01 INFRAESTRUCTURA
01.01 BLOQUE I
01.01.01 ESTRUCTURAS, BLOQUE I
01.01.01.01 OBRAS PRELIMINARES
01.01.01.01.01 GIGANTOGRAFA DIGITAL DE 3.60 X 2.40 m Und 1.00
Descripcin Zapatas A (m) B (m) hexc (m) Volumen (m) Area Afirmado(m)
Z - A2 1.50 1.50 1.80 4.05 2.25
Z - A3 1.55 1.55 1.80 4.32 2.40
EJE A Z - A4 1.75 1.75 1.80 5.51 3.06
Z - A5 1.85 1.85 1.80 6.16 3.42
Z - A6 1.50 1.50 1.80 4.05 2.25
Z - B2 1.95 1.95 1.80 6.84 3.80
Z - B3 2.00 2.00 1.80 7.20 4.00
EJE B Z - B4 2.10 2.10 1.80 7.94 4.41
Z - B5 2.35 2.35 1.80 9.94 5.52
Z - B6 1.90 1.90 1.80 6.50 3.61
Z - C1 1.10 1.10 1.80 2.18 1.21
Z - C2 2.00 2.00 1.80 7.20 4.00
Z - C3 1.90 1.90 1.80 6.50 3.61
EJE C
Z - C4 2.00 2.00 1.80 7.20 4.00
Z - C5 2.35 2.35 1.80 9.94 5.52
Z - C6 1.90 1.90 1.80 6.50 3.61
Z - D1 1.60 1.60 1.80 4.61 2.56
Z - D2 1.85 1.85 1.80 6.16 3.42
Z - D3 1.55 1.55 1.80 4.32 2.40
EJE D Z - D4 1.60 1.60 1.80 4.61 2.56
Z - D4' 0.75 0.75 1.80 1.01 0.56
Z - D5 1.45 1.45 1.80 3.78 2.10
Z - D6 1.30 1.30 1.80 3.04 1.69
Z - E1 1.70 1.70 1.80 5.20 2.89
Z - E2 1.00 1.00 1.80 1.80 1.00
Z - placa acensor 7.03 0.75 1.80 9.48 5.27
EJE E
Z - E3 1.00 1.00 1.80 1.80 1.00
Z - E4 1.60 1.60 1.80 4.61 2.56
Z - E4' 1.50 1.50 1.80 4.05 2.25
Z - F1 1.50 1.50 1.80 4.05 2.25
Z - F1' 0.75 0.75 1.80 1.01 0.56
Z - F2 1.45 1.45 1.80 3.78 2.10
EJE F
Z - F3 1.45 1.45 1.80 3.78 2.10
Z - F4 1.70 1.70 1.80 5.20 2.89
Z - F4' 1.55 1.55 1.80 4.32 2.40
Z - G1' 1.75 1.75 1.80 5.51 3.06
Z - G3 1.55 1.55 1.80 4.32 2.40
EJE G
Z - G4 1.45 1.45 1.80 3.78 2.10
Z - G4' 1.25 1.25 1.80 2.81 1.56
Z - H1' 1.10 1.10 1.80 2.18 1.21
Z - H3 1.20 1.20 1.80 2.59 1.44
EJE H
Z - H4 1.10 1.10 1.80 2.18 1.21
Z - H4' 1.00 1.00 1.80 1.80 1.00
TOTAL 203.86 m 113.25 m
Vigas Riostras L (m) b (m) hexc (m) Volumen (m) Area Afirmado(m)
Tramo 2-3 1.53 0.250 0.75 0.29 0.38
Tramo 3-4 1.15 0.250 0.75 0.22 0.29
EJE A
Tramo 4-5 2.90 0.250 0.75 0.54 0.73
Tramo 5-6 2.48 0.250 0.75 0.47 0.62
Tramo 2-3 0.98 0.300 0.75 0.22 0.29
Tramo 3-4 0.85 0.300 0.75 0.19 0.26
EJE B
Tramo 4-5 2.38 0.300 0.75 0.54 0.71
Tramo 5-6 1.88 0.300 0.75 0.42 0.56
Tramo 1-2 2.23 0.250 0.75 0.42 0.56
Tramo 2-3 1.00 0.300 0.75 0.23 0.30
EJE C Tramo 3-4 0.95 0.300 0.75 0.21 0.29
Tramo 4-5 2.43 0.300 0.75 0.55 0.73
Tramo 5-6 1.88 0.300 0.75 0.42 0.56
Tramo 1-2 1.74 0.250 0.75 0.33 0.44
Tramo 2-3 1.35 0.250 0.75 0.25 0.34
Tramo 3-4 1.23 0.250 0.75 0.23 0.31
EJE D
Tramo 4-4' 2.20 0.250 0.75 0.41 0.55
Tramo 4'-5 0.23 0.250 0.75 0.04 0.06
