Vous êtes sur la page 1sur 56

PLUS

AUGUST 2012 Fm and fire


safety
real estate
JULY 2012 arbitration
building iconic
UAE hotels

By royal
appointment
The exclusive story behind Saudi Arabias
$1.24bn King Khalid Medical City, from AECOM
vice president of buildings, Anthony McCarter

EVEN MORE tenders and new Top project listings


AD
AUGUST

Contents REGULARS FEATURES


Editors letter 6 16 News analysis
Gavin Davids reports on how FM

20 Regional news 9 and fire regulations can increase life


safety standards

Top tenders 14
Rounding up the regions most
23 Legal comment
TLGs Fareya Azfar explains the
expensive new tenders
complications of real estate
arbitration clauses
In profile 20
Maskan Arabia CEO Engineer Hossam
Al Rashoudi shares his observations 30 Iconic structures
of Saudi Arabias affordable housing Project profiles of Harscos most
market challenging UAE hotel projects

23 Business brief 26
Best Interiors on why the luxury market
36 Cover story: By Royal
appointment
isnt always the most lucrative option The full story behind AECOMs
record breaking contract on King
30
and how to break out beyond it
Khalid Medical City, Saudi Arabia

Supplier news 43 46 Career ladder


Ammad Naser on the changing real
Tenders 49 estate market dynamics in Dubai

Diary 54

36
www.thebigprojectme.com | 3
AD
www.thebigprojectme.com | 5
V1200
700 900 V32
V1200 V1800 V45 V2500 V55 V4500 V65
700MS 900MS V32MS
MS
EDITORS COMMENT

s
t 12 - 20 15 - 25 18 - 30 18 - 30 20 - 35 27 - 40 27 - 40 35 - 50 45 - 80 45 - 90

989 1120 1450 1739


d tool kg 1884 2547 2571 3430 4500 5589
1044 1190 1525 1805

thing contained in this brochure is intended to extend any warranty or representation expressed or implied, regarding the products described herein. Any such warranties or other terms and conditions of sale products shall be in
mm 112 118 122 122 140 150 160 170 190 202

Nothing contained in this brochure is intended to extend any warranty or representation expressed or implied, regarding the products described herein. Any such warranties or other terms and conditions of sale products shall be in
l mm 502 475 546 545 674 580 781 644 754 795
Publisher
Dominic De Sousa
kW 33 31 38 44 61 73 65 88 117 116Chief operations officer
Nadeem Hood
0 blows/ 400 - 510 - 440 -
880 800 540 - 770 310 - 800 350 - 800 500- 750 380 - 950
Managing director
min 1050 1160 1045 Richard Judd

ordance with Montabert's standard terms and conditions of sale for such products, which are available upon request. Specifications and machines can be modified at any time and without notice.
t top Editor
mm 1977 2120 2290 2500 2558 2658 2853 2925 3320 3510
Melanie Mingas

A new high
melanie@cpidubai.com
T +971 4 440 9117
l/min 80 - 140 100 - 150 120 - 170 120 - 170 140 - 220 180 - 265 175 - 250 240 - 320 280 - 380 380 - 420
M +971 56 758 7834

Publishing director
aker bar 140 125 135 155 165 165 155 165 185 165Raz Islam

I
raz@cpidubai.com
n the newspaper industry its know as Elsewhere, ADPC has announced T +971 4 440 9129
silly season, but despite the soaring the opening date for Khalifa Port and M +971 50 451 8213
e bar 16 10 6 12 25 6 25 6 15 6
temperatures, empty offices and Emirates Nuclear Energy Corporation
Commercial director
Ramadan working hours, summer 2012 has granted the licence for construction Michael Stansfield
50
is already 1 shaping 1 up to
15 be
autoanything
2 auto of two
2 auto nuclear2 auto
12 auto power 12 reactor
auto units
2 auto 12 auto
michael@cpidubai.com
other than a slow news day for the at Barakah, Abu Dhabi. Kuwait will T +971 4 440 9128
M +971 55 150 3849
construction industry. embark on the construction of the
New Option Option
statistics Standard
report that in Standard
2012 Standard Standard
regions Standard
largest Standard
oil refinery andStandard Standard
contracts Marketing manager
awarded building project values for Jeddahs sewerage network worth Carole McCarthy
20 will increase 13%, to hit $65.5bn; $53.3m have been awarded. carolem@cpidubai.com
Yes Yes Yes Yes Yes Yes Yes Yes Yes YesT: +971 4 440 9157
completed construction projects will In this issue we bring new project M: +971 55 978 8605
increase 71%, to $79.75bn; and the tender announcements on everything
value
% thanks to the energy ofsystem.
recovery commercial real estate projects from Abu Dhabis Louvre to the Riyadh Online editor
will almost double, reaching $15.3bn. Monorail, with a new top tenders section Gavin Davids
gavin@cpidubai.com
The positive trends certainly reflect and dedicated online tenders section, T +971 4 4409118
what the industry has told The Big listing the top oil and gas, airport and rail
Project over recent weeks. projects. Designer
Rebecca Teece
o Last month Saudi Arabias Ministry of The influx of major projects in the rebecca@cpidubai.com
Health announced the first in a $4.4bn region has also been inspiring the
Photography
string of health care cities, King Khalid new Big Project team and September Cris Mejorada
rd Medical City. issue will mark the beginning of a new
Webmasters
Not only is it the largest such project chapter for the magazine. Troy Maagma
in the Kingdom, but its the largest to be With a new name and new look, we Jerus King Bation
undertaken by global healthcare specialists will be returning to the original concept Erik Briones
AECOM; appointed to handle consultancy of big projects; analysing the biggest Joel Azcuna

