PROJECT STUDY 1

LOGISTICS 1

SUBMITTED BY:

Aurin, Darvey Jay C.

Blanco, Manilyn

Concepcion, Denzelle

Lucim, Ronie

Palad, Regine V.

MAY, 2017

SUBMITTED TO:

Mr. Rommel Constantino

(Project Study 1 Instructor)

CHAPTER 1

1.0 PROJECT BACKGROUND


Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Assets Management is a process of deploying, operating,

maintaining, and disposing of assets effectively. Assets are classified into

two, Current Assets and Property Plant Equipment (PPE). Current assets

include cash on hand or bank accounts receivables while PPE or Property

Plant Equipment is a Tangible and fixed assets like school facilities and

equipment. The Assets are managed by the President and each

department. After the budget process, they buy the goods of services

according to their needs. Then the old items that not be used will be

dispose. Disposal happened by pull out all the items that are subjected for

disposal in their records.

Procurement system allows you to control many things, Ensuring all

goods and services are acquired from the right suppliers by paying the

right price for the right quality and within the specified time. The

purchasing process is transparent and fully tracked through an auditable

trail of documentation and records, maintaining high ethical standards and

financial probity. Having a good procurement strategy and using the right

leverage increases flexibility while lowering fixed costs because capital is

a main amount driver for all airlines.

Warehouse management solutions are primarily tactical tools,

purchased and used by businesses to satisfy the unique customer

LOGISTICS PART 1
Page 1
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

demand requirements of their supply chain and distribution channel, when

the inventory and workload is larger than what can be handled manually,

with spreadsheets. Motivation to purchase generally comes from need to

support sales growth or improve performance, and occasionally both.

A warehouse management system is a software application that

supports the day-to-day operations in a warehouse. WMS programs

enable centralized management of tasks such as tracking inventory levels

and stock locations. WMS systems may be standalone applications or part

of an Enterprise Resource Planning system.

Maintenance or repair and overhauling is very important in the

airport. This is where they fix the damaged plane or some tools that is

used in the airline. It includes by performing daily inspections and

performs routine maintenance and clean-up of airport runways, taxiways,

airport grounds, perimeter fences, gates and related equipment for

compliance with federal, state, and general aviation airport rules and

regulations.

Air transport is a component of many logistics networks, managing

and controlling the flow of goods, energy, information and other resources

like products, services, and people, from the source of production to the

marketplace. Logistics involves the geographical repositioning of raw

materials, work in process, and finished inventories.In a general business

LOGISTICS PART 1
Page 2
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

sense, logistics is the management of the flow of things between the point

of origin and the point of consumption in order to meet requirements of

customers or corporations. The resources managed in logistics can

include physical items such as food, materials, animals, equipment, and

liquids; as well as abstract items, such as time and information. The

logistics of physical items usually involves the integration of information

flow, material handling, production, packaging, inventory, transportation,

warehousing, and often security.

1.1.1 Problem/Opportunity Description


Lack of Security most of the records in the departments
saved in spreadsheet or in paper form only so it is easy to
tamper, and logistics information needs to be confidential.
Miscommunication among departments the most common

problem of asset management. This kind of problem is a great

disadvantage.
Lack of updates in the evaluation asset reports not being

evaluated properly.
No proper bidding process bidders and bidding not filtered

properly to acquire right item.


Inflexible suppliers some suppliers may not meet the needs

of the company.
Rushed purchases some of the items dont go proper bidding

process.
Inaccurate Reports most of the reports of are very likely to
be incorrect.

LOGISTICS PART 1
Page 3
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Item Tracking Difficulty difficulties in locating the necessary


item.
No detailed monitoring Unexpected lost cannot be
monitored easily. There is no information added once the
property repaired, or when the items are repaired, or who are
the persons used the particular item.
Equipment damage or losses Equipment are damaged or
losses because of no proper checking before receiving the
materials in other company.
Unorganized Location materials were stored in different
locations without systematic and orderly manner
Improper maintenance update one of the key problems of

maintenance information system is the provision of the raw data

input and the maintenance of up-to-date information.


Ignored maintenance some of the maintenance request or

reports is being ignored, or not notifying it directly to the

maintenance personnel.
No notification for equipments lifespan not knowing when
an item is already in its lifespan due.
1.1.2 Benefits
The company will secure all information and records
The proposed system will benefit them by lessening manpower

and man-hours.
Real time monitoring of everyday activities of the company.
Enhancing the serviceable life of building materials.
Ease the user of the system.

1.1.3 Goals
Secure records and not easy to access by an unauthorized
user.
Proper communication of departments by integration.
Accurate reports for the evaluation of the assets.

LOGISTICS PART 1
Page 4
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Proper bidding process by choosing good suppliers.


Filtered suppliers that meet requirements.
Purchase goods or services, undergo proper purchasing.
Warehouse reports is updated thru real-time notifications and
updates.
Detailed monitoring of items.
Checking of item delivered and item received.
Organize storing of materials in warehouse.
An up-to-date reporting of every maintained item.
Notifying directly the system user.
Real-time notification of item lifespans.

LOGISTICS PART 1
Page 5
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.1.4 Stakeholders and Clients

LOGISTICS PART 1
Page 6
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Stakeholders Description/ Participation


Company Give information about their business process
Logistic Logistic staff/s organize incoming and outgoing

Department freights.
He/she is a software engineer in charge of one or

Lead more software projects. Participate in project

Programmer activities including planning, implementation of

deliverables and quality control.


He/she is a professional in the field of project

management. Project Manager reports and receives

directions from sponsors. He/ she is managing,


Project
reviewing and prioritizing project work plans. He/ she
Manager
manage project team and recommend changes,

escalate issues and mitigate risks.


He/she is an IT professional who specializes in

analyzing, designing and implementing information


System
systems. Participate in project activities including
Analyst
planning, implementation of deliverables and quality

control.
He/she is the one who analyzes an organization

and designs its processes and systems, assessing

Business the business model and its integration with

Analyst technology. Participate in project activities including

planning, implementation of deliverables and quality

control.
He/she is an expert at creating effective information

Documents products traditionally known as documents.

LOGISTICS Specialist
PART 1 Participate in project activities including planning,
Page 7
implementation of deliverables and quality control.
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Clients Description/ Participation


Give information about their business process
Company
Logistic Logistic staff/s organizes incoming and outgoing

Department freights.

LOGISTICS PART 1
Page 8
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.1.5 Enterprise Information System (EIS) Required Functionalities


Personalized Screen
Customize the appearance of the system depends on the

design that the developer will be creating.


Free Report Facilities
The system has a capability to desire or to select the report that

will be going to print of a user. In this way, the user can no

longer to print such a long information that it cannot be used by

the user.
Business Analytics
Use the data imported into the system to evaluate the business

process and to manage the transaction.


Work Flow
The workflow of the system is about the progression of step by

steps that comprise a work process, involve two or more

persons, and create or add value to the organization's activities.


Framework
Use the Java Language or NetBeans as platform programming

for business module of the system.

LOGISTICS PART 1
Page 9
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.2 PROJECT SCOPE


1.2.1 Objectives
To secure all information where all data records will be saved in

the database, so all datas coming will be stored and organized.


To secure all information where all data records will be saved in

the database.
It involves the maintenance of item or equipment. Such as

return, repair and lost. Monitor the information of property in the

database.
To generate accurate reports of canvassing/quotation.
To create an efficient process of purchasing items in different

companies.
To create an efficient process of storing materials in a

warehouse with a systematic and orderly manner.


To use QR code to easy know what is the item information.

1.2.2 Deliverables
Objective no.1:Make transaction in System

Project Description

Deliverable
Organize warehouse
Systematic storing materials in
Transactio
warehouse
ns Notification

LOGISTICS PART 1
Page 10
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Objective no. 2: Security of Data and Information

Project Description

Deliverable
Report Audit Trail Users system logs, date, time,

s name/ user of the system on a specific day and

time can be viewed for security purposes.

Transaction Reports Track the users activity

in a day and what the user did.

Critical Reports reports of renewed and

disposed stocks.

Objective no. 3: Deliver data

Project Description

Deliverable
Stocks Viewing Real time detailed stock inventory.
Add/ Edit A functionality where can be added and

altered.
Viewing Real time update

1.2.3 Out of Scope

The system will not cover the following features:

Asset Management
Finance assets declaration.
Handling of contracts

LOGISTICS PART 1
Page 11
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Procurement
Online access
Contacting the suppliers thru the module
Warehouse Management
Freight managing
Online requests and update
Maintenance, Repair and Overhaul
Managing of vehicles

LOGISTICS PART 1
Page 12
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.3 Project Plan


1.3.1 Approach and Methodology

The proponents used System Development Life Cycle

(SDLC) as the methodology in doing the proposed project.

Fig. 1.2.2 V Model Methodology

Coding

- Start coding the Java programming language in software

development where inputting the source codes into system to

compile into the final software program and start testing.

Unit Testing and Module Design

- Testing every parts of application to check its proper operation.

When having conflicts or errors, go back to Module Design to adjust

LOGISTICS PART 1
Page 13
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

the design and add, edit the design that will make the Unit Testing

success.

Integration Testing and Software Design

- Testing the integrations of database tables if succeed in inputting

and exporting data without errors. If having errors, edit the design

of software for changes on operation in database to software to

make the validation cleared.

System Testing and System Analysis

- Testing the System Flow for data process. Testing every transaction

to evaluate the system's compliance with the specified

requirements. If having some problems. Analyzing the system flow,

solving the problems of the system, studying the parts of system to

accomplish the purpose.

Acceptance Testing and Acquirement Gathering

- Testing to determine and evaluate if the system has met the

requirements specification. Verify if it is has met the required criteria

for delivery.If the requirements is not met, Acquirement gathering

on interviews, sessions, request for proposals to determine how

close match the needs of user.

LOGISTICS PART 1
Page 14
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.3.2 Project Timeline

Task Name Start Finish Duration


Group meeting (planning) 02/1517 02/15/17 5 hours
Group Meeting 02/22/17 02/22/17 1 day
(brain storming about
project)
Conduct a Research 02/24/17 02/25/17 4 days
Chapter 1 02/27/17 03/02/17 7 days

1.3.3 Success Criteria

When the proposed project already at its full functionality.

The project is considered a success if the systems is fully

functional and were able to cater transactions, generate

accurate reports and be able to use all of its functions properly.

When the proposed project is already implemented

The project will be successful if the proposed module is already

running and already being applied.

