GEHO Experience

The GEHO Commitment to the Mine Backfill Industry

Weir Minerals Netherlands b.v. is part of the Weir backfill will allow mining of ore that would have been
Minerals division, one of three divisions that form The left as pillars and not available with the current
Weir Group based in Scotland. method. Construction of the paste backfill plant and
Weir Minerals Netherlands b.v. has established itself as associated underground infrastructure will also begin
the technological leader in high pressure, crankshaft immediately and is expected to be completed in the
driven, piston diaphragm pumps and hydraulically driven second quarter of next year. For this new backfill
piston pumps, under the trade name GEHO. plant, the company has ordered two hydraulically
These pumps are currently serving worldwide a wide driven piston pumps, model DHC 26220, which
variety of applications in the mining, mineral processing handle 150 m/h of backfill paste against 90 bar.
and pipeline transportation industries.
GEHO pumps has been working with the industry to 2008 Tulsequah Chief Mine Canada
make tailings pipeline operation reliable and economical, Mine backfill
for example for mine backfill applications. Backed by The Tulsequah Chief project near the city of Atlin in
extensive application experience, GEHO is in a unique British Columbia, centres on re-opening an
position to offer the best of technology, equipment, underground zinc-copper-lead-gold-silver mine that
service and technical support and solve your particular closed in 1957. Mineral reserves are sufficient for
mine backfill system. With this capacity, GEHO offers eight years of production, with a strong likelihood that
bottom line advantages and great value for your money. more ore will be found at greater depth and
immediately adjacent to the known orebody. The
owner of the mine, Redcorp Ventures Ltd., has
GEHO EXPERIENCE ordered a hydraulically driven piston pump, model
DHC 21180, for the mine backfill application. The
2011 Uchalinsky GOK Russia pump will handle 68 m/h of mine tailings against 95
Mine backfill bar discharge pressure.
EngiTech Company in Moscow has ordered one
hydraulically driven piston pump, model DHT 21140-2F, 2007 Konkola Deep Mine, Zambia
for a mine backfill application at the Uchalinsky Mine in Mine backfill
the Ural region. This pump with transfer tube will handle The Konkola Deep Mining Project (KDMP) aims at
75 m/h of mine tailings with large amounts of course deepening the Konkola mine in Chililabombwe to
particles. access the deep rich ore that contains 250 million
tones of copper ore at 4 per cent contained copper at
2009 Niobec Mine, Canada an investment of 400 million dollars, this makes it the
Mine backfill largest single investment in Zambia and is poised to
Canadian gold-miner Iamgold will expand its mill and add increase the life of the mine for another 22 years, to
a paste backfill plant at its Niobec niobium mine, in 2032.
Quebec. Niobium is used in specialty high-strength Konkola Copper Mines has ordered four hydraulically
steels, and the Niobec operation currently produces about driven piston pumps, 2x model DHC 21180 and 2x
10% of global consumption of the metal. model DHC 1590 for their mine backfill project. The
Construction will begin immediately and the project is pumps are rated for a capacity between 45-145 m/h
scheduled for completion in the third quarter of 2010. and discharge pressure between 12 and 20 bar.
The Niobec mine has traditionally been mined using a
mining method of longhole open stoping without backfill, 2006 Somincor, Portugal
which means that significant levels of ore-grade rock is Mine backfill
permanently left behind. By changing to a different mining For their Neves Corvo Mine, Somincor ordered one
method using paste backfill, made from mill tailings mixed hydraulic driven piston pump, model DHC 21200.
with cement and another binder, which is pumped Somicor has 4 GEHO crankshaft driven piston
underground, Iamgold will be able to achieve nearly diaphragm pumps in operation for mine dewatering.
complete extraction of the ore body, leaving behind The hydraulic driven pump is going to transport mine
almost no ore pillars. For the lower block at Niobec, paste tailings for a mine backfill system.