Tramo 5-6 2.88 0.250 0.75 0.54 0.72
Tramo 1-2 2.04 0.250 0.75 0.38 0.51
Tramo 2-3 2.05 0.250 0.75 0.38 0.51
EJE E
Tramo 3-4 1.50 0.250 0.75 0.28 0.38
Tramo 4-4' 1.15 0.250 0.75 0.22 0.29
Tramo 1-1' 1.07 0.250 0.75 0.20 0.27
Tramo 1'-2 0.18 0.250 0.75 0.03 0.05
EJE F Tramo 2-3 1.60 0.250 0.75 0.30 0.40
Tramo 3-4 1.23 0.250 0.75 0.23 0.31
Tramo 4-4' 1.05 0.250 0.75 0.20 0.26
Tramo 1'-3 2.65 0.250 0.75 0.50 0.66
EJE G Tramo 3-4 1.30 0.250 0.75 0.24 0.33
Tramo 4-4' 1.48 0.250 0.75 0.28 0.37
Tramo 1'-3 3.05 0.250 0.75 0.57 0.76
EJE H Tramo 3-4 1.65 0.250 0.75 0.31 0.41
Tramo 4-4' 1.90 0.250 0.75 0.36 0.48
Tramo C-D 2.60 0.250 0.75 0.49 0.65
EJE 1 Tramo D-E 2.45 0.250 0.75 0.46 0.61
Tramo E-F 3.25 0.250 0.75 0.61 0.81
Tramo F-G 3.05 0.250 0.75 0.57 0.76
EJE 1'
Tramo G-H 0.70 0.250 0.75 0.13 0.18
Tramo A-B 3.00 0.250 0.75 0.56 0.75
Tramo B-C 4.33 0.250 0.75 0.81 1.08
EJE 2 Tramo C-D 2.00 0.250 0.75 0.38 0.50
Tramo D-E 0.70 0.250 0.75 0.13 0.18
Tramo E-F 3.63 0.250 0.75 0.68 0.91
Tramo A-B 2.80 0.300 0.75 0.63 0.84
Tramo B-C 4.25 0.300 0.75 0.96 1.28
Tramo C-D 2.13 0.250 0.75 0.40 0.53
EJE 4 Tramo D-E 2.50 0.250 0.75 0.47 0.63
Tramo E-F 3.20 0.250 0.75 0.60 0.80
Tramo F-G 2.98 0.250 0.75 0.56 0.75
Tramo G-H 0.75 0.250 0.75 0.14 0.19
Tramo D-E 2.63 0.250 0.75 0.49 0.66
Tramo E-F 3.33 0.250 0.75 0.62 0.83
EJE 4'
Tramo F-G 3.15 0.250 0.75 0.59 0.79
Tramo G-H 0.95 0.250 0.75 0.18 0.24
Tramo A-B 3.03 0.250 0.75 0.57 0.76
EJE 6 Tramo B-C 4.40 0.250 0.75 0.83 1.10
Tramo C-D 2.33 0.250 0.75 0.44 0.58
TOTAL 23.28 m 31.05 m
Area cad Falso Piso Area Zapatas Area a Excavar Vol. A Excavar
553.340 113.254 440.086 286.056
Eliminacin Volumen
En Zapatas, cimientos, vigas de cimentacin 249.96
En Cuneta 0.14
En Suelo de fundacin para pisos 286.06
Total 536.16
01.01.01.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA (Dist. menor o igual a 6km) m3 670.20
Eliminacin Volumen
En Zapatas, cimientos, vigas de cimentacin 249.96
En Cuneta 0.14
En Suelo de fundacin para pisos 286.06
Total 536.16
Ubicacin Area
PARA VIGAS RIOSTRAS DE CIMENTACIN e = 0.20 m 31.05
PARA ZAPATAS e = 0.20 m 113.25
01.01.01.04.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA, TM 6" m3 23.28
01.01.01.04.04 SOBRECIMIENTOS
01.01.01.04.04.01 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.15 m m3 11.12
01.01.01.04.05 CUNETAS
01.01.01.04.05.01 CONCRETO f'c=175 kg/cm2 m3 0.83
vigas de cimentacion L (m) b (m) hv (m) Volumen (m) Area encof. (m2)
Tramo 2-3 2.65 0.25 0.50 0.33 2.65