When the proponents already met the proposed project

goals and objectives

In meeting the projects goals and objectives, the

proposed module will becomes successful.

LOGISTICS PART 1
Page 15
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.3.4 Risk Management Plan

Risk Factors Probabilit Impact Risk


(H-M-L)
y Management
(H-M-L)
Action
Technical Risk Provides a
Cause of generator to
Low High
dust sustain the full
Machine
system or
system
provide a
requiremen
higher system
ts
requirements.
Financial Risk Saving money
Lack of Medium High
and have
finance to some
sustain the alternatives to
system get budget.
Time Risk Availability of
Personal the member to
Medium Medium
reason ensure that
Project
the project will
deadline
be done.
Files Risk Secured all
Back up Medium Medium
the
files information for
safety
purposes.

LOGISTICS PART 1
Page 16
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.3.5 Service Transition

Users Manual The users manual will be the guide

for the user to manipulate or operate the whole

system. It will give a systematic step on how to run

the application. The manual will be a big help to the

users who doesnt have any idea to work on the new

system environment.
Maintenance The proponents need to monitor the

functionalities and deliverables condition of the

system during the implementation process.


Warranty The proponents will have a form that will

help to determine the rules and guidelines about the

warranty process of the system.


Users Training The proponents will conduct a

training for the user to help them operate and

manipulate the new system. It would be a big help for

them to understand and learn more about the system

that they would use.

LOGISTICS PART 1
Page 17
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

1.3.6 Options Analysis

Researching on company knowing the process of the

system similar to the proposed project. It is the important to

consider which method will best balance the control project

cost and risk against achieving project objectives and

outcomes.

1.3.7 Technical Features

Operating System: Windows 7 or Higher


The proponents most used the Windows Operating System

in developing the proposed project.

Memory: 4.00 GB ram or Higher

The 4.00 GB capacity of laptop or computer is the

proponents used in developing the new system. The Java

NetBeans and Microsoft SQL Server 2014 might eat up a

huge amount of memory capacity of the desktop and thats

the reason why 4.00 GB memory is more appropriate for the

system.

Processor: Dual Core or Higher Specs Processor

The central processing unit (CPU) is the brain of the

computer. It handles all the instructions you give to the

computer, it is faster and better.


1.4 Project Organization and Staffing

LOGISTICS PART 1
Page 18
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Role Names and Contact Responsibilities


Information
Lead Aurin, Darvey Jay C. He is responsible in creating
Programmer the front end and the back
end of the system.

He is responsible of the
Project Manager Concepcion, Denzelle planning, controlling,
John Q. facilitating, decision making.

He is responsible for knowing


the solutions of the problems
System Analyst Blanco, Manilyn M. given by the Business Analyst
throughout the system
making.

He is responsible in knowing
the problems pertaining to the
Business Analyst Lucim, Ronie D. researches about the
proposed module.

He is responsible in
Document Palad, Regine documenting all about the
Specialist making of the system.

1.5 Project Budget

Budget Item Description Budgeted Cost

LOGISTICS PART 1
Page 19
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

One Time Costs


Transportation Transportation for meeting place and Php.1000.00

conducting interview
Documentation Printing of Documentation in Chapter I Php. 50.00
Miscellaneous Pocket money for food or any Php. 500.00

pop-up expenses.
Total One-Time Costs Php. 1550.00

LOGISTICS PART 1
Page 20
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

CHAPTER 2

2.0 REVIEW OF LITERATURE


This chapter will provide a brief discussion of concepts, theories and tools

that the proponents used to determine the solution to problems. Therefore,

thorough reading and research must be done to obtain necessary information. It

is necessary for the proponents to have background and knowledge about the

different Industrial Engineering tools and techniques to help in conducting the

study.
2.1 Related Literature
2.1.1 ForeignLiterature
2.1.1.1 Pakistan International Airlines

The Government of Pakistan carried out a

comprehensive study on the reasons for corruption in

public procurement in Pakistan and made its

recommendations in the National Anti-Corruption

Strategy (NACS) Report published in 2002. The

NACS report describes various modes of corrupt

practices prevailing in public procurement and their

impact on the national economyIn order to address

these serious drawbacks in the public procurement

procedures, the National Anti-Corruption Strategy

(NACS) has prescribed the use of the World Bank /

Pakistan Engineering Council Procurement

LOGISTICS PART 1
Page 21
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Procedures and Standard Bidding Documents. At the

same time it has also recommended specific

improvements in these procedures to enable them to

be transparent and discretion free. .On june 10 2005

Pakistan International Airlines signed a Memorandum

of understanding with transparency international

Pakistan (TI-Pakistan) in which it was agreed that PIA

along with TI-pakistan will work jointly on the

implementation of the recommendation of the

National Anti-corruption strategy for providing

systematic improvements in PIA for transparency in

its procurement procedures. That PIA would include

Transparency in all its dealing and incorporate the

necessary checks and balances in PIAs efforts to

reduce corruption. It was also agreed that the

integrity Pact which is an Integral Part of the

National Anti-corruption Strategy which was approved

by the Cabinet on 20th September 2002 & 5th October

2002 with its Implementation mechanism approved by

the President on 24th October 2002, would be a part

of all contracts award by the PIA.

LOGISTICS PART 1
Page 22
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

It is an established fact that the misuse of

discretionary authority, and the discriminatory

evaluation procedures can only be prevented by a

transparent procurement process and with the

participation of Civil Society.

PIA firmly believes that Transparency through internal

and external scrutiny is an essential element of

accountability and should be an inherent

characteristic of all processes and procedures, plans,

actions or decisions relating to Procurement.

http://www.piac.com.pk/pia_business/d_l/Procur
ement_Manual.pdf

2.1.1.2 Logisuite Corporation, 2017

The Cargo Warehouse Management (CWM)

allows you to effectively manage and control the flow

of cargo as it enters the warehouse. It transforms a

typical warehouse operation into a totally connected

logistics and fulfillment business. It's a comprehensive

warehouse management system which combines

powerful tracking and reporting features to manage

inventory, shipping, receiving, labor, rates, billing and

LOGISTICS PART 1
Page 23
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

much more. CWM can be used by warehousing

companies, freight forward and shipping companies to

receive goods at their docks, store them in the

warehouse, prepare withdrawal receipts, shipping

documents and keep control of their operations. The

module includes all of the options required to process

warehouse operations from beginning to end as well

as to generate invoices and transfer to various

accounting software for business financial

management and book-keeping applications.

Logisuite Corporation is a software company that

provides the highest quality and friendly software

solutions to the Transportation Industry. Since our

creation, our software was designed to be industry

oriented from the ground up. The industry-oriented

approach is reflected by our market focus, products,

service offerings, our customer support, and the talent

base we employ. We always stay on the cutting edge

of technology innovations to deliver state-of-the art

solutions to our clients.

LOGISTICS PART 1
Page 24
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

We understand that today is not only the software but

also the customer support that is critical to our

customers. Our goal is to build a relationship of trust

with our customers and that is why we provide our

customer with 24/7 support. If you are interested in

any of our products or services.

Logisuites mission is to become the preferred

logistics software provider in all areas of the logistics

industry by consistently exceeding our Customer's

expectations. Deliver the best possible reliable

software solutions to help our clients improve

customer service and business profitability.

We strive to be the trusted partner you can count on

every day. We do business with a set of values that

are at the core of our company. We will perform our

business by being ethically unyielding and honest.

Inspiring trust by being upfront with our customers

and taking responsibility for our actions.

Logisuite values your business and trust no matter if

you are a one-person company or a multi-million

LOGISTICS PART 1
Page 25
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

corporation. You will always be treated with respect,

professionalism and honesty.

http://www.logisuite.com/cargo-warehouse/ - This

website includes the CWM of logisuite company.

2.1.1.3 Trimble AllTrak

The Trimble AllTrak Asset Management

System is the one asset management solution

designed specifically to help contractors and tool crib

managers track construction asset usage and reduce

loss.

Contractors can manage asset acquisition and cost,

distribution and utilization, maintenance schedules,

and eventual retirement. With this information, they

can calculate return on investment and reduce the

costs of asset loss through theft or misplacement.

Take Control of Your Assets with Trimble AllTrak

With Trimble AllTrak you can:

Centralize and simplify management of equipment and tools

LOGISTICS PART 1
Page 26
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Improve asset utilization and productivity

Minimize equipment rental costs

Reduce loss due to theft or misplacement

The Trimble AllTrak system leverages the wireless

connectivity and barcode or RFID scanning capabilities of

the rugged Trimble Nomad controller. Tool crib managers

can perform essential tool transactions such as check-in,

check-out, transfers and additions from anywhere with

increased speed and efficiency.

Asset and tool management can be a time consuming

and inaccurate process, with Trimble AllTrak employees are

able to easily and quickly manage what is going in and out of

the tool crib, warehouse, or truck with barcode or RFID

scanning technology while recording the transactions quickly

with Trimble AllTrak Mobile.

With the barcode scanning technology you can scan

the assets quickly while recording the transfer taking out the

manual recording of the transfer. RFID scanning technology

takes the speed of tool and asset transfers to a new level.

With RFID technology you no longer need to find the

barcode for scanning, as it passes the RFID scanner the

LOGISTICS PART 1
Page 27
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

transfer is recorded with just a click of a button on the

computer or Trimble AllTrak Mobile.

This advanced tracking information is particularly

useful for managing rental tools and equipment and

prorating costs. Users can set up visual and email reminder

alerts for rental return dates and track total rental cost versus

asset value ratios.

Trimble AllTrak reports gives decision-makers

accurate real-time information critical to identify inventory

that is underutilized, at the end of its life cycle, costing

money, or making money. Trimble AllTrak includes more than

20 standard queries that can filter data hundreds of

customizable ways.

http://www.trimble.com/construction/trimble-alltrak.aspx

- this site contains Trimbles asset management system.

2.1.2 Local Literature


2.1.2.1 NJS I.T Solution and Computer System

LOGISTICS PART 1
Page 28
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Computerization has been a valuable tool for every

business and organization, especially for you.

Faster data processing, outright information and

electronic exchange of data and communication are

just some of its convincing benefits.

But a full computerized system is only useful when it

is available and working, thus maintenance is the key

to its efficiency.

NJS I.T. Solutions has long been in the information

and technology business, constantly researching to

be able to cope up with the latest in technology. With

our extensive computer and information technology

experience, we were able to help several companies,

cooperatives and businesses in maximizing their

computers and network infrastructures through an

extensive preventive maintenance system and other

I.T. related quality services.