design services earlier this year. and most significant from a range of Printed by
In an exclusive interview with The Big perspectives. Ahead of the changes, Printwell Printing Press LLC
Project, the man who will coordinate the were asking readers to tell us what
city, Anthony McCarter, said the project they want to see more of and we look Published by
is indicative of a positive trend in the forward to hearing from you.
development of social infrastructure in Until then, put your feet up while you
the Kingdom. still can because things are about to hit
a new high. Head Office
Montabert: an international presence in more than 100 countries.
Optimize the performance of your demolition accessories by conta
PO Box 13700
which is designed to support our products. The Montabert networ
Melanie Mingas Dubai, UAE you with expertise during implementation, maintenance with orig
Tel: +971 (0)4 440 9100 technical assistance and training.
Editor
Fax: +971 (0)4 447 2409
Web: www.thebigprojectme.com
mail.info@montabert.com
w w w.montaber t .com
Copyright 2012 CPI.
All rights reserved.
2010 MONTABERT 86716172-EN (09-2010)
While the publishers have made every effort
to ensure the accuracy of all information in
this magazine, they will not be held responsible
for any errors therein.

Montabert: an international presence in more than 100 countries.


Optimize the performance of your demolition accessories by contacting our network
Montabert: an international presencetoinsupport
which is designed more than 100 countries.
our products. The Montabert network will provide
you withofexpertise
Optimize the performance during implementation,
your demolition maintenance
accessories by contacting ourwith original spare parts,
network
6 | www.thebigprojectme.com
which is designed totechnical
support assistance and The
our products. training.
Montabert network will provide
you with expertise during implementation, maintenance with original spare parts,
.
accordance with Montabert's standard terms and conditions of sale for such products, which are available upon request. Specifications and machines can be modified at any time and without notice.

rk will provide
ginal spare parts,
acting our network

P.O. Box: 2841


HEAD OFFICE

Al Khobar - 31952, Saudi Arabia

Email: marketing@saudidiesel.com.sa
Tel: +966 3 8576769, Fax: +966 3 857 4681
BRANCHES
||

Jubail Tel: +966 3 362 4050 / Fax: +966 3 362 4050


Madina Tel: +966 4 8697313 / Fax: +966 4 8690322
Riyadh Tel: +966 1 231 1932 / Fax: +966 1 231 1031
Jeddah Tel: +966 2 659 8500 / Fax: +966 2 659 8600
MONTABERT SAS - 203, route de Grenoble - 69800 Saint Priest, France
Nothing contained in this brochure is intended to extend any warranty or representation expressed or implied, regarding the products described herein. Any such warranties or other terms and conditions of sale products shal
accordance with Montabert's standard terms and conditions of sale for such products, which are available upon request. Specifications and machines can be modified at any time and without notice.
Hydraulic Breakers Medium & Heavy Product Range
Hydraulic Breakers Medium & Heavy Product Range
Hydraulic Breake
SETTING THE STANDARD IN SECURITY SOLUTIONS

TOTAL SECURITY MANAGEMENT SOLUTIONS


Arkan provides complete safety and security 24/7 with advanced
Security Management Solutions for all sector communities
including commercial, retail, residential, healthcare, financial,
educational and more.
Our solutions include:

Security Surveillance
Security Guards
Parking Management
Life Guards

04-4337080
NEWS | REGIONAL NEWS
NEWS BULLETIN
Eastern Provinces 4.1million inhabitants, end with the tender for the entire phase one
phase one of King Khalid Medical City due to be launched and awarded by early 2013.
(KKMC) will comprise of a 1500 bed hospital The project, as it is currently planned, is pre-
with six Centres of Excellence, housing and its dicted to reach full capacity by 2022, by which
own utilities plant. time a second phase providing additional
AECOMs consultancy design services housing, medical education facilities and a
contract, worth $27.85m for the company, community hospital will be fully operational.
will cover master planning, medical plan- We are using evidence based design to
ning, architecture, interior design, medical make the project flexible to meet future needs
equipment planning, engineering services, in terms of the development of healthcare
landscape and cost consultancy. technology, which will validate the design we
This is a very important project for are currently undertaking, but equally looking
AECOM, vice president of buildings for the at advances in technology and endeavouring
Middle East, Anthony McCarter, told The to anticipate the potential developments in
Big Project. healthcare, McCarter added.
The Ministry of Health was very clear in Announced by Royal Decree in 2011, King
AECOM appointed terms of wanting to ensure the medical city
has an identity, rather than being a large hos-
Khalid Medical City is one of four such cities
planned by the Ministry of Health with a total
to KSAs largest pital, so it has been carefully planned to
achieve that level of character, McCarter
budget of $4.4bn. The second largest city will
be based in Jeddah but details of the other
health care added, explaining that the design was based
on function, rather than form.
projects have yet to be released.
I think the scale of the development
project AECOMs global healthcare portfolio to reflects the fact the countries are growing very
date includes Cleveland Clinic, Abu Dhabi; quickly. We are seeing a greater emphasis on
Tenders for $4.4bn medical city to American Hospital, Dubai; Qatar Orthopaedic these types of projects now, for example
be launched 2012 end and Sports Medicine Hospital; Mayo Clinic, healthcare, schooling and housing, particu-
Minnesota; Yonsei University Medial Centre, larly in places like Saudi. Those are very strong

A
ECOM has announced its appoint- Korea; Carilion Roanoke Memorial Hospital, growth areas and that is why this is such a
ment to the largest health care project Virginia; Mary Washington Healthcare, great project for us, McCarter continued.
to be undertaken in Saudi Arabia: A Virginia; University of Kentucky and the
$1.24bn medical city, set on a 700,000m site Albert B. Chandler Hospital. Turn to page 35A for the full story
with a total built up area of 1,000,000m. Tenders for the enabling works on King and visit www.thebigprojectme.com to view
Located in Dammam and serving the Khalid Medical City will be launched by 2012 the King Khalid project gallery

Save the with the aim of officially opening Khalifa


Ports new container terminal on

date: Khalifa September 1, ADPC said.


The first phase of the Khalifa Port

Port opening Container Terminal will initially handle


2.5 million TEUs container traffic and 12

announced million tonnes of general cargo annually-


and by 2030, it is expected to be able to
handle 15 million TEUs and 35 million
September 1, 2012 set by ADPC tonnes of general cargo per year.
The new port has been designed to

A
bu Dhabi Ports Company service the worlds largest seagoing con-
(ADPC) and its port operator tainer vessels. It covers a 9-km2 area,
Abu Dhabi Terminals (ADT) including a 2.7 km2 man-made port
have announced the regions only semi- island.
automated container terminal is set for
official opening on September 1, 2012. A full background on the entire Kizad
During the course of the coming and Khalifa Port and an interview with
months we will continue to transition ADPC CEO Tony Douglas project can be
and test with individual shipping lines found at www.thebigprojectme.com

www.thebigprojectme.com | 9
NEWS | REGIONAL NEWS

MENA region to become steel


world centre
Near 6% demand and production rises predicted for 2012

S
teel demand in the MENA region is pre- contraction witnessed in 2011 to regional
dicted to rebound by 5.7% this year fol- political turmoil, but concluded the sector
lowing a 2% contraction in 2011, now poses immense future business oppor-
according to the World Steel Association, tunities, regionally.
with regional production increases in both Currently the region is the second largest
steel and iron driving the region to world producer globally, with a production com-
centre status within a decade. pound annual growth rate (CAGR) of 5.9%;
The growth is driven by the construction while this puts is more than four times ahead
programmes planned for GCC countries of the third highest producer the rest of
contributing to a Middle East sector pre- Africa with 1.2% CAGR, it is significantly
dicted to grow 3.5% through 2015 and worth behind leading producer Asia, at 11%.
$4.3 trillion by 2020 and huge state-funded Around 2% of global crude steel production
investments facilitated by high oil prices over was from the MENA region in 2010, mainly in the GCC and demand for the product is
the last three years. In a global steel market contributed by Iran, Egypt, Saudi Arabia and rising higher than the current global produc-
report, Frost and Sullivan attributed the 2% Qatar. There are currently 67 steel plants tion capacity.

Nass subsidiary
removed from
India blacklist
100 workers permitted to leave Bahrain
after legal bar
Compensation for 17 after
B
ahraini construction firm Nass Contracting
Company, a subsidiary of Nass Corporation, has
announced it would allow more than 100 work-
ers to leave the country and return home after with-
Dubai Metro disturbances
drawing all cases filed against them, including RTA study recommends concrete barriers to absorb vibrations
accusations of absconding.