Tramo 3-4 2.40 0.25 0.50 0.30 2.40
EJE A
Tramo 4-5 4.30 0.25 0.50 0.54 4.30
Tramo 5-6 4.30 0.25 0.50 0.54 4.30
Tramo 2-3 2.45 0.30 0.50 0.37 2.45
Tramo 3-4 2.40 0.30 0.50 0.36 2.40
EJE B
Tramo 4-5 4.10 0.30 0.50 0.62 4.10
Tramo 5-6 4.20 0.30 0.50 0.63 4.20
Tramo 1-2 3.68 0.25 0.50 0.46 3.68
Tramo 2-3 2.45 0.30 0.50 0.37 2.45
EJE C Tramo 3-4 2.40 0.30 0.50 0.36 2.40
Tramo 4-5 4.10 0.30 0.50 0.62 4.10
Tramo 5-6 4.20 0.30 0.50 0.63 4.20
Tramo 1-2 3.66 0.25 0.50 0.46 3.66
Tramo 2-3 2.65 0.25 0.50 0.33 2.65
Tramo 3-4 2.40 0.25 0.50 0.30 2.40
EJE D
Tramo 4-4' 3.10 0.25 0.50 0.39 3.10
EJE D
01.01.01.05.03 COLUMNAS
01.01.01.05.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm m3 38.28
Area de
Descripcin a (m) b (m) Area (m) Permetro (m) h (m) Volumen (m3) Encofrado (m)
C-A2 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-A3 0.25 0.40 0.100 1.300 8.18 0.82 10.33
EJE A C-A4 0.25 0.40 0.100 1.300 8.18 0.82 10.18
C-A5 0.25 0.40 0.100 1.300 8.18 0.82 10.18
C-A6 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-B2 0.30 0.50 0.150 1.600 8.18 1.23 12.64
C-B3 0.30 0.50 0.150 1.600 8.18 1.23 12.79
EJE B C-B4 0.30 0.50 0.150 1.600 8.18 1.23 12.94
C-B5 0.30 0.50 0.150 1.600 8.18 1.23 12.79
C-B6 0.30 0.50 0.150 1.600 8.18 1.23 6.00
C-C1 0.25 0.40 0.100 1.300 4.03 0.40 4.79
C-C2 0.30 0.50 0.150 1.600 8.18 1.23 12.94
C-C3 0.30 0.50 0.150 1.600 8.18 1.23 12.79
EJE C
C-C4 0.30 0.50 0.150 1.600 8.18 1.23 12.94
C-C5 0.30 0.50 0.150 1.600 8.18 1.23 12.79
C-C6 0.30 0.50 0.150 1.600 8.18 1.23 12.94
C-D1 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-D2 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-D3 0.25 0.40 0.100 1.300 8.18 0.82 10.33
EJE D
C-D4 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-D5 0.25 0.40 0.100 1.300 8.18 0.82 10.18
C-D6 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-E1 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-E2 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-E3 0.25 0.40 0.100 1.300 8.18 0.82 10.48
EJE E
EJE E C-E2-az 0.25 0.30 0.075 1.100 2.70 0.20 2.67
C-E3-az 0.25 0.30 0.075 1.100 2.70 0.20 2.82
C-E4 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-E4' 0.25 0.40 0.100 1.300 8.18 0.82 10.33
C-F1 0.25 0.40 0.100 1.300 8.18 0.82 10.48
C-F2 0.25 0.40 0.100 1.300 8.18 0.82 10.18
EJE F C-F3 0.25 0.40 0.100 1.300 8.18 0.82 10.48
C-F4 0.25 0.40 0.100 1.300 8.18 0.82 10.48
C-F4' 0.25 0.40 0.100 1.300 8.18 0.82 10.18
C-G1' 0.25 0.40 0.100 1.300 8.18 0.82 10.33