A Computer Maintenance Service to ensure you with

on time and prioritized quality technical support. With

our in-depth knowledge of computer systems, we

LOGISTICS PART 1
Page 29
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

greatly believe that we would be able to help you in

maintenance of the most critical and important

aspects of your computer system.

NJS I.T. SOLUTIONS is TESDA certified and DTI

Accredited as Data Equipment and Service provider

with Accreditation Number NCR-A3-00279-07OM.

Contact us to learn more of the scope and details of

service of the Computer Maintenance Service.

We are a business solutions company that provides

enterprise insights, increased flexibility and great

value to all our clients.

We exceed the expectations of every client with the

development of appropriate business analytics, and

optimization of their systems processes, functionality

and operational efficiency.

We help businesses focus on their core competencies

with our outstanding technical consulting, and

aftersales support.

LOGISTICS PART 1
Page 30
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

We ensure that our clients receive the most effective,

hands-on and professional service with our dedicated

technical support teams.

We share our expertise to any type of business goal

with our extensive experience in both hardware and

software fields.

We believe that the success of every clients project

goals and implementations is about maximizing their

investments and cost efficiency in their business

processes.

http://njsitsolutions.com/about_us.php - this

website contains NJS Solution and Computer System


2.1.2.2 AirAsia
In these days and in every industry there is

some negative and positive trends, airline industry

has limited customer so growth rate is not too high, so

AirAsia has to try to be winner between its

competitors. AirAsia offers flights with lower price that

other companies, but there are some companies that

also offer service by the same price such as Tiger

Airways and Firefly and also these companies provide

LOGISTICS PART 1
Page 31
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

service with the same level of AirAsia so, in this case

rivalry among existing competitor is quit high to

AirAsia
Success of industry can influenced by buyer so, those

companies offer better service to their customers are

winner of competition. AirAsia has lower price with

better services than others so it can be a good choice

for customer. Power of buyer is a quite high to

AirAisa.
Every industry has some suppliers these

suppliers have their own effect on the industry for

airlines. There are only two options Boing and Airbus.

All airline company have the same situation. Both of

them provide almost same standards aircraft and

hence switching to AirAsia is low. Moreover AirAsia

place order form Airbus to expend its routs to

international routes so power of supplier may be

reduced as Airbus's profit may be influenced by

AirAsia. Generally power of supplier is a quit

moderate to AirAsia.
In another way AirAsia is closed to government in

south Asia this helps AirAsia to open up and capture a

sizable market in south Asian countries.

LOGISTICS PART 1
Page 32
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Government policy has limited new entrant so AirAsia

is already settled on the market.


If companies are to deliver value to their customers

they must understand where value is created and

where value potentially loses. Value chain put forward

by Michael E. Porter is help managers identify

activities which especially import for competitiveness

and for attainment of company overall strategy this

activity categorize in tow main activities 1: Primary

activity, 2: Supportive activity.


This procurement department must source raw

materials for the business and obtain the best price

for doing so. The challenge for procurement is to

obtain the best possible quality available (on the

market) for their budget.

https://www.slideshare.net/mariammana/task2-
tc644mariam-afsharp67787

2.1.2.3 Pambato Distribution

Cargohaus Inc. (CHI) implementated a new

Warehouse Management System in 2009.Although the

initiative consisted of implementing an off-the-shelf product

provided byINFOR Global Solutions, the differentiating

factor that made it unique from other global implementation,

LOGISTICS PART 1
Page 33
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

is that this is the first utilization of the software for a Customs

temporary storage/transit facility in the Philippines. As a

transit facility, there are certain requirements to align the

business processes with the controls and regulations

promulgated by the Bureau of Customs.


As one of five Customs public bonded warehouse

operating in the Ninoy Aquino International Airport that are

directly controlled by the Bureau of Customs, CHI is the first

transit facility that is compliant to the new e2M System in

that.
The interfaces to the On-Line Release System under

the new format andSOA architecture required by the Bureau

of Customs e2M System has already been built.


The Advance Shipment Notification (ASN) is already

in line with the XMLformat of the electronic manifest

submitted by the freight forwarders to theBureau of

Customs. The same electronic manifest is submitted to

Cargohausthrough the IDX Interface Gateway and saved in

the database as ASNs. Thismeans that CHI and BOC are

working on the same electronic manifest andcould be used

as cross-reference points for the generation of Overstaying

and Abandoned Goods Report.The receiving process is

mostly driven in an automated fashion because of

LOGISTICS PART 1
Page 34
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

theutilization of RF terminals which can be hand-held by the

personnel even on thewarehouse floor. Prior to this

implementation, the receiving process involved the use

ofpen, paper and clipboards to manually capture details of

the shipments from themanifest and shipping labels. The list

is then given to the data entry operator to register the receipt

of the goods inside the warehouse. With the current

implementation,shipping barcode labels attached to the

cartons are scanned by the RF terminals andtransmitted to

the server in real time. The effect is a cut-down in the

receiving process.by as much as 30 minutes per batch of

shipments. The cross-docking functionality of the software is

also taken advantage of for JIT shipments that requires

immediaterelease from the warehouse straight out of the

receiving area. This has not beenpossible under the old

warehouse management system because it required

allocatingthe shipments first to the storage compartments

and processing the picking andshipping like non-JIT

shipments.The automatic customer notification that was

incorporated in the system provided theimporters a means to

know the status of the release of shipments from the

warehouse.Prior to this implementation, Customer Service

LOGISTICS PART 1
Page 35
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

specialists call to regularly inform theclients of the shipment

status. The system is capable of automatically sending out

Proofof Release messages through SMS or email to the

importer immediately upon releaseof the goods to the

importers representative.
In addition to the automatic customer notification, CHI

also provides a web tracking facility through its website,

www.cargohaus.com, that allows its clients to view the

statusof the shipments via the Internet. It is accessible to the

public on a 24x7 basis andprovides dynamic and real-time

information on the shipment status from the time of itsreceipt

up to its release to the consignee.A billing estimation facility

allows our clients to generate in advance the billing

chargesthat they will incur upon release of the shipment from

the warehouse. This will enable the importer to allot the

corresponding funds needed to effect the release of cargoes.


http://www.cargohaus.com/content/warehouse-

management-system- this link provides the website of

Cargohaus Inc. about their Cargo Warehouse Management

System.

2.2 Related Studies


2.2.1 Foreign Studies
2.2.1.1 A Case Study of IBM Enterprise Content

Management, Sun Life Asia PH, 2012

LOGISTICS PART 1
Page 36
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Based on the case study of Sun Life Financial group

of companies published on August 22, 2012, Sun Life Asia-

Philippines (Sun Life) is based in Manila, the Philippines,

and provides insurance products, investment performance

tools and asset management practices to individuals and

companies around the world. The company employs

approximately 600 people in the Philippines and contracts

with more than 3,200 advisors. Without automated systems

to handle application distribution or tracking to help manage

workloads, Sun Life experienced extremely long application

transmission times for new individual life insurance policies.

Applications were often transferred among geographically

dispersed customer centers, the head office and interoffice

units. Sales advisors repeatedly following up on the status of

their applications consumed as much as 50 percent of

underwriters time, yet the advisors remained dissatisfied

when there were no immediate answers. Responses to

inquiries were slow because accurate answers often

required searching for physical applications to see reviewer

or underwriter assessments. The frequency of inaccurate

responses usually increased during peak periods because

employees were burdened with heavy workloads and the

LOGISTICS PART 1
Page 37
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

company was forced to hire less experienced temporary

workers. Sun Life worked with IBM Business Partner Asian

Business Solutions, Inc. (ABSI) to implement a workflow

management system (WMS) for new business. The client

used key elements of the IBM Enterprise Content

Management solution, including IBM FileNet Business

Process Manager, IBM FileNet Content Manager and IBM

FileNet Capture software, to better capture and manage

documents, automate workflow and help ensure compliance

with established company practices.

The application process for individual life insurance

policies usually comprises six steps: encoding, speedy

review, underwriting, facilitating (with medical assessment),

policy printing and policy contract back-end review and

release. Before WMS, all these phases were handled

manually. After WMS, an application submitted by the sales

advisor is scanned at the point of receipt from any Sun Life

customer center nationwide and then electronically routed to

its designated processing points. The status of an

application and any additional requirements are sent to the

sales advisor at each stage of processing, freeing up

LOGISTICS PART 1
Page 38
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

underwriters time that would otherwise be spent answering

status inquiries from the field.

2.2.2.1A model for selecting a computerized maintenance

system, Anna GlarnerDepartment of Terotechnology

Phil, 2007

Maintenance used to be considered as a necessary and

unavoidable cost. Today companies have

increased their use of automation and mechanization, such

as robots, Alsyouf (2007). The size of

the production crew is reduced due to more automation. At

the same time the amount and

complexity of the maintenance work has increased. By

managing and controlling maintenance

instead of reacting when a machine failure occur

maintenance become more effective and

efficient. To be able to continue to improve maintenance,

leadership and control of the daily

maintenance has to be achieved. Having a maintenance

system and the process under control will

help to achieve intelligent and informed decisions and

thereby achieve optimized maintenance.

LOGISTICS PART 1
Page 39
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

By improving maintenance less downtime, better quality at

lower unit costs and higher

production rates are achieved, Cambell and Jardine (2001).

To have a well working maintenance organization it is

important to match resources to workload.

By doing this, agreed plant output shall be achieved at

minimum resource cost. By achieving a

well working maintenance organization the company needs

to have a resource structure, a

maintenance administrative structure and a work planning

system. Resource structure can be

workforce, spares, tools and information, their function,

composition, size and logistics. The

maintenance administrative structure can be a hierarchy of

work roles, where the authority and

responsibility for deciding when and how maintenance works

is ranked. A work planning system

defines the way the work is planned, scheduled, allocated

and controlled. The system should aim

at getting the right balance between the cost of planning the

resources and the savings in the

direct and indirect maintenance costs, Kelly (1997).

LOGISTICS PART 1
Page 40
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

According to Johansson (1997) a maintenance system can

be manual or computerized. It should

support:

1. Planning

When, how much and what resources are needed.

2. Doing

Preventive maintenance, corrective maintenance, modifying

etc.

3. Studying

Study the cost for maintenance and production stops, get

proposals for measures etc.

4. Learning

By repeating the cycle the work will improve.

