EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Inspect the cable bus for proper installation and freedom from surface 16-SAMMS-520
A3
defects. Sec. 9.1
Schedule Q
A4 Check the testing instrument for calibration validity.
Att.IV, Sec.7.1
Using a continuity tester, verify the end to end continuity of the cablebus
SAES-P-104
A6 installation and record the results.( NFPA 70, NEC 110.3 Manufacturer
Sec. 4.1
instructions)
Measure the insulation resistance of each bus run phase to phase and SAES-P-104
A11
phase to ground for one (1) minute. (NETA ATS, 2009 Sec. 7.4.2.1) Sec. 3.2
The overpotential test shall proceed only if the cablebus has passed the SAES-P-104
A14
insulation resistance test. (NETA ATS, 2009 Sec. 7.4.2.2) Sec. 3.2
Page 1 of 6
SAUDI ARAMCO ID/PID - 20-August-08 - REV 0 (Standards Cutoff - MAR 2013) REV 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
MV Cablebus Continuity and Insulation Resistance Testing SATR-P-3233 30-Apr-13 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
All conductors shall be left grounded when not on test, during the testing
SAES-P-104
A21 on other conductors, until completely discharged of all DC potential.
Sec. 3.2
(IEEE 400, Sec.4.5)
B3 Thermometer
B4 Hygrometer
B5 DC Overpotential Tester
Schedule Q
B6 Test equipment calibration cycle shall not exceed six (6) months.
Att. lV, Sec. 7.1
C. TEST RESULTS
C1 A Phase _
C2 B Phase _
C3 C Phase _
C4 Neutral Bus _
C5 Ground _
Page 2 of 6
SAUDI ARAMCO ID/PID - 20-August-08 - REV 0 (Standards Cutoff - MAR 2013) REV 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
MV Cablebus Continuity and Insulation Resistance Testing SATR-P-3233 30-Apr-13 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Temperature
Measured R1000 ft.
Applied Adjusted
Insulation Length Insulation
Bus Phases Voltage Insulation PASS FAIL REMARKS
Resistance (ft.) Resistance
(volts) Resistance
(mega-ohms) (mega-ohms)
(mega-ohms)
C6 A Phase to Ground
C7 B Phase to Ground
C8 C Phase to Ground
C9 A Phase to B Phase
Note: The insulation shall withstand the overpotential test voltage applied.
D. CONCLUSIONS
Test results are acceptable and in accordance with Saudi Aramco Schedule Q
D1
Engineering Standards and contractual requirements. Sec. 1.3
Page 3 of 6
SAUDI ARAMCO ID/PID - 20-August-08 - REV 0 (Standards Cutoff - MAR 2013) REV 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
MV Cablebus Continuity and Insulation Resistance Testing SATR-P-3233 30-Apr-13 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
REMARKS:
Page 4 of 6
SAUDI ARAMCO ID/PID - 20-August-08 - REV 0 (Standards Cutoff - MAR 2013) REV 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
MV Cablebus Continuity and Insulation Resistance Testing SATR-P-3233 30-Apr-13 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), Contract Specific
2. Schedule Q -- Quality Requirements (Pro Forma Contract), Contract Specific
3. NFPA 70 -- National Electrical Code (NEC), 2011
4. NETA ATS -- Acceptance Testing Specifications for Electric Power Equipment and Systems, 2009
5. SAES-P-104 -- Wiring Methods and Materials, 08 August 2010
6.16-SAMSS-520 -- Cablebus, 19 October 2008
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 5 of 6
SAUDI ARAMCO ID/PID - 20-August-08 - REV 0 (Standards Cutoff - MAR 2013) REV 7 31-Mar-13
Attachment - 1
NETA ATS, 2009 Table 100.14
Insulation Resistance Factors for Conversion of Test Temperature to 20 degrees C
0 0.40
5 0.45
10 0.5
15 0.75
20 1
25 1.3
30 1.6
35 2.05
40 2.5
45 3.25
50 4
55 5.2
60 6.4
65 8.7
70 10
75 13
80 16
Page 6 of 6