by a boldly supplemented the PERI formwork concept.
projecting cantilevered roof construction. For formwork support along with the
The museum has over 10,000 m of exhibi- required shoring over the course of several
tion space with a further 7,500 m outdoors. floors, up to 12,000 PEP steel props and
Due to the numerous projections and MULTIPROP aluminium slab post shores
recesses as well as the change between were utilized.
glass facades and large-sized architectural
concrete walls, the closed exhibition
structure appears almost to be floating.
Contractor
Reinforced Structures, Inc., Clearwater, FL
Architect
Herzog & de Meuron, Basel
Field Service
PERI Formwork Systems, Inc. USA, Orlando Branch
224 225
Aquatics Centre, London, United Kingdom Cultural Buildings
Designed by Zaha Hadid, the eye-catching design which could be exactly positioned concrete quality, all formlining that came
Aquatics Centre in London is character- and assembled together on the construc- into contact with the concrete was taped
ized by its bold designs and extraordinary tion site supported on a PERI UP shoring so that no rivet and screw impressions are
architectural concrete quality. For this, and working scaffold. In addition to the high visible on the concrete surfaces.
PERI planned and supplied the formwork architectural concrete requirements, maxi-
and scaffolding solution. mum accuracy with minimum tolerances The 3D formwork concept consisted of
had to be complied with especially in con- load-bearing basic elements and form-giving
The Aquatics Centre like many other build- nection areas to existing structural elements formwork units whilst still taking into
ings created by Zaha Hadid often touches as well as for subsequent glazing work. account easy on-site assembly and maxi-
the limits of technical feasibility. The curved mum transport dimensions. The basic
shape of the highly visible roof construction For an all-round, uniform concrete finish, elements consisted of the variable VARIO
is consistently transferred to the inside of PERI engineers compiled the available data GT 24 girder wall formwork system. Timber
the building. The so-called Scoreboard Wall regarding the complete element arrange- formers, which had been precision-manufac-
and the Welcome Zone with complex ment beforehand. By means of a 3D model, tured using CNC woodworking equipment,
geometries and double-curved surfaces all details such as the joint arrangement and were converted during the PERI formwork
were cast in-situ. For this, PERI planned, tie positions could be coordinated with the assembly to create moulds. The in-situ
produced and delivered more than 200 cus- architectural team in London. Furthermore, application is similar to system formwork
tomized formwork units realized using a 3D in order to achieve maximum architectural supported by project-related assembly plans.
226 227
Transport Engineering
228 229
Waldschloesschen Bridge, Dresden, Germany Transport Engineering
The name Waldschloesschen Bridge has not only In spite of the geometric changes found in the super- The project-specific solution with lightweight raised
been given to the bridge structure itself but also refers structure, only two standard raised formwork units were formwork units ensured fast and simple moving to the
to the complete 4.5 km long traffic route which leads up used which resulted in a very high degree of material next concreting section with the crane.
to it. For the planning of the bridge height and geometry, utilization. On the VARIOKIT load-bearing system, GT 24
a range of design aspects as well as ensuring an unim- lattice girders provided support for the formlining.
peded view of the Dresden city centre were taken into
consideration.
The Waldschloesschen Bridge connects structure were SRU steel walers and SLS
the eastern and southern districts of the heavy-duty spindles. The mounting points
city with areas in the north of Dresden. for the formwork units were planned before
PERI planned and supplied the formwork the production of the steel structure. GT 24
for the superstructure of the steel com- wooden lattice girders transferred the loads
posite bridge and won over the construc- into the formwork units and allowed large
tion site team with an easy-to-use and, spans with minimal deflection. All system
above all, cost-effective solution. components used for the frame construc-
tion units were rentable. Michael Wothe
The Waldschloesschen Bridge has a total Project Manager
length of around 635 m. Two steel arches In order to minimize deformations, a total of
with a span of 148 m reach of a height of 21 casting segments were planned for the PERI provided us with the most
almost 26 m above the Elbe and carry the carriageway slab and cantilevers. In spite of logical concept for the superstructure
central part of the bridge. The foreshore the geometric changes found in the bridge formwork, specially tailored to match
bridges account for a large part of the construction, forming could be carried out the specified bridge geometry. Already
structures length with double V-shaped using only two standard raised formwork in the tendering phase, the formwork
piers in place to support the superstructure. units: the length of the units was planned proposals were very detailed.
so that they could be easily combined in The VARIOKIT sub-structure provided
The standard cross-section of the bridge a number of ways for the construction of us with the ideal option to suit the
in the arched area has an overall width of the sections. The raised formwork units local conditions. This could then be
approx. 28 m. A 4-lane carriageway runs mounted on-site are thus being used for adapted to any site situation without
between the two steel arches whilst almost the entire bridge structure. any problems.
4.45 m wide pedestrian and cycle lanes
cantilever outwards on both sides of the
bridge respectively. The formwork solution
for the superstructure was developed by
PERI engineers on the basis of the VARIOKIT
engineering construction kit. Essential
system components for the raised form- Contractor
ARGE Ingenieurbau Waldschlsschenbrcke
work construction suspended on the steel Schsische Bau GmbH, Dresden
and EUROVIA Beton GmbH, Oebisfelde
Field Service
PERI GmbH Germany, Chemnitz Office
230 231
Puente Baluarte, Mexico Transport Engineering
Contractor
TRADECO Infraestructura, S.A. de C.V.
The formwork for the double-pier cross beams was Field Service
supported with the help of PERI UP shoring up to PERI Cimbras y Andamios S.A. de C.V., Huehuetoca and
13.50 m high. PERI GmbH Germany, Weissenhorn Office
The Baluarte Bridge is one of the most highest bridge in the world. The main span For the forward and reverse-inclined external mum of 145 m according to the shape of construction. In the cantilevered areas of
outstanding infrastructure projects in of the structure is 520 m long whilst the walls, the platforms could be continuously the terrain. These were also formed using the working platforms, PERI UP Rosett Flex
520.00
Mexico. PERI planned and supplied a 20 m wide superstructure is supported by adjusted to match the angle of inclination VARIO GT 24. Most surfaces could be real- was assembled with a 1.50 m x 1.50 m
cost-effective formwork and scaffolding two pylons and nine bridge piers. P5 is which meant that horizontal working levels ized with standard panel formwork. For the basic grid. In the supporting, heavily loaded
concept for the construction of the the highest pylon and reaches a height of were always available. As formwork, the tight inner areas, PERI delivered tailored area underneath the massive reinforced
bridge piers as well as the up to 170 m 169 m with the topmost point of its neigh- flexible VARIO GT 24 girder wall formwork pre-assembled elements to the jobsite which concrete cross members, grid dimensions
high pylons. The ACS self-climbing bour ending 13 m below this. The cross- system was used. The formwork elements exactly matched the geometrical and static could be reduced by the installation of 25 cm
390.00
formwork allowed crane-independent section of the pylon base measures were designed so that they could be quickly requirements. Externally, VARIO together walers which increased the load-bearing
climbing in all weather conditions which 18.00 m x 8.56 m which widens to 31.30 m adapted by the construction team with CB 240 brackets formed large-sized capacity of the scaffold.
significantly accelerated the construction in the carriageway centre, and then tapers to suit the requirements of the 46 or 49 climbing units whilst in the internal area
progress. upwards to 8.00 m x 4.10 m at the top. concreting sections with variable concreting of the double piers, shaft platforms were
heights of between 3.28 m and 3.90 m. realized with the help of BR platform beams.
The bridge over the almost 400 m deep Baluarte ravine The 1,124 m long cable-stayed bridge For the construction of this complex
has a total length of 1.1 km with a span of 520 m.
crosses a ravine which has a depth of geometry, PERI developed a self-climbing The foreland piers were designed as double 13.50 m high PERI UP shoring carried the
almost 400 m, and is ranked the third solution on the basis of the ACS system. piers and vary in their height up to a maxi- formwork for the cross beams during
232 233
Lekki Ikoyi Bridge, Lagos, Nigeria Transport Engineering
Contractor
Julius Berger Nigeria PLC
Planning Operations
Julius Berger International GmbH, Wiesbaden
Field Service
PERI Export Division Nigeria, Frankfurt and
PERI GmbH Germany, Weissenhorn Office
For the pylon of the first cable-stayed connection between the top and bottom
bridge in Nigeria, the ACS and RCS climbing rails. As a result, the fillet section
climbing systems were combined to could therefore be climbed over at only
create a project-specific solution, optimally a 77 m radius in sections with 3.60 m
adapted to suit all geometrical and safety concreting cycle heights without requiring
requirements. In addition, crane-inde- any modification work on the formwork and
R = 77 m pendent working operations ensured working platform. With the help of mobile
rapid construction process. climbing hydraulics, moving procedures
took place without a crane. The ACS self-
A striking, 90 m high pylon characterizes climbing technology accelerated moving
the appearance of the 1.4 km long bridge operations on the front sides. Even with
3.65
structure. The 635 m long main bridge is the inclined climbing rail arrangement with
suspended along a length of 225 m on a angles of up to 14, ACS ensured that the
90.15
234 235
Motorway Bridge T4, Paradisia-Tsakona, Greece Transport Engineering
Bundled 42-leg VARIOKIT shoring towers carried the By halving the 150-cm basic grid using 75 cm long PERI engineers combined two modular construction
extremely high loads in the connecting area of the steel ledgers, the PERI UP could be optimally adapted for systems to form a comprehensive load-bearing concept
arch connections. the load concentrations. with heights of up to 20 m.
