Vous êtes sur la page 1sur 1

PRELIMINARY

MAY 2017

SU
ASH BASIN

N
FOCUS AREA FOCUS AREA

BU
RK RD
BOUNDARY PA

RY
CHURCH

RD
LEGEND
9:49:46 AM

FOCUS AREA BOUNDARY

PROPERTY LINES
ELECTRIC
CEMETERY
5/15/2017

ORIGINAL ALIGNMENT
UN

TRANSMISSION
D
PARK R
NG

WESTERN ALTERNATIVE LINES


R

CHURCH
ROLLI

CENTRAL ALTERNATIVE
N

RD
E
PLOTTED:

EASTERN ALTERNATIVE
GRE

ER
SH
FOCUS AREA

FI

E
V
A
th
11
SOUTHERN
ASH BASIN
FILE NAME: c:\pwworking\gfpw01\jbuck\d0699254\Board 07 - SR 15 Focus Area Project Map May 2017.dgn

ORIGINAL
FOCUS
ALIGNMENT
CSVT AREA
ELECTRIC
M

E
TRANSMISSION ON

V
SH TO RO

A
LINES W
DAM AM NS E

R
OK HI
P
LE
BO I
N
ET RO
ASH BASIN NORTHERN UG DAM
ST

H
FOCUS AREA ASH BASIN
BOUNDARY

DAM

THIS PLAN SHOWS THE FOCUS AREA


BEING STUDIED AND PRELIMINARY ALTERNATIVES
DEVELOPED TO MOVE CSVT
AND THE PA 61 CONNECTOR OFF THE ASH BASINS.

20" GAS LINE PRELIMINARY


MAY 2017
FOCUS AREA
ASH BASIN FOCUS AREA
CSVT
M

ORIGINAL
UG DA

DISPLAY AREA ALIGNMENT S.R. 15, Section 088


NS E
P

H
HI
RO

RO N

PA 61 CONNECTOR
BO OKI

Central Susquehanna Valley


TO ON

Transportation Project
W

AM
M

Southern Section
SH

61 CONNECTOR

Snyder County
SCALE

0 300 600 FEET

pennsyvania
DEPARTMENT OF TRANSPORTATION

PROJECT LOCATION

Vous aimerez peut-être aussi