2.2.1.2 A Case Sudy of Improving WMS of Einsco Company Inc.

by Camille Anne Cruz and ReyaEufemia de Ocampo,

Mapua Institute of Technology, 2009


Einsco Company Inc. (ECI) is one of the best-known

high-quality clothing brands in the Philippine casual jeans

wear that sells products under its signature brands FREEGO

Jeans and FG-the Revolution Denim Jeans nationwide.

Freego jean is a modern basic form flattering casual denim

wear for the young adult, ages 18-25, while FG is a lifestyle

LOGISTICS PART 1
Page 41
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

denim brand that offers an array of unique line of apparel

and accessories that appeal to male and female teens, ages

12-18. Einsco Company Inc. is a Filipino-owned apparel

company established in 1983 as Eivin Cottage Industry that

specializes in the design, manufacture, distribution, and sale

of apparel products for men and women. Throughout the

years, Einsco Company Inc. has imbibed in its culture a

tradition of high quality standard aimed towards delivering

total customer satisfaction. Every pair of jeans undergoes a

series of concept development, evaluation and testing to

conform to companys commitment in delivering product

excellence and customer satisfaction. In order to evaluate

the companys performance, McKinsey &Co's 7S Framework

is used for analysis. This provides a useful framework for

analyzing the strategic attributes of an organization. 2 The

company values are fundamental to their success. This

means that the employees share the same guiding values

that the company would strive for even it is demonstrably not

profitable. The companys core values are customer

satisfaction, excellence and integrity. The company believes

that the customers are integral to the companys success

because it is the ultimate source of income. If the company

LOGISTICS PART 1
Page 42
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

doesnt value the customers and give what they want, the

company may end up losing its business, thats why the

company pays attention, listens and understands its

customers for a better response. The company does better

and strives for excellence in every undertaking because the

only way to survive in a highly competitive world is to

perform excellence in the world. The company implies

reliability with its works in good intentions, true commitments

and upright actions. As long as these shared values are

applied, the company will employ teamwork and

camaraderie for the betterment of its performance. The

strategy of the company in operating its business is in

accordance with its integrated vision and direction of the

company, as well as the manner in which it derives,

articulates, communicates and implements that vision and

direction. The vision of the company is to be globally

recognized as the leading Philippine jeans wear company.

Their mission is to provide high quality engineered

fashionable jeans wear that conform to customers discerning

taste in fashion. Objectives of the company are to continually

earn high profit, prolong and expand its life in the business,

grow its market share and to be the number one in apparel

LOGISTICS PART 1
Page 43
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

industry. By doing so, the company gives importance of the

values in achieving their goals. In executing the companys

strategy, other forces outside the company that have an

impact to companys performance are considered. To date,

the company has 3 fourteen suppliers which offer big

discounts and long-term payments because of their good

relationship with one another. This can help the company to

provide low price for its products and gain cost competitive

advantage among rivals but in terms of style, the company

has low competitiveness with other brands. Another

important force model is the buyers; the company still lacks

the ability to meet the customers needs because of limited

resources in shipping the products. In order to achieve the

goals, proper arrangement of chain command is necessary

to have organization inside the company with regards to

management. An organizational structure shown in Figure

1.1 is provided for achieving target levels of organizational

performance. The arrangement of the organization is

according to its functions with specific job description. This is

done to divide the tasks accordingly and to perform

operation directed to companys vision. Each department

has its own specific tasks which are important to the

LOGISTICS PART 1
Page 44
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

companys operation in providing high quality products and

serve the customers with high satisfaction. Overlapping of

works between departments is avoided. However, within a

department, there may be an extension beyond of tasks if

one employee has filed a leave and one will cover that

employees tasks. Sometimes, the company replaces the

employee for a short time to cover all the tasks to be done

but the replacement must be capable of doing so.


However, compared to other areas, retail operation is loaded

with subsystems since it has numerous departments under

which may result to overlooked activities by the vice-

president. This may be a hindrance in improving the

performance of the company. To avoid encountering

problems, the company provides a policy wherein lawfully

actions should be carried out whenever necessary.

Employees that are proven guilty of committing wrong 4

actions are punished accordingly to control mischief and

misbehavior of the employees. If the person has been

charged of stealing and proven guilty, the person is

dismissed effectively. In the case of tardiness, employees

have only five offenses before dismissal. The policy is fair for

both sides and does not tolerate bad actions. In this way,

LOGISTICS PART 1
Page 45
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

employees can behave righteously for the betterment of the

company.

2.2.2 Local Studies


2.1.1.1 A Case Study of IBM Enterprise Content Management,

Sun Life Asia PH, 2012

Based on the case study of Sun Life Financial group

of companies published on August 22, 2012, Sun Life Asia-

Philippines (Sun Life) is based in Manila, the Philippines,

and provides insurance products, investment performance

tools and asset management practices to individuals and

companies around the world. The company employs

approximately 600 people in the Philippines and contracts

with more than 3,200 advisors. Without automated systems

to handle application distribution or tracking to help manage

workloads, Sun Life experienced extremely long application

transmission times for new individual life insurance policies.

Applications were often transferred among geographically

dispersed customer centers, the head office and interoffice

units. Sales advisors repeatedly following up on the status of

LOGISTICS PART 1
Page 46
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

their applications consumed as much as 50 percent of

underwriters time, yet the advisors remained dissatisfied

when there were no immediate answers. Responses to

inquiries were slow because accurate answers often

required searching for physical applications to see reviewer

or underwriter assessments. The frequency of inaccurate

responses usually increased during peak periods because

employees were burdened with heavy workloads and the

company was forced to hire less experienced temporary

workers. Sun Life worked with IBM Business Partner Asian

Business Solutions, Inc. (ABSI) to implement a workflow

management system (WMS) for new business. The client

used key elements of the IBM Enterprise Content

Management solution, including IBM FileNet Business

Process Manager, IBM FileNet Content Manager and IBM

FileNet Capture software, to better capture and manage

documents, automate workflow and help ensure compliance

with established company practices.

The application process for individual life insurance

policies usually comprises six steps: encoding, speedy

review, underwriting, facilitating (with medical assessment),

LOGISTICS PART 1
Page 47
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

policy printing and policy contract back-end review and

release. Before WMS, all these phases were handled

manually. After WMS, an application submitted by the sales

advisor is scanned at the point of receipt from any Sun Life

customer center nationwide and then electronically routed to

its designated processing points. The status of an

application and any additional requirements are sent to the

sales advisor at each stage of processing, freeing up

underwriters time that would otherwise be spent answering

status inquiries from the field.

2.2.2.1 A Case Study on the IDS Logistics, by Heidi Kate

Bonifacio, Rosa Rio Edillo and Rhoda Salas, DLSU

Manila, 2008

IDS Logistics (Philippines) is concerned with the

business of providing contract logistics, warehousing and

supply chain management services to customers throughout

the Philippines. The area of concern for this study would be

the Warehouse Department of IDS Logistics located in IDC

Bldg. E. Rodriguez Jr. Ave., Ugong Norte Quezon City (QC)

wherein various products of different principals like Proctor &

Gamble (P&G), Mandom, Gillette and 3M are stored.

LOGISTICS PART 1
Page 48
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

The inventory accuracy of the said warehouse was

not able to meet the 100% target set by Key Product

Indicators (KPIs) of the company indicating the occurrence

of variance costing the company a total of Php45,724,546.82

for negative variance due to the 656,785 units of

discrepancy found in the warehouse and the system records.

Using Why-Why and Failure Mode and Effects

Analysis (FMEA) to determine the root causes of incurring

variance from wrong pick which is further categorized into

three parts: wrong serve, wrong barcode and short/over

issuance. Evaluating each category, five causes were

identified namely: different locations assigned for specific

customers, inadequate pick list design, product placement

for pallet utilization, inadequate lighting and unfamiliarity and

confusion caused different bundling quantities of the

products.

The new system is proposed to address the identified

causes is composed of assignment of pickers to pick only on

one location (1601 or 1608), regulating /controlling the

method of releasing pick lists, redesigning the pick lists,

changing of layout and changing of lights.

LOGISTICS PART 1
Page 49
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

2.2.2.3 A Case Study of Warehousing Operations of NFA in

Batangas City by AngelitaPagcaliwagan, Melvin De

Leon, Francis Del Rio, Rey Ryan M. Flores, Darwin

Hornilla, Lyceum of the Philippines University, Batangas

City, 2015
The main objective of the study is to evaluate the

warehousing operation of National Food Authority (NFA)-

Batangas. The research is basically a descriptive type of

research that dealt with the warehousing operations of NFA.

Results showed that warehousing operation evaluation in

terms of inspection and quality control operation revealed

that the warehouse workers have an excellent level of

operation in maintaining the quality of products while the

common problem they have encountered in the operation

includes manual storing of the products, defective pallets,

and spoilage of the product being stored. The pallets were

not in good condition because the warehouse cant sustain

right temperature to prevent it from deterioration caused by

molds. Molds exist because the warehouse cannot maintain

the proper humidity required for such warehouse. Dull-

LOGISTICS PART 1
Page 50
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

looking rice batches indicate excessive drying or self-

heating. Birds waste invites pests that causes poor quality or

rejected rice products.


This study evaluated the warehousing operations

being adopted by the National Food Authority in Batangas

City, Philippines with respect to inspection and quality control

operation, storage operation and withdrawal operation; to

determine the problems encountered in the warehousing

operation; to test the significant relationship between the

warehouse operation and problems encountered and to

propose an action plan that can improve the warehousing

operations of NFA-Batangas.
Inspections are usually non-destructive. The results

are usually compared to specified requirements and

standards for determining whether the item or activity is in

line with these targets. Storage functions are usually an

extension of receiving department duties. The basic

functions of storage are the movement of products from the

dock area to a holding location, the recording of the location

and quantity, and the updating of storage records so that the

product can be found easily when it is needed. Withdrawal

operation is where the final steps are taken to prepare

orders for shipment via the requested mode of transit. Due to

LOGISTICS PART 1
Page 51
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

the problems encountered in the Warehousing Operations, it

may probably result to delays that will affect the companys

cost. Based on the data gathered during the study, there is a

high-performance evaluation rating in terms of storage and

withdrawal operation. And the problems encountered by the

employees are not factors that influenced the warehouse

operation of NFA-Batangas.

