Vous êtes sur la page 1sur 10

EQUAL ENGINEERS AND CONSULTANTS

BOQ for GREEN FIELD SHARE SITE DHK_G2988

Indoor BTS

BOQ SUMMARY

SL. Item Quantity Unit

1 Soil Excavation 32.40 m3

2 Backfilling 25.80 m3

3 Plain Concrete 1.32 m3

4 Reinforced Concrete 12.90 m3

5 Reinforcement (60 Grade ) 1,617.78 kg

6 250 mm Brick wall 8.40 m3


G2988
Mat Foundation :

No. of Mat / Thickness


Type Long Side Short Side H Rebar Type Spacing Rebar
Com. Footing of C.C.

No. m m m m mm kg
1 4.4 3 0.4 0.1 Bottom Short 16 mm 200 114.40
M1 Bottom Long 16 mm 200 116.72
Top Short 16 mm 200 114.40
Top Long 16 mm 200 116.72

No. m m m m mm kg
0 6 6 0.5 0.1 Bottom Short 20 mm 200 0.00
M2 Bottom Long 20 mm 200 0.00
Top Short 20 mm 200 0.00
Top Long 20 mm 200 0.00

462.24
kg/m kg/ft
10 mm 0.11 0.616 0.187748
12 mm 0.20 0.888 0.270649

concrete CC
16 mm 0.31 1.579 0.481256
cum cum 20 mm 0.44 2.466 0.7516
5.28 1.32 22 mm 0.60 2.985 0.909784
25 mm 0.79 3.854 1.174642
#9 1.00
#10 1.27
#11 1.56
cum cum #14 2.25
0.00 0 #18 4.00

5.28 1.32
Column :

Long Short Single Tie


Type No. Height Main Rebar No. Tie Spacing No. of Tie
Side Side Length
m m m mm m
C1 4 0.3 0.3 3.5 #5 or 16 mm 8 150 2 0.95
C2 0 0.6 0.6 5.8 #6 or 20 mm 16 150 2 2.15
C3 0 0.6 0.6 5.8 #6 or 20 mm 16 150 2 2.15
C4 0 0.6 0.6 5.8 #6 or 20 mm 16 150 2 2.15
C5 0 0.6 0.6 5.8 #6 or 20 mm 16 150 2 2.15
kg/m kg/ft
#3 or 10 mm 0.11 0.616 0.187748
#4 or 12 mm 0.20 0.888 0.270649

Rebar Tie concrete


#5 or 16 mm 0.31 1.579 0.481256
Kg kg cum #6 or 20 mm 0.44 2.466 0.7516
194.53 119.61 1.26 #7 or 22 mm 0.60 2.985 0.909784
0.00 0.00 0.00 #8 or 25 mm 0.79 3.854 1.174642
0.00 0.00 0.00 #9 1.00
0.00 0.00 0.00 #10 1.27
0.00 0.00 0.00 #11 1.56
194.53 119.61 1.26 #14 2.25
#18 4.00
Beam :

Dimension Main Rebar Tie Rebar


Type No. Long Width Depth Main Rebar No. Tie Spacing Single Tie Length Rebar
m m m mm m Kg
FB1 2 3.8 0.25 0.4 #5 or 16 mm 5.67 175 1.13 74.85
FB2 2 1.8 0.25 0.4 #5 or 16 mm 4 175 1.13 25.01
FB3 2 4.1 0.25 0.3 #5 or 16 mm 4 200 0.93 56.97
FB4 2 2.5 0.25 0.3 #5 or 16 mm 4 200 0.93 34.74
GB1 2 3.8 0.25 0.3 #5 or 16 mm 4 175 0.93 52.80
GB2 2 1.8 0.25 0.3 #5 or 16 mm 4 175 0.93 25.01

269.38
Tie Concrete kg/m kg/ft
kg cum #3 or 10 mm 0.11 0.616 0.187748
33.20 0.76 #4 or 12 mm 0.20 0.888 0.270649
16.50 0.36 #5 or 16 mm 0.31 1.579 0.481256
25.87 0.62 #6 or 20 mm 0.44 2.466 0.7516
16.24 0.38 #7 or 22 mm 0.60 2.985 0.909784
27.33 0.57 #8 or 25 mm 0.79 3.854 1.174642
13.58 0.27 #9 1.00
#10 1.27
#11 1.56
#14 2.25
#18 4.00

132.71 2.95
Slab :

Long Short Slab


Type No. of Slab Rebar Type Spacing Rebar concrete
Side Side Thicness
No. m m m mm kg cum
Floor Slab 1 5 3 0.125 Bottom Short 10 mm 175 58.21 1.88
Bottom Long 10 mm 175 61.45
Top Short 10 mm 150 67.91
Top Long 10 mm 150 67.91

Roof Slab 1 4.1 3 0.125 Bottom Short 10 mm 200 42.69 1.54


Bottom Long 10 mm 200 42.43
Top Short 10 mm 150 56.27
Top Long 10 mm 200 42.43

439.31 3.41
Area kg/m kg/ft
(sqin)
10 mm 0.11 0.616 0.187748
12 mm 0.20 0.888 0.270649
16 mm 0.31 1.579 0.481256
20 mm 0.44 2.466 0.7516
22 mm 0.60 2.985 0.909784
25 mm 0.79 3.854 1.174642

Vous aimerez peut-être aussi