A huge inclined pier supports the motor- Supporting element of the bridge is a huge, formwork was formed, gradually increasing
way bridge on the Greek peninsula of almost 30 m high, inclined twin-pillar pier up to the total support height of over 20 m
Peloponnese. A team of Greek and with an asymmetrical V-shape. On the one to the rear and upwards respectively. Using
German PERI engineers supported the hand, this serves as an intermediate sup- 25, 50 and 75-cm long ledgers, the 150-cm
site management team with project- port for the in-situ concreted carriageway basic grid could be adapted extremely flexi-
specific system solutions. and, on the other, as support and starter bly here to suit the geometric and static
section for the steel arch. requirements. This allowed the polygonal
The 160-km long A7 motorway connects 32 to 36 shallow-pitched inclined piers on
the towns of Kalamata and Corinth. The PERI developed a comprehensive formwork both sides of the bridge to be constructed
principle element being used to close the gap and scaffolding solution for constructing in eight segments, each 4.50 m long.
between Paradisia and Tsakona is a 390 m the pier structure and reinforced concrete
long arched bridge. Two-thirds of the 22 m superstructure as well as providing tempo- Trusses consisting of rentable VARIOKIT
wide bridge superstructure is suspended on rary support for the bridge during the entire standard elements supported the obliquely-
a steel arch and was constructed using the building project. Essentially, two modular positioned VARIO GT 24 girder formwork
steel composite construction method. For construction systems were combined with and transferred the formwork and concret-
the northern bridge section, a pre-stressed each other in order to transfer the high ing loads of the inclined piers safely into the
concrete superstructure variant was selected loads safely into the ground. With help of scaffolding. In addition, the VARIOKIT mod-
which features a twin-cell hollow box cross- PERI UP Rosett Flex, a spatial load-bearing ular construction system formed the basis
section. structure for the piers and superstructure for the heavy-duty shoring. In the connect-
ing area between the cast-in-place bridge
and steel arch, two 17 m high, 42-leg
Nikolaos Donas heavy-duty shoring towers were used to
Site Manager accommodate the high loads until the
inherent load-bearing capacity was reached.
PERI convinced us with the best technical and most cost- Each tower was designed to carry loads of
effective formwork and scaffolding concept. Together with 1,200 t, as well as high earthquake and
the PERI engineers, we were able to select the optimal horizontal loads, due to the long utilization
system in each case adapted to match the complex project period. For load concentrations, four standard
requirements. Apart from technical support in the planning towers respectively, each with 2.00 m by
and during the construction phase, I would particularly like to 2.00 m axis dimensions, could be bundled
highlight the on-site project support as well as the provision by means of 37.5 cm additional frames
of materials in accordance with the construction schedule. using only rentable system components
Contractor
ARGE Alpine Bau G.m.b.H./ Terna SA and type-tested connection means.
Field Service
PERI Hellas Ltd., Athens and PERI GmbH Germany,
Weissenhorn Office
236 237
Vistula Bridge, Kwidzyn, Poland Transport Engineering
Contractor
BUDIMEX S.A.
Ferrovial Agroman S.A.
Field Service
PERI Poland Sp. z o.o., Danzig Office
With the help of PERI modular solutions The PERI concept for the main bridge The superstructure of the foreland bridges,
for all formwork and scaffolding tasks, included self-climbing formwork for the two with a total length of 1,000 m, was carried
the Vistula Bridge could be realized with- bridge piers, the superstructure formwork out using the incremental launching method
in a very tight construction schedule for the hollow box cross-sections with with the help of VARIO girder formwork,
largely independent of crane and weather. formwork carriage as well as the falsework in 30 m casting segments in regular weekly
for the edge sections. The parapet beams cycles. A protective roof construction based
The Vistula crossing near Kwidzyn extends were formed with the help of the VARIOKIT on the LGS lattice girder system made the
over a total length of almost 12 km. The formwork carriage which was customized construction work weather-independent. An
most important components are the 808 m to meet site requirements, anchoring in the inside heating system ensured that working
long main bridge and three foreland bridges. structure was not necessary here. For the operations continued during the winter and
In spite of the different constructions, PERI bridge pylons, the TRIO formwork was consistently high concrete quality was
provided a comprehensive overall solution climbed using the RCS rail-guided climbing achieved. When required, the weather
largely based on the VARIOKIT, RCS and technology - thanks to the mobile RCS protection roof took only a few minutes to RCS climbed the bridge pylons rail-guided as well as ST 100 stacking towers served as falsework for the The LGS weather protection roof allowed continuous
crane-independent thanks to the mobile self-climbing edge sections of the 808 m long main bridge. construction progress regardless of the weather
PERI UP modular systems. self-climbing devices without a crane and open as the roof segments could be moved technology. conditions.
regardless of wind and weather. by hand without the use of a crane.
238 239
Puente Ejrcito, Lima, Peru Transport Engineering
For assembling the steel arched bridge, PERI engineers created an assembly scaffold tions, the stability of the structure could be
PERI UP served as shoring and working on the basis of the PERI UP scaffolding extensively verified which led to shorter
scaffold at the same time. In addition, an system. This served as a temporary, up to set-up times.
important element of the scaffolding 20 m high support structure for the steel
structure was the load-bearing capacity segments as well as a working platform for The high flexibility of the PERI UP system
and load transfer into the sub-structure the final assembly. Each arch consisted of enhanced safety conditions for the steel
using system components. 11 steel segments and had a total weight of erectors and accelerated their work proce-
100 t. A big advantage for the design of the dures. Then the different working levels
Two 105 m long steel arched bridges con- shoring towers and working levels was the were continuously connected in a longitudinal
nect the northern district to the city centre high load-bearing capacity and, in particular, direction by means of system steel decks
of the Peruvian capital. These were posi- the adaptability of the PERI UP Rosett Flex. with side protection ensured through the
tioned to the left and right of the 50-year In addition, system components from the use of ledgers. Due to the system grid of
old existing bridge in order to better manage PERI product portfolio supplemented the 25 cm or 50 cm, all adjustments can be
the high volume of traffic through the scaffolding structure: through the use of carried out without any time-consuming
expansion to 10 lanes as well as being able GT 24 formwork girders and SRU steel tube and coupler connections; in particular,
to accelerate the public transport system as walers, the load distribution was also sys- the self-securing ledger assembly with the
a whole. tematized. As an integral part of the PERI gravity lock also increased the working
implementation planning and static calcula- safety for the scaffold assemblers.
Contractor
COSEI Consorcio, Fiansa
Field Service
PERI Peruana SAC, Lima
23.20
The assembly of the 11 steel arched segments
required temporary support and working levels
with heights of up to 20 m.
105.00
Aristteles Parra
Project Manager
The PERI UP Rosett Flex modular scaffolding precisely matched the bridge geometry Through the combination of PERI UP and Scaffolding and bridge assembly went
thanks to the system-integrated flexibility without any time-consuming tube and system components of the formwork hand in hand with fast working speeds
coupler assembly. programme, loads could be reliably trans- and maximum level of safety.
ferred.
240 241
Chachenka Bridge, Moscow, Russia Transport Engineering
Contractor
OOO SGC Autostrada
Field Service
OOO PERI Russia, Noginsk/Moscow Offices
PERI Poland Sp z o.o., Warsaw Office
The VARIOKIT formwork carriage
solution could be flexibly adapted
to meet the individual project
requirements. For the first con-
4.00
Two groups of VARIOKIT formwork carriages worked PERI UP suspended scaffold served as safe access With CB/VARIO climbing formwork units, the 40 piers of
simultaneously for realizing the weekly completion of means to the bearing points on the pier heads. the foreland bridge could be cost-effectively constructed.
six casting segments.
A total of four VARIOKIT parapet carriages For the over 2.2 km long Danube bridge, of parapet per week. One of the formwork
operated at the same time which resulted PERI engineers worked closely together carriages also took into account the desig-
in the regular completion of six concreting with the site management team to develop nated points of the parapet widening in
sections per week with a parapet length a common formwork concept which envis- order to accommodate the lamp posts.
of 130 m. aged the use of the VARIOKIT parapet car- Simple and thereby fast shuttering and
riage that was to be operated from above. striking procedures, as well as the system-
Parallel to the existing bridge structure, the As a result, no additional mounting compo- atic concreting sequence, ensured rapid
Danube crossing near Beska has been com- nents, such as anchor sleeves, were progress for constructing the parapets
plemented by a so-called twin bridge. As a required on the underside. In addition, the with a total length of 4,440 m. In this way,
result, a subsequent, continuous four-lane standardized assembly system minimized the construction team was able to maintain
expansion for the E75 motorway between the planning effort and ensured maximum the extremely tight schedule without any
Belgrade and Novi Sad has been made pos- flexibility of the formwork carriage solution problems.
sible. On the southern side, a 180 m long when adapting to local site conditions.
foreland bridge is joined to the 540 m long Two formwork carriage groups, each with In addition, PERI supplied the climbing form-
main bridge which is supported on three four coupled VARIOKIT formwork carriages, work for the construction of the 40 bridge
river piers, and the almost 1,500 m long worked in parallel. This meant that six cast- piers with heights up to 50 m. CB 240
approach bridge to the north also crosses ing segments, each 21.50 m long, could be climbing brackets and VARIO GT 24 formed
a floodplain of the Danube river. realized in only five days 130 linear metres large-sized movable units with concreting
cycle heights of 5 m. For the bridge piers
with hollow box cross-sections, shaft ele-
ments made sure that the TRIO internal
formwork could remain connected as a
Claudia-Maria Graber Shuttered Struck complete unit as a result, valuable time-
Site Manager savings were achieved during the construc-
tion of the piers. PERI UP suspended scaf-
It was a positive challenge for us to folds rounded off the comprehensive PERI
work simultaneously and safely with four project solution for the bridge over the
formwork carriages and thus comfortably Danube. This served as secure access to
0.50
maintain our tight schedule. the bearing points on the pier heads.
2.15
14.40
Contractor
ARGE DSD/Alpine Bau GmbH
Field Service
The VARIOKIT parapet carriage features load transfer via cantilever beams, requires no PERI - Oplate d.o.o., Belgrade Office and
anchoring in the structure and can be optimally adjusted to suit jobsite requirements. PERI GmbH Germany, Weissenhorn Office
244 245
Bridge over the Golden Horn, Istanbul, Turkey Transport Engineering
Optimized load transfer: superstructure The VARIOKIT framework units trans- With the help of the PERI UP Rosett Flex
formwork and falsework for the foreland ferred the loads into the shoring while modular scaffolding system, adaptions
bridges based on the flexible VARIOKIT the curvatures in the transverse and could be made to accommodate any
and PERI UP modular construction longitudinal directions were formed with obstructions.
systems. formwork units.