LOGISTICS PART 1
Page 52
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

2.3 Matrix
2.3.2 Foreign

Pakistan
Logisuite Trimble All Proposed
Features Internationa
Corporation Track System
l Airport
Real Time
Updates

Critical
Notificatio
n
Incoming
Reminder

QR Code
Reports
2.3.3 Local

NJS I.T Pambato Proposed


Features Air Asia
Solutions Distribution System
Real Time
Updates

Critical
Notificatio
n
Incoming
Reminder

QR Code
Reports
2.4 Synthesis
While the related studies and system above have different

features, and process each unique to its own needs the

LOGISTICS PART 1
Page 53
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

proponents proposed system collected all the relevant information

from these studies and apply all of these features to make the

proposed systems process superior to any existing system out

there.

LOGISTICS PART 1
Page 54
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Chapter 3
A. Project Management Plan
1. Overview
This section describes a management summary. Air transport is a

component of many logistics networks, managing and controlling the flow of

goods, energy, information and other resources like products, services, and

people, from the source of production to the marketplace. Logistics involves

the geographical repositioning of raw materials, work in process, and finished

inventories.
2. Goal and Scope
2.1. Project Goals
The goal of this project is to provide the companys logistics a

computerized-system that handles asset management, procurement,

warehousing, and maintenance, repair and overhaul. And to minimize

paper works going paperless can save money, boost productivity, save

space, make documentation and information sharing easier, keep

personal information more secure, and help the environment.

LOGISTICS PART 1
Page 55
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

2.2. Project Scope


This project will consist of creating different modules of the sub-

system Logistics Part 1. The project will be completed by December,

2017. Modules of the sub-system are Asset Management,

Procurement, Warehouse Management and Maintenance, Repair and

Overhaul.
2.2.1. Included
The project consists mainly of the following:
Asset Management
Viewing of Assets
Declaring new Assets
Graphical reports of Asset
Procurement
Viewing of contact suppliers
Viewing of bidding items
Notification of payed items
Warehouse Management
Viewing of warehouse items
Real-time notification
Graphical reports of items in the warehouse
Adding new items in the warehouse
Maintenance, Repair and Overhaul
Viewing of under maintenance items or vehicles
Notification of items or vehicles need to repair
Item estimated lifespans

2.2.2. Excluded
The system will not cover the following features:

Asset Management
Finance assets declaration.
Handling of contracts
Procurement
Online access
Contacting the suppliers thru the module
Warehouse Management

LOGISTICS PART 1
Page 56
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Freight managing
Online requests and update
Maintenance, Repair and Overhaul
Managing of vehicles

3. Organization
This section will describe all internal organization that will be affected and
involved by the result of this project.
3.1. Organizational Boundaries and Interfaces
Company the goal of the project is to improve productivity of
every staff handling the proposed systems and in that case
the companys profit may increase by lessening man-hours,
manpower and paperless in some transactions. The
beneficiary of this is the company itself.
Logistics Team one of the beneficiary of this project and
system is the logistics staffs and managers. They were the
main users of the proposed systems, it will also ease their
everyday transactions.

3.1.1. Resource Owners


The resource owners of the Logistics 1 project are the
following.
Name Responsibilities
Ms. Blanco, Manilyn The proponent and also the
resource owner of the Asset
Management and responsible for
systematic process of deploying,
operating, maintaining,
upgrading, and disposing
of assets cost-effectively.
Ms. Palad, Regine The proponent and resource
owner of the Procurement and

LOGISTICS PART 1
Page 57
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

responsible for procuring in the


companys logistics.
Mr. Aurin, Darvey Jay This proponent and resource
owner of the Warehouse
Management that can ensure
that a company ships and
receives vital stock in time for
replenishment on store shelves
or in manufacturing facilities.
Mr. Concepcion, Denzelle John The proponents and resource
and
owner of Maintenance, Repair
Mr. Lucim, Ronie
and Overhaul involves fixing any
sort of mechanical, plumbing, or
electrical device should it
become out of order or broken.

3.1.2. Receivers
Receiver of Deliverables Project Deliverables
Warehouse managers and Warehouse Management
staffs
Procurements managers and Procurement
staffs
Top Managers Asset Management System
Maintenance managers and Maintenance, Repair and
staffs Overhaul
Repair and Overhaul managers Maintenance, Repair and
and staffs Overhaul

3.1.3. Sub Contractors


The project is independent and dont have any sub-
contractors. Products, knowledge and services will be
exclusively provided by the project organization itself.

LOGISTICS PART 1
Page 58
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

3.1.4. Suppliers
The proponents and the project will not include any
suppliers as all of the resources, tools, equipments and
products are part of the projects deliverables and will be
provided by the proponents itself.

3.1.5. Cross Functions


Function Name Responsibility
Declaring and viewing
Asset Management Blanco, Manilyn
of assets
View and analyze
Procurement Palad, Regine
suppliers
Viewing, sorting of
Warehouse
Aurin, Darvey Jay warehouse
Management
information.
Concepcion, Viewing, adding and
Maintenance, Repair
Denzelle John and estimation of items
and Overhaul
Lucim, Ronie need to maintain.

3.1.6. Other Projects


Project Project Manager Dependency
Logistics Part 2 Ms. Tatad, Kristine This project is valuable
part of the Logistics 1
as it is the second half
of this project. And
some of the
information need to in

LOGISTICS PART 1
Page 59
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

their project.

3.2. Project Organization


Figure 3.2 Project Organization

3.2.1. Project Manager


Name Organizational Responsibility
Role
Mr. Denzelle Project He is the one whos
John Manager responsible in
Concepcion planning, oversee and
document all aspects
of the
specific project we are
working on.

3.2.2. Project Internal Functions


Function Name Description
Project Manager Concepcion, Responsible in
Denzelle John planning, oversee

LOGISTICS PART 1
Page 60
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

and document all


aspects of the
specific project we
are working on.
Responsible for
budgeting, and
Business Analyst Lucim, Ronie analyzing of
business aspects
during the project.
Responsible for
System Analyst Blanco, Manilyn analyzing of the
proposed system.
Responsible for the
Document
Palad, Regine documentation of
Specialist
the project.
Responsible for
design, coding and
Programmer Aurin, Darvey Jay
support for
proposed system.

3.2.3. Project Team


Name Availability Comment
Aurin, Darvey Always available None
Jay
Blanco, Manilyn Always available None
Concepcion, Always available None
Denzelle John
Palad, Regine Always available None
Lucim, Ronie Always available None

LOGISTICS PART 1
Page 61
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

3.2.4. Steering Committee


The following people are members of the Steering

Committee (SteCo) and are responsible for the authority

over the project:

Organization Name Comme


BCP BSIT Department Head Mr. Rommel Constantino The committee as

the entire Project

the Academic Y

2018.
BCP ACT Department Head Mr. Rico Bondoc The committee as

the Project Mana

the Academic Y

2018
BCP Instructor Mr. Joel Cajipe The committee as

the Information S

Development in

Year 2017-2018

4. Schedule and Budget


Logistics 1
Logistics 1
Project
Project

Project
Project Software
Software
Manageme
Manageme Analysis
Analysis Design
Design Developme
Developme Testing
Testing
nt
nt nt
nt

Requireme
Requireme
Business
Business Technical
Technical nt
nt Top
Top Level
Level Constructio
Constructio Module
Module
Planning
Planning Requireme
Requireme Requireme
Requireme Specificatio
Specificatio Design
Design n
n Testing
Testing
nts
nts nts
nts ns
ns

EIS
EIS System
System
Scope
Scope Integration
Integration
Functionalit
Functionalit Hardware
Hardware Use
Use Case
Case Architectur
Architectur Coding
Coding
Statement
Statement Test
Test
ies
ies e
e

Supplementary
Supplementary
Schedule
Schedule Software
Software Specs
Specs
LOGISTICS PART 1
Page 62
Reporting
Reporting
Risk Plan
Risk Plan Requirements
Requirements
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

4.1. Work Breakdown Structure

Figure 4.1 Work Breakdown Structure

LOGISTICS PART 1
Page 63
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

4.2. Schedule and Milestones


Milestones Description Milestone Planned
Criteria Date
M0 Start Project Identification 2017-01-19
The projects Identification of 2017-01-20
goals and scope project
was defined in stakeholders
project charter. and clients and
the construction
of project
proposal.
M1 Start Planning 2017-02-02
Plans for project Project plans 2017-02-03
resources are carefully
financial reviewed and
statements and verified,
meetings. resources
checked and
the
documentation
of project
M2 Start 2017-02-16
Execution
Execute the Project plans 2017-02-16
projects plans are carefully
and reviewed and
documentation verified,
of all project resources
requirements checked and
and monitor all the

LOGISTICS PART 1
Page 64
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

other project documentation


related of project
information.
M3 Confirm 2017-03-09
Execution
Plans and 2017-03-09
documents
reviewed and
stable.
M4 Start 2017-07
Organizing
Organize and
plan what
platform will be
use in the
project.

4.3. Budget

Category Budget for Period in PHP


M0-M1 M1- M2- M3-M4 M4-M5 M5-M6
M2 M3
Computer 15,00 0 0 0 0 0
0
Peripherals 2,000 0 0 0 0 0

Printing of Documents 0 0 0 250 250 250


Group Budget 500 50 500 500 500 500
0
Transportation 100 10 100 100 100 100
0
Food 300 30 300 300 300 300
0
Total 17,90 90 900 1,15 1,15 1,15
0 0 0 0 0

4.4. Development Process

LOGISTICS PART 1
Page 65
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

For this project the proponents use System Development Life Cycle
(SDLC) as the methodology in this project.

Figure 4.4 Development Process (V Model Diagram)

LOGISTICS PART 1
Page 66
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

4.5. Development Environment


Item Applied for Availability by
Methods
User Case Requirement capturing M1
Object-Oriented A programming technique M5
Programming mainly popularized by C+
+ and to be in Java.
SDLC(V-Model) V-Model demonstrates M2
the relationships between
each phase of the
development life cycle
and its associated phase
of testing.
Tools
NetBeans IDE used for Java M5
Microsoft SQL A relational database M5
Management management system.
Studio 2014
JDK Java development kit. M5
JRE Java run-time M5
environment.
Microsoft Windows Operating system that will M2
be mainly used.
Languages
Java Programming language M4
used for front end
development.
SQL is used to communicate M4
with a database

LOGISTICS PART 1
Page 67
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

4.6. Measurements Program


Type of Data Purpose Responsible
Changes in To quickly adapt for Project Manager
project any sudden changes
requirements in project deliverables
if certain risks are
found.
Performance To asses achievement Project Manager
Data of project
requirements.
Defects found To catch any bugs and Project Team
before M2 errors that will occur
during testing.

