Vous êtes sur la page 1sur 8

CONSTRUCTION OF SHYAM AVENUE

BUILDING

A Report submitted to

INDUS UNIVERSITY, AHMEDABAD


In the partial fulfillment for the award of degree of

BACHELOR OF TECHNOLOGY
IN
CIVIL ENGINEERING

By

DESAI VISHAL DHARAMSINH


IU1241040013
Under the guidance of

PROF. MAYURI PRAJAPATI


ASSISTANT PROFESSOR

CIVIL ENGINEERING DEPARTMENT


INDUS INSTITUTE OF TECHNOLOGY & ENGINEERING
INDUS UNIVERSITY AHMEDABAD
MAY-2017

I
CERTIFICATE
This is to certify that the report entitled CONSTRUCTION OF SHYAM
AVENUE BUILDING, which is being submitted to The INDUS UNIVERSITY
by DESAI VISHAL DHARAMSINH. in fulfillment of the requirements for the
degree of Bachelor of Technology (Civil), is the record of work done by her, under
my supervision and guidance during January 2017 to May 2017. In my opinion, the
submitted work has reached a level required for being accepted for Practical
Training Final Jury examination.

Date:
Place: Ahmedabad

Prof. Mayuri Prajapati Name & Sign Prof. Tejendra G. Tank


Assistant Professor External Examiner Head Of Department
Civil Engineering Department Civil Engineering Department
Iite Iite
Indus University Indus University
Ahmedabad Ahmedabad

II
DATE: 05/05/2017

INTERNSHIP COMPLETION CERTIFICATE

This is to certify that, DESAI VISHAL DHARAMSINH., a student of B.Tech.


(Civil Engineering) from Indus University, Ahmedabad has successfully completed
his internship at this Construction of shyam avenue building, location- vatva
road near vatva, Ahmedabad. During the period of his internship with us he was
found to be intelligent, punctual, hardworking and inquisitive.

We wish him all the very best for his future endeavors.

SIGNING AUTHORITY

III
ACKNOWLEDGEMENT

First and for all I would like to thank our Indus University, Ahmedabad

I would like to take the opportunity to bestow my Acknowledgement to all the persons who have
directly or indirectly availed me in making my project feasible and to turn it up into successful
piece of work.

I would like to thanks Mr. JIGNESH DESAI for creating the light environment which well
suited for the outgrowth of the student personality. His insinuations will help a lot in sailing my
ship in the professional world.

It has been an overhauling experience to develop this project. It has helped us to gather
information about various aspects of working of trade and has broadened over vision on the
applicability and the implementation of this system.

We would like to thanks lecturer, Prof. MAYURI PRAJAPATI the Guide of the project for
guiding and correcting various documents of mine with attention and care. She has taken pain to
go through the project and make necessary correction as and when needed.

We are also extending over gratitude to our Head of CIVIL Department Prof. TEJENDRA
TANK for immensely enriching our academics by including this subject in our courseware.

Lastly, we are very grateful to our family members and friends for moral support given throughout
the study

DESAI VISHAL
IU1241040013

IV
ABSTRACT

With the recent advancements in building construction, it is utmost important to acquire the
knowledge about the complete construction from start till end as a Civil Engineer so as to keep
pace with the recent developments and advancements that are involved in a building construction
project. There are many projects on building construction, such as construction of residential
building, public building, educational building, and industrial building. This report presents an
extended study of a project on building construction which includes office information, project
information, agencies involved, location, structure details, construction methods, procedures,
estimation, and work at site.

This project covers the construction of a College building which comprises of mainly 4 blocks.
.The various construction technologies such as, pumping (through RMC plant) , using fly ash (to
increase the compressibility of concrete), rubber soiling (to control the seepage problems in
foundation), consolidation, use of admixture , such as polyester fiber (in external plaster work)
etc. is been studied in detail. Beginning with surveying, excavation works till provision of
reinforcement, thorough study is been done at the particular site.

Apart from implementing of the various technologies, it is very much important to be able to or to
learn about solving the shortcomings as well as to rectify problems/issues on daily basis. A
construction site not only requires materials, machinery, plans, masons etc. but also a proper
management of these resources is of equal importance.

It has been an overhauling experience gets to work under this project. It has helped us to gather
information about various aspects of working of trade and has broadened over vision on the
applicability and the implementation of this system.

V
INDEX

Title Page I

Certificate II

Certificate from company III

Acknowledgement VI

Abstract V

Table of Contents VII

VI
TABLE OF CONTENTS

CHAPTER CONTENT PAGE NO.

1. INTRODUCTION .....................................................................Error! Bookmark not defined.


1.1. INTRODUCTION ...................................... Error! Bookmark not defined.
1.2 MAJOR OBJECTIVE OF Aroma.................. Error! Bookmark not defined.
1.3 GENERAL .......................................................................................... 1
1.3.1. Location of Site: ........................................................................... 3
1.3.3. Availability of Labour: ................................................................... 4
1.3.4. Housing, Water Supply And Drainage: ............................................. 4
1.3.5. Marketing Centres: ....................................................................... 4
1.3.6. Facilities: ..................................................................................... 4
1.4. SALIENT FEATURES OF THE PROJECT ................................................... 5
1.5. TECHNICAL SPECIFICATIONS OF THE PROJECT ...................................... 6
1.6. FACILITIES PROVIDED AT SITE: .......................................................... 6
1.6.1. Infrastructure Facilities: ................................................................ 6
1.6.2 Equipment Facilities ........................... Error! Bookmark not defined.
1.7. PROJECT BREAK-DOWN STRUCTURE .................................................... 8
1.8. MATERIAL INFORMATION ......................... Error! Bookmark not defined.

1.7 SPECIFICATIONS OF TANDER DOCUMENT ................Error! Bookmark not defined.

2. FOUNDATION..TYPES OF FOUNDATION ..........................Error! Bookmark not defined.


2.1 LINE OUT ............................................... Error! Bookmark not defined.
2.2 EXCAVATION .......................................... Error! Bookmark not defined.
2.3 PCC WORK ...................................................................................... 18
2.4 FOUNDATION ................................................................................... 20
2.5 FORMWORK AND SUTTERING ............................................................. 25
2.6 R.C.C WORK ..................................................................................... 27
2.7 BACKFILLING...................................................................................36

2.8 CHECK LIST.....................................................................................46

2.9 STAIR.47

VII
2.10 CURING.49

2.11 BRICK MASONARY50

2.12 PLASTERING.55

3. ESTIMATION OF CONSTRUCTION ACTIVIES...59

4.MATERIAL.60