Contractor
Astaldi Glermak J.V.
Field Service
PERI Kalp ve skeleleri San. ve Tic. Ltd.ti Turkey, Istanbul
12.60
The combination of detailed planning combination of cable-stayed and swing Framework units on the basis of the PERI UP 72.50
work, continuous site supervision and bridges as well as a 450 m foreland bridge. Rosett Flex modular scaffolding formed the
1.10
optimized system use was the basis for supporting structure for transferring the verti-
2.50
ensuring fast construction progress and The construction of the single-webbed cal and horizontal loads. The supporting
excellent quality of execution. T-beam cross-section superstructures in the heights of between 1 m and 14 m could be
foreland areas was realized on PERI UP false- flexibly realized whilst the framework unit
The bridge over the Golden Horn (Turkish: work. Web and cantilever formwork were width was maintained at a constant 2.00 m.
14.00
Hali) connects the historical, millennia-old formed with variable frame construction units In the area of the
piers, the carriageway slab
Istanbul with the modern, European-influ- comprising of VARIOKIT system components is up to 2.50 m thick: here, the shoring tower
enced districts of the city. It is an integral due to the continuously changing cross-sec- width was halved with the legs bundled in
part of the urban transport system expan- tion. With the help of CNC-milled formwork 50 cm x 100 cm grids. The bay lengths in the
sion programme in an effort to cope with units prepared at the PERI formwork assem- direction of the frames could also be adapt-
the increase in traffic volumes: two 950 m bly hall, the distinctive underside of the ed to suit the web and cantilever thicknesses
long subway tracks cross over the famous bridge could be realized through curvatures in 25 cm increments by means of system
The thickness of the massive bridge superstructure changed continuously from 1.10 m to 2.50 m.
Bosphorus straits. The new connection is a in the transverse and longitudinal directions. ledgers without any additional effort.
Superstructure formwork and framework units could be easily adapted to suit the varying geometries and loads.
246 247
Trans-Rhumel Bridge, Constantine, Algeria Transport Engineering
248 249
Motorway Bridge V12 over the Rio Sordo, Vila Real, Portugal Transport Engineering
Contractor
INFRATNEL, Construtores do Tnel
do Maro A.C.E., Porto
Field Service
PERIcofragens Lda Portugal, Queijas
PERI GmbH Germany, Weissenhorn Office
For construction of the motorway bridge The falsework was delivered to the con-
over the Rio Sordo, VST heavy-duty shor- struction site pre-assembled as 1.25 m to
ing towers were used as falsework 30 m 10.25 m high variable frame arrangements,
high and with leg loads of up to 600 kN. further extended on the ground to form
Through the use of rentable system com- tower segments, and erected and extended
ponents taken from the VARIOKIT engi- with the help of a crane. Safe PERI UP
neering construction kit for the super- working platforms are used to ensure accu-
structure formwork and shoring, the PERI rate positioning along with fixing in place
solution was extremely cost-effective. with bolts and pins. Together with the VST
towers, these were continuously added to
The A4 motorway passes through the Maro as required and were easily connected by
Mountain Range in the north of Portugal. means of corresponding adapter elements.
Near Vila Real, the route requires the building In addition, both modular construction
of a 412 m long bridge for crossing the Sordo systems are based on a metric grid pattern
Valley which is in the form of a five-section so that the load-bearing system, working
structure with two separate superstuctures. levels and access technology could be
The almost 20 m wide and 3.60 m high pre- perfectly coordinated.
stressed concrete hollow box girders are
being realized using two different construc-
tion methods: the three middle bridge spans 19.39
with the balanced cantilever method and the
respective edge spans formed on falsework.
The falsework support provided for the edge sections was the biggest challenge
due to the difficult terrain. With VARIOKIT and especially the VST heavy-duty towers,
we were presented with a very practical solution that was designed precisely for the
given foundation areas. The concept could easily be implemented on site combined
with fast and safe assembly.
250 251
Bridge over the Dunajec, Tarnow, Poland Transport Engineering
Karol Malinowski
Site Manager
Contractor
Dragados S. A.
Field Service
PERI Polska Sp. z.o.o., Krakow and Warsaw Offices, PERI GmbH, Weissenhorn
much on safety. The compatibility with the a continuous change in the angle between
PERI UP modular scaffold was the basis the outer side of the web and the cantile-
for the creation of safe working areas with vers which meant the web formwork had to
a minimum of effort for the construction be re-adjusted for each concreting section.
team. Using standardized connection parts, For this, PERI developed a simple and prac-
PERI UP could be combined with the tical solution with variably fixable slab form-
VARIOKIT components. work and a formable steel sheet between
the web and carriageway formwork. The
The single-cell hollow box cross-section of construction team thus achieved extremely
the superstructure varies in height from accurate results in accordance with the
around 2.50 m up to 6.10 m. The result was required low dimensional tolerances.
3.50 - 5.00
With some supplementary system com- The 600 m long motorway bridge is sup- forward symmetrically in both directions
ponents, the VARIOKIT engineering ported by twelve pairs of 13 m wide piers. from the starting point of two piers with
construction kit can also be used for the The two parallel superstructures of the fore- 3.50 m to 5.00 m long sections until the
balanced cantilever construction method. land bridges with hollow box cross-sections gap was finally closed.
For the construction of the motorway were realized on falsework with the help
bridge near Tarnow, the construction of VARIO GT 24 formwork elements as well The VARIOKIT cantilevered construction
crew achieved a 4 to 5-day cycle thanks as ST 100 and MULTIPROP shoring towers. equipment demonstrated its great flexibility
to the easy to use, mechanical solution. For the 210 m long section between the during the forming of the bridge cross-sec-
At the same time, the high requirements seventh and the tenth piers, the balanced tions and, at the same time, was easy to
concerning the very small tolerances for cantilevered casting method proved to be operate. In particular, the moving procedure
the variable bridge cross-sections could the most cost-effective solution. A total of to the next concreting section each time
be fulfilled. four cantilever construction units were used was extremely user-friendly by means of a
for constructing the bridge superstructure hydraulic skidding system which is based For moving to the next section by means of hydraulic The VARIOKIT engineering construction kit guaranteed VARIOKIT and PERI UP could be ideally combined
drive cylinders, the construction team only required maximum adaptability for the wide range of bridge and provided safe working platforms and access.
in 48 casting segments respectively. on PERI self-climbing technology. Apart 2 hours. cross-sections.
Construction of the superstructure moved from the ease of use, the focus was very
252 253
Dalsfjord Bridge, Norway Transport Engineering
Contractor
Bilfinger Berger Ingenieurbau GmbH
BBS Schalungsbau GmbH, Bobenheim-Roxheim
Field Service
PERI GmbH Germany, Stuttgart and Weissenhorn Offices
254 255
Pfnder Tunnel, Bregenz, Austria Transport Engineering
PERI planned, designed and delivered a For this, PERI provided a cost-effective
tunnel formwork carriage based on rent- formwork solution based on rentable
able system components in a very short VARIOKIT system components. The
space of time. The execution proceeded formwork carriage was thus extremely
smoothly and without problems whilst economical and, in particular, was available
the dimensional stability resulted in at very short notice. In order to minimize
excellent concrete results. the assembly work on site, seven sub-seg-
ments were prefabricated in the PERI
Bernd John The 6.6 km long Pfnder Tunnel near assembly hall and delivered to the construc-
Site Manager Bregenz connects the Austrian A14 Rhinetal tion site. After only 10 days, the construction
motorway to the A96 highway on the team could begin work on the first of alto-
The entire process went very German side. For realizing a continuous four- gether seven concreting segments. The
smoothly. It took just three weeks lane expansion, a second tube was excavat- standard length of the tunnel segments
from designing the formwork carriage ed using a tunnel boring machine (TBM) was 5.90 m; after a short period of introduc-
to the first concrete placement. parallel to the 30-year old east tube and tion, a 3-day cycle could be achieved.
then lined with pre-fabricated liner seg-
ments. A 43.10 m long crosscut combines Due to the small length of the tunnel, PERI
the new with the old tube and thus enables designed a mechanical formwork carriage
evacuation to take place in the event of fire. solution. Generously-sized working levels
served the simple operability which apart
Contractor 9.80 from high degree of safety was given top
Alpine BeMo Tunnelling GmbH,
Innsbruck
priority. Shuttering and striking was carried
Field Service out by means of spindles whilst the form-
PERI Ges. mbH Austria, work carriage was moved using flanged
Nudorf ob der Traisen Office
PERI GmbH Germany,
wheels on crane rails. In spite of its filigree
Weissenhorn Office construction, the formwork carriage provid-
ed high dimensional stability which resulted
in excellent concrete finishes.