5. Risk Management

Risk Factors Probabilit Impact Risk Management


y (H-M-L) Action
(H-M-L)
Technical Risk Provides a generator
Cause of dust to sustain the full
Machine system Low High system or provide a
requirements higher system
requirements.

Financial Risk Saving money and


Lack of finance Medium High have some
to sustain the alternatives to get
system budget.

Time Risk Availability of the


Personal reason member to ensure
Project deadline Medium Mediu that the project will be
m done.

LOGISTICS PART 1
Page 68
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Files Risk Secured all the


Back up files Medium Mediu information for safety
m purposes.

6. Sub Contract Management


Sub-contractor Sub-contracted Ref. to Sub-
Work contracting
Company Contact

Not applicable since no sub-contracting exist.

7. Communication and Reporting


Type of Method Frequency Information Participants/
Communication / /Schedule Responsible
Tool
Internal Communication:
Project meetings Casual Weekly Project Project Team
meeting problems,
change in
requirements,
dependencies
and status.
Sharing of project Social Everyday To share Project Team
data Medias document
progress of
every
modules
External Communication and Reporting:
Project Report Word Weekly Project status, Project Team
Docum progress,
ent forecast and
risk.

LOGISTICS PART 1
Page 69
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

8. Delivery Plan
8.1. Deliverables and Receivers
ID Deliverable Planned Delivery Date Receivers
D Passing Chapter 1 March 2, 2017 Mr. Rommel
1 Constantino
D Passing revision of March 9, 2017 Mr. Rommel
2 Chapter 1 Constantino
D Passing Chapter 2 March 30, 2017 Mr. Rommel
3 Constantino
D Passing Chapter 3 March 30, 2017 Mr. Rommel
4 Constantino

9. Quality Assurance
A Quality assurance is the end-to-end process of preventing
mistakes in products and services.
1. Test Phase
2. Test Condition
3. Input data
4. User action

10. Configuration and Change Management


Configuration Management
Configuration management (CM) refers to a discipline for

evaluating, coordinating, approving or disapproving, and implementing

changes in artifacts that are used to construct and maintain software

systems. An artifact may be a piece of hardware or software or

documentation. CM enables the management of artifacts from the initial

concept through design, implementation, testing, base lining, building,

release, and maintenance


Change Management
It refers to any approach to transitioning, individual, cans and
organization using methods include redirecting the use of resources,
business process, budget allocations, or other needed.

LOGISTICS PART 1
Page 70
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

The following are a few conditions for Change Management:


Delay in schedule: if the schedule is delayed, group will need to
have a new schedule reflecting the current situation and try to get it
approved.
Cost overrun: If the individual run out of money, individual will need
to re-estimate the cost to complete the project and get it approved.

LOGISTICS PART 1
Page 71
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

11. Security Aspects


Security aspect refers security that applicable in proposed system.
And it also applicable in documentation that involve in developing a
system. Using aspects, a system application involves a large number of
users.

Security Aspects Description / Impact

Preserving authorized restrictions on information access and


Confidentiality of
disclosure, including means for protecting personal privacy
Information
information. The unauthorized disclosure of information could
be expected to have a severe effect on organizational
operations, organizational assets, or individuals.

Guarding against improper information modification or


Integrity of
destruction, and includes ensuring information authenticity.
Information

Ensuring timely and reliable access to and use of


Availability of
information. The disruption of access to or use of information
Information
or an information system could also be expected to have a
severe effect on organizational operations, organizational
assets, or individuals.

Provides baseline for implementing security plans to protect


Risk Assessment
assets against various security threats. Definition of project
assets/ deliverables within the organization that needs
protection.

Security threats usually come from either human attacks or


Identifying Security
natural disasters. Human can attack the security maliciously
Threat and Method of
by cracking and hacking or; non-maliciously by performing
Attacks

LOGISTICS PART 1
Page 72
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

accidental error by some ignorant employees.

The User ID that is given shall be consistent with all systems


User Identity Policy
across the Airline Logistics. There should not be a need to
have multiple, different user IDs. The reason for this is to
ensure that all User Accounts can be reconciled with an
individual user and can be de-provisioned effectively when
the user is no longer at the organization.

It is vitally important that only the person, who should be


using the user account, should be the only user. If this is not
No Sharing of
strictly adhered to, the ability to audit individual actions will
Accounts Policy
be diminished. If a certain user account is misused, the
person to whom the account was issued must take sole
responsibility for those actions, regardless of who was
actually using the User Account at the time. The reason for
this is that in order to audit incidents there must be
confidence that the user account is used by the person it was
assigned to. User account is the only way to identify a person
from an action and trust must be maintained that the
relationship between the person and the account is unique.

A password is initially assigned to user after the user account


Password Policy
is successfully created. It must be changed periodically, must
be remembered at all times and must not be disclosed to
anyone including the administrator. Password is set to a
minimum of 8 alpha-numeric characters to 25 maximum
alpha-numeric characters. Special characters are allowed but
are not required. Password are salted and encrypted in the
database to avoid cracking.

LOGISTICS PART 1
Page 73
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Administrator can enable/disable a user account if any


Account Lockout/
anomalies are spotted on the audit trails or reported within
Suspension
the organization.

12. Abbreviations and Definitions


D1-D5 Deliverables 1 -5
M1-M5 Milestone 1- 5
PHP Philippine Peso
HR Human Resources
SteCo Steering Committee
SDLC System Development Life Cycle
SQL Structured Query Language
IDE Integrated Development Environment

13. References
Doc. [1] <Asset Management Module Project Charter>
Doc. [2] <Procurement Module Project Charter>
Doc. [3] <Warehousing Module Project Charter>
Doc. [4] <Maintenance, Repair and Overhaul Module Project Charter>
14. Revision
Revision ID Page(P) Description Date
Chapter(C)
1 C1 Project Charter 2017-03-02
2 C2 Related Studies 2017-03-23

LOGISTICS PART 1
Page 74
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

B. EIS Development (Enterprise Information System)


B.1. System Requirements
Section 1: Purpose
The purpose of this document is to specify the overall

system requirements that will govern the system development and

implementation. . The document will also establish initial security,

training, capacity and system architecture requirements, as well

as, system acceptance criteria agreed upon be the project sponsor

and key stakeholder.


Section 2: General System Requirement
2.1. Major System Capabilities
System must be available 24 hours per day

All modules under the EIS functionalities system must

be available 24 hours per day. Allowing the head managers

to alter or view data without delay.

System must be running real-time

All modules that are included in the EIS functionalities

system must run on real-time basis. Any sudden changes in

information are expected to be updated automatically without

refresh. Allowing the head managers to view real-time data.

System must be accessible on LAN computers

User management system must be accessible on

LAN-based computer for local-based transactions.

2.2. Major System Conditions

LOGISTICS PART 1
Page 75
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Specify major system assumptions and conditions. The


conditions may limit the options available to the designer/developer.

- System must use MS SQL Server 2014


- System must have report using Jasper report.
- System must use only by a Logistics Staff.

2.3. System Interfaces


- Not applicable at this phase

2.4. System User Characteristics


User Function Location Device Used
Asset Managers Asset Top Managers Computer
Management Department
Module
Procurement Procurement Logistics Computer
Managers and Module Department
Staffs
Warehousing Warehousing Warehousing Computer
managers and module Department
staffs
Maintenance Maintenance, Maintenance Computer
managers and Repair and Department
staffs Overhaul module

Section 3: Policy and Regulation Requirements


3.1. Policy Requirements
RA 10173 Data Privacy Act

LOGISTICS PART 1
Page 76
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

According to the Constitution, the Republic Act No. 10173 is

an act protecting individual personal information and

communications systems in the government and the private sector,

creating for this purpose a national privacy commission and for other

purposes. The Airline Management System totally adheres to the

Data Privacy Act by providing security policies stated in the Security

Requirements of this document.

RA 8293 Intellectual Property Code of the Philippines

According to the Constitution, this policy protects patents,

trademarks, and other forms of intellectual property. The law is

enforced through a body established by the law: the Intellectual

Property Office, or IPO, and its various branches. Copyright

implementation is done with the coordination of the IPO and the

Copyright Division of the National Library of the Philippines. The Bus

Transportation Management System particularly the EIS

Functionalities System protects its right for intellectual property. Any

unauthorized use, distribution of the system as well as the source

code is hereby prohibited.

3.2. Regulation Requirements


The company must have licensed or approval to use from the
developers of this system.

LOGISTICS PART 1
Page 77
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Letting unauthorized person to use this system will be punished


according to the contract and policy requirements.

Section 4: Security Requirements


Security Requirements Description
Availability of Ensuring timely and reliable access to and use
Information of information. The disruption of access to or
use of information or an information system
could also be expected to have a severe effect
on organizational operations, organizational
assets, or individuals.
Integrity of Information Guarding against improper information
modification or destruction, and includes
ensuring information authenticity.
Confidentiality of Preserving authorized restrictions on information
Information access and disclosure, including means for
protecting personal privacy information. The
unauthorized disclosure of information could be
expected to have a severe effect on
organizational operations, organizational assets,
or individuals.
Risk Assessment Provides baseline for implementing security
plans to protect assets against various security
threats. Definition of project assets/ deliverables
within the organization that needs protection.
Identifying Security Security threats usually come from human
Threat and Method of attacks or from natural disasters. Human can
Attacks attack the security maliciously, by cracking and
hacking or; non-maliciously by performing
accidental error by some ignorant employees.
User Identity Policy The User ID that is given shall be consistent with

LOGISTICS PART 1
Page 78
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

all systems across the Bus Transportation


Management EIS. There should not be a need
to have multiple, different user IDs. The reason
for this is to ensure that all User Accounts can
be reconciled with an individual user and can be
de-provisioned effectively when the user is no
longer at the organization.
No Sharing of Accounts It is vitally important that only the person, who
Policy should be using the user account, should be the
only user. If this is not strictly adhered to, the
ability to audit individual actions will be
diminished. If a certain user account is misused,
the person to whom the account was issued
must take sole responsibility for those actions,
regardless of who was actually using the User
Account at the time. The reason for this is that in
order to audit incidents there must be
confidence that the user account is used by the
person it was assigned to. User account is the
only way to identify a person from an action and
trust must be maintained that the relationship
between the person and the account is unique.
Account System Administrator can enable/disable a user
Lockout/Suspension account if any anomalies are spotted on the
audit trails or reported within the organization.