A
The Indian labourers were legally barred from exiting s many as 17 families are to be The initial results concluded by the
Bahrain for six years after leaving the firm before complet- compensated by Dubais Roads work team entrusted with carrying out
ing their contract terms, which led to banning Nass and Transport Authority (RTA) site studying and surveying include the
Contracting from recruiting workers from the for damages resulting from the vibra- disbursement of funds for the mainte-
Subcontinent since 2006. tions and disturbance by a Dubai nance and refurbishment of 17 impacted
The issue prompted over 20,000 people to sign an online Metro station. houses, said Al Tayer.
petition to send the workers back to their home country. The move comes after the RTA con- The compensation also includes
We shall immediately withdraw all the court cases ducted a study which recommended that constructing sound barriers to shield
pending as of today such that the present runaway workers residents living near the Al Rashidiya the noise from the affected houses pro-
can leave Bahrain at any time, Sameer Nass, deputy chair- Metro station are to receive monetary vided that such barriers are high
man and managing director of Nass Corporation told the compensation, according to Mattar Al enough to ensure the privacy of resi-
Gulf Daily News. Tayer, chairman of the RTA. The study dents, he added.
The Indian Embassy said it will now inform authorities recommended building underground The study could also provide lessons
in India to remove the construction firm from the govern- concrete barriers at a suitable depth suf- for Qatars rail project, which will see
ment blacklist. The embassy is now in talks with Indian ficient to absorb vibrations resulting large portions of track built under exist-
associations in the Kingdom to raise money to pay for the from the rail traffic and prohibiting the ing buildings, through the use of tunnel
workers plane tickets home. use of horns within the Depot. boring equipment.

10 | www.thebigprojectme.com
NEWS | REGIONAL NEWS
Dramatic month the state-owned developers Dubai Waterfront
project. The projects former executive director

in court for and the ex-operations manager have both


denied the charges of abusing public office and

Dubai World intentionally causing loss and dispersing pub-


lic funds.
Advocates who defended the two execu-
Sleeping judge and sabotage tives asked the court earlier to disregard the
accusations mar tribunal financial report submitted by the financial
control department of the rulers court

T
he Dubai World tribunal, being heard in because it was unsubstantiated and based on
courts at DIFC, Dubai, has been plagued
with demands for re-trials and investiga-
unfounded reports and calculations, accord-
ing to Gulf News.
Saudi reviews
tions after a tribunal member was spotted
asleep during proceedings and allegations of
Nakheel has had some good news recently.
The same day as the second incident, it was
391 Riyadh
sabotage were labelled unsubstantiated.
The first incident, on May 9, saw one of the
announced that Kele Contracting was the suc-
cessful bidder to build a 246 room hotel that
monorail bids
three tribunal judges, Michael Hwang, fall will become part the 177,000 m2 Dragon Mart Ministerial committee to release
asleep during a dispute hearing with The Phase 2 development, on the outskirts of Dubai.
World developer and investor Shokat On July 1 it was announced Nakheel is to consortia shortlist
Mohammad Dalal. develop a $7.5m neighbourhood mall, Jumeirah

A
As a result, David Thomas QC, barrister for Park Community Centre, described as a key Saudi ministerial committee has met
Clifford Chance, told the tribunal that anything part of its business plans. to review bids from 391 consortia
short of a retrial of the case would damage from 50 countries who have submit-
public confidence in the judicial system of ted prequalification bids for the contract to
Dubai, and that any result would be unfair to implement a monorail project in the capi-
all parties involved. tal, Riyadh.
Tribunal chair Sir Anthony Evans admitted The committee will draw up a shortlist of con-
the incident was a breach of duty, but that the sortia for the contract once the prequalification
tribunal had dismissed Nakheels complaint process has been concluded. When completed,
because a full transcript of the hearing was the project will incorporate six main routes cov-
available to Hwang, including a video. ering an approximate total length of 175km.
In a separate hearing the Public Funds The network will form the backbone of the
Prosecution was asked to probe un-investigated public transport system in Riyadh, covering
incidents relating to a graft case involving two densely populated areas in the city centre,
Nakheel executives to after almost three years government facilities and commercial cen-
of proceedings. tres and will link to King Khaled
The Australian suspects are accused of International Airport, King Abdullah finan-
allegedly causing deliberate loss of $11.98m to cial district and major universities.

