1.

RFI Summary UP TO MAY 11, 2017


No. of RFIs Status of RFI
No. of RFIs
No. of RFIs checked (This Month)
Sr. raised from
Description of item submitted from May 1 % Checking
No. May 1 to Approved Rejected
till date to May 11,
May 11, 2017 By IC by IC
2017
Highway RFI
1 TBM Checking 5 - - - - -
2 Stump removal 4 - - - - -
3 Clearing- Grubbing 32 - - - - -
4 Construction of OGL Bed 103 04 00 - - 0.00%
5 Excavation 83 10 05 04 01 50.00%
6 Construction of Embankment Layers 293 25 11 08 03 44.00%
7 Construction of Subgrade Layers 267 74 20 14 06 27.02%
8 Construction of GSB Layers 12 12 09 00 09 75%
Structure RFI
PCC for Structures (M-15)
1 48 09 4 4 - %
(Headwall PCC & Pipe Bedding)
Checking of R/f. & Shuttering for Headwall & Cradle &
2 104 15 8 8 - 0.00%
Raft in HPC & Duct Pipe Culverts
Checking for Headwall Concreting M20 grade & Cradle
3 104 15 8 8 - 0.00%
Concreting M20
4 Checking of Pipe Laying 42 7 3 - 0.00%
5 Checking of R/f. & Shuttering for Raft in Box Culverts 3 3 3 2 1 0.00%
6 Checking of Concreting for Raft in Box Culverts 2 2 2 2 0.00%
7 Steel Checking and Concreting of Wall (Box Culvert) - - - - - -
8 Steel Checking and Concreting of Slab - - - - - -
9 Curtain wall Concreting (M15) - - - - - -

LAB RFI SUMMARY FROM MAY 1 TO MAY 11 IS NOT CONSIDERED


2. RFI Summary APRIL
No. of Status of RFI
No. of No. of RFIs
RFIs (This Month)
Sr. RFIs raised
Description of item checked
No. submitted during this Approved Rejected % Checking
during this
till date month By IC by IC
month
Highway RFI
1 TBM Checking 5 - - - - -
2 Stump removal 4 - - - - -
3 Clearing- Grubbing 32 - - - - -
4 Construction of OGL Bed 99 34 28 15 13 82.35%
5 Excavation 73 09 05 05 - 55.55%
6 Construction of Embankment Layers 268 148 39 23 16 26.35%
7 Construction of Subgrade Layers 193 170 75 31 44 44.12%
Structure RFI (HPC, Duct Pipe Culverts, Box Culverts)
1 PCC for Structures (M-15) 39 14 - - - 0.00%
2 Checking of R/f. & Shuttering for Headwall & Cradle 89 56 - - - 0.00%
Checking for Headwall Concreting M20 grade & Cradle
3 89 56 - - - 0.00%
Concreting M20
4 Checking of Pipe Laying 25 15 - - - 0.00%
5 Steel Checking and Concreting for Raft (Box Culvert) - - - - - -
6 Steel Checking and Concreting of Wall (Box Culvert) - - - - - -
7 Steel Checking and Concreting of Slab - - - - - -
8 Curtain wall Concreting (M15) - - - - - -
Lab RFI
1 Cube (7 Day) Strength 1 1 1 1 - 100.00%
2 Cube (28 Day) Strength - - - - - -
3 Existing soil Sampling and Testing - - - - - -
4 Borrow area Sampling and Testing 4 1 1 1 - 100.00%
5 Sampling of Sources for various materials 10 8 8 8 - 100.00%
6 Calibration of Plant & Machineries 1 1 1 1 - 100.00%
7 Mix Design of Concrete 1 1 1 1 - 100.00%
3. RFI Summary - MARCH
No. of
No. of No. of RFIs Status of RFI
Sr. RFIs
RFIs raised (This Month)
No Description of item checked
submitted during this
. during this Approved Rejected % Checking
till date month
month By IC by IC
Highway RFI
1 TBM Checking 5 - 2 2 - -
2 Stump removal 4 1 - - - 0.00%
3 Clearing- Grubbing 32 06 02 02 - 33.33%
4 Construction of OGL Bed 65 58 30 25 05 51.72%
5 Excavation 64 36 21 21 00 58.33%
6 Construction of Embankment Layers 120 120 45 31 14 37.50%
7 Construction of Subgrade Layers 23 23 07 04 03 30.44%
Structure RFI
PCC for Structures (M-15)
1 25 13 - - - 0.00%
(Headwall PCC & Pipe Bedding)
2 Checking of R/f. & Shuttering for Headwall & Cradle 33 22 - - - 0.00%
Checking for Headwall Concreting M20 grade & Cradle
3 33 22 - - - 0.00%
Concreting M20
4 Checking of Pipe Laying 10 10 - - - 0.00%
5 Steel Checking and Concreting for Raft - - - - - -
6 Steel Checking and Concreting of Wall (Box Culvert) - - - - - -
7 Steel Checking and Concreting of Slab - - - - - -
8 Curtain wall Concreting (M15) - - - - - -
Lab RFI
1 Cube (7 Day) Strength - - - - - -
2 Cube (28 Day) Strength - - - - - -
3 Existing soil Sampling and Testing 9 5 4 4 - 80.00%
4 Borrow area Sampling and Testing 3 3 3 3 - 100.00%
5 Sampling of Sources (Aggregates & Sand) 2 2 1 1 - 50.00%
4. RFI Summary FEBRUARY
No. of
No. of No. of RFIs Status of RFI
Sr. RFIs
RFIs raised (This Month)
No Description of item checked
submitted during this
. during this Approved Rejected % Checking
till date month
month By IC by IC
Highway RFI
1 TBM Checking 5 5 3 3 - 60.00%
2 Stump removal 3 3 3 3 - 100.00%
3 Clearing- Grubbing 26 26 20 20 - 76.92%
4 Construction of OGL Bed 7 7 - - - 0.00%
5 Excavation 28 24 24 24 - 100.00%
6 Construction of Embankment Layers - - - - - -
7 Construction of Subgrade Layers - - - - - -
Structure RFI
PCC for Structures (M-15)
1 12 12 - - - -
(Headwall PCC & Pipe Bedding)
2 Checking of R/f. & Shuttering for Headwall & Cradle 11 11 - - - -
Checking for Headwall Concreting M20 grade & Cradle
3 11 11 - - - -
Concreting M20
4 Checking of Pipe Laying - - - - - -
5 Steel Checking and Concreting for Raft - - - - - -
6 Steel Checking and Concreting of Wall (Box Culvert) - - - - - -
7 Steel Checking and Concreting of Slab - - - - - -
8 Curtain wall Concreting (M15) - - - - - -
Lab RFI
1 Cube (7 Day) Strength - - - - - -
2 Cube (28 Day) Strength - - - - - -
3 Existing soil Sampling and Testing - - - - - -
4 Borrow area Sampling and Testing 4 4 2 2 - -
5 Sampling of Sources (Aggregates & Sand) 8 2 - - - -