Section 5: Training Requirements


This section will describe the requirements for users of

Airline Management System. The tools, materials and other

LOGISTICS PART 1
Page 79
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

requirements may be provided by the client or the project

organization depending on the agreement of both parties.


Visual elements
The actual training presentation includes graphics, videos,

tables and other visual tools to reinforce important concepts.


Hands-on access to software
Users will be trained by actual usage of the system. In

accordance with the user manual, user will be instructed step-

by-step on how to use the software according to their user role.


Technical Equipment
If the training area is not on the actual site, the training must

have the complete technical equipment in order to train users

efficiently.

Section 6: Initial Capacity Requirements


6.1 Normal Transaction
Module No. of Est. No. of Level Frequency
Users Transaction

Asset 5 150 Low Daily


management
Procurement 5 20 Low Frequent

Warehousing 20 300 Medium Daily

Maintenance, 10 50 Low Daily


Repair and
Overhaul

6.2 Seasonal Peaks

LOGISTICS PART 1
Page 80
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Module No. of Est. No. of Level Frequency


Users Transaction

Asset 5 300 High Daily


management
Procurement 5 40 Medium Frequent

Warehousing 20 600 High Daily

Maintenance, 10 100 High Daily


Repair and
Overhaul

Section 7: Initial System Architecture


System Architecture Tools Description
Data Platform
MSSQL 2014 Relational Database

Management System.
Software
Netbeans 8.1 or above IDE for developing in Java

language.
Hardware Specifications
Hard Disk 1 Terabyte in memory.
Programming and Scripting Languages
Java language Language will be used in

developing the proposed

systems.
Operating System and Network Tools

LOGISTICS PART 1
Page 81
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Microsoft Windows Main operating system to be

use.

Section 8: System Acceptance Criteria


This section will identify criteria and conditions that a

software product must satisfy to be accepted by a user, customer,

or in the case of system level functionality, the consuming system.


Hereby specified system acceptance criteria that must be attained

before the acceptance of the end product:

4.1. Functional Criteria


The new system passed the unit, system and integration tests.

System testing and integration testing ensures that the

application works correctly in the server environment and with the

other enterprise systems it might be interacting with.

The new system passed the quality assurance tests.

The new system will be accepted if the system adheres to the

standards, procedures and policies stated in the Quality Assurance

stated in the Project Plan.

LOGISTICS PART 1
Page 82
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

4.2. Non Functional Criteria


The systems proposed is not working according to the project.

The proposed system didnt pass the quality assurance tests.

The new system didnt pass the unit, system and integration tests.

4.3. Performance Criteria

If specific performance is critical to the acceptance of a user


story, it should be included. This is often measured as a group
response time for the maintenance and operation of the system and
should be spelled out as a threshold.
Section 9: Current System Analysis

Section 10: References

Doc. [1] <Asset Management Module Project Charter>


Doc. [2] <Procurement Module Project Charter>
Doc. [3] <Warehousing Module Project Charter>
Doc. [4] <Maintenance, Repair and Overhaul Module Project Charter>
Section 11: Glossary

Database- is a collection of information that is organized so that it


can easily be accessed, managed, and updated.

Hardware- is the physical parts or components of a computer.

Integrated Drive Electronics (IDE) is a standard electronic


interface used between a computer motherboards data paths or
bus and the computers disk storage devices.

LOGISTICS PART 1
Page 83
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

MS SQL - Microsoft SQL Server is the high-performance relational


database engine from Microsoft for its Windows Servers and
development tools.

Random Access Memory (RAM) is the place in a computing


device where the operating system, application programs and data
in current use are kept so they can be quickly reached by the
devices processor.

Report to describe statement in detail an event, situation usually


as a resort of observation.

Software -the programs and other operating information used by a


computer.

Storage the retention of retrievable data from the database into


the system.

System Requirements are often used as a guideline as opposed


to an absolute rule.

System Interface - is a shared boundary across which all sub


modules of the system exchange information.

Section 12: Document Revision History

Revision/ Pages/Chapter Description Date


Individua
l

LOGISTICS PART 1
Page 84
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

LOGISTICS PART 1
Page 85
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

B.2. Software Requirement Specification

Section 1: Purpose

The purpose of the Software Requirement Specification is to

describe the business requirements in detail. This document will

establish the application business requirements, business

processes, functional and data requirements. Upon completion of

this document, this document will be used for designing the

application.

Section 2: Business Requirement

2.1. Define Business Requirements

2.1.1. Business Area A

Priority 1: Must Have

Warehouse sorting and location


Asset management
Maintenance check, repair and overhaul
Procurement
Analytical reports
Integration
Transaction Reports
Audit Trail

Priority 2: Nice to Have

Online modules or PHP

2.1.2. Business Area B

Priority 1: Must Have

LOGISTICS PART 1
Page 86
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Integration of modules

Priority 2: Nice to Have

Mobile application for module

2.2. Business Process Model

2.2.1. Business Process Definition

The EIS of Logistics 1 starts in login were the user

need to log the accounts to start a process as an employee.

In this EIS the source of process is the Logistics Team,

processes facilitate the relationships between production

and the movement of products. Specifically, logistical

processes should address many of the aspects of

production, including time, costs and quality. When a

company successfully coordinates these logistical

processes, the company can track the process through

production, consumption, storage and disposal. A functional

logistical process also relies on the proper geographical

location of all assets within the organization.

2.2.2. Business Process Flow

LOGISTICS PART 1
Page 87
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Figure 2.2.2 Business Process Flow

2.3. Functional Requirements

2.3.1. Functions

Asset Management Module

Real-time monitoring.
Proper disposal of depreciated assets.
Detailed monitoring.
Purchased items monitoring.
Procurement Module
Track supplier information
Reports of canvas and quotas
Automatic estimation of the cost
Warehouse Management Module
Secure all information
Track items in the warehouse
Generate accurate reports
Notify the user
Maintenance, Repair and Overhaul Module

LOGISTICS PART 1
Page 88
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Frequent Checking of the engine


Maintenance checking of facilities

2.3.2. Inputs

Asset Management Module

Asset Data
Appreciated and Depreciated Data
Procurement Module
Contacts of suppliers
Legitimate suppliers
Warehouse Management Module
Items details
Maintenance, Repair and Overhaul Module
Under maintenance details
Items repaired

2.3.3. Operation

Asset Management Module

Declaring of new assets


Setting of assets that depreciate and appreciate
Generate asset reports
Procurement Module
Check legitimate suppliers
Contact old and new suppliers
Warehouse Management Module
Sorting of new and old items
Checking of items
Generate reports of the items in the warehouse
Maintenance, Repair and Overhaul Module
Maintenance checking of facilities
Declaring of disposable items

2.3.4. Outputs

Asset Management Module

LOGISTICS PART 1
Page 89
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

All assets of the company


Graphical reports
Print reports

Procurement Module
New items bought or sell
Legitimate suppliers
Warehouse Management Module
Graphical reports
Printing reports
Maintenance, Repair and Overhaul Module
Repaired items
Items in disposal reports

2.3.5. Use Case

Figure 2.3.4 Use Case Diagram

Section 3: Data Management Requirement

3.1. Archive/Purge Requirements

Data Description Archive Purge

LOGISTICS PART 1
Page 90
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Asset Data This data is being saved in Asset data Unable


the database for the that is 10 to
retrieval of asset years old will remove
information. be archive in
the database.
Procurement This data is being saved in Data need to Unable
Data the database for the be manually to
retrieval of contacts archive by remove
information of suppliers. the user.
Warehouse This data is being save in Data that is 5 Unable
Data the database for the years old will to
information of items in be archive in remove
warehouse. the database
or manually
archive by
the user.
Maintenance This data is being save in Data that is 5 Unable
Data the database for the years old will to
information of maintenance be archive in remove
and repaired facilities or the database
items. or manually
archive by
the user.
Log Reports This data is being save to Data that is Unable
know who logged in the 10 years old to
proposed system. will be remove
archive in the
database.
Transaction This data is being save to Data that is Unable
Reports know the transaction of the 10 years old to

LOGISTICS PART 1
Page 91
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

user created. will be remove


archive in the
database.

3.2. Audit Requirement

The following in information that see in the table is

requirements of creating audit report for based:

Phase Description

Audit preparation consists of everything

Audit preparation that is done in advance by interested

parties, such as the auditor, the lead

auditor, the client, and the audit program

manager, to ensure that the audit

complies with the clients objective.

It consists of activities including on-site

audit management, meeting with the

Audit auditee, understanding the process and

performance system controls and verifying that these

controls work, communicating among

team members, and communicating with

the auditee.

LOGISTICS PART 1
Page 92
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

The report should provide correct and

Audit reporting clear data that will be effective as a

management aid in addressing important

organizational issues. The audit process

may end when the report is issued by the

lead auditor or after follow-up actions are

completed.

Audit follow-up The audit is completed when all the

and closure planned audit activities have been carried

out, or otherwise agreed with the audit

client.

3.3. Conceptual Data Model

LOGISTICS PART 1
Page 93
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Figure 3.3 Conceptual Data Model Diagaram.

3.3.1. Table Names and Description

LOGISTICS PART 1
Page 94
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Asset Management
Object Name Description
Asset Data Adding of new asset data.
Appreciated Declaring of appreciation value of an
Asset asset.
Depreciated Declaring of depreciation value of an
Asset asset.
Procurement
Object Name Description
New Suppliers Adding of new suppliers information.
Bid Data Under bidding items will be recorded.
Warehouse Management
Object Name Description
Item Data New items information in the database.
Maintenance, Repair and Overhaul
Object Name Description
Maintenance Information of items, facilities,
details equipment and vehicles that is
undergoing of maintenance.

3.3.2. Integrity Constraints

LOGISTICS PART 1
Page 95
Asset Management

Object Name Data type Null Not null


Bestlink College of the Philippines
Asset ID1071 Brgy.Integer
Kaligayahan, Quirino Highway,
Novaliches, Quezon City
Asset Type Varchar

Serial Number Varchar

Description Varchar

Brand Varchar

Purchased Date
Date
Purchased Varchar
Cost
Status Varchar

Department Varchar

Procurement

Object Name Data type Null Not null

PO # Integer

PO Date Date

Vendor ID Varchar

Vendor Name Varchar

PO Status Varchar

Delivery Date Date

Terms Varchar

Remarks Varchar

Warehouse Management

Object Name Data type Null Not null

Item No. Integer

Item Name Varchar

Item Category Varchar


LOGISTICS PART 1
Item Code Varchar
Page 96
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Section 4: Reporting Requirements

This section defines different requirements for report, make

clear to the proponent all parts that need to write or create a

reporting.