Manchester the construction and maintenance of sports sta-


diums more sustainable and eco-friendly, it was
throughout the world and delivering messages
on sustainability through sport can reach a

United legend
announced on July 16. diverse global audience, he added.
In partnership with Dale Vince, founder of He explained that Sustainability in Sport
Ecotricity, a UK based energy company, Neville aimed to set eco-standards for stadiums, sports
calls for has set up the Sustainability in Sport foundation.
The organization aims to bring the sports gov-
pitches and other related facilities.
Furthermore, Neville said that the foundation
sustainable stadia erning bodies, clubs and fans together to take on
more responsibility towards reducing the envi-
would partner with companies to develop tech-
nology that would help football clubs produce
Spotlight on worldwide impact of ronmental impact of sport. their own renewable energy and improve their
The environmental impact of sport is mas- energy efficiency, so as to reduce costs and their
stadia construction sive but often overlooked. With the Olympics carbon footprints.
putting sport at the forefront of peoples minds, Vince added that the foundations focus was to

G
ary Neville, the former Manchester we believe that the time is right to launch a green put environmental issues at the heart of all sport,
United and England football star, has set revolution in sport, Nevill said. with the Olympics providing a perfect example
up a new foundation aimed at making Sporting stars are role models for people of the issues that needed to be addressed.

www.thebigprojectme.com | 11
NEWS | REGIONAL NEWS

Abu Dhabi
reactor
Doha Port authorities move to promote construction
greater transparency licences granted
Unprecedented move will see companies named ahead of appointment UAE nuclear body names Emirates
Nuclear Energy Corporation

P
arties bidding for work on New Doha demonstrate capability in each of these areas

T
Port have been told their company name Al Buenain continued. he Federal Authority for Nuclear
will be published if they apply for pre- During the Qatar Infrastructure Projects Regulation (FANR) of the United
qualification or are short listed to the project. conference, held last month in London, a Arab Emirates announced on
Part of an effort to increase transparency number of professionals looking to tap Qatars Wednesday that it had granted the Emirates
in the tender process and improve the over- opportunities, concluded the measures will Nuclear Energy Corporation a license to
all quality of submissions, authorities result in a need for contractors to be more construct two nuclear power reactor units at
involved in New Doha Port have suggested strategic regarding business development its proposed Barakah site in Abu Dhabi.
this could become best practice, despite criti- practices in the Gulf state. The license authorises ENEC to construct
cism from contractors. What we have now is a cultural disconnec- two Korean designed advanced pressurised
We are trying to improve transparency tion between clients and companies. water reactors. The reactors are known as
between the client and bidders, explained Contractors need to change the way they APR1400, a type capable of producing
Nabeel Mohammed A. R. Al Buenain, project approach a deal, adding more value beyond 1,400MW of electricity.
executive director, New Doha Port. contractual communications by bringing new However, the license does not allow ENEC
Some companies have complained to us about ideas and being innovative. Companies have to to operate them, as that would require the
publishing their names when they have not pre- manage the client relationship as much as the corporation to apply for a separate license
qualified, but we believe this creates a more com- contract. It can mean the difference between from FANR, said Hamad Al Kaabi, the
petitive and fair marketplace, he added. succeeding and losing the bid, said James UAEs permanent representative to the
According to Al Buenain, bidders must Brenan from law firm Herbert Smith. International Atomic Energy Agency.
satisfy six criteria before tendering for pro- In total, current calculations conclude that The issuance of a construction license is a
jects, including: acceptable cash flow; expe- there is more than $70bn in major projects to significant milestone in the UAEs nuclear
rience in the field; equipment, skills and staff; be awarded in order to achieve 2022 objectives energy programme, he added.
and the ability to be committed to the pro- Al Kaabi also confirmed that the license
ject and Qatar. September issue will carry an exclusive for the construction of Units One and Two
In order to improve efficiency for the tender interview with Martin Barnes, author of the of the Barakah Nuclear Facility and Related
process all tender and bid processes are now NEC; the contract of choice for sporting devel- Regulated Activities was approved by the
completed online, where details of past, current opment projects in Europe that is hailed by FANR Board of Management, which is
and future tender packages are also available. experts as Qatars best options for transparency chaired by Dr Ahmed Al Mazrouei, during a
It is very important that submissions and potential dispute resolution. meeting on July 17, 2012.

12 | www.thebigprojectme.com
XXXXXXXX
NEWS | TOP TENDERS
Top tenders Tenders provided by