EJE G
C-G3 0.25 0.40 0.100 1.300 8.18 0.82 10.48
Descripcin a (m) b (m) Area (m) Permetro (m) h (m) Volumen (m3) Area de
Encofrado (m)
0.15 0.25 0.038 0.800 2.50 0.09 1.70
0.15 0.25 0.038 0.800 2.50 0.09 1.70
0.15 0.25 0.038 0.800 2.50 0.09 1.70
EJE 1 0.15 0.25 0.038 0.800 2.50 0.09 1.70
0.15 0.25 0.038 0.800 2.50 0.09 1.70
0.15 0.25 0.038 0.800 2.50 0.09 1.70
0.15 0.25 0.038 0.800 2.50 0.09 1.70
COLUMNAS 0.15 0.25 0.038 0.800 2.50 0.09 1.70
PERIMETRALES
0.15 0.25 0.038 0.800 2.50 0.09 1.70
EJE 5 0.15 0.25 0.038 0.800 2.50 0.09 1.70
0.15 0.25 0.038 0.800 2.50 0.09 1.70
- - 0.053 1.000 2.50 0.13 2.20
0.15 0.25 0.038 0.800 2.50 0.09 1.70
EJE 6
EJE 6 0.15 0.25 0.038 0.800 2.50 0.09 1.70
- - 0.053 1.000 2.50 0.13 2.20
TOTAL 1.48 m 26.50 m
01.01.01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m 458.01
Area de
Descripcin Placas a (m) b (m) Area (m) Permetro (m) h (m) Volumen (m3) Encofrado (m)
P-D4' 0.15 0.45 0.068 1.200 7.18 0.48 8.32
P-F1' 0.15 0.45 0.068 1.200 7.18 0.48 8.32
P-ACENSOR 0.15 8.00 1.200 16.300 7.18 8.62 116.73
P-ACENSOR-AZOTEA 0.15 8.00 1.200 16.300 2.70 3.24 43.71
TOTAL 12.83 m 177.08 m
01.01.01.05.05 VIGAS
01.01.01.05.05.01 CONCRETO EN VIGAS f'c=210 kg/cm m3 38.62
Descripcin L (m) b (m) h (m) Volumen (m3) Area de Encofrado Area de pintado
(m) (m)
EJE A-A 13.65 0.250 0.400 1.365 14.333
EJE B-B 13.15 0.300 0.450 1.775 15.780
2.65 0.250 0.400 0.265 2.783
EJE C-C
13.15 0.300 0.450 1.775 15.780
1 PLANTA EJE D-D 17.32 0.250 0.350 1.516 16.454
PRINCIPALES
EJE E-E 11.55 0.250 0.350 1.011 10.973
EJE F-F 11.53 0.250 0.350 1.009 10.954
EJE G-G 9.05 0.250 0.350 0.792 8.598
EJE H-H 9.05 0.250 0.350 0.792 8.598 104.250
EJE 1-1 12.15 0.250 0.200 0.608 7.898
EJE 1'-1' 6.20 0.250 0.200 0.310 4.030
10.95 0.250 0.250 0.684 8.213
EJE 2-2
12.10 0.250 0.200 0.605 7.865
4.95 0.250 0.250 0.309 3.713
6.00 0.30 0.25 0.450 4.800
EJE 3-3
4.85 0.25 0.35 0.424 4.608
14.00 0.250 0.200 0.700 9.100
1 PLANTA
4.95 0.250 0.250 0.309 3.713
SECUNDARIAS
EJE 4-4 6.00 0.300 0.250 0.450 4.800
18.60 0.250 0.200 0.930 12.090
EJE 4'-4' 14.95 0.250 0.200 0.748 9.718
4.45 0.250 0.250 0.278 3.338
EJE 5-5 6.00 0.300 0.250 0.450 4.800
3.65 0.250 0.200 0.183 2.373
10.45 0.250 0.250 0.653 7.838
EJE 6-6
3.65 0.250 0.200 0.183 2.373
EJE A-A 13.65 0.250 0.400 1.365 14.333
EJE B-B 13.15 0.300 0.450 1.775 15.780
EJE C-C 13.15 0.300 0.450 1.775 15.780
Dimensiones N Lad / m Area (m) Cantidad Lad. Volumen Total Vol. Lad. Vol. Ladrillos Vol. Concreto
