Vous êtes sur la page 1sur 1

OPGC -II Night Shift HSE Report

Date: 17.05.17 Shift Timing: 21:00 Hours to 06:00 Hours

ENVIRONMENT, SAFETY & HEALTH ISSUES / ACTIONS


Remark/Correct
Sl No Area Job continuing Site Details with Nature of Job Manpower Observations
ive Action

1 Batching Plant-1 No work No work

2 Batching Plant-2 No work No work


3 Batching Plant-3 & Batching Plant 4 No work No work
4 Main Steel Yard near BGRE Office No work
5 Switchyard No work

6 Pipe Rack Fabrication Yard No work

7 Re-Routed Piperack No work


8 New Pipe Rack No work

9 ESP 3 Control Building No work

10 ESP-4 Control Building No work

11 TG-3 No work

12 TG-4 No work
13 Transfer Points No work
14 TRs No work
15 PTP No work
16 DM plant No work
17 Raw Water Pump House No work
18 Clarifier No work
19 Chemical House No work
20 IDCT - 3 No work

Name of the Supervisor:- Mr.Govind Raja(Safety Supervisor,M/S-BGRE.) Mr.Harekrishna Pradhan (Supervisor,M/S-


NRME).
PPEs:-
1. Welder found not using leather apron and gloves
llumination:-
Observations are
21 IDCT-4 Welding 06 (Up to 4 AM) 1. Illumination was found Ok.
rectified.
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package : found OK
22 CW channel No work

1 BOP Area
Name of the Supervisor:- Mr.Govind Raja(SafetySupervisor,M/S-BGRE.) Mr.Lakhender (Supervisor,M/S-BGRE).
PPEs:-
1. Full sleeves and leather apron were not used by two welders.
llumination:-
1. Illumination was found inadequate under HT Line work. Observations are
23 C W Pipe line Fabrication (Welding) & Back Filling 04 + 10 Up to 5 AM)
Access:- rectified.
1. Proper access provided.
Others:-
1. Body Earthing of the welding machine not provided.
2. Work package : found OK

Name of the Supervisor:- Mr.Govind Raja(Safety Supervisor,M/S-BGRE.) Mr.Harekrishna Pradhan (Supervisor,M/S-


NRME).
PPEs:-
1. PPE Compliance found Ok.
llumination:-
24 CW Pump House Welding 06 (Up to 4 AM) 1. Illumination was found Ok.
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package : found OK

25 Chlorination Building No work


26 Track Hopper No work
27 Crusher House No work
28 Ash Silo No work
29 Stacker Reclaimer No work
30 ERH No work
31 Air Compressor House No work
32 ACW Pump House No work

Name of the Supervisor:- Mr.Govind Raja(Safety Supervisor,M/S-BGRE.) Mr.Joshil(Supervisor,M/S-BGRE ).


PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
1. Illumination was found Ok.
33 Chimney Fabrication Work (Ground Level) 11 (Up to 5AM)
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

34 Boiler 3 No work

35 Boiler 4 No work
36 Fire Water Pump House & Fire Water Tank No work
37 FOPH & Control Building No work
38 HFO Tank No work
39 Transformer Yard No work
40 AHP No work
41 Buffer Hopper No work
42 ID System 3 No work

Name of the Supervisor:- Mr.Govind Raja(Safety Supervisor,M/S-BGRE.) Mr.Nalini Kumar(Supervisor,M/S-BGRE ).


PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
1. Illumination was found Ok.
43 FD FAN Back Filling 4(Up to 5AM)
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

Name of the Supervisor:- Mr.Rajesh( Safety Supervisor,M/S-EDAC.) and Mr.Biswajit, Mr.Manoj


Tomar(supervisor,M/S-EDAC)

PPEs:-
1. Workers found not using Leather hand gloves while doing hand gloves
llumination:- Observations are
BTG Area 1 Boiler-3 Welding and fit up 42 (Up to 2 AM) rectified.
1. Illumination was found Ok.
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

Name of the Supervisor:- Mr.Kausik ( Safety Supervisor,BEPL.) and Mr.Rajesh Singh (supervisor,BEPL)
PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
2 Boiler-4 Coil Erection and Welding Work 30(up to 1 AM & 5 AM) 1. Illumination is found to be proper.
Access:-
1. Proper access provided.
Others:-
1. Work package: found OK

Name of the Supervisor:- Mr.Purnendu(SafetySupervisor,PMPL.) Mr. Sandip (Supervisor,PMPL)&Mr.Mr.


Partha(HSE,M/s-BHEL)
PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
M/S-PMPL,TG-3 Structural welding 25 (up to 1 AM) 2.Illumination is found to be proper.
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

Name of the Supervisor:- Dharmender (SafetySupervisor,PEE.) Mr. Jashketan Pradhan (Supervisor,PEE)


PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
1. Illumination was found Ok.
M/S-PEE ,TG-3(8 mtrs) Pipe Welding 10 (up to 2AM)
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2 2. Work package: found OK

Name of the Supervisor:- Mr.Kausik ( Safety Supervisor,BEPL.) and Mr.Biswajit Samal(supervisor,BEPL)


PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
1. Illumination is found to be proper.
4 TG-4 Welding and Bolting 10 (Upt to 4 AM)
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

Name of the Supervisor:- Mr.rajesh( Safety Supervisor,M/S-EDAC.) and Mr.Biswajit (supervisor,M/S-EDAC)

PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
5 ESP-3 Welding 11(Up to 3 AM) 1. Illumination was found Ok.
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

6 ESP-4 No work

7 M/s- Power mech Febrication yard No work No work No work

8 M/s- BEPL Fab Yard No work No work No work

Name of the Supervisor:- Mr.Kausik ( Safety Supervisor,BEPL.) and Mr.Sanjay Das(supervisor,BEPL)


PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
1. Illumination is found to be proper.
9 M/s- BEPL Bunker yard Fabrication Work 19 (Full Night)
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

Name of the Supervisor:- Mr.Rajesh( Safety Supervisor,M/S-EDAC.) and Mr.Biswajit,

PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
10 ID Fan 3 Welding and fit up 06 (Up to 2 AM) 1. Illumination was found Ok.
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: found OK

Name of the Supervisor:- Mr. Dinesh ( Safety Supervisor,M/S-EDAC.) and Mr.Viswanath

PPEs:-
1. PPEs compliance was satisfactory.
llumination:-
11 SWT Tank Painting and Radiography 03+2 1. Illumination was found Ok.
Access:-
1. Proper access provided.
Others:-
1. No Other violations observed.
2. Work package: Found OK

General / Follow up Action


3
to be taken

BGRE 41
EDAC 59
BEPL 51
Agency Wise Manpower
PMPL 25
USPL 6
PE.E 10
Total manpower at site including all Agencies in night shift 192

Report Prepared By : Rajesh Dash Mohini