| XXXXXXXXXX
Louvre Abu Dhabi Museum Project - and 100 stations - Phase 1. City; and Blue following the coast
Saadiyat Island Development Status New Tender road and run from NDIA to West
Remarks According to the Bay, the Pearl and Lusail with a
Territory Abu Dhabi client, drilling works for this spur linking up to the Education
Client TDIC development will commence at City.
Budget $1,000,000,000 the beginning of 2013. Tenders are A joint venture of local Qatari
expected to be awarded by the end Diar Real Estate Investment
Address Behind Khalifa Park, finalised and detailed architectural
Company and Germanys
Eastern Ring Road (Salam designs, and all foundation and piling of this year.
Street) work. The acquisition of vast art Client is currently evaluating Deutsche Bahn is acting as the
City Abu Dhabi collections that will be housed in the prequalification entries before conceptual design and supervision
Country United Arab Emirates museum is already taking place, as well short-listing the consortiums consultant.
Phone (+971-2) 406 1400 as the training of expertise that will to invite to bid for the planned Design Consultant Qatari Diar
Fax (+971-2) 406 1500 operate this institution. elevated works on this scheme. Real Estate Investment Company
Web http://www.tdic.ae This 24,000sqm Saadiyat Island Tenders for the elevated part of the (Qatar)
Email info@tdic.ae projects will feature collections drawn Design Consultant-1 Deutsche
Description Construction of scheme are expected to be issued
from the Louvre and eminent French by the end of 2012. Bahn AG (Germany)
Louvre Abu Dhabi museum
public museums Centre Pompidou, The metro will eventually Project Manager Parsons
comprising a dome-shaped
Chateau de Versailles, Musee dOrsay, Brinckerhoff Middle East
building, covering an area of 24,000 consist of four lines: Red, NDIA
square metres, including 6,000 Musee Rodin and Bibliotheque (Dubai)
Nationale de France. to West Bay; Gold, NDIA and
square metres of galleries devoted Project Manager-1 Turner
Client has invited contractors to airport city to industrial west
to permanent installations and & Townsend Construction
submit bids for the main contract on Doha; Green, from industrial areas
2,000 square metres reserved for & Management Consultants
temporary exhibitions this scheme. in the south through the center
(Qatar)
Status New Tender Design Consultant Nathalie Criniere of Doha and to the Education
Remarks Abu Dhabi Executive Agency (France)
Engineering Consultant Buro
Council (ADEC) has given its approval
Happold Consulting Engineers Ltd. Riyadh Metro Project
to resume work on this development.
It is understood that ADEC has (Dubai) Territory Saudi Arabia
approved the budget and deadline for Main Architect Jean Nouvel Client Saudi Arabia
(France)
inauguration of the project on Saadiyat
Main Consultant Pascall & Watson Budget $ 3,000,000,000
Island in close coordination with its
Architects (Abu Dhabi)
partner Agence France Musees. City Riyadh 11614 light rail lines running north-
Project Manager AECOM Middle south and east-west. It is still not
Client has announced its decision Country Saudi Arabia
East (Abu Dhabi) clear whether the project would be
to extend the completion date of Phone (+966-1) 488 3331
Civil Engineering Contractor Mero implemented on a design-build, a
this project due to the immense Middle East L.L.C (Dubai)
Fax (+966-1) 482 9331
magnitude of work associated with Web http://www.arriyadh. design-build-operate or a design-
Foundations, Enabling & Piling build-operate-finance scheme.
the development. The company is Contractor Bauer International (Abu com
Email info@arriyadh.com The client is also in the process
currently working closely with its Dhabi) of evaluating proposals from
valued partners on the creation of Steel Products Supplier Mero Description Design and build
international consultants to carry
a new delivery timeline and looks Middle East L.L.C (Dubai) (DB) contract for the construction
out a comprehensive study for
forward to announcing this in due Tender categories Construction of Riyadh Metro, involving the
the light railway network. Seven
course. Significant progress has already & Contracting, Leisure & construction of two light rail lines companies, including Parsons
been made on the museum, including Entertainment running over a total distance of Brinckerhoff and Systra, submitted
about 42 kilometres, including 36 proposals for the contract. The
stations. study is expected to take 12-18
Doha Metro Project - Phase 1 Status New Tender months. While the 30 % design
Remarks This project involves the will be based on over-ground
Territory Qatar first stage of a light railway scheme options only, the comprehensive
Client Qatar Railways Company (QRC) in Riyadh. It will include one 25km study might re-introduce an
Budget $3,000,000,000 line with 23 stations and one 17km underground element.
track with 13 stations. Design Consultant Dar Al
Address C/o. Qatari Diar Real Fax (+974) 4497 4333 Handasah (Shair & Partners) -
The client is currently
Estate Investment Company, Web www.qataridiar.com preparing to release ITB to Saudi Arabia
Qatari Diar Visitors Centre, Lusail Email info@qataridiar.com international consultants for the Design Consultant-1 Egis Rail
District Bldg. Description Design and execution contract to carry out a 30% design (France)
City Doha of Doha Metro spanning 360 of the planned light railway. The Tender categories Public
Phone (+974) 4497 4444 kilometres comprising four lines design contract will cover both Transportation Projects

