SolarPhotoVoltaic(PV)PowerPlantEarthingDesignServices
In 2015 1.7GW of renewable energy capacity was added in Australia (46% of this was solar), while 1.3GW of coal
basedcapacitywasdecommissioned.LargescalePVpowerplantsproposedinAustraliamayexceedagigawattin
thenextfewyears.TogetherwithrooftopPVgeneratedpower,totalinstalledSolarcapacityexceeded5GWin2016,
andhasbecomeanintegralpartoftheelectricitysupplynetwork(Australiascurrentelectricitygenerationcapacity
is 56GW). Recently commissioned plants at Royalla (24MW), Broken Hill (53MW), Moree (56MW) and Nyngan
(102MW)havehighlightedelectricalearthingdesignissueswhichneedtobeaddressedupfronttosavecostslater
intheproject.Futurelargescaleplantsinthepipeline(BulliCreek2GW,Kidston150MW,Clare100MW)emphasise
the need for designers to be aware of the likely fault scenarios and how to design earthing systems accordingly.
LibertyConsultingServices(LCS)usesCDEGSsoftwaretoadequatelymodelverylarge,extendedearthingsystems,
andisuniquelyplacedtoprovidearangeofearthingdesignandtestingservicestoassistwiththeseprojects.

EarthingsystemsinalargescaleSolarPVFarm RelevantEarthingRelatedStandards&Codes
AS/NZS5033Installationandsafetyrequirements
LargesolarplantsconsistofmanyPVpanelsmounted forphotovoltaic(PV)arrays
on support frames with structural steel piles or ENAEG0PowerSystemEarthingGuide,Part1:
footings.Theseformlargearrays,connectedtogether ManagementPrinciples(includingArgon)
throughDCsystemstoinverters,feedingACpowerto ENAEG1SubstationEarthingGuide
stepuptransformersataspecifiedexportvoltage. AS/NZS2067Substationsandhighvoltage
installationsexceeding1kVa.c.(Section8)
Sections of PV arrays, inverter groups and stepup AS/NZS1768Lightningprotection
transformers are often combined into larger blocks AS/NZS3000Electricalinstallations(Australian&
thatconnecttothemainHVsubstation. NewZealandWiringRules:Section5)

Thismeansthereareseveraldistinctearthingsystems WhileAS5033appliesto smallsystemsupto240kW,
that are interconnected and cover large areas, often itmaybeappliedtolargerinstallations.Howeverthe
many times larger than typical power plant earth utility scale PV plants require knowledge from the
grids. This extended earthing system requires design library of other Australian earthing standards, and
optimisationforaneconomicalsolution. alsoneedtofollowStatebasedutilityrequirements.

CopyrightLCS2016 www.libertyconsulting.com.au


Soil resistivity testing for large earthing systems extensive, buried earthing systems may not
Soilresistivitytestingintheproposedsolarfarmarea necessarilyberecommended.
isessentialforaccurateearthinganalysis.Thisistobe
done at the start of the project, by experienced and Earthing and bonding methods for PV modules
qualified testers. Guidance is not readily available on ThePVpanelframeistypicallypartoftheearthfault
how many traverses are required, or the maximum current path (ve polarity of DC circuit), and is
spacings that are required in Wenner tests, so required to be electrically bonded to the installation
experienceisnecessarytodeterminethis. earth system. Earthing bonds for PV module frames
are susceptible to corrosion and weathering failures,
Manytesttraversesarenecessaryinlargesolarfarms, henceneedtobeselectedcarefullyforlongevity(e.g.
with suitably powered test equipment for the longer AluminiumversusCopperdissimilarmetalcontact).
spacings. Portable, off the shelf testers are often
unsuitablefortestingtheselargesolarfarms. Secure connections from the module frames to the
piles or reinforced concrete footings are required to
lastthelifeofthesolarfarm,20yearsormore.

Different resistivity values are often apparent across


the site, and seasonal weather variation means the
designer must allow for scenario analysis when
interpretingthesoilresistivitytestdata.