6.83
Shuttered Struck
256 257
Hallandsas Tunnel, Sweden Transport Engineering
For the Hallandsas Tunnel, VARIOKIT conditions along with maintaining high and dismantling work in the tunnel was
could be used extremely versatilely for environmental standards. not required. In connection with the use of
the assembly and dismantling sections rentable system components, the VARIOKIT
of the tunnel boring machine with a gen- The main drive was carried out by means of solution was therefore extremely cost-
erously-sized excavation cross-section. a closed tunnel boring machine whilst the effective.
problematic sections with the expected
The 8.7 km long twin tube railway tunnel strong water penetration were convention- PERI engineers developed two formwork
runs through the hills of the Hallandssen ally realized with the help of a VARIOKIT carriage constructions with hydraulically
area in southern Sweden and significantly tunnel formwork carriage. The bottom slab controlled shuttering and striking proce-
reduces the travelling time between Malmo and arched formwork carriages were dures. The bottom slab formwork was
and Gothenburg. The realization was long designed so that both the pre-lining as well mounted on a support frame whose launch-
regarded as one of the worlds most diffi- as the final lining could be carried out using ing beam bridged two section lengths and
cult tunnel building projects: heavy water the same formwork carriage without any could be freely moved independently of the
ingress and ecological problems due to the time-consuming modification work. Here, formwork. With the help of a second form-
use of environmentally-unfriendly stabilizing the diameters were 10.08 m and 8.84 m, work carriage, the side and ceiling arches
agents meant that construction work, with section lengths of 6.00 m in each were formed and concreted together.
which had begun in 1992, came to a halt. case. The multiple use resulted in reduced Moving took place using heavy-duty rollers
Years later, construction work was resumed on-site material requirements and also on an integrated mobile frame.
this time taking into account all boundary meant that time-consuming assembly
8.84
Contractor
Visualization of complex formwork processes: the 3D planning makes technical Skanska Vinci HB
Acceptance of delivery: project managers solutions more comprehensible and demonstrate the whole construction process in Field Service
and PERI engineers during the test run on a virtual form. On the left, the bottom slab formwork carriage with movable launching PERIform Sverige AB, Halmstad
the PERI site in Weissenhorn. beam; on the right, the arched formwork carriage on an integrated mobile frame. PERI GmbH Germany, Weissenhorn Office
Kieran Deasy
Site Manager
258 259
Hongkong-Zhuhai-Macao Bridge (HZMB), China Transport Engineering
Lin Ming
Project Director
The 180 m long tunnel tubes are moved from the field Contractor The 3D graphic shows one of the two production lines The tunnel elements are cast in eight individual The internal formwork moves hydraulically over the
factory into a dry dock and sealed with bulkheads; the China Communications Construction Company Ltd. (CCCC) with three sets of tunnel formwork as horizontal moving segments each 22.50 m long without ties and in launching beam into the reinforcement cages, and thus
dry dock is then flooded and then towed out to sea to Field Service device as well as stationary external and slab formwork. compliance with strict dimensional tolerances. in a concreting position.
the lowering point. PERI GmbH Germany, Weissenhorn Office
The longest underwater tunnel in the together with Macau and Zhuhai. Central 33tunnel elements. Each of the reinforced towed to the point of installation on the sea- position after each operation and thus and without anchors. As a result, thousands
world is being realized with PERI know- element of this ambitious project is the 6 km concrete tubes for the standard sections is bed using a lowering basin. retract into the prefabricated reinforcement of tie points can be saved this minimizes
how: two hydraulically-operated shutter- underwater tunnel. Positioned 45 m below 180 m long, 38 m wide, 11.40 m high and cages. In addition, the shoring construction the danger of leakage. Around 30 hours are
ing machines are being used for the effi- the surface of the water, the six-lane car- weighs 72,000 t. With the help of the two Per production line, the hydraulically-operat- and portal crane as well as two stopend required for concreting a complete segment
cient realization of 33 tunnel elements riageway is in the area of the approach flight PERI forming machines, 22.50 m long ed PERI formwork solution consists of six formwork variants are likewise important with 3,600 m of concrete being formed.
with a length of 180 m using the incre- path for Hong Kong International Airport, sections are constructed one after the other main structural components: slab form- components of the PERI overall concept. The planned service life of 120 years places
mental launching method. Chek Lap Kok. Two artificial islands form the each time using the incremental launching work, two external and three internal sets enormous demands on all construction
transitions between the tunnel and bridge method. Altogether, eight such segments of formwork. Together with the 50 m long With the help of the PERI process engi- materials used and requires site personnel
Through a 35 km long road connection across structures. In a field factory, two production form one tunnel element which is subse- truss girders, this forms a horizontal moving neering, the bottom plate, external walls to achieve the highest level of quality stand-
the Pearl River Bay, Hong Kong can now grow lines are being used to produce a total of quently moved into a dry dock and then device in order to return to the concreting and slab can be constructed monolithically ards, all within a tight schedule.
260 261
Strasswalchen Bypass, Salzburg, Austria Transport Engineering
Contractor
HOCHTIEF Construction Austria GmbH & Co KG
Field Service
PERI Ges. mbH Austria, Nussdorf ob der Traisen Office
0.55 10.40 PERI GmbH Germany, Weissenhorn Office
1.00
6.10
Boris Grlitzer
Site Manager
Unobstructed tunnel access for site traffic: HD 200 heavy-duty props and VARIOKIT
diagonal bracing carried the loads into the available strip foundations of the tunnel.
A more than 20 m long, hydraulically between 55 cm and 75 cm thick, with whereby no bracing was necessary in those
controlled VARIOKIT tunnel formwork heights varying from 5.40 m to 6.50 m. areas already concreted with load transfer
carriage was used for the two tunnel taking place via the VARIOKIT construction.
tubes. The high proportion of rentable PERI project engineers planned a tunnel
system components, minimum crane formwork carriage based on VARIOKIT sys- With the help of the integrated hydraulics,
requirements and the low number of tem components which meant geometric shuttering and striking was carried out
anchors resulted in an economic form- adjustments could be quickly and easily quickly as well as facilitating accurate
work solution. carried out. By coupling the two units, the height adjustments on the formwork car-
construction team was able to cost-effec- riage. Thanks to the integrated moving unit,
Certain parts of the Strasswalchen western tively realize the total of 54 sections using the decoupled carriage units could be
bypass have underground stretches of road 20.60 m standard cycle lengths. The wall moved very quickly and easily. After this
which run through two tunnels 688 m and formwork with a waler line consisting of procedure, the two formwork carriages are
267 m long respectively. Although both RCS rails was extremely rigid which meant re-coupled and prepared for construction of
tunnels have a clear standard width of only three anchors were required for the the next block. The external formwork could
10.40 m, there are a range of wall heights complete height of the wall this saved a be pulled on heavy-duty rollers positioned
and slab inclinations. The walls of the lot of work. In addition, the client demanded in U-profiles by means of a cable.
arched rectangular cross-section are a design solution for the stopend formwork
Two coupled tunnel formwork carriages consisting of The external formwork could be moved on heavy-duty
VARIOKIT system components formed the over 20 m Due to the hydraulic equipment with moving units, rollers positioned in U-profiles by means of a cable
long construction. a weekly cycle could easily be achieved. without requiring a crane.
262 263
Underpass for wild animals R-88, Albi/Rodez, France Transport Engineering
Thanks to the straightforward opera- formwork carriage were steel walers, main
tions of the VARIOKIT formwork carriage, beams and heavy-duty spindles from the
pre-assembled formwork elements and VARIOKIT engineering construction kit. For
support provided by a PERI supervisor, the transfer of loads into the strip founda-
the required four-day cycle could be tions, HD 200 heavy-duty props were used.
quickly reached. With the PROKIT safety
system, the project solution was com- The extensive utilization of rentable system
plete as well as being particularly safe. components significantly increased the cost-
Julien Pasqualetto effectiveness; in addition, PERI supplied
Site Manager The 80 m long wild animal underpass close pre-assembled formwork elements and plat-
to a nature reserve was part of a four-lane forms with up to 2.50 m widths on a just-in-
Choosing the right formwork concept highway expansion between Lyon and Tou- time basis to the jobsite. The focus was on
was the key to success. The VARIOKIT louse. The generously-sized semicircular the ease of use. Due to the low number of
solution in conjunction with the excel- cross-section, with a width of 15.00 m and uses, it was decided not to use hydraulic
lent cooperation with the PERI team a height of 9.24 m, was selected so that components for shuttering and striking.
ensured we could maintain the con- the animals do not shy away from using the In order to pivot the side elements inwards,
struction schedule and achieve optimal tunnel a small stream also runs along the only the lowest spindle had to be used.
results. complete length. The tunnel was construct- After releasing the heavy-duty wedges, the
ed using the cut-and-cover method and formwork unit is lowered by approx. 8 cm
above the bottom plate as a single unit. and then the formwork carriage was pulled
The main components of the 10 m long by means of winches into the next section.
Contractor
Sogea Sud-Ouest TP, Toulouse 0,50 15,00 0,50
Field Service
PERI SAS France, Meaux and Sud-Ouest Offices 0,50
Shuttered Struck
Focus on the highest level of safety: the generously-sized The use of mostly rentable system components The mechanically-operated formwork carriage was 10 m
working platforms are equipped with PROKIT side mesh significantly increased the cost-effectiveness of the long and the construction team required four days for
barriers. individually-planned formwork carriage. each concreting section.
Hydraulic jacks lifted the formwork carriage internal vibrators. Even without hydraulic slab which reduced assembly time and
into the concreting position again and the support, a 4-day cycle could quickly be effort here. The posts automatically locked
side elements were then spindled upwards. achieved. in position when inserted into the slab feet;
After fast installation of the reinforcement subsequently, it was a simple matter of
facilitated through a high degree of pre-fab- The safety of site personnel also had the attaching the 240 cm long mesh barrier.
rication, a mobile crane moved the external highest priority: the carriage had generous-
formwork into position. This consisted of ly-sized working levels, reliably secured
only two elements per side. 12 concreting with 1.10 m high PROKIT side mesh barri-
windows were used for placing the con- ers. Only three system components are
crete, compaction was carried out through required side mesh barrier, post and foot
264 265
Wankdorf Underground Roundabout, Bern, Switzerland Transport Engineering
Re-positioning a roundabout almost 10 m The customized wall formwork elements for The four truncated cone-shaped slab seg-
under the ground transformed a some- the curved external walls of the roundabout ments are up to 1.20 m thick with a 3 %
what dismal downtown intersection into were prefabricated on the basis of the PERI gradient on the upper side as well as differ-
an attractive gateway to the countrys VARIO GT 24 girder wall formwork system. ent inclinations and a number of height
capital. PERI provided a comprehensive The radii ranged from 30 m to 45 m with a offsets. The extremely tight construction
formwork solution for the realization of wall inclination of 10:1. Particularly advanta- schedule meant that sufficient formwork
the massive beams, reinforced concrete geous was the combined use with TRIO materials had to be available on site for
slab along with the conically-shaped panel formwork on the opposite side. For the complete slab area approximately
roundabout walls formed in architectural this, the tie points of the VARIO elements 1,400 m. For the intermediate platform
concrete. were matched to the TRIO tie arrangement. that covered the entire area, GT 24 cross
beams were radially positioned on GT 24
Wankdorfplatz was transformed into a Construction of the 1.80 m wide, cross- twin main beams which was in turn sup-
two-storey structure and the underground shaped beams with heights between 1.15 m ported by the MULTIPROP system. The
roundabout with a 50 m diameter has accel- and 2.70 m, took place on a combined load- precisely assembled form was achieved
erated the flow of traffic. At the same time, bearing and working level which angled by means of additional modules.