www.thebigprojectme.com | 13
NEWS | TOP
REGIONAL

Top tenders
TENDERS
NEWS

Kuwait Clean fuels project is expected to be revealed in first cubic metres. A handling unit will
quarter of 2012. also need to be constructed as well
A joint venture of local Saudi as berth facilities, substation, fire
Clean Fuels Project Basic Industries Corporation fighting and truck loading and
and Netherlands Vopak has unloading facilities. Tank will be
Territory Kuwait prequalified at least five international mainly used to store petrochemical
Client Kuwait National Petroleum Company (KNPC) contractors for the scheme. products produced at the Jubail
Budget $18,000,000,000 The contractors include: South Industrial City before export.
Koreas Hanwa Engineering & Client has received six bids on July
Address Imad Commercial submitted bids in the range of $789
Construction, Hyundai Engineering 01, 2012 for the EPC contract on this
CentreCity million-$836 million. The client may & Construction and SK Engineering scheme and a decision is expected
Postal/zip Safat 13001 award this contract to several bidders & Construction; Local/Singapores in the late third quarter or early
Country Kuwait to ensure speedy delivery of reactors. Petro Steel and Chinas Sinopec. The fourth quarter of 2012. Contractors
Phone (+965) 2398 9900 A joint venture of local System contractors are formulating the bids. who submitted the bids include:
Fax (+965) 2398 6188 Development Project Management Bids submission date is on May 31, US CB&I; Chinas China National
Web http://www.knpc.com.kw (SDPM) and US Hill International are 2012. A decision is expected in the Chemical Corporation, Wison
Email aayprj@knpc.com.kw the project consultants. third quarter of 2012. Project is being and Sinopec; South Koreas Hanwa
Description Engineering, It is understood that bids have been executed on a lump-sum-turnkey Engineering & Construction and
procurement and construction (EPC) opened for the project management basis. The main scope of expansion Local/Singapores Petro Steel.
contract for implementation of Clean consultancy (PMC) contract on this includes construction of (37) storage Tender categories Gas Processing
tanks with a total capacity of 330,000 & Distribution, Oilfields
Fuels scheme involving upgrading scheme. Australias WorlyParsons is
and increase in capacity at three understood to be the lowest bidder
refineries. at a price of $459-million. Other Follow the top transport tenders online via www.thebigprojectme.
Status New Tender bidders include: US Foster Wheeler; com and turn to page 49 for The Big Projects listing to all this
Remarks Work will be split into three UKs Amec; Frances Technip and US months newest tenders, in association with Emirates Tenders
main EPC packages: process units at Flour.
Mina Abdullah refinery; revamp of FEED Consultant Fluor Mideast
Mina Abdullah and Shuaiba plants (Kuwait)
together with off-sites and utilities;
revamp and installation of units and
Main Consultant Hill International
Middle East Ltd. (Kuwait)
Julys top web stories
interfaces at Mina Al-Ahmadi refinery. Main Consultant-1 System
Six companies have submitted bids Development & Project Management -
for a contract to supply reactors for SDPM (Kuwait)
Chinese contractors quit Saudi market
this scheme. Indias Larsen & Toubro Project Manager Fluor Mideast over standards, quality
(L&T) is the lowest bidder at $609 (Kuwait)
million, followed by Italys Belleli at Tender categories Oilfields & Regional CEO made Hastie exit from
$734 million. Four other companies Refineries, Gas Processing Middle East over arrest fears

In pictures: the worlds tallest. Lego towers


Jubail storage tanks expansion project
Territory Saudi Arabia Expert calls on FM companies to revamp
Client Sabic Terminal Services Company (Saudi Arabia) approach to Fire and Life Safety
Budget $450,000,000
Consortium obtain rights for Medinah Airport
Address C/o. Saudi Basic Industries (EPC) contract for the expansion
Corporation Bldg. of storage tanks in Jubail industrial
City Riyadh 11422 area.
Country Saudi Arabia
Get involved:
Status New Tender
Phone (+966-1) 225 8000 Remarks This project is in Saudi Visit: www.thebigprojectme.com
Fax (+966-1) 225 9701 Arabia. It aims at increasing
Web http://www.sabic.com the capacity from (77) tanks to Follow us on Twitter: METheBigProject
Email info@sabic.com 150-200 tanks. The scheme is Become a group member on LinkedIn
Description Engineering, currently under planning. The
procurement and construction projects implementation schedule Or become a fan on Facebook: Thebigproject ME

14 | www.thebigprojectme.com
VOLVO OCEAN RACE ABU DHABI STOPOVER DECEMBER 31 JANUARY 14
NEWS ANALYSIS | FIRE SAFETY

Playing with fire


Gavin Davids hears from top FM and fire safety experts on the major
issues facing the proper implementation of fire systems in the region ABOVE: Afschin Soleimani.