Requirements Description
Reporting Purpose Why is the report needed?
Reporting Requirement Who is requesting the reporting output?
Audience
Reporting Owner Who is the nominated person accountable prod
the reporting output?
Reporting Documentation What documentation exists for this reporting pro
Identified the dependencies Pre-requisites the other, that need to be satisfie
before the report can be prepared.
Related Business Processes Identify other existing processes impact by the
delivery of the report.
Other Information and Notes Include any further information that you conside
relevance.

Section 5: References

Doc. [1] <Asset Management Module Project Charter>


Doc. [2] <Procurement Module Project Charter>
Doc. [3] <Warehousing Module Project Charter>
Doc. [4] <Maintenance, Repair and Overhaul Module Project Charter>

Section 6: Glossary

LOGISTICS PART 1
Page 97
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Analytical Report offer both information and analysis, but they

also include recommendations.

Archive collection of historical documents or records providing

information about a place or group of people.

Business process- is a collection of linked tasks which find their

end in the delivery of a service or product to a client.

Business Requirements are the critical activities of an

enterprise that must be performed to meet the organizational

objectives while remaining solution independent

Integrated Drive Electronics (IDE) is a standard electronic

interface used between a computer motherboards data paths or

bus and the computers disk storage devices.

Analytical reports it is a data that are using graphical

representation using plots and charts.

PHP (Hypertext Preprocessor) is an HTML embedded Web

scripting language.

SRS (Software Requirements Specification) is a description of

a software system to be developed.

Use case is a methodology used in system analysis to identify,

clarify and organize system requirements.

LOGISTICS PART 1
Page 98
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Section 7: Document Revision History

Revision/ Pages/Chapter Description Date


Individua
l

Section 8: Appendixes

LOGISTICS PART 1
Page 99
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

B.3. Software Design Specification

Section 1: Introduction

The System Design Specification (SDS) is a complete

document that contains all of the information needed to develop the

system. Unlike the SRS, the target audiences of this document are

the implementation and testing teams, so the SDS should be

written at a more technical level.


It merely sets up guidelines showing what is required. Within

each section of each document, students are encouraged to use

their past experience and organizational abilities to come up with

the best method of describing their particular system.

1.1. Purpose

Section 2: Data Model Design

Section 3: Process Model Design

Section 4: Create/Read/Update/Delete/(CRVD) Matrix

LOGISTICS PART 1
Page 100
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Sub-Module Create Read Update Delete


Warehouse Functional Functional Functional Non-
Management functional
Asset Management Functional Functional Functional Non-
functional
Procurement Functional Functional Functional Non-
functional
Warehouse and Functional Functional Functional Non-
Overhaul functional
Section 5: Detailed Design

5.1. User/Batch/Report Interface Design Overview

5.2. User Interface Navigation Hierarchy

5.3. User Interface Functional Screen/Report/Batch Process

5.4. Other Interface

Section 6: Technical Architecture

6.1. System Architecture

6.2. Technical Architecture Diagram

6.2.1. Class Diagram

6.2.2. Object Mapping

6.2.3. Component Diagram

6.2.4. Interface Control Document

6.2.5. Sequence

6.3. System Development/Testing Environment

6.3.1. Development Environment

LOGISTICS PART 1
Page 101
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Name Specification Description


Java NetBeans IDE Front-End The proponents will use
8.1 the Java NetBeans IDE for
the front -end in the
proposed system to have
a better outlook and
performance
Microsoft Server Back-End The proponents use the
SQL 2014 MS SQL Server for the
back-end in the proposed
system for security
purpose
Random Access 6GB To store information and
Memory can allow the laptop or
computer to do more
things at once
Processor AMD A4-6300 For the enhancement of
APU performance, reduced
power consumption and
more efficient
simultaneous processing
of multiple tasks
Graphics 2048mb For the visual images or
designs on some surface
on the system.
System Type 64-bit (x64) Is the compatibility of the
running system in the
system type to be able to
run the system without
problem

LOGISTICS PART 1
Page 102
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Hard Drive 320 GB The storage space of the


proponents used in the
development of the
proposed systems.

6.4. Quality Assurance Testing Environment

6.4.1. Unit Testing

6.4.2. Integration Testing

6.4.3. Functional Testing

6.4.4. System Integration Testing

6.4.5. Regression Testing

6.4.6. User Acceptance Testing

6.4.7. User Acceptance Environment

Section 7: Requirement Traceability Matrix

Logistics Functional Non-Functional


Mobile Application X
Personalized Screens
Analytical Reports
Free Reporting Format

LOGISTICS PART 1
Page 103
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Work Flow
Import/Export Facility
Enable/Disable
Search/Adding
Information
Generate Reports

Section 8: Reference

Document no. Document Title Date Author

Section 9: Glossary

CRUD (Create, Read, Update and Delete) are the four basic
functions of persistent storage.
SDS (Software Design Specification) it contains specific
information about the expected input, output, classes and
functions.
UI (User Interface) - is everything designed into an information
device with which a person may interact.

LOGISTICS PART 1
Page 104
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

B.4. Test Specification and Procedure

1. Scope

The scope of Logistics 1 is to test the system functions regarding

on the Asset Management, Procurement, Warehouse Management, and

Maintenance, Repair and Overhaul modules. This is to clarify the system

functionalities that the group declared in the documentation.

1.1. System Overview

The purpose of Logistics 1 project is to enhance, develop,

improve and compass more of the existing and provide functionalities

that the client needs in the project.

1.2. Overview

Testing Scenarios Procedures to the system contains the

scope, documents and test procedures. It provides a detailed

description of each test scenario and the requirements for the system.

Each requirement to testing procedure in the system includes the

unique identification or user ID and specifies the functionality of the

system. The test procedures describe the step by step procedures of

testing scenario and expecting the possible and impossible result of

the system.

1.3. Performance Testing

LOGISTICS PART 1
Page 105
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

The performance testing is based on the system unit that the

clients used, proponents or project team requires. There are four

performance techniques to test the proposed system.

1.3.1. Load Testing

The simplest form of testing to understand the

behavior of the system. The main parameter focus is the

response time. This testing must determine whose people are

logged in to the system

1.3.2. Stress Testing

This type of testing find the limitation and capacity of

the system and also determine the current workload of goes

well above the expected maximum.

1.3.3. Soak Testing

Also, known as endurance testing determines the

availability test and run for a longer duration of the proposed

system

1.3.4. Spike Testing

This type of testing is to verify the stability of the

system.

1.4. Security Test and Evaluation

LOGISTICS PART 1
Page 106
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Develop tests and test them to ensure they work correctly.

Some tests require test data


Test rerun/expected results problem
Organize tests for maximum efficiency and automate

Execution and recording of results as much as

possible
Classical Security Testing Method
Validate tests with Designated Accrediting Authority or
Designee if possible prior to certification/acceptance

testing
Store tests in a test library for future use (e.g., new

releases of software, patch testing, new systems)


Retain test results for auditors
Some tests require test data
Test rerun/expected results problem

1.5. System Compatibility Testing

Compatibility is a non- functional testing to ensure customer

satisfaction. It is to determine whether your software application or

product is proficient enough to run in different browsers, database,

hardware, operating system, mobile devices and networks.

Application could also impact due to different versions, resolution,

internet speed and configuration.

LOGISTICS PART 1
Page 107
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Hardware It is to check the application software


compatibility with the different hardware
configurations.

Network It is to check the application in different


network like 3G, Wi-Fi or Lan

Operating System It is to check if application is compatible with


the different Operating System like Windows,
Linux and Mac.

Forward Testing of the application or software in new


Compatibility Test or upcoming versions.

2. Referenced Documents

2.1. Regulatory References

2.2. Department of Commerce Document References

2.3. Project Specific Document References

2.4. Commercial Document References

3. Test Specifications and Procedures

Login Testing
Interface Testing
Unit Testing
Integration Testing
Validation Testing
Test Record Keeping
Test Tools and Environment

3.1. Features to be Tested

LOGISTICS PART 1
Page 108
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

Verify log in functionality with right username and password.


Not able to verify if the Username and password was wrong.
Able to verify wrong username and password
Adding of data needed in modules.
Designation of assets, materials, and repairs.
Appointing of Schedules of repairs .
Monitoring in maintenance.
Integration working properly.
Able to logout.

3.2. Features Not to be Tested

3.3. Approach Refinements

There are no changes to the testing approach that was defined

in the Logistics Part 1 Test plan.

3.4. Feature Pass/Fail Criteria

Criteria Description

Critical Any condition found in the


proposed project the possibility
of causing injury or harm to the
life or safety of the user of the
product or others in the
immediate vicinity of its use.

Major Affecting the products


marketability and sale-ability or
adversely affecting its required
budget allocation.

Minor The proposed project did not

LOGISTICS PART 1
Page 109
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

meet the user or clients


system functionalities and the
client was requesting for
another functionality in the
system.

3.5. Input Specifications

3.6. Output Specifications

3.7. Environmental Needs

3.7.1. Hardware

The group is consists of five members and two


members has their very own laptop and desktops that has
been used for making this project.
Processor AMD A4-4000 3.7ghz & Intel Core 2 Duo
2.53ghz
Memory Minimum of 4 Gigabyte RAM
HDD 100 to 500 Gigabyte
External Storage Flash drive (Minimum 8gb) and
External Drive (500gb)
Router (internet connection) Router / LAN / WLAN

3.7.2. Software

Operating System - Windows 7 64bit


Programming Application Netbeans IDE 8.1
Database MsSQL server 2014
Documentation Microsoft Word 2013
Photo editing Adobe Photoshop CS6 and MsPaint

3.7.3. Other Needs

LOGISTICS PART 1
Page 110
Bestlink College of the Philippines
1071 Brgy. Kaligayahan, Quirino Highway,
Novaliches, Quezon City

3.8. Test Specifications and Procedures

Step Operator Action Expected Results


1 Login into the system User will be able to login the
main screen of the system
2 Dashboard Panel Dashboard panel can be
viewed by the user.
3 Asset Panel Asset Panel can be access by
the user.
4 Procurement Panel Procurement panel can be
access by the user.
5 Warehouse Panel Access the warehouse panel
smoothly.
6 Maintenance Panel Maintenance module can
access by the user.