space was created for pedestrians and upwards to the centre of the roundabout. Due to the accurate prefabrication at the
cyclists above ground as well as greatly This was formed using GT 24 twin main PERI assembly hall, they could be quickly
improving bus and tram connections. For beams and VT 20 cross beams, supported assembled on site.
construction of the pre-stressed beams and by shoring towers consisting of MULTIPROP
reinforced concrete slab along with the con- slab props connected with MRK frames.
ically-shaped roundabout walls in architec- Variable height adjustments could be car-
tural concrete quality, PERIs formwork ried out very quickly by means of the free-
solutions were used consisting mainly of running collar and the integrated measuring
rentable PERI system equipment which tape. TRIO panel formwork also found use
perfectly matched the requirements of the as side formwork. The double thickness
contractor. Due to the traffic intersection formlining, screwed on from the rear,
being heavily frequented during the con- resulted in excellent architectural concrete
struction period, only limited storage space surfaces. Contractor
was available which meant the formwork ARGE Wankdorfkreisel Los 3
Implenia AG, Frutiger AG and Marti AG
materials were delivered to the jobsite on Field Service
a just-in-time basis. PERI AG Switzerland, Ohringen Office
266 267
Water Retaining Structures
268 269
Panama Canal Lock Facilities, Panama Water Retaining Structures
Jos Pelaez
Site Manager Gatun/Atlantic
The expansion of the Panama Canal is In three lock chambers formed that are Contractor
Grupo Unidos Por el Canal, SA (GUPC) Joint Venture:
the largest single order in the history of positioned one behind the other each lock Sacyr Vallehermoso, Spain; Impregilo, Italy;
PERI: a challenge in terms of know-how is 403 m long and 55 m wide the conti- Jan De Nul, Belgium and Constructora Urbana, Panama
as well as performance and the ability nental divide has been overcome which is Field Service
PERI S.A. Spain, Algete/Madrid; PERI Panama Inc.,
to deliver. PERI Spain and PERI Panama located 26 m above the level of the Atlantic Panama City; PERI GmbH Germany, Weissenhorn Office
were responsible for the formwork plan- and Pacific. Three huge economising basins
ning, logistics and on-site assistance serve the purpose of re-using about 60 %
competently supported by PERI head- of the water required for individual lock
quarters in Weissenhorn. Well in time for operations. To ensure that the tight sched-
the start of construction work, the sys- ule can be maintained, over 4,200 site per-
tem equipment was sourced from the sonnel process 6,300 m of concrete on a
PERI logistics centres as well as being daily basis in two shifts. Within a three-year
produced within the space of only a few construction period, approx. 6.6 million m
months and then shipped to Central of concrete and 337,500 t of steel will have
America. Altogether, more than 700 con- been required; the total area to be formed
tainers were needed for the operation. is over 2.2 million m. The construction site The SCS working platforms can be inclined by 15 and 30
which means site personnel can always work safely.
facilities include 70 cranes and 30 concrete Rafael Sarmiento
pumping stations, and there is also an Site Manager Miraflores/Pacific
immense need for formwork and scaffold- structure and, as SCS 250 with formwork
ing material along with a comprehensive carriage and a 60 cm retraction distance, For more than 95 % of this project,
overall concept. provides sufficient working space. In we have relied on PERI systems. PERI
accordance with the project requirements, has not disappointed us, they have
PERI provides the consortium of building the brackets are combined in different areas shown great commitment and provide
contractors with an ideal combination of with either VARIO girder wall formwork or us with good solutions and services
formwork know-how, performance and abili- TRIO panel formwork. Different shoring sys- for problem-free working operations.
ty to deliver as well as innovative system tems taken from the PERI product portfolio
equipment. An essential element of the support the slab formwork and tables being
PERI solution is the new SCS climbing used. Here, the PERI UP Rosett in particular
system for single-sided applications. The demonstrated its extreme versatility: as
modular system with multi-part brackets is shoring and for the erection of safe access
flexibly adapted to suit the geometry of the points.
270 271
PPL Holtwood Hydroelectric Station, Holtwood, USA Water Retaining Structures
Contractor
Walsh Construction, Pittsburgh
Field Service
PERI Formwork Systems, Inc., USA, New York
and Baltimore Offices;
PERI GmbH Germany, Weissenhorn
Joseph DeFiore
Project Manager
For increasing the generating capacity of Expansion measures included an intake Extremely high loads had to be carried to the
the 100 year old Holtwood hydroelectric structure as well as a powerhouse charac- ground during construction of the intake
power station on the Susquehanna River, terized by their large dimensions resulting structure roof: slab thickness of up to 4.60 m
the project management decided in in high loads being imposed on the form- and the 13.20 m height that had to be
favour of the formwork and shoring con- work and shoring. One of the biggest chal- bridged required heavy duty load-bearing
cept of PERI USA engineers after care- lenges was maintaining the tight schedule. shoring. VARIOKIT shoring towers were
fully reviewing proposals from numerous For the north wall and 30 m high south wall used with three separate towers being
vendors. Essentially, VARIOKIT heavy of the powerhouse along with the pier walls aligned in a single row in each of the bays.
duty shoring towers served to safely of the six bays of the two turbine units, The 6 and 4-legged towers were positioned
transfer the enormously heavy loads CB 240 climbing brackets were combined on HDT main beams with a corresponding
from the slabs of the intake structure. In with TRIO panel formwork to form climbing special wedge connection component com-
addition, the planning and supply of the formwork units. For single-sided concreting pensating for the bottom 34 % slab inclina-
formwork and scaffolding was from a of the external walls against the rock face, tion. For height adjustment at the top of the
single source so that the systems used the SKS climbing scaffold system was used towers, VST head spindles were utilized
were perfectly matched to one another. in combination with VARIO GT 24 girder which allowed hydraulic lowering and lifting
wall formwork. under full load. PERI delivered the shoring
to the jobsite as pre-assembled, and after ly and efficiently using the mobile hydraulic
the final assembly on the ground, the units lowering device and the towers were sub-
could be quickly positioned between the sequently lowered onto roller bearings and
intake walls with the crane. pulled out of the intake structure.
With PERI UP Rosett, safe working platforms The PERI modular construction kit with
and up to 30 m high access points were mostly rentable standard components
realized thanks to the compatibility with allowed project-related rental of large quan-
VARIOKIT system connecting parts. In addi- tities of materials resulting in very cost-
tion, GT 24 lattice girders, SRU steel walers effective construction. Apart from the sys-
and RCS rails served as system components tem equipment, the PERI overall solution
for the slab formwork elements. These were includes all technical documentation such
also pre-assembled on the ground and then as static calculations, assembly drawings as
flown into place with the crane. The striking well as assembly support and continuous
procedure was carried out extremely quick- on-site support.
272 273
Vianden Pumped Storage Plant, Luxembourg Water Retaining Structures
Jrgen Mller
Site Manager Underground Operations
The complex geometry of the under- demands now reaches 1,300 MW. The new frames for those areas requiring single-sid-
ground power plant, complete with mas- machine uses the existing upper and lower ed forming. In addition, TRIO also served as
sive reinforced concrete structures, reservoirs. Inside the mountain, new cav- side formwork for beams and parapets. Fur-
required the use of flexible, versatile erns as well as dedicated intake and outlet thermore, the upper sections of the turbine
formwork systems and continuous on- structures were required. The rock cavity shaft in the power house were polygonally
site support. The site-compliant planning alone for the power house measures 52 m formed with the help of TRIO articulated
undertaken by the PERI engineers took long, 25 m wide with an impressive height corners whereby RUNDFLEX could be con-
into account all boundary conditions of 55 m. tinuously adjusted to match the different
including a large number of mounting radii for the shaft walls at the bottom.
parts while detailed practical solutions For the almost 2 years of structural work,
were also developed within a very short the construction team used proven and Concreting of the 500 m long underwater
space of time. versatile systems. As a universal supporting gallery with a 5 m internal diameter was
system, the ST 100 stacking tower could carried out in 12 m standard sections using
The pumped storage plant in Vianden on be used with support heights ranging from a coupled VARIOKIT tunnel formwork car-
the German-Luxembourg border was 1 m to 15 m, often with varying contact riage. Striking, moving, shuttering and con-
recently expanded through the addition of areas. With the TRIO panel formwork, the creting operations were performed on a
a 200 MW pump turbine. As a result, the differing wall heights could be cost-effec- daily basis with hydraulic support. PERI
capacity of the power plant for peak period tively realized, with the help of SB brace engineers designed their construction
based on the intention that the extremely
tight curvature areas at the start, with an
axle radius of 25 m, could be polygonally
realized. Only in the transition area to the
The different cross-sections of the turbine tract in the The ST 100 stacking tower required only 5 system com- straight tunnel tubes with a 10 % incline in
power house could be cost-effectively constructed with ponents for all heights and was mounted without
the direction of the outlet structure were
TRIO and RUNDFLEX. tools.
the carriages coupled.
Contractor
ARGE Erweiterung PSW Vianden, Los 1;
Ed. Zblin AG, STRABAG, Jger Bau
Client
Socit lectrique de lOur (SEO), Vianden
Field Service
PERI GmbH Germany, Weissenhorn Office
274 275
Cooling Water Tank, Water Retaining Structures
Contractor
Sunway Construction Sdn. Bhd. Especially for structures with special requirements,
Field Service such as watertightness, selection of the right anchor
PERI Formwork Malaysia Sdn. Bhd., Seri Kembangan technology is crucial. With the SK system, the tie points
Office are closed and reliably sealed by means of bonded
0,75
concrete cones.
4.25
Subba Rao V. Semenchalam
Assistant General Manager
45.50
formwork system is tremendously important.
We decided in favour of PERI because the
systems are easy to use and ensure safe
operational sequences. In connection with
the PERI implementation planning and the
construction site support, we can achieve
fast cycle times.
276 277
Industrial Structures
278 279
Westfalen Power Plant, Hamm, Germany Industrial Structures
Zbigniew Zo
Site Manager
During the assembly work as part of the of working platforms from the PERI UP
new power plant development, PERI UP Rosett Flex modular scaffolding system.
