SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Overhead T&D - Circuit Polarity, Continuity and Insulation


SATR-P-3219 30-Apr-13 ELECT-
Resistance Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A. INSULATION RESISTANCE (MEGGER) TEST PROCEDURES

Erect safety barriers and post safety man at conductor remote end.
SAES-P-107
A1 (SAES-P-104, Sec. 3.1 and S A Pre-Commissioning Form # P-041 &
Sec. 3.1
Form # P-042)
Check the overhead conductor connections & identification as per Schedule Q
A2
specification and drawings.(NETA ATS, Sec. 7.3.3.1.9) Sec. 1.3
Insulate overhead conductors from ground.(SAES-P-104, Sec. 3.1 and SAES-P-107
A3
S A Pre-Commissioning Form # P-041 & Form # P-042) Sec. 3.1

Measure the insulation resistance of overhead conductor using a


megger tester. The test voltage should be 5000 volts for rated 5000 volts
and above overhead conductors. Connect megohmmeter between each
SAES-P-107
A4 phase-to-phase and each phase-to-ground. Record the insulation
Sec. 3.1
resistance of each overhead conductor between phase to phase and
phase to ground for one (1) minute.(SAES-P-104, Sec. 3.1 and S A Pre-
Commissioning Form # P-041 & Form # P-042)

On completion of insulation resistance test, each overhead conductor


SAES-P-107
A5 shall be grounded to allow residual charge to dissipate.(SAES-P-104,
Sec. 3.1
Sec. 3.1 and S A Pre-Commissioning Form # P-041 & Form # P-042)
Check the conductor connections, phase identification and color coding Schedule Q
A6
as per specification and drawings.(NETA ATS, Sec. 7.3.3.1.9) Sec. 1.3
Check conductor bends to ensure the bending radius is equal to or
Schedule Q
A7 greater than the minimum bending radius specified.(NEC 110.3 B, NEC
Sec. 1.3
300.34 and NETA ATS, Sec. 7.3.3.1.6)
Schedule Q
A8 Check for proper conductor support, clamping and blocking.
Sec. 1.3
Insulate associated feeder cable cores from ground.(SAES-P-104, Sec. SAES-P-107
A9
3.1 and S A Pre-Commissioning Form # P-041 & Form # P-042) Sec. 3.1

Measure the insulation resistance of feeder cables using a megger


tester, for each core and any metallic armor or sheath grounded at one
end only. Measure insulation resistance at one minute following the
application of the test voltage. The test voltage should be 5000 volts for SAES-P-107
A10
5000 volt and above cables. Record the insulation resistance of each Sec. 3.1
core between phase to phase and phase to ground for one (1) minute.
(SAES-P-104, Sec. 3.1 and S A Pre-Commissioning Form # P-041 &
Form # P-042)

Record the megohm values of each phase-to-ground and between each


phase-to-phase, along with the description of the equipment, the voltage SAES-P-107
A11
level, humidity, temperature, time, and the date of the test.(SAES-P-104, Sec. 3.1
Sec. 13.6 and S A Pre-Commissioning Form # P-041 & Form # P-042)
On completion of insulation resistance test, the cable shall be grounded
SAES-P-107
A12 to allow residual charge to dissipate.(SAES-P-104, Sec. 3.1 and S A Pre-
Sec. 3.1
Commissioning Form # P-041 & Form # P-042)
Perform a physical inspection of the overhead feeders to ensure there is
Schedule Q
A13 not any damage to the poles, conductors at termination points,
Sec. 6.4
insulators, jumpers, cable supports, stays etc. prior to energization.

Page 1 of 7
Check tightness of all bolted connections (Torque Wrench Method). Schedule Q
A14
(NETA ATS, Sec. 7.3.3.1.3.2) Sec. 1.3

Page 2 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Overhead T&D - Circuit Polarity, Continuity and Insulation


SATR-P-3219 30-Apr-13 ELECT-
Resistance Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No.

The results of all tests performed on cable rated 5 kV and above shall be
documented on the Saudi Aramco H.V. Cable Test Record Form 7823- SAES-P-107
A15
ENG, or on an equivalent form containing the same information.(SAES- Sec. 3.1
P-104, Sec. 13.6)

B. TEST EQUIPMENT

Test shall be performed using an Insulation Resistance Test Set


(Megohmeter) 5000 V dc minimum. SAES-P-107
B1
(SAES-P-104, Sec. 3.1 and S A Pre-Commissioning Form # P-041 & Sec. 3.1
Form # P-042)

Schedule Q
B2 The test equipment calibration cycle shall not exceed twelve months. Att. IV
Sec. 7.1

Test Equipment Manufacturer: Serial Number:

Scale Range and accuracy: Calibration date:

Calibration Company and Technician: Calibration Expiration Date:

C. TEST RESULTS

Test Voltage level__________ Humidity____________ Temperature_______________ Time/Date of Test____________

MEASURED INSULATION RESISTANCE (M)


Temp.
Adjusted
Condu
Insulation Pass Fail Re-Test date
ctor # A-G B-G C- G A-B B-C C-A
Resistance
(M)

D. CONCLUSIONS

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No.

