BOQ SUMMARY
2 Backfilling 25.80 m3
No. m m m m mm kg
1 4.4 3 0.4 0.1 Bottom Short 16 mm 200 114.40
M1 Bottom Long 16 mm 200 116.72
Top Short 16 mm 200 114.40
Top Long 16 mm 200 116.72
No. m m m m mm kg
0 6 6 0.5 0.1 Bottom Short 20 mm 200 0.00
M2 Bottom Long 20 mm 200 0.00
Top Short 20 mm 200 0.00
Top Long 20 mm 200 0.00
462.24
kg/m kg/ft
10 mm 0.11 0.616 0.187748
12 mm 0.20 0.888 0.270649
concrete CC
16 mm 0.31 1.579 0.481256
cum cum 20 mm 0.44 2.466 0.7516
5.28 1.32 22 mm 0.60 2.985 0.909784
25 mm 0.79 3.854 1.174642
#9 1.00
#10 1.27
#11 1.56
cum cum #14 2.25
0.00 0 #18 4.00
5.28 1.32
Column :
269.38
Tie Concrete kg/m kg/ft
kg cum #3 or 10 mm 0.11 0.616 0.187748
33.20 0.76 #4 or 12 mm 0.20 0.888 0.270649
16.50 0.36 #5 or 16 mm 0.31 1.579 0.481256
25.87 0.62 #6 or 20 mm 0.44 2.466 0.7516
16.24 0.38 #7 or 22 mm 0.60 2.985 0.909784
27.33 0.57 #8 or 25 mm 0.79 3.854 1.174642
13.58 0.27 #9 1.00
#10 1.27
#11 1.56
#14 2.25
#18 4.00
132.71 2.95
Slab :
439.31 3.41
Area kg/m kg/ft
(sqin)
10 mm 0.11 0.616 0.187748
12 mm 0.20 0.888 0.270649
16 mm 0.31 1.579 0.481256
20 mm 0.44 2.466 0.7516
22 mm 0.60 2.985 0.909784
25 mm 0.79 3.854 1.174642