Vous êtes sur la page 1sur 2
EHS. cSP.03 CSF-038 oe bly 8 pb) Adtailly Sadly tpilpll Lanne eo Deoarment of Raming& Development aig per Caste Fre Zone Corprsion GYR Government of Dubai Trakhees NIGHT SHIFT NOC APPLICATION FORM ‘This application must be completed and submitted by the Main Contractor/Consultant for all projects having @ proposal for right shift, Application must be made after meeting EHS requirements. Night shift NOC will cover from 08.00 Pm to 07.00 Am xsan Hamad Ali Hassan Alamic Jumeirah Village Circle lent: Location : project Name; BYG*4 Residential Building pees Plot Number: IVCIIDMRP200 Consultant: Aljawaher Engineering Consultancies Office Number: 043218854 Project Engineer: Suraj Desai Contact Number : 0552643579 Email: aljawaher3@ gmail.com Contractor ‘Aina alamir Contacting Office Number: 043477488 Project Manager : Omar Sharif Zilani Contact Number: 0552855970 mall Iuzancom@emiraesnet.ae ‘Activities at Night; Concrete Casting and Steel Erection \We hereby confirm that the following EHS requirements have been complied with:- em # Description é z 5 1 | No Objection letter from the Developer is obtalned and submitted to Trakhees EHS. “al< 2 | Responsible Engineer needs to be available on site, with authority for decision making, AINA SS 3. | Night shite Risk Assessment is prepared and available at site (Approved by consultant) 4 | Method statements are available for night shift activities. 5 | emergency procedures are established and implemented for night shift activites. | 6 | Approved Safety Professional, accredited from Trakhees EHS must be available. 7 | Allthe staircases & work areas are fitted with adequate lights and back-up power. 8 | Trained and Certified first aider & fire fighters are avallable for night shift activities. NINVN 9 _| Site security is available for night Shit. yo _ | Adequate site supervisors are nominated forthe night shift with communication faciltes 11_| Records for Safety induction awareness program for night shift activities are available. Environment, Health & Safety Division LeSLally La aaly Zt a 0 80417000, Dubai Usted Arab Emirates al Aaa ALA gi Wo ge Tels soy 4 ABBE» Fax 19714 8818857 SMOOAMY EVE ga AAV YART AVN tall EHS.consnucon@Trakhes 2 Web Sites wuwsratbees. ae sates finSP) gly +S Castracionerattee 36 A572 ag Re i: 02 October 2016 Page 1 of AS.CSP.-43 cSF-03a Department of Planing & Development aig pepe Tp pcm ttretnccomenim SMI Fiery areas yinl inate Government of Dubai Trakhees pare a NIGHT SHIFT NOC APPLICATION FORM ae ian miele on | nein notreatec romans wate am. vit ‘We undertake to carry out the night shift activities in accordance with EHS/CED Regulation and other relevant International construction safety standards, We are aware that we are liable for financial penalties/warning letters for falling to carry out ‘our works in accordance with EHS regulations & standards. We are also aware that in the event of EHS issuing Stop Work (Orders or Prohibition Notices we are bound to stop the work immediately in accordance with EHS Regulations & Standards, [Note: Any Construction activities that generates high Noises and high Vibrations shall not be permitted Date; 22-05-2017 xe GN P.0.8ox: 519 N=) Abn BRR SD ua; Yae RP Name & Signature of the Project Manager & Company Stamp Envronment, Health & Seley Dion .0.Bax7000, Dubai, United Nab Enirates Tels p74 881884 «Fe 0971 4888857, mall ES, Constncton@rknees 2» Web Se: wnumrabhees. 3¢ LaSatly La nly Ato Basal dyad bla ge IV ge WARIO EN esti AN IART De ln srmtenesae jahSIH gly ENS Cnstrionarakees2e AAC al Revision: 02 October 2016 Page 2 of 2

Vous aimerez peut-être aussi