1 Planta 0.30x0.30x0.2 8.333 348.030 2901.000 87.008 0.018 52.218 34.790
0.30x0.30x0.15 8.333 509.350 4245.000 101.870 0.014 57.308 44.563
2 Planta
0.30x0.30x0.12 8.333 13.180 110.000 2.241 0.011 1.188 1.053
TOTAL 870.560 TOTAL 80.40 m
01.01.01.05.06.04 LADRILLO HUECO DE ARCILLA 12x30x30 PARA TECHO ALIGERADO h = 0.17 u 110.00
01.01.01.05.06.05 LADRILLO HUECO DE ARCILLA 15x30x30 PARA TECHO ALIGERADO h = 0.20 u 4,245.00
01.01.01.05.06.06 LADRILLO HUECO DE ARCILLA 20x30x30 PARA TECHO ALIGERADO h = 0.25 u 2,901.00
01.01.01.05.07 ESCALERAS
01.01.01.05.07.01 CONCRETO EN ESCALERAS f'c=210 kg/cm m3 5.32
01.01.01.05.09 DINTELES
Area de Encofrado
Descripcin L Libre (m) L (m) b (m) h (m) N VECES V (m3) (m) L acero (m)
01.01.01.05.10 PARAPETOS
01.01.01.05.10.01 CONCRETO f'c=175 kg/cm2 EN PARAPETOS m3 4.84
Descripcin b (m) Perimetro (m) hc Volumen (m) acero 3/8" (m) Encofrado (m)
TEATINA 1 0.15 15.30 0.30 0.69 28.98 9.18
TEATINA 2 0.15 5.90 0.30 0.27 11.40 3.54
TEATINA 3 0.15 4.60 0.30 0.21 8.55 2.76
TEATINA 4 0.15 4.90 0.30 0.22 9.50 2.94
TEATINA 5 0.15 14.60 0.30 0.66 27.55 8.76
JARDINERA ESTACIONAMIENTO 0.10 20.10 0.80 1.61 76.95 32.16
JARDINERA INGRESO PRINCIPAL 0.10 9.20 0.80 0.74 36.10 14.72
PARAPETO (BARANDA) INGRESO PRINCIPAL 0.15 3.00 0.80 0.36 12.35 4.80
0.15 3.00 0.15 0.07 6.00 0.90
0.15 0.15 1.40 0.03 2.80 1.68
TOTAL 4.84 m 220.18 m 81.44 m
1.150
1 planta sobre ingreso de emergencia 16.20 18.63 0.10 1.86 166.71 19.47
2 Planta SOBRE PARAPETO EN AZOTEA Bloque I (area cad) 122.75 141.16 0.10 14.12 1435.26 15.92
TOTAL 159.793 15.979 1601.97 m 35.39 m
Viga CA
f'c= 175 kg/cm2
Losa de CA
f'c= 175 kg/cm2
Viga CA
f'c= 175 kg/cm2
Losa de CA
f'c= 175 kg/cm2
VIGA DE AMARRE (ANCLAJE P/ LOSAS ARMADAS) 0.15 79.60 0.20 2.39 323.71 31.84
TOTAL 79.600 2.388 323.71 m 31.84 m
base 17.25
tatina 1 transversales 16.00
verticales 7.40
base 5.90
tatina 2 transversales 2.30
verticales 2.90
base 4.60
tatina 3
tatina 3 transversales 1.80
verticales 2.90
base 4.90
tatina 4 transversales 4.80
verticales 2.90
base 14.60
tatina 5 transversales 17.30
verticales 7.40
TOTAL 112.95 m
Descripcin e (m) H Hprom (m) L (m) N veces Area Vano(m) Area (m)
ENTRE EJES A-B:2-6 0.15 2.98 21.30 1 21.80 41.67
0.15 2.98 25.80 1 6.06 70.82
ENTRE EJES B-C:2-6 0.15 2.98 17.15 1 17.79 33.32
0.15 2.98 14.10 1 11.73 30.29
ENTRE EJES C-D:2-6 0.15 2.98 20.32 1 18.50 42.05
1 Planta 0.15 2.98 29.05 1 8.67 77.90
ENTRE EJES D-E:2-6 0.15 2.98 18.45 1 20.53 34.45
