Vous êtes sur la page 1sur 2

4

3
2
1
Sr. #

DAP
TOTAL

4
4

DZ-2024-C
DZ-2024-B
DZ-2024-A

DZ-2024-D
EQ. Tag

4
4
SCAFFOLDING ERRECTION

12-Jan
12-Jan
11-Jan
11-Jan
REMOVAL OF INTER-

4
4

CONNECTION PIPES

12-Jan
12-Jan
12-Jan
12-Jan
REMOVAL OF CABLE TRAY AND
2
2

INSTRUMENT CONNECTION
12-Jan
12-Jan

REMOVAL OF UPSTREAM &


1
1

DOWN STREAM CHUTES


12-Jan

REMOVAL / HOLDING AND


1
1

CLAMPING OF FEEDERS
12-Jan

DE-BOLTING / REMOVAL OF
1
1

HOPPERS
12-Jan

REMOVAL OF EXISTING
0
0

SCREENS SUPPORT COLUMNS

DE-BOLTING OF SCREENS
1
1

SUPPORT BRACKETS
12-Jan

DISMANTLING OF EXISTING
1
1

SCREENS
12-Jan

DISMANTLING OF EXISTING
1
1

SCREENS
12-Jan
FFBL ATA-17

0
0

SHIFTING OF OLD SCREENS

MODIFICATION OF CHUTES AND


0
0

HOPPERS

FABRICATION OF TRANSITION
0
0

PIECES FOR INLET & DISCHARGE


DAILY PROGRESS MOINTRING SHEET - SCREEN JOB

CHUTES,

FIELD WELDING / BOLTING OF


0
0

TRANSITION PIECES

ERECTION OF SUPPORT
0
0

COLUMNS FOR NEW SCREENS


0
0

SHIFTING OF NEW SCREENS

ASSEMBLING / DISMANTLING
0
0

OF SCREENS FOR RIGGING

ASSEMBLING / ANCHORING OF
0
0

NEW SCREENS

REINSTALLATION OF CABLE
0
0

TRAY AND INSTRUMENT


CONNECTION

REINSTALLATION OF INTER-
0
0

CONNECTION PIPES

REMOVAL OF SCAFFOLDING
0
0

AND RIGGING STRUCTURE


0
0

HOUSKEEPING
0
0

REMARKS
FFBL ATA-17
PROGRESS SHEET OF SCREEN JOB
DATE: 12-Jan-17
DAP AREA DAP AREA DAP AREA DAP AREA
SR. NO ACTIVITIES DZ-2024-A DZ-2024-B DZ-2024-C DZ-2024-D OVERALL STATUS
TOTAL COMPLETED TOTAL COMPLETED TOTAL COMPLETED TOTAL COMPLETED

1 SCAFFOLDING ERRECTION 1 1 1 1 1 1 1 1 4 4

2 REMOVAL OF INTER-CONNECTION PIPES 1 1 1 1 1 1 1 1 4 4

REMOVAL OF CABLE TRAY AND


3
INSTRUMENT CONNECTION 1 1 1 1 1 0 1 0 4 2

REMOVAL OF UPSTREAM & DOWN


4
STREAM CHUTES 1 1 1 0 1 0 1 0 4 1

REMOVAL / HOLDING AND CLAMPING OF


5
FEEDERS 1 1 1 0 1 0 1 0 4 1

6 DE-BOLTING / REMOVAL OF HOPPERS 1 0 1 0 1 0 1 0 4 0

REMOVAL OF EXISTING SCREENS


7
SUPPORT COLUMNS 1 1 1 0 1 0 1 0 4 1

DE-BOLTING OF SCREENS SUPPORT


8
BRACKETS 1 1 1 0 1 0 1 0 4 1

9 DISMANTLING OF EXISTING SCREENS 1 0 1 0 1 0 1 0 4 0

10 DISMANTLING OF EXISTING SCREENS 1 0 1 0 1 0 1 0 4 0

11 SHIFTING OF OLD SCREENS 1 0 1 0 1 0 1 0 4 0

12 MODIFICATION OF CHUTES AND HOPPERS 1 0 1 0 1 0 1 0 4 0

FABRICATION OF TRANSITION PIECES FOR


13
INLET & DISCHARGE CHUTES, 1 0 1 0 1 0 1 0 4 0

FIELD WELDING / BOLTING OF


14
TRANSITION PIECES 1 0 1 0 1 0 1 0 4 0

ERECTION OF SUPPORT COLUMNS FOR


15
NEW SCREENS 1 0 1 0 1 0 1 0 4 0

16 SHIFTING OF NEW SCREENS 1 0 1 0 1 0 1 0 4 0

ASSEMBLING / DISMANTLING OF SCREENS


17
FOR RIGGING 1 0 1 0 1 0 1 0 4 0

ASSEMBLING / ANCHORING OF NEW


18
SCREENS 1 0 1 0 1 0 1 0 4 0

REINSTALLATION OF CABLE TRAY AND


19
INSTRUMENT CONNECTION 1 0 1 0 1 0 1 0 4 0

REINSTALLATION OF INTER-CONNECTION
20
PIPES 1 0 1 0 1 0 1 0 4 0

REMOVAL OF SCAFFOLDING AND RIGGING


21
STRUCTURE 1 0 1 0 1 0 1 0 4 0

OVERALL COMPLETION
%AGE PROGRESS SCREEN PROGRESS %AGE

TOTAL COMPLETED
30% 16.67%

25%

20%
COMPLETED
REMAINING
15%

10%

83.33%
5%

0%
DZ-2024-A DZ-2024-B DZ-2024-C DZ-2024-D