Compare test results with previous test results and with manufacturer
data corrected for temperature variations using manufacturer Schedule Q
D1
recommended correction factors. Sec. 1.3
(NEC 110.3 B and NETA ATS, Sec. 5.4.1.5)

Consult conductor manufacturer's published data for acceptable test


results. If published data is not available, investigate any values which
Schedule Q
D2 deviate from previous test results under similar conditions by more than
Sec. 1.3
50% of the lowest value.
(NEC 110.3 B and NETA ATS, Sec. 5.4.1.5)

Page 3 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Overhead T&D - Circuit Polarity, Continuity and Insulation


SATR-P-3219 30-Apr-13 ELECT-
Resistance Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No.

Test results are acceptable and in accordance with Saudi Aramco


Schedule Q
D3 Engineering Standards and contractual requirements.
Sec. 1.3
(NETA ATS, Sec. 5.4.1.5)

E. TEST PROCEDURE FOR CONTINUITY TEST OR RESISTANCE TEST

Using a four-point, low-resistance ohmmeter, connect both C1 and P1 of


SAES-P-107
E1 the test set to one end of the conductor.
Sec. 3.3
(NEC 110.3 B)

Connect C1 and P1 of the test set to one end of the conductor. SAES-P-107
E2
(NEC 110.3 B) Sec. 3.3

Connect the C2 and P2 of the test set to the other end of the conductor.
NOTE: Observe the correct orientation for the current circuit (C2) and
SAES-P-107
E3 the potential circuit (P2) hook-ups at the opposite end (P2 connection
Sec. 3.3
closer to the specimen than C2).
(NEC 110.3 B)

SAES-P-107
E4 Record result. (SAES-P-104, Sec. 13.6)
Sec. 3.1

F. TEST EQUIPMENT AND MATERIALS CRITERIA

Schedule Q
Test shall be performed using a Ductor or the Digital Low Resistance
F1 Att. IV
Ohmmeter (DLRO) for contact resistance test.
Sec. 7.1

Schedule Q
F2 The test equipment calibration cycle shall not exceed twelve months. Att. IV
Sec. 7.1

Test Equipment Manufacturer: Serial Number:

Scale Range and accuracy: Calibration date:

Calibration Company and Technician: Calibration Expiration Date:

G. TEST RESULTS

Conductor # Cable type Cable length Resistance () Pass Fail Re-Test Date

H. CONCLUSIONS

Page 4 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Overhead T&D - Circuit Polarity, Continuity and Insulation


SATR-P-3219 30-Apr-13 ELECT-
Resistance Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No.

Investigate any breaks in continuity, along with any resistance values in


excess of 10 ohms per 1000 feet of cable. SAES-P-107
H1
(SAES-P-104, Sec. 3.1 and S A Pre-Commissioning Form # P-041 & Sec. 3.1
Form # P-042)

Test results are acceptable and in accordance with Saudi Aramco


Schedule Q
H2 Engineering Standards and contractual requirements.
Sec. 1.3
(NETA ATS, Sec. 5.4.1.5)

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), Contract Specific
2. Schedule Q -- Quality Requirements (Pro Forma Contract), Contract Specific
3. SAES-P-104 -- Wiring Methods and Materials, 08 August 2010
4. S A Pre-Commissioning Form # P-000 Testing Guide Lines, Issue Date (March 2006)
5. S A Pre-Commissioning Form # P-041 High Voltage Cables (5kV-15kV-35kV), Issue Date (March 2006) - supersedes S A Pre-Commissioning
Form # P-004 Medium Voltage Cables, Issue Date (10/97)
6. S A Pre-Commissioning Form # P-042 High Voltage Cables (69kV-115kV), Issue Date (March 2006) - supersedes S A Pre-Commissioning
Form # P-005 High Voltage Cables, Issue Date (10/97)
7. NFPA 70 National Electrical Code (NEC) 2011 Edition
8. Acceptance Testing Specifications for Electric Power Distribution Equipment and Systems- NETA (2009)
ATTACHMENT DOCUMENT:
Phasing & Insulation Resistance Test Forms

NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer
indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Page 5 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Overhead T&D - Circuit Polarity, Continuity and Insulation


SATR-P-3219 30-Apr-13 ELECT-
Resistance Testing
Attachment 1 --

Page 6 of 7
Page 7 of 7