0.15 2.98 11.25 1 3.60 29.93
1 Planta ENTRE EJES E-F:2-6 0.15 2.98 10.40 1 2.70 28.29
0.15 2.98 16.35 1 9.36 39.36
ENTRE EJES F-G:2-6 0.15 2.98 13.30 1 10.65 28.98
0.15 2.98 16.90 1 4.20 46.16
ENTRE EJES G-H:2-6 0.15 2.98 10.45 1 2.70 28.44
0.15 2.98 9.60 1 1.80 26.81
ENTRE EJES A-B:2-6 0.15 2.95 17.25 1 5.55 45.34
0.15 2.95 19.55 1 2.43 55.24
ENTRE EJES B-C:2-6 0.15 2.95 23.75 1 24.12 45.94
0.15 2.95 35.71 1 5.64 99.70
ENTRE EJES C-D:2-6 0.15 2.95 18.85 1 8.18 47.43
0.15 2.95 24.70 1 14.96 57.91
ENTRE EJES D-E:2-6 0.15 2.95 17.26 1 15.38 35.54
2 Planta
0.15 2.95 9.55 1 7.60 20.57
ENTRE EJES E-F:2-6 0.15 2.95 6.68 1 2.34 17.37
0.15 2.95 14.25 1 6.90 35.14
ENTRE EJES F-G:2-6 0.15 2.95 8.97 1 0.60 25.86
0.15 2.95 17.20 1 16.32 34.42
ENTRE EJES G-H:2-6 0.15 2.95 14.31 1 4.68 37.53
0.15 2.95 11.15 1 3.28 29.61
EJE 1-1 0.15 2.50 22.40 1 56.00
MURO PERIMETRICO EJE 5-5 0.15 2.50 19.50 1 48.75
EJE 6-6 0.15 2.50 4.50 1 11.25
TOTAL 1262.08 m
Descripcin e (m) H Hprom (m) L (m) N veces Area Vano(m) Area (m)
SS.HH. MUJERES 0.10 2.10 2.85 1 1.80 4.19
0.10 2.10 7.10 1 14.91
1 PLANTA
1 PLANTA SS.HH. VARONES 0.10 2.10 1.40 1 2.94
0.10 2.10 2.40 1 1.20 3.84
0.10 0.15 1.45 1 0.22
SS.HH. PREPARACION 0.10 0.15 1.55 1 0.23
SS.HH. DILATACION 0.10 0.15 1.55 1 0.23
2 PLANTA SS.HH. HOSPITALIZACION DE MUJERES 0.10 0.15 1.70 1 0.26
SS.HH. CUIDADOS INTENSIVOS 0.10 0.15 1.60 1 0.24
SS.HH. HOSPITALIZACION NIAS 0.10 0.15 1.60 1 0.24
TOTAL 27.29 m
1 Planta
SS.HH. ESPERA EMERG. 1.80 5.60 1 10.08
1 Planta SS.HH. GINECOLOGIA 1.80 5.45 1 9.81
SS.HH. MEDICINA GENERAL 1.80 5.45 1 9.81
SS.HH. PEDIATRIA 1.80 5.60 1 10.08
SS.HH. CONTROL 1.80 5.20 1 9.36
SS.HH. TRIAJE 1.80 5.30 1 9.54
SS.HH. CONSULTORIO EXTERNOS 1.80 5.80 1 10.44
SS.HH. CUID. INTEN. NIOS 1.80 8.40 1 15.12
SS.HH. HOSP. NIAS 1.80 9.30 1 16.74
SS.HH. HOSP. MUJERES 1.80 10.60 1 19.08
SS.HH. EST. ENFERMERIA 1.80 5.40 1 9.72
LAVACHATA 1.80 4.70 1 8.46
SS.HH. VESTIDOR 1.80 5.30 1 9.54
CUARTO ASEPTICO 1.80 7.50 1 13.50
PREPARACION 2.10 15.40 1 32.34
2 PLANTA
SALA DE PARTOS 2.10 21.00 1 44.10
SALA DE ESTERILIZACION 2.10 11.20 1 23.52
SS.HH. PREPARACION 1.80 7.35 1 13.23
SS.HH. DILATACION 1.80 8.10 1 14.58
CAMBIO DE BOTAS, LAVAMANOS 1.80 10.50 1 18.90
HALL CENTRO QUIRURG. 1.80 8.95 1 16.11
DILATACION 2.10 13.40 1 28.14
RECIEN NACIDO 1.80 10.40 1 18.72
TOTAL 444.00 m
Descripcin Area
Columnas en Interior de Edificacin 431.51 m
Columnas en muro perimtrico 26.50 m
458.005