Earthing design approach for large Solar PV Farms
Perimeter fence to bond or not to earth system
Software modelling is necessary for main substation
A metallic perimeter fence may exist, and if it is
grid areas, stepup transformer earthing, enclosures
connected, it will contribute to the solar farm earth
forDC/ACinvertersandswitches,andPVframeswith
system.Ifthefenceisisolateditneedstobeassessed
theirstructuralfootingsandpiles.
for touch potential hazards based on the fault
Manysoftwareprogramsassumeallearthconductors scenarioandEPR.
areatthesamepotentialunderearthfaultconditions.
Earth fault current scenarios for EPR design analysis
However CDEGS MALZ accounts for voltage drop
Faultscenariosincludedirectandindirecteffectsfrom
along earth conductors which significantly alters the
lightning,DCearthfaults(liveDCcircuitconnectionto
performanceofalarge,extendedearthingsystem.
frames),leakagecurrent,andACearthfaults.Usually
Duetothelargenumberofsteelfootingsandburied aloadflowandfaultprotectionstudyisperformedfor
piles that support the solar PV panel frames, these thesite.Thisoftenshowsfaultcurrentlevelswillvary
equivalent earth electrodes are readily available, considerablyacrossthesolarfarm.
negating the need for additional ground rods. Buried
ThehighestfaultlevelstypicallyoccureitherattheHV
earthconductorsmaybeusedtointerconnectthePV
side of the step up transformers (if they are not
panel frames, or this may be achieved by short, PVC
current limited), or at the main collector substation,
insulated conductors in DC cable trays. Therefore
whichhasautilitysourcecontribution.

CopyrightLCS2016 www.libertyconsulting.com.au

However as with typical substation earthing analysis, Long runs of earthing conductors and services will
the worst case touch voltages will often be found at mean some voltage drop is expected, hence the
theedgesorcornersoftheearthsystem,wherethere importanceofsurgeprotectiondevices(SPDs).
is minimal installed earthing to control voltage
gradients. These areas should be examined closely,
especiallyifsoilresistivityishigherhere.

SmallleakagecurrentsoccurfromthePVcellstothe
moduleframes,viathemoduleglass.Thisflowsfrom
theframetotheearthsystemandreturnsviaearthed
(ve polarity) conductors to the modules. Typically

these are not dangerous, but for large systems, with
aging defective PV modules with damaged glass or The damage associated with nearby strikes needs to
delamination, in wet conditions, leakage current can beavertedwiththecorrectselectionofSPDs.BothDC
behazardous. and AC SPDs are needed to protect sensitive
electronicsincollectorunitsandsubstationareas.
Lightning and surge protection considerations
There is definitely a correlation between solar Testing of completed PV array earthing system
radiation, humidity and lightning frequency. Solar Testing a large solar farms earthing system is often
farm sites are selected for their high solar radiation, impracticalduetothesheersizeoftheearthsystem
andtheassociatedhighhumiditymeanstheymaybe footprint.TheresultwillbeafractionofanOhm,but
moresusceptibletolightning. howusefulisthisnumberinpracticalterms?

Experience in Europe and the US has shown the Off frequency current injection techniques using the
devastating impacts of not installing adequate fall of potential method, may still be employed to
lightningandsurgeprotectionduringtheconstruction investigate localised EPR and touch and transfer
phaseoflargesolarfarms.ThecostofLPSisnegligible voltage hazards at specific areas around the solar
compared to overall cost of plant. Just one electrical farm, to confirm agreement with the design model.
storm could prove catastrophic with enormous Thisshouldbeconsideredonacasebycasebasis.
financialimplications,andsomerecentinstallationsin
AustraliaappeartohaveneglectedtheneedforLPS.

AstandardLPSapproachwilleitherhaveairterminals
spacedfromthemoduleframes,ormounteddirectly Testing should also concentrate on the collector
on them. The air terminals preinstalled on module substations,andthemainsolarfarmsubstation,prior
framesmaybeamoreeconomicalsolution. toconnectionwiththerestofthePVarrays.
The earth termination system of the installed LPS is Earth grid continuity, integrity testing of earthing
also critically important. Equipotential bonding is connections,bondstoequipmentandmoduleframes,
required to the main electrical earth system so that and periodic integrity checks over the life of the
lightning induced EPR does not create significant installationformanessentialpartofanytestregime.
potentialdifferences.

CopyrightLCS2016 www.libertyconsulting.com.au

Vous aimerez peut-être aussi