Vous êtes sur la page 1sur 1

REKAPITULASI

VOLUME PEKERJAAN
PROYEK JALAN LUBUK ALUNG - SICINCIN

Proyek : Jalan Lubuk Alung - Sicincin


Pekerjaan : Pasangan Batu
Mandor : EDI TANJUNG
Periode Opname : 7 JUNI 2017

NO Item Pekerjaan Sat Perhitungan Volume Harga Satuan Jumlah Keterangan

1 Pasangan Batu STA 1+800 - 1+815 = 14.7m m3 V=14.7*0.82 12.05 Rp485,000.00 Rp5,846,190.00
2 Pasangan Batu (1) STA 1+815 - 1+846 = 31.4m m3 V=31.4*0.82 30.77 Rp485,000.00 Rp14,924,420.00
3 Pasangan Batu (2) STA 1+849 - 1+896 = 47.2m m3 V=47.2*0.98 46.26 Rp485,000.00 Rp22,434,160.00

Jumlah 89.08 Rp485,000.00 Rp43,204,770.00

Disetujui, Diketahui, Diperiksa, Dihitung, Diajukan,

Mohammad Taufik Moehammad Fadhil Abu Bakar .............................. Edi Tanjung


(General Superintendent) (Site Engineering Manager) (Site Operational Manager) (Pelaksana) (Mandor)