Rosett Flex proved to be extremely Thus, one externally-mounted working scaf-
adaptable and thus fulfilled the highest fold with integrated 75 cm flights of stairs
requirements regarding the working was used for the final assembly of the eight
platforms which were to be installed. inlet ducts. The scaffold solution could be
Given that the modular scaffold was optimally adjusted in a metric grid arrange-
mounted with the guardrail in advance, ment to suit the up to 4.50 m cantilevered
required safety levels for the scaffolding funnel shape suspended in part on a scaf-
assembly team was provided to a high fold construction comprised of PERI UP
degree. system components.
With the two new D and E blocks, the The PERI UP system grid was particularly
Westfalen power plant increased its advantageous for the spatial scaffolding of
capacity by 1,600 MW. The high efficiency the funnel filter: scaffold bays could be hori-
and extremely effective filter and purifica- zontally and vertically divided almost arbi-
tion facilities make the coal-fired power trarily with the help of standard compo- With the PERI UP Rosett Flex system grid, the steel
construction could be modified as well as achieving
plant in Hamm the most modern in the nents. As a result, the bay lengths of the optimum adjustment to suit the filter funnel.
world. As the upgrading plant was to be lower sections could be generously-dimen-
fully integrated into the existing site, all sioned for easy access and with a minimum
construction and installation work had to use of materials. In the area of those rele-
be carefully coordinated to match ongoing vant components with geometrical adapta-
power plant operations. tion, 300 cm scaffold bays, for example,
were divided into three sections of 75 cm,
On the two 64 m long and 35 m high elec- 150 cm and 75 cm widths, so that construc-
trostatic precipitators for flue gas desul- tion could continue upwards with reduced
phurization, access for the welding and bay widths.
insulation work was realized with the help
Client
RWE Generation SE, Hamm
General Contractor Flue Gas Purification
Hitachi Power Europe GmbH, Duisburg Also, the insulation work on the 35 m high outer sides
Insulation Work required a safe working scaffold as well as stair access
Kaefer SA, Polaniec, Poland adapted to match the steel structure. The modular scaf-
Field Service folding assembly was carried out extremely safely with
PERI Poland Sp. z o.o., Pochocin Office the guardrail in advance which meant rope protection
PERI GmbH Germany, Weissenhorn Office was not required.
280 281
Biocel Pulp Mill, Paskov, Czech Republic Industrial Structures
With the help of the PERI UP Rosett Flex construction was realized without anchors
modular scaffold, the working platforms and pressure supports, and was also provid-
could be optimally adapted to the silo ed with temporary roofing. Due to the met-
structural components without anchors ric system grid, the PERI UP Rosett Flex
and pressure supports. As a result, all modular scaffolding allowed bay lengths
welding, coating and installation work between 1.50 m and 3.00 m and bay widths
could be carried out safely and according of 0.75 m to 1.50 m to be combined with
to the required level of quality. each other in 50 cm and 25 cm increments
Radim Skora respectively. The adaptability provided by
Managing Director The pulp mill in the Czech town of Paskov means of internal brackets and steel deck-
has expanded and modernized its produc- ing mounted in chess board fashion meant
The silos and the technical equip- tion facilities. The special pulp produced that all working areas were optimally acces-
ment with the countless number of there is an important raw material for fur- sible and a high level of safety was ensured
pipes in particular, presented an enor- ther processing into high-quality cellulose when the scaffolding was used.
mous challenge for the scaffolding fibre products. For this, five 13 m high circu-
work. With PERI UP, we managed to lar steel tanks were erected which featured In addition, especially advantageous was
provide a scaffolding construction to diameters of varying dimensions. PERI UP the fact that individual decks could be
the satisfaction of our customer. scaffolding provided safe and comfortable removed at any time and installed in anoth-
working conditions for the complex welding er position. As a result, the scaffolding
and coating work. could be subsequently self-adapted for any
unforeseen technical installation work
For a long-lasting coating, the surfaces without complex scaffold assembly and
were not under any circumstances to be whilst maintaining the high level of safety.
soiled or brought into contact with any
foreign matter. Therefore, the scaffold
Scaffold Contractor
Scaffmont s.r.o., Ostrava
Field Service
PERI spol. s r.o. Czech Republic, Jesenice and Prague
43.25
7.50
5.
5.
10
Modular adaptation: ledgers could be installed in almost Safe working conditions: work could be carried out Short distances: the access technology was integrated
any combination and the decks mounted in a chess quickly and safely on completely covered working levels into the scaffolding construction with the help of
board fashion. with non-slip surfaces. 75 cm wide aluminum stairways.
282 283
Waste Incineration Plant, Industrial Structures
Klaipeda, Lithuania
Mobile working platform
reduces time and material costs
The PERI scaffolding solution, complete The 31 m long and only 7.50 m wide plat- featured an 8 m cantilever on this side; as a
with a movable working platform in a form with integrated wheel units was sup- result, the span between the rails was
longitudinal direction, reduced material ported on aluminium rails and could be 22.30 m.
costs and saved time. The compatibility moved by hand in a longitudinal direction to
with rentable system components taken the next section. Compared to a flat scaf- An important element of the PERI scaffold-
from the extensive PERI product range folding construction, time and material ing solution were the system components
increased the cost-effectiveness and requirements could therefore be significant- taken from the extensive formwork portfo-
safety levels at the same time. ly reduced. LGS girder segments were con- lio. The use of SRU steel walers and RCS
nected by means of 150 cm ledgers, which climbing rails in the scaffold sub-structure
The waste incineration plant in Klaipeda is had been pre-assembled on the ground and as well as anchors from the brace frame
the first thermal waste utilization facility in then raised into position by crane. Due to programme avoided any on-site temporary
the Baltic States and is regarded as a pilot the limited load-bearing capacities of the solutions and was also very cost-effective
project. With a 50 MW heat and 20 MW ground on one side of the hall, the platform due to the rentable components.
power output respectively, it covers almost
half the urban thermal energy requirements.
In addition, the recycling capacity of approx. 22.30 8.00
240,000 t/a household and industrial waste
as well as biomass, makes a significant
contribution for easing the burden on land-
fill sites in the region.
17.40
for the assembly of the wall elements.
Furthermore, this also served as a 15 m
high support for a working platform based
on the LGS lattice girder system. This was
47 m above the bottom plate of the bunker
so that the bunker roof frame construction
could be completed.
29.50
Contractor
JSC Litana ir Ko, Gargdai
Field Service The working platform based on the LGS lattice girder The scaffold sub-structure serves as support for the rails
Waste collection bunker and steel hall of the modern PERI UAB Litauen, Vilnius Office system was supported on wheels and moved by hand and as working scaffold for the wall-side indoor hall With the help of rentable system components, such as
waste incineration plant are 54 m high. PERI GmbH Germany, Weissenhorn Office to the place of assembly. assembly. the RCS climbing rails, large spans could be bridged.
Dmitrij Cariov
Site Manager
284 285
Grain Silo near Parma, Italy Industrial Structures
Type-tested and a high level of safety in all operational Optimal jobsite results: climbing formwork solution Safe and convenient: PERI UP site stairs with 1.00 m
areas: CB 240 and CB 160 climbing scaffold system on with CB climbing platforms and accurately rounded step widths and separate landings.
the inside and outside. VARIO GT 24 wall formwork.
Contractor
Ghidini Egidio S.p.a., Alberi-Parma
Field Service
0.20 7.00 0.85 7.00 0.85 7.00 0.40 PERI S.p.A. Italy, Basiano Office
3.25
Mauro Ghidini
Contractor
Cost-effective climbing concept: with a complete platform level and halved on-site wall
formwork requirements, fast and continuous work operations were achieved.
With the PERI climbing formwork solu- Nine grain silos stretch 52 m into the sky In order to maintain the 8-month construc- heights in each case, took into account that ready-to-use to the jobsite. Tight connections Including the finishing platforms on the
tion, nine silos grew steadily upwards in with which the Molino Agugiaro & Figna tion schedule as well as ensuring an opti- only one crane was available and could not were ensured by using articulated couplings CB brackets and concreting scaffolds on the
2-week cycles with reduced on-site company in Collecchio near Parma signifi- mal construction process, PERI engineers be worked around the clock. which also meant that the formwork ele- internal formwork, optimum accessibility
material requirements which were pre- cantly expanded its storage capacity recent- combined a complete CB climbing platform ments could be easily positioned. In addi- and safety was ensured on three levels.
cisely adapted to the project require- ly. The circular silos, with a 7 m diameter level with the amount of wall formwork VARIO GT 24 girder wall formwork elements tion, the PERI implementation planning This was complemented by an up to 40 m
ments. Ready-to-use elements from the and 25 cm wall thickness respectively, are reduced by a half. As a result, rapid and were used to form the silo walls, and the included construction-compliant realization high PERI UP steel staircase, mounted as
PERI formwork assembly hall ensured connected to each other. 1,350 tons of continuous working operations reinforce- formlining for the 3.50 m and 3.75 m internal of the striking procedures within the con- 10-legged tower with 1.00 m step widths
dimensional accuracy. wheat are stored in the silos; a neighbour- ment, forming, concreting could be and external radii respectively was exactly straint points. 88 CB climbing platforms and separate landings. Toe boards on the
ing building, which was constructed at the achieved with reduced on-site material rounded by means of shaped timber form- with CB 160 brackets on the internal and landings and closed risers prevented any
same time, houses the new cleaning and requirements. The concept, with 16 climb- ers. These were accurately pre-assembled CB 240 on the external sides of the silo small components from falling to the
grinding plant with a daily production of 30 t. ing cycles and 3.25 m concreting cycle at the PERI assembly facility and delivered formed one complete working level. ground.
286 287
Refuse Derived Heating and Power Station, Spremberg, Germany Industrial Structures
The skeleton work for the power station complex With PERI UP staircase towers, the working areas The massive power plant walls were climbed with
complete with fuel and slag bunkers, boiler house, could be safely accessed also at great heights. CB 240 and VARIO. With every fourth climbing cycle,
flue gas purification unit and tipping hall was realized the wall thickness is reduced by 10 cm.
in only 18 months.
