Calculation Sheet

Job Name: Conrad Hotel Job No. :


Subject : Page No. : of
By : EF Date :

Design

Concrete Strength F'c = 45 mpa


Steel Strength Fy = 460 mpa
Width beam bw = 600 mm
Depth of beam h = 1000 mm
Depth efective beam d = 930 mm

Momen Max. Mmax = 440.93 kN.m


Shear Max. Vmax = 500 kN

1. Flexural

Lever arm a=d- d2 - 2 x Mmax = 23.24 mm


0.85 x F'c x 0.9 x bw

Tension Bar As = M-max = 1159.71 mm2


x Fy x (d - a/2)
3 T 25

Compression Bar As-min = 0.25 x F'c x bw x d = 2034.34 mm2


Fy
5 T 25

2. Shear

Shear Strength Conc. Vc = 0.166 x F'c x bw x d = 621.37 kN

Check : 1/2 Vc < Vmax < Vc = Need Shear Bar

Shear Strength Reinf. Vs = Vmax - Vc = 45.30 kN


Min. Shear Strength Vs = 0.33 x F'c x bw x d = 1235.25 kN

Max. Spacing of Stirrups s = 465 mm

Shear Reinf. Av = Vs = 0.11 mm2/mm


s Fys x d
1 T 10 - 250

0.63 mm2/m ==OK==

Av = 0.34 x bw = 0.00 0
s Fys
1 T 10 - 250
0.63 mm2/m ==OK==
Calculation Sheet
Job Name: Conrad Hotel Job No. :
Subject : Page No. : of
By : EF Date :

3. Torsion

Perimeter o Beam Ph = 2880 mm


Area of Beam Aoh = 478400 mm2

Momen Torsion Max. Tmax = 113.33 kN.m

a. Check Section Limitation

Torsion Strength vt = Vmax + Tmax x Ph = 1.32 MPa


bw x d 1.7 x A0h

Con.Torsion Strength vtc = x Vc + 0.66 F'c = 4.16 MPa


bw x d

vtc > vt OK

b. Torsion Required

Torsion Conc. Tc = x 1 F'c x Aoh2 = 33.32 kN.m


12 Ph

Tc < Tmax Need the torsion bar

c. Torsion Bars

- Links Ast = Tmax = 0.40 mm2/mm


s 1.7 x x Aoh x Fy

- Longitudinal bars Al = Ast x Ph x Fyv = 1163 mm2


s Fyl

Al-min = 0.42 x F'c x Aoh - Ph x Fyv x Max(Ast ; 0.17 bw)= 1766.8797 mm2 Govern
Fyl Fyl s Fyv

2x 2 T 25

- For Combined area of stirrups

Acs = Asv + 2 x Ast = 0.91 mm2/m


s s s
2 T 12 - 200

2.26 mm2/m OK