Copyright Weir Minerals Netherlands b.v.- August 2006 Page 1


GEHO Experience

2005 Stillwater, USA 1997, JCI South Deep Mine, South Africa
Mine backfill Gold tailings slurry
The Stillwater Palladium mine in Montana, USA, is going With this 1997 order for four piston pumps, JCI has
to use a second duplex piston diaphragm pump, model now a total of eleven GEHO DHT pumps in
ZPM 700, for transporting sand slurry to a disposal area. operation for mine backfill one of the deepest gold
mines in the world.
2004 Northwich, UK
Mixture of salt, brine, cement and fly ash 1996 Kali und Salz, Germany
The English contractor Wrekin Construction awarded Mine tailings slurry
Weir Minerals Netherlands a contract for two hy-draulic The German potash mining company Kali und Salz
driven piston pumps, type DHC 21180-8, for the has acquired several mines in the former
Northwich Salt Mines Stabilisation project in England. communistic eastern part of the country. As many of
Part of the town centre of Northwich is sinking due to the old stopes in these mines had never been
flooded salt mines. The brine water is pumped out and backfilled there is a danger to the environment due to
mixed with PFA (Pulverised Fuel Ash) and cemented to possible collapse. New German mining regulations
form a stable and gradually hardening slurry that is oblige Kali und Salz to introduce a high density
pumped back into the mine by the two GEHO pumps. backfill system. To plan this system for their mine in
The pumps will operate in parallel be-cause the whole Unterbreizbach, Kali und Salz has awarded the
backfill operation has to be completed by the end of 2006, German engineering company Jacoby to design an
after which the pumps will probably be re-used by Wrekin automatic system to reslurry ashes delivered from
for other backfill jobs in the UK. A reference visit gave waste incinerators and mix it with water and cement.
Wrekin valuable input for the pipeline design. The system is designed to create 60 m3/h of a
mixture with a certain rheology to achieve optimum
2004 Yunnan Metallurgical Group, China and most economic conditions for backfill. Two
Lead and zinc tailings GEHO hydraulic driven DHC pumps charge the
The Yunnan company ordered three hydraulically driven slurry to the stopes at a pressure of up to 120 bar.
piston pumps, model DHC 21180-E for a mine backfill
application. The pumps will handle 60 m/h of lead and 1996, Galmoy Mine, Ireland
zinc tailings at a discharge pressure of max. 120 bar. Dolomite/pyrite slurry
The UK engineering company Davy International
2000 Inco Ltd., Canada purchased a hydraulically driven piston pump, model
Mine tailings slurry DHC 21140-8D. This pump unit will be used for mine
Inco, which has already six pumps in operation at various backfill of the Galmoy Mine on Kilkenney County,
mining facilities in Canada, has purchased a crankshaft Ireland.
driven piston pump, model TZP 500, for a mine backfill
system.

2000 Stillwater Mine, USA 1996, Wolfram, Austria


Mine tailings slurry Mine tailings slurry
Stillwater Mine, Montana, purchased one duplex piston Due to the satisfactory results of the first TZPM 180
diaphragm pump, model ZPM 800, for their mine backfill pump for mine backfill, Wolfram placed an order for
system. The duplex pump will transport a mixture of sand one more triplex pump, model TZPM 250. A new
slurry and mine water (57 m/h against 69 bar). pump was necessary due to expansion of the mine
and its capacity. This second pump is also going to
1997 Power plant Velenje, Slovenia transport the very abrasive tailings for mine backfill.
Fly/furnace ash slurry
Premogovnik awards Weir Minerals Netherlands a 1994 JCI South Deep Mine, South Africa
contract to supply two ZPM 400 fly ash disposal pumps. Gold tailings slurry
This unit transports high density ash slurries from the JCI purchases two additional pumps for mine backfill
power plant alternately to a disposal pond or in a nearby of the South Deep Gold Mine; identical to the two
underground coal mine for backfill. Pump capacity is 25 hydraulically driven piston pumps, model DHT
m/h. 21140, ordered in 1992.

Copyright Weir Minerals Netherlands b.v. 2009 Page 2


GEHO Experience

Minas Gerais. At the Mina de Raposos Mine, located


1994 Sweetwater County, Wyoming USA in the Nova Lima area, one GEHO ZPM 600 pump
3
Tailings slurry is utilised for mine backfill. 20-30 m /h (90-130
Rhone-Poulenc of Wyoming Co. operates an USgpm) of tailings, at a solids concentration of 70%
underground soda ash mine and refinery. The tailings by weight, are pumped a total distance of
disposal system (wet pond) was re-engineered to return approximately 3,000 m (9800'), to the mining area.
tailings to the mine. A paste is pumped down boreholes Pump discharge pressure is approximately 40 bar
and then horizontally to the mine area being filled, vertical (580 psi), with pump design pressure being 61 bar
drop 245 m (800'), horizontal distance max. 3650 m (885 psi).
(12,000'). A high density paste system was selected to
minimise bleed water at the filling area. As a result, the 1992, '93 JCI South Deep Mine, South Africa
installation of an expensive mine dewatering system was Gold tailings slurry
avoided. Two GEHO industrial paste pumps, model The South Deep gold ore body is located 60
DHT 21140, were purchased for this application. The two kilometres south west of Johannesburg, South Africa
pumps will be driven by a common 500 hp power pack and extends to a depth of 3300 m (10,800') below
and handle paste from a mixer which combines various sea level. During the first phase of development, no
flows consisting of a screen oversize, a rod mill product shaft access will be in place and ore hoisting will take
and thickener underflow. The system is rated for 76,4 place via an existing shaft, at approximately 3
m3/h 56,3% Cw ore tailings paste at 103 bar (1500 psi). A kilometres (1.9 miles) distance. In view of the limited
conventional slurry system would typically operate at 30- capacity of this shaft, ore processing will be handled
35% Cw only and would require seven centrifugal slurry underground, with all waste material being placed
pumps in series. GEHO conducted extensive lab and directly into stopes as backfill. This system requires
pumpability tests to determine the most suitable type and the pumping of high density backfill (85% wt.), over a
size pump for the application. distance of 1000 m (3280'), with a 250 m (820')
vertical lift. For this high density backfill pumping,
1993 El Indio, Chile four GEHO DHT 21140 hydraulically driven piston
Cement/gold tailings slurry pumps were supplied. All of the supplied pumps were
The El Indio Mine is located at 4,000 m above sea level. of the "transfer tube" design. In addition, two pumps
Lac Minerals own the mine, which is the largest gold were also equipped with "crusher" type non-return
producer in Chile. The principal mining method utilised at valves, which eliminate slurry back flow. Each pump
this mine is undercut and fill. Mill tailings will be used as is capable of pumping 0-45 m3/h (0-200 Usgpm),
the main source of backfill material. Dewatered tailings at against a discharge pressure of 94 bar (1365 psi). All
66-68% solids by weight, are transported a total distance pumps and valves have been designed to handle 26
of 1,870 m (6,100'), to the backfill preparation plant which mm (plus 1") aggregate. In 1993, in order to increase
is situated 283 m (930') above the mill. This material is flexibility of their backfill operations, JCI purchased
transported with one GEHO ZPM 600 pump, which has an additional GEHO pump. This newest unit is a
a capacity of 28 to 34 m3/h (125-150 USgpm), at a model DHT 21120 and will be used as an
discharge pressure of 63 bar (914 psi). This ZPM 600 intermediate pump in the backfill system.
pump was preferred over an existing pump with hydraulic 1990 Mineria Nor Peru Quiruvilca Mine, Peru
drive, as a result of its features, functions and operational Mine tailings slurry
benefits. At the backfill preparation plant, slurry is This silver, zinc, lead and copper mine is located in
combined with 5-6% of cement, resulting in a backfill the northern portion of the Andes Mountains, at an
slurry with a solids concentration of 76% by weight. One elevation of 4,200 m (13,800').
GEHO DHT 10115, hydraulic driven piston pump, An old (1920) triplex plunger pump had been used to
transports this dense backfill material to the backfill transport backfill tailings to the mine, where the
stopes. This pump has a capacity of 42 m3/h (185 stopes were filled manually. Maintenance costs on
USgpm), at a discharge pressure of 42 bar (610 psi). this existing pump were US $200,000 annually, and
pump availability was poor due to average valve life
1993 Morro Velho, Brazil of 40 hours, and plunger life of only 250 hours.
Gold tailings slurry In 1990, Mineria Nor Peru installed a GEHO TZPM
Morro Velho Mining Co. (Anglo-American Corp. 49% 180 pump for transporting backfill 5 kilometres (3 1/8
interest), is Brazil's largest gold producer. The original miles) horizontally and 245 m (800') vertically,
operations are concentrated at Nova Lima, in the state of directly into the mining stopes. The design

Copyright Weir Minerals Netherlands b.v. 2009 Page 3


GEHO Experience

specifications for this backfill pump were a capacity of 30


m3/h (132 USgpm), at a discharge pressure of 103 bar 1987 Wolfram, Austria
(1500 psi). The material to be transported was an Mine tailings slurry
extremely abrasive, 65% by weight, 28 mesh, Wolfram Bergbau und Httengesellschaft operates a
quartz/pyrite slurry. The Miller number of this slurry has tungsten mine, located in the Groglockner mountain
been determined to be 179. In order to further improve range. One GEHO TZPM 180 pump is used to
valve life, the originally supplied "mushroom" valves have transport 65% by weight backfill tailings, a total
been successfully replaced with the GEHO patented distance of approximately 3,000 m (9,800'). The
3
UP-TIME valve. The net result of this improved backfill design specifications of this pump are 30 m /h (132
transportation system, has been a 15% increase in mine USgpm), at a discharge pressure of 107 bar (1550
production. psi). The tailing material has a maximum particle size
of 0.2 mm and is extremely abrasive, with a Miller
1990 Cominco-Snip, British Columbia, Canada number of 200. The originally installed, cone type
Mine tailings slurry suction and discharge valves, exhibited a wear life of
The Snip Mine is a 450-tpd underground gold mine 500-800 hours. With the development of a new,
situated in British Columbia's Coastal mountain range. patented, valve design, GEHO was able to triple
The mine workings are inside Johnny Mountain, at this wear life. This new slurry valve is now marketed
elevations from 60 to 350 metres (200'-1150') above the under the registered trade name UP-TIME. It is
surface plant. Cominco ordered two ZPM 600 pumps, to spherically shaped and has matching metal and
transport dense tailings backfill (65% Cw) from the elastomer faces - within the valve and seat. The long
processing plant to excavated mining areas. Each pump wear life of this valve, is a result of unique geometry,
is capable of a flow of 34 m3/h (150 USgpm), at a as well as, special metallurgy. As a result, the wear
discharge pressure of 63 bar (915 psi). One pump is rate is reduced and wear allowance is increased. In
located at the mill and feeds the second GEHO pump, this fashion, the sealing function is maintained
which is installed at the 180 m (590') elevation of the irrespective of wear.
mine. Fine gravity is required to liberate most of the gold
particles in the ore. After processing, only about 30% of 1986 Powerplant Velenje, Slovenia
mill feed is of sufficient particle size to allow adequate Fly/furnace ash slurry
drainage at backfill. Since the mine's productive capacity In 1986 Gip Gradis awards GEHO a contract to
depends on how quickly stopes can be put back into supply a ZPM 500 fly ash disposal pump. This unit
production after backfill, a separate waste rock grinding transports high density ash slurries at a capacity of
circuit in the mill provides additional backfill material. The 25 m/h from the power plant alternately to a disposal
mill-generated fill is also augmented by placement of pond or in a nearby underground coal mine for
development waste rock as additional fill material. Backfill backfill. The pump was overhauled in 1997.
primarily acts as a working sill for the next lift.
1983 Minas de Arcata Mine
1989 Inco, Canada Mine tailings slurry
Cement tailings slurry Minas de Arcata is one of the largest silver producing
In 1988, Inco Limited awarded GEHO a rental/purchase companies in Peru. At its mining operation site in the
contract for one DHT 21101 hydraulic driven piston pump Andean Mountains, Minas de Arcata is using a piston
with transfer tube. This pump was designed for 75 m3/h diaphragm pump for its mine backfill system. The
(330 USgpm), at a maximum intermittent discharge ZPM 500 pump is used for transporting mine tailings
pressure of 83 bar (1200 psi). slurry at a capacity of 19 m/h against 28 bar
In 1989, as part of Inco's high density backfill research discharge pressure.
program, this pump was used to fill a number of vertical
retreat mining stopes at the Garson Mine. During these All of the listed projects, which total 46 pumps, are
backfill trials, materials with pulp densities as high as 87% testimony of the experience, involvement and
by weight were pumped. In 1990, having fulfilled all commitment GEHO pumps have in Mine Backfill
pumping performance parameters, GEHO received a Systems
Purchase Order for the outright purchase of this pump. In
1993, having completed numerous additional fill pumping Weir Minerals Netherlands b.v.
P.O. Box 249, 5900 AE Venlo, the Netherlands
trials, this pump was installed on a permanent basis at
Tel: +31(0)77-3895200, Fax: +31(0)77-3824844
Inco's Frood-Stobie mining complex. Email: weir@weirminerals.com, www.weirminerals.com

Copyright Weir Minerals Netherlands b.v. 2009 Page 4