Total = 10 cft.
Sl. No. Concrete Class Used for Proportion Material for 1m3 concrete
20mm stone 29.7 cft.
V- 1:1.28:2.64 Sand 14.4 cft.
1 G-35 Prestressed Girder
W-1:1.32:2.79 Cement 450 kg. = 9 bags
Admixture 2.25 Ltr.
20mm stone 29 cft.
V- 1:1.30:2.6
2 G-35 Wearing Course Sand 14.7 cft.
W-1:1.35:2.73
Cement 450 kg. = 9 bags
Under pass, EDS, DBC,
20mm stone 30.1 cft.
Bridge, Rigid pavement, V- 1:1.48:2.94
3 G-30 Sand 15.2 cft.
Guard post, Kilometer W-1:1.53:3.11
Cement 410 kg. = 8.2 bags
post & Median
20mm stone 30.8 cft.
V- 1:1.49:3.08 Sand 14.9 cft.
4 G-30 (For pile) All Piles
W-1:1.54:3.3 Cement 400 kg. = 8 bags
Admixture 3.6 Ltr.
25mm brick chips 25.7 cft.
V- 1:2.45:2.94
5 G-20 (with brick) C.C Block Sand 21.5 cft.
W-1:2.5:2.06
Cement 350 kg. = 7 bags
20mm stone 30.9 cft.
V- 1:1.86:3.53
6 G-20 R.O.W post, C.C. Block Sand 16.3 cft.
W-1:1.93:3.74
Cement 350 kg. = 7 bags
Surface drain, U-shaped 20mm stone 30.4 cft.
V- 1:1.62:3.20
7 G-25 drain, Toe drain, Footpath, Sand 15.4 cft.
W-1:1.67:3.39
Paved slab, Fencing Cement 350 kg. = 7 bags
20mm brick chips/shingles 31.8 cft.
All blinding conc. drain, of V- 1:3:6
8 G-15 Sand 15.88 cft.
WDB embankment
Cement 212 kg. = 4.24 bags