01.01.02.02.05 TARRAJEO DE SUPERFICIE Y ARISTAS DE PLACAS m2 177.08
Ancho
Descripcin Ancho Alfeizar (m) Altura (m) Cantidad Derrame (m)
Derrame
V-1 1.90 0.90 1.80 5.00 0.15 37.00
V-2 1.00 0.90 1.80 6.00 0.15 33.60
V-3 1.00 2.10 0.60 12.00 0.15 38.40
V-4 1.00 2.10 0.60 0.00 0.15 0.00
V-5 1.05 0.30 2.40 1.00 0.15 6.90
V-6 1.50 1.50 1.20 0.00 0.15 0.00
V-7 1.00 0.30 2.40 6.00 0.15 40.80
V-8 1.80 0.90 1.80 1.00 0.15 7.20
V-9 0.70 0.30 2.40 3.00 0.15 18.60
V-10 1.10 2.53 0.60 2.00 0.15 6.80
V-11 0.50 1.50 1.20 2.00 0.15 6.80
V-12 0.40 1.50 0.40 0.00 0.15 0.00
V-13 0.30 0.90 1.80 2.00 0.15 8.40
P-1 1.20 - 2.70 1.00 0.15 6.60
VANOS 1 PLANTA
P-2 1.00 - 2.70 8.00 0.15 51.20
P-3 1.00 - 2.70 1.00 0.15 6.40
P-4 0.90 - 2.70 5.00 0.15 31.50
P-5 1.40 - 2.70 0.00 0.15 0.00
P-6 0.80 - 2.70 8.00 0.15 49.60
P-7 1.00 - 2.45 1.00 0.15 5.90
P-8 2.82 - 2.45 1.00 0.15 7.72
P-9 1.80 - 2.70 1.00 0.15 7.20
P-10 0.60 - 2.00 5.00 0.15 23.00
P-11 1.20 - 2.70 2.00 0.15 13.20
P-12 1.40 - 2.10 0.00 0.15 0.00
M-1 1.80 - 2.93 1.00 0.15 7.66
M-2 2.20 - 3.08 1.00 0.15 8.36
M-3 2.40 - 2.93 1.00 0.15 8.26
76.00 TOTAL 431.10 m
01.01.02.03 CIELORRASOS
01.01.02.03.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1:5 m2 870.56
01.01.02.04.02 PISO CERAMICO ALTO TRANSITO TREVISO MARFIL (unidades de 0.36 x 0.36 m) m2 272.10
1 planta
CONTROL DE NIO SANO 11.30 11.80
1 planta TOPICO CONS. EXTERNOS 20.20 17.50
TRIAJE 18.60 17.60
CONTROL 2.60 5.00
TRIAJE 8.20 10.00
TOPICO DE EMERGENCIA 16.00 14.60
VEREDA EXT. SS.HH. 10.15 12.13
01.01.02.04.03 PISO CERAMICO ALTO TRANSITO VARADERO (unidades de 0.33 x 0.33 m) m2 357.68
01.01.02.04.04 PISO CERAMICO ALTO TRANSITO BLANCO (unidades de 0.45 x 0.45 m) m2 131.95
01.01.02.04.05 PISO CERAMICO ALTO TRANSITO PORCELANATO (unidades de 0.50 x 0.50 m) m2 34.33
Descripcin Area CAD (m) Perimetro CAD (m)
01.01.02.04.07 PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" m2 408.45
01.01.02.05 CONTRAZOCALOS
01.01.02.05.01 CONTRAZOCALO DE CERAMICO TIPO TREVISO MARFIL, h = 0.10 m 280.48
Descripcin Permetro
PSICOPROFILAXIS 20.70
GINECOLOGIA Y OBST. 17.30
MEDICINA GENERAL 13.40
PEDIATRIA 15.80
CONTROL DE NIO SANO 11.80
1 planta TOPICO CONS. EXTERNOS 17.50
TRIAJE 17.60
CONTROL 5.00
TRIAJE 10.00
TOPICO DE EMERGENCIA 14.60
VEREDA EXT. SS.HH. 12.13
Descripcin Permetro
CORREDOR ASEPTICO 20.15
2 piso
HALL CENTRO QUIRURG. 8.95
TOTAL 29.10 m
Descripcin Permetro
ESTACIONAMIENTO 4.50
INGRESO EMERG. 14.50
TOTAL 19.00 m
Descripcin Permetro