A
t the end of May 2012 the GCC was In order to further develop the progress
rocked by the news that 19 people, most
of them young children, were killed by a
There should be a made, Gregory has called for the UAE govern-
ment to establish an inter-body lobby, so as to
fire that began in a nursery and swept through lobby to the insurance help change current practices.
Dohas Villaggio Mall. As accusations flew and Furthermore, he believes the UAE could help
the families grief grew, details slowly began to industry, maybe through set the tone for the GCC when it comes to
emerge about the cause of the tragedy.
Investigations into the incident by the Qatari
the government. It adopting fire and life safety codes that have been
proven to work.
civil defence forces found that the fire and life could be something There should be a lobby to the insurance
safety systems specified for the mall did not industry, maybe through the government. It
function as well as they could have; contributing RERA could take on and could be something RERA could take on and
significantly to the deaths of children, nursery
staff and fire-fighters.
they should be pushing they should be pushing this and not accepting
the current insurance methodologies, he says.
As a result, the tragedy has highlighted a this and not accepting I think as well that more government agencies
number of issues, prompting mall owners and should be included in handovers. It would
civil authorities across the Gulf to seriously re- the current insurance increase costs but at the end of the day its a tiny
evaluate the importance of the fire and life amount compared to the capital costs of an asset.
safety codes in operation. In addition, authori-
methodologies Exemplifying London, Gregory explains that
ties have begun to examine the guidelines in in the UK capital, inspections by the fire brigade
place at shopping malls and revamp them, so as authority, recalls Martin Gregory, managing and civil defence are required before a building
to ensure the events in Doha are never repeated. director of Facilities Management Overseas. can be operated.
One such positive development is the begin- They wouldnt talk to civil defence, police, It doesnt really happen here. You get inspec-
ning of dialogue between the government and department of health or the municipality tion from DEWA but only so they know the
authorities and the facilities management com- authorities, because they felt that if they spoke to metres are in. There should be an inspection at
panies maintaining malls and other public them they would interfere, he adds. least by civil defence, he asserts, adding: The
areas. This progress has been welcomed by some He says the need for a coherent fire code UAE is the most mature GCC market because it
of the regions leading fire and life safety experts. and the prevention of loss of life and property was built ahead of others. When I first arrived
Developers need to talk to each other more. has encouraged both developers and civil here, Dubais FM market was very immature,
When I first started in this field around 10 years defence authorities to be more receptive to but now there is a recognition that people need
ago, developers really had a suspicion of local each others input. to engage in FM [to move forward].

16 | www.thebigprojectme.com
NEWS ANALYSIS
| REGIONAL |NEWS
Theres a saying thats appropriate in this circumstance, and thats
what is cheap, will end up costing you

FIRE SAFETY
Life Safety Code, NFPA 5000: Building
Construction and Safety Code and NFPA 13:
Standard for the Installation of Sprinkler
Systems, Soleimani says.
Although this is a major step in the right
direction, Garald Todd, head of fire and life
safety at WSP Middle East, warns that the code
is still very much in its infancy.
This is a young code thats attempting to
address a lot of issues in the first place, while the
more mature model codes seen in other coun-
tries have had time to mature and develop more
organically. This is why the NFPA is a great base
to start from as its got substantial amounts of
history and experience captured in the require-
ments of the code, he explains.
Looking beyond the implementation of the
code, Todd admits that he has greater concerns
about the actual installation of systems and their
maintenance, based on contractor competency,
commissioning of systems and maintenance.
In order to overcome this hindrance, Todd
RIGHT: Martin Gregory, FMO. says that education is the only answer, especially
in light of the shifting landscape in the wake of
the market crash.
Afschin Soleimani, director of fire and life uncommon for exit stair doors of public build- We work very closely with civil defence and
safety at Ramboll agrees and wants to take it ings to be locked in order to maintain security contractors in raising awareness of the need for
one step further. of such buildings and prevent theft and break- inspections throughout the construction pro-
With respect to the management of facilities, ins, Soleimani reveals, before confirming cess and [we stress] on ensuring competent,
especially public facilities, there are always such measures are strictly forbidden and not qualified third parties are involved in the testing
improvements that can be undertaken. Major the best way to maintain security. and commissioning to ensure the intent of the
public buildings should have dedicated fire However, Soleimani points out that the situa- strategy and system installations are main-
safety wardens and staff that routinely inspect tion is steadily improving in the region, with tained, he explains.
such facilities, he says. clients becoming more and more likely to prior- Whereas pre-crash, major issue hindering
With respect to compliance with fire sys- itise fire and life safety and detection systems. installation of tried and tested systems was a lack
tem provisions, some of the key responsibili- Furthermore, recent major fires in the of time, post crash Todd says the issue is financial.
ties of a fire safety warden should consist of Middle East have taught clients not to underesti- Financial pressures in other countries have
regular visual inspections, ensuring that exