Académique Documents
Professionnel Documents
Culture Documents
8/04
Reinforced Concrete Box Drop Spillway - 3' Overfall Height
Steel Schedule
Box depth (b) feet
Box width (W) feet
Headwall height above crest (HT) feet
Headwall length (L) feet
A B Length
Mark Type Quantity
(ft-in) (ft-in) (ft-in) 1. Complete the above blanks for Box depth, Box width, and Headwall height.
1 1 A F ----- P The Headwall length and values in the steel schedule will automatically be filled.
2 3 8 G N Q 2. Transfer the steel quantity and length of A and B dimensions to the steel
3 3 8 H O R schedule spreadsheet in the KS-ENG-446 .dwg file format. The total length of
4 1 B I ----- S each "Mark" bar and combined total length and weight of the steel required will
5 3 C J 2-0 T automatically be filled. Complete the blank for the Concrete volume.
6 3 D K 3-0 U 3. All blank items in the steel schedule will need to be completed if using the PDF
7 3 E L 3-0 V file format.
8 1 4 M ----- W 4. Complete the Box depth and Headwall height dimensions in the SIDE VIEW. Use
Total length (feet) X X 004xb_Notes_Dimensions text style.
Weight (lbs) Y 5. Complete the box width and headwall length dimensions and the Crest and Floor
Concrete volume = Z cu. yds. El. blanks in the FRONT VIEW. Complete the quantity blanks for "Mark"
bars 1,4, 5, 6, and 7 in the FRONT and TOP VIEWS
6. The quantity shown in the FRONT and TOP VIEWS for "Mark" bars 1, 4, and 7
will be 1/2 of the quantity shown in the steel schedule.
7. Complete the title information using 001xb_Lettering text style.
8. Additional information for completing KS-ENG-446 can be found in the Practice
Documentation Requirements in Section IV of the electronic Field Office
Technical Guide for any county in Kansas. eFOTG-Document Locator