AZOTEA 98.20
TOTAL 98.20 m
01.01.02.05.06 CONTRAZOCALO DE VINILICO H=10 cm m 42.30
Descripcin Permetro
SALA DE PARTOS 21.00
SALA DE OPERACIONES MENORES 21.30
TOTAL 42.30 m
01.01.02.06 CUBIERTAS
01.01.02.06.01 COBERTURA DE TEJA ANDINA (1.14 x 0.72 x 5mm) m2 159.79
01.01.02.07.02 PUERTA DE MADERA APANELADA TIPO P-02 (Incluye Cerradura y Accesorios) pza 8.00
01.01.02.07.03 PUERTA DE MADERA APANELADA TIPO P-04 (Incluye Cerradura y Accesorios) pza 5.00
01.01.02.07.04 PUERTA DE MADERA CONTRAPLACADA TIPO P-06 (Incluye Cerradura y Accesorios) pza 9.00
01.01.02.07.05 PUERTA DE MADERA CONTRAPLACADA TIPO P-09 (Incluye Cerradura y Accesorios) pza 2.00
01.01.02.07.06 PUERTA DE MADERA CONTRAPLACADA TIPO P-10 (Incluye Cerradura y Accesorios) pza 5.00
01.01.02.07.07 PUERTA DE MADERA APANELADA TIPO P-11 (Incluye Cerradura y Accesorios) pza 2.00
01.01.02.07.08 MAMPARA CON MARCO DE MADERA DE VIDRIO TEMPLADO TIPO MO1 Und 1.00
01.01.02.07.09 MAMPARA CON MARCO DE MADERA DE VIDRIO TEMPLADO TIPO MO2 Und 1.00
01.01.02.07.10 PUERTA DE MADERA CONTRAPLACADA TIPO P-13 (Incluye Cerradura y Accesorios) pza 1.00
01.01.02.07.11 PUERTA DE MADERA APANELADA TIPO P-14 (Incluye Cerradura y Accesorios) pza 3.00
01.01.02.07.12 PUERTA DE MADERA CONTRAPLACADA TIPO P-16 (Incluye Cerradura y Accesorios) pza 5.00
01.01.02.07.13 PUERTA DE MADERA CONTRAPLACADA TIPO P-17 (Incluye Cerradura y Accesorios) pza 4.00
01.01.02.07.14 PUERTA DE MADERA CONTRAPLACADA TIPO P-18 (Incluye Cerradura y Accesorios) pza 7.00
01.01.02.07.15 PUERTA DE MADERA CONTRAPLACADA TIPO P-21 (Incluye Cerradura y Accesorios) pza 5.00
01.01.02.07.16 PUERTA DE MADERA CONTRAPLACADA TIPO P-23 (Incluye Cerradura y Accesorios) pza 2.00
01.01.02.07.17 PUERTA DE MADERA CONTRAPLACADA TIPO P-24 (Incluye Cerradura y Accesorios) pza 2.00
01.01.02.08 CARPINTERIA METALICA
01.01.02.08.01 REJA METALICA TIPO P07 pza 1.00
Descripcin Longitud
Tramo Inclinado Inicial Izquierdo 7.38
Descripcin Longitud
Tramo Inclinado Inicial Izquierdo 2.05
Tramo Inclinado Inicial Derecho 2.05
Descanso Interseccin Tramo Inicial con Tramo Final 0.10
Descanso Tramo Inicial 7.20
Tramo Inclinado central 1.25
Descanso Tramo Final 1.80
Tramo Inclinado Final Izquierdo 2.05
Tramo Inclinado Final Derecho 2.05
TOTAL 18.55 m
Descripcin perimetro (m) altura (m) Cantidad Area (m) Area (p) factor convers.
teatina 1 13.30 0.80 1.00 10.52 113.24 10.76
01.01.02.10 PINTURA
01.01.02.10.01 PINTURA LATEX EN CIELORRASOS Y VIGAS m2 1,086.13