For the massive components with a high Construction site personnel continually
degree of reinforcement, PERI planned adapted the scaffold units to match the
and delivered the combined use of building progress. The flexible fields of
climbing formwork, access technology, applications maximized material utilisation
reinforcement and shoring through to and the craneability of larger scaffold units
the heavy-duty towers, optimally clearly accelerated the moving process.
matched to suit project requirements. Fast and safe access to all working areas
was provided by up to 60 m high PERI UP
Four VST heavy-duty shoring towers from staircase towers with 75 cm wide alumini- Hanno Pradel, Site Manager
the VARIOKIT engineering construction kit um flights of stairs. Walkways and landing Klaus-Dietrich Koch, Supervisor
supported the cantilevered massive compo- junctions were also assembled with light-
nents at heights of 23.60 m with a load of weight and load-bearing PERI UP Rosett The technical support provided by
over 200 t or 560 kN per leg. The heavy Flex system components. In addition, the PERI is extremely competent and pro-
duty towers were assembled easily and modular scaffold system was used as type fessional and perfectly matches our
safely in a horizontal position on the ground tested shoring for supporting heights of site requirements. With the VARIOKIT
using two 10 m sections which were sup- up to 20 m and served as up to 10 m high, heavy-duty tower, we especially like
plemented with the corresponding base craneable reinforcement scaffolding. the simple and time-saving assembly
and head units. The heavy-duty towers with the help of system components
could be ideally combined with the PERI UP CB 240 climbing scaffold and VARIO GT 24 and connections. Regarding the work
Rosett Flex modular scaffolding system in girder wall formwork formed crane-shiftable and protection scaffolding, the support
order to form safe working platforms in the climbing formwork units for constructing system can be combined with PERI UP
head area. These had already been connect- the massive walls of the building with con- in many ways. In addition, the scaffold
ed to the VST towers during assembly on creting cycle heights of 4 m. In particular, has a universal application and can be
the ground and then erected together with the formwork concept took into considera- moved by crane in large units.
the tower unit this meant that no risky tion adapting the different climbing cycles
assembly operations were necessary at to suit the complicated building geometry Contractor
Glass Ingenieurbau Leipzig GmbH
great heights. with haunched corners and gradual tapering
Client
of the walls from 1.40 m to 0.30 m. Spreerecycling GmbH & Co. KG, Spremberg
In addition, PERI UP provided the basis for Field Service
PERI GmbH Germany, Leipzig, Cottbus and Weissenhorn
all access means as well as the shoring and
Offices
reinforcement scaffold on the jobsite.
288 289
Building Redevelopment
290 291
Tallinn Oceanographic Museum, Estonia Building Redevelopment
Harto Vallimgi
Site Manager
One of the cultural highlights of Tallinn is In order to be able to optimally work on all Here, the shoring towers were fully inte-
a historical domed structure dating from areas of the underside of each dome, the grated into the spatial working scaffold
the time of the last Russian Czar which PERI scaffold solution featured stepped used for renovating the underside of the
was converted into an attractive oceano- working levels in 50-cm increments at dome. In addition, a light-duty aluminium
graphic museum. PERI UP was optimally heights of 11 m at the corners and 19.50 m stairway with alternating staircase units was
adapted here to suit the geometry of the at the centre of the dome. For exact geo- centrally positioned in the working scaffold
almost 100-year old reinforced concrete metrical adjustments in the edge sections, which ensured safe and easy access.
complex and was used for a wide range the substructure was sub-divided in each
of applications on both the interior and case into two 1.50 m wide fields. In addi- For the refurbishing work on the outer sides
exterior. tion, cantilevers have been installed using of the domed structure, PERI UP T 72
standard node braces thus providing 1.50 m facade scaffolding was used. This provided
The reinforced concrete renovation work on extended platforms at both ends. a twofold level of safety: during the assem-
the self-supporting shell-shaped construction bly sequence featuring the guardrail in
complete with three impressive domes, The ring beams of the lanterns, the opening advance and utilization when fitting inside
without disturbing any intermediate sup- in the centre of the domes, were supported guardrails without any accessories a big
ports, was extremely time-consuming and during the entire renovation operations with advantage in the case of this oceanographic
labour-intensive. The old reinforcement was the help of PERI UP Rosett shoring towers. museum with missing external walls. Here,
exposed using an ultra-high pressure clean- These had grid dimensions of 1.50 m by too, a stair tower provided safe access to
ing device, corrosion protection was then 1.50 m and carried up to 40 kN per leg the roof and, when necessary, to the
applied, followed by injection work along with heights of 21 m. respective scaffold levels.
with replacement of any damaged reinforc-
ing bars all this in order to subsequently
install an additional layer of reinforcement
and a 50 mm thick shotcrete covering. Safe working conditions also for outside work: PERI UP T 72 facade scaffolding complete with
with PERI UP T 72 frame scaffolding with internal site access stair tower scaffold supplemented the
guardrail and without additional components. comprehensive solution.
The domes had to be temporarily supported
so that overall stability could be maintained;
at the same time, the PERI UP scaffold sys-
tem served as a spatially adapted working
platform with integrated shoring and stair
access. The detailed design of the birdcage
scaffold was based on metric grid dimen-
sions of 3.00 m by 3.00 m.
Contractor
Nordecon AS, Tallinn
Field Service
PERI AS Estonia, Saku vald
292 293
Modernization of Motorway Underpass, Gstrow, Germany Building Redevelopment
Contractor
H. F. Wiebe GmbH & Co. KG, Achim
Field Service
PERI GmbH Germany, Hamburg and Weissenhorn Offices
Retraction of
reinforcement Struck
0.55
6.25
11.80 8.00
14.40
The extended VARIOKIT formwork carriage stands ready The F6 concrete was placed via 15 concrete pump
for placing the 15 t of reinforcement for the next casting connections integrated in the VARIOKIT formwork
segment. carriage construction.
PERI engineers created an efficient and Significant damage to the polygonal-vaulted The site-compliant formwork carriage con- well as the realization of an opening for In addition, PERI engineers took into con- work, longitudinally-arranged PERI UP
through the use of rentable system com- underpass on the A19 motorway necessi- struction consisted largely of rentable sys- allowing the passage of agricultural traffic. sideration all scaffolding tasks as an inte- reinforcement scaffold was also available
ponents cost-effective formwork and tated the construction of a replacement tem components and connections taken 15 t of reinforcing steel was to be installed gral part of a comprehensive project solu- for the site personnel.
scaffolding solution for the refurbish- structure. In addition, this resulted in from the VARIOKIT engineering construc- per standard section. This was placed in an tion. Thus, PERI UP Rosett Flex modular
ment of an existing motorway under- achieving a higher load-bearing capacity and tion kit. This solution allowed work to be extended and lowered position respectively scaffolding mounted on the front side of
pass. With the VARIOKIT tunnel form- a structural widening from 52 m to 74 m. caried out in weekly cycles without a on the formwork carriage and subsequently the formwork carriage served as a working
work carriage, the 4-man construction Construction work included five 8 m long crane and with only a four-man construction retracted and raised up to the existing platform for operating the stopend form-
crew was able to achieve the planned standard cycles as well as two portal sec- crew. The formwork concept took into arched roof. Placing the highly compactable work when extended. In the retracted con-
weekly cycle also on account of the tions, and also featured an access portal for account all the different stages of construc- concrete took place using 15 concrete pump creting position, it could be back-anchored
problem-free shuttering and striking agricultural machinery. tion including retraction of the reinforce- connections which were integrated in the in the cycle for the existing structure from
procedures. ment using the tunnel formwork carriage as VARIOKIT formwork carriage construction. there. For efficient reinforcement binding
294 295
Main Station Roof Renovation, Wiesbaden, Germany Building Redevelopment
Contractor
ARGE Instandsetzung Hallendach
Rainer Morawietz, Project Manager Hauptbahnhof Wiesbaden:
and Metin Kizmaz, Site Supervisor Ed. Zblin AG / Eiffel Deutschland
Stahltechnologie GmbH
Scaffold Contractor
This here is a project that falls outside of any Gerstbau Paul GmbH, Frankfurt a. M.
standard scaffold frame undertaking. In spite Field Service
of the uniqueness of the PERI solution with the PERI GmbH Germany, Dsseldorf
Frankfurt and Weissenhorn Offices
mobile platforms, everything worked smoothly.
On the basis of the PERI solution featur- remained virtually unaffected during the Bridging the retail outlets and kiosks was
ing transversely and longitudinally entire refurbishment work as the railway realized using system components. Shear
movable working and safety platforms, tracks in the section to be renovated frames were formed that were adapted to
refurbishment work for the glass roofing were covered by a PERI protective roof suit the local conditions. Integrated HDT
on the five-span train shed was carried construction. main beams taken from the HD 200 heavy
out very quickly and without significant duty system carried the loads even from
interference to rail operations and pas- Mobile platform units minimized the time large spans of up to 10 metres and
senger movements throughout the sta- required for moving to the next phase. For reliably transferred these into the PERI UP
tion. Thanks to the mutually supportive the planning of the PERI UP load-carrying supporting structure. For accommodating
cooperation from the planning phase system, not only were the rail tracks to be corresponding load concentrations, the
onwards between the ARGE partners, kept open but suitable walkways for pedes- scaffold legs could be bundled together by
scaffolding contractor and PERI engi- trians with sufficient width of passage means of short 25 cm ledgers.
neers, all specified deadlines were met. also had to be taken into consideration. In
The use of standardized, rentable system addition to the vertical loads, the scaffold
components from the extensive scaffold- sub-structure also carried all horizontal
ing and formwork product ranges also loads from the platform. Anchoring to the
played an important role here. steel components which were to be refur-
bished was not possible due to structural
The 17.50 m to 25.50 m wide glass-steel reasons. Safe access was provided by
roof constructions of the five listed, 195 m 75 cm wide aluminium and 1.00 m wide
long platform halls were replaced section steel stairs respectively of the PERI UP
by section. Normal station operations scaffolding system.
The 190 m long protective roof construction straddled Manoeuvring at a height of 7 m: moving the platforms
the rail tracks with spans ranging between 7.50 m and both transversely and longitudinally was carried out on
12.50 m this meant that the refurbishment work on rails thus being secured on the sides at all times. The ... where they were easily moved by hand in a longitudi-
the hall roofs could be carried out without affecting train units moved sideways on roller blocks from the newly nal direction by means of a trolley on steel walers to the
schedules and passenger movements. renovated hall into the next ... next place of operations.
296 297
Eaton Centre, Toronto, Canada Building Redevelopment
During the modernization of the Canadi- At the same time, protective roof structures
an shopping centre, the PERI UP scaffold ensured that visitors could move around the
solution made a very convincing case mall safely. Through the detailed scaffold
through its great adaptability and pro- and cycle planning with generously-dimen-
vided both users and visitors with maxi- sioned passageways along with large-sized
mum safety. The extensive refurbishing advertising banners, a construction site
work was carried out during normal busi- atmosphere was scarcely felt in spite of the
ness hours. ongoing modernization measures. Bridging
width and passage heights were optimally David Gerdun
The seven-storey Toronto Eaton Centre is adapted to suit the use of the centre by the Site Superintendent
home to over 230 shops, restaurants and visitors as well as the geometry of the
service providers as well as an impressive building. We have used PERI scaffolding sys-
glass gallery, and is one of the largest tems in several projects in the past.
shopping malls in Canada. Over a period of Here, PERI UP Rosett provided several PERIs engineering design considers
two years, the shopping centre underwent advantages: the modular scaffold could be the site conditions. The adaptable
extensive renovation and modernization. flexibly adapted to the geometrical and stat- PERI UP system, completed by logis-
While escalators, elevators, floor coverings, ic requirements for maximum accessibili- tic support enables us to achieve the
balustrades and lighting were being ty for the workmen. The ledger connections strict safety, speed, convenience and
replaced on several floors at one time, by means of the gravity lock, installation esthetic requirements of the project.
the mall nevertheless remained open for of the steel decks with integrated lock
visitors as usual. against lift off as well as the lattice girder
bridging with the help of the starter tube
With the help of the PERI UP Rosett scaf- also accelerated scaffold erection and
fold system, PERIs Canadian engineers ensured safe working conditions during
created a project solution with working assembly, modifications and dismantling.
platforms and integrated access for subse- Furthermore, selected system components
quent work carried out by sub-contractors. were used which, in addition to the static
requirements, also met all aesthetic
demands. Contractor
PCL Construction, Mississauga
Field Service
PERI Scaffolding Services Inc. Canada, Bolton Office
Refurbishing work took almost 2 years The publicly accessible areas were strictly separated
however, the Toronto Eaton Centre was from the working areas by means of advertising banners The PERI UP Rosett scaffold solution could be adapted
open for visitors during the entire project. and thus made safe for passers-by. to meet all geometrical and static requirements.
298 299
Restoration of St. Vitus Cathedral, Prague, Czech Republic Building Redevelopment
Required cantilevers could be realized with both scaffold PERI UP Rosett Flex adapts perfectly to the complex In order to preserve the historic structure of the St. Vitus
brackets and system diagonals. geometry in 25 cm increments. Cathedral in Prague, on-going restoration and scaffolding
work is required.
The restoration of the historic St. Vitus Through the 25 cm grid arrangement,
Cathedral in Prague called for an adapta- PERI UP Rosett Flex can be adapted to suit
ble scaffolding system with working almost any geometric shape, and the direc-
levels also designed to accommodate tion of the decking within a scaffold bay can
the storage and transport of large-sized also be turned at will. As a result, the dis-
blocks of stone. tance between the working level and the
structural element to be worked on is mini-
St. Vitus Cathedral is situated entirely within mized. This optimizes the working condi-
the Prague Castle complex and is the most tions for the stonemasons and increases Rbert upej
visited place of interest in the country with safety. Scaffold Contractor
1.5 million visitors a year. In order to pre-
serve the historic structure of the Gothic- During the scaffold planning phase, the can- We love to work with PERI UP
style cathedral which was built in 1344, tilevered transition points to be mounted as because it is flexible and safe. This is a
ongoing and extensive restoration work is well as the defined load transfer into the big advantage particularly for the work
required. stable existing structure and on the access on the St. Vitus Cathedral in Prague.
areas were to be taken into consideration.
The PERI UP Rosett Flex modular scaffold- In addition, pedestrian tunnels are integrat-
ing system serves as a flexible, adaptable ed into the scaffold construction which is
working scaffold as well as for material covered with safety nets in order to protect
storage and support system for the almost the many visitors.
45 m high traction elevators. Thus, the
working levels are 4.50 m wide in some
areas in order to accommodate the large-
sized and up to 600 kg stone blocks.
Restoration
Kamenosochastv Pnek, any
Scaffold Contractor
upej Scaffolding Contractors, ilina/Slovakia
Field Service
PERI spol. s r.o., Czech Republic, Jesenice and Prahy
300 301
PERI International 42
44
36
19
20 43
7 23
22 32 50 51 10
44
37
34 39 40
18 56
59 55
38 49 47 58
11 57 35 54
52 65
6
21
1 64
Germany
01 5 62
PERI GmbH 14
17 46 66
Rudolf-Diesel-Strasse 15
89264 Weissenhorn 2 30
info @ peri.com 3 8
16
www.peri.com 13
29 61 26 63
28
9
53
24 48
4
41 27
31
45
60
25
33 12
02 France 09 Italy 16 Austria 23 Korea 30 Slovakia 37 Lebanon 44 Russian Federation 51 Turkmenistan 57 Saudi Arabia 64
Nigeria
PERI S.A.S. PERI S.p.A. PERI Ges.mbH PERI (Korea) Ltd. PERI spol. s. r.o. PERI Representative Office OOO PERI PERI Kalp ve skeleleri PERI Saudi Arabia Com.Ltd. Heights Access Nigeria Ltd.
77109 Meaux Cedex 20060 Basiano 3134 Nudorf ob der Traisen Seoul 135-936 903 01 Senec 90416 Jdeideh 142407, Noginsk District Agabat 21463 Jeddah Victoria Island, Lagos
peri.sas@peri.fr info@peri.it office@peri.at info@perikorea.com info@peri.sk lebanon@peri.de moscow@peri.ru ahmet.kadioglu@peri.com.tr info@peri.com.sa info@heightsaccessng.com
www.peri.fr www.peri.it www.peri.at www.perikorea.com www.peri.sk www.peri.com www.peri.ru www.peri.com.tr www.peri.com.sa www. heightsaccessng.com
03 Switzerland 10 Japan 17 Czech Republic 24 Portugal 31 Australia 38 Lithuania 45 South Africa 52 Belorussia 58 Qatar 65 Oman
PERI AG PERI Japan K.K. PERI spol. S r.o. Pericofragens Lda. PERI Australia Pty. Ltd. PERI UAB PERI (Pty) Ltd IOOO PERI Belarus PERI Qatar LLC PERI (L.L.C.)
8472 Ohringen Tokyo 103-0015 252 42 Jesenice u Prahy 2790-326 Queijas Glendenning NSW 2761 02300 Vilnius 7600 Stellenbosch 220100 Minsk P.O.Box: 31295 - Doha Muscat
info@peri.ch info@perijapan.jp info@peri.cz info@peri.pt info@periaus.com.au info@peri.lt info@peri.co.za info@peri.by info@periqatar.com perimct@perime.com
www.peri.ch www.perijapan.jp www.peri.cz www.peri.pt www.periaus.com.au www.peri.lt www.peri.co.za www.peri.by www.periqatar.com www.perime.com
04 Spain 11 United Kingdom/Ireland 18 Denmark 25 Argentina 32 Estonia 39 Morocco 46 Ukraine 53 Croatia 59 Algeria 66
Colombia
PERI S.A.U. PERI Ltd. PERI Danmark A/S PERI S.A. PERI AS PERI S.A.U. PERI Ukraina PERI oplate i skele d.o.o. Sarl PERI PERI S.A.S. Colombia
28110 Algete - Madrid Rugby, CV23 0AN 2670 Greve B1625GPA Escobar Bs. As. 76406 Saku vald Tanger 07400 Brovary 10 250 Luko-Zagreb Kouba 16092, Alger Chapinero Alto, Bogot
info@peri.es info@peri.ltd.uk peri@peri.dk info@peri.com.ar Harjumaa peri25@menara.ma peri@peri.ua info@peri.com.hr info@peri.com peri.colombia@peri.com.co
www.peri.es www.peri.ltd.uk www.peri.dk www.peri.com.ar peri@peri.ee www.peri.com www.peri.ua www.peri.com.hr www.peri.com www.peri.com.co
www.peri.ee
07 USA 14 Malaysia 21 Poland 28 Romania 35 United Arab Emirates 42 Iceland 49 Mexico 56 Kuwait 62 Panama
PERI Formwork Systems, Inc. PERI Formwork Malaysia Sdn. Bhd. PERI Polska Sp. z o.o. PERI Romnia SRL PERI (L.L.C.) Armar ehf. PERI Cimbras y Andamios, PERI Kuwait Company WLL PERI Panama Inc.
Elkridge, MD 21075 43300 Seri Kembangan, 05-860 Pochocin 077015 Baloteti Dubai U.A.E. 220 Hafnarfjrur S.A. de C.V. 13011 Kuwait 0832-00155 Panama City
info@peri-usa.com Selangor Darul Ehsan info@peri.com.pl info@peri.ro perillc@perime.com armar@armar.is Estado de Mxico, Huehuetoca kuwait@peri.com info@peri.com.pa
www.peri-usa.com info@perimalaysia.com www.peri.com.pl www.peri.ro www.perime.com www.armar.is info@peri.com.mx www.peri.com www.peri.com.pa
www.perimalaysia.com www.peri.com.mx
302 303
Our commitment to environmental
protection
carbon neutral
natureOffice.com | DE-141-882396
print production
Important notes
Without exception, all current safety regulations must
be observed in those countries where our products are
used.
PERI GmbH
2 3
Formwork
Scaffolding
Engineering
www.peri.com