RFI NO. ACTIVITIES / DESCRIPTION Activity SATIP/SAIC
No.
No.
LEVEL OF
INSPECTOR Location of Time of Date of
INSPECTION SAPMT
Inspection Inspection Inspection
POSCO SA POSCO NAPID
,WGP PLA
KAEFER ABU
SAIC-H-2027
1 RFI-292 Mechanical WASIT HYDRIYA SATIP-H-100-01 /3.1
SATR-H-2006
PAINTING YARD
KAEFER ABU
SAIC-H-2028
2 RFI-293 Mechanical WASIT HYDRIYA SATIP-H-100-01 /3.2
SATR-H-2006
PAINTING YARD
KAEFER ABU
SAIC-H-2027
3 RFI-294 Mechanical WASIT HYDRIYA SATIP-H-100-01 /3.1
SATR-H-2006
PAINTING YARD
KAEFER ABU
SAIC-H-2028
4 RFI-295 Mechanical WASIT HYDRIYA SATIP-H-100-01 /3.2
SATR-H-2006
PAINTING YARD
3 of 8
KAEFER ABU
SAIC-H-2029&
5 RFI-296 Mechanical WASIT HYDRIYA SATIP-H-100-01 /3.3
SATR-H-2006
PAINTING YARD
KAEFER ABU
SAIC-H-2031&
6 RFI-297 Mechanical Q98/WASIT HYDRIYA SATIP-H-100-01 /3.5
SATR-H-2006
PAINTING YARD
KAEFER ABU
SAIC-H-2031&
7 RFI-298 Mechanical Q98/WASIT HYDRIYA SATIP-H-100-01 /3.5
SATR-H-2006
PAINTING YARD
KAEFER ABU
8 RFI-299 Mechanical Q68/WASIT HYDRIYA SATIP-L-350-08/4.1 SAIC-L-2038
PAINTING YARD
4 of 8
RFI FOR R.PIPE &SPOOL PAINTING
5 of 8
Inspection of primer coat prior to top coat application
application Shoe supports S1-S10-73 Nos
K.KANNAN Mr.Shahanad Mr.Arun singha 20.08.2016 7:30:00 AM
Paint system APCS-11C
6 of 8
Contractor
Aramco
Inspection level REMARKS
Inspection level
H W
H W
H W
H W
7 of 8
H W
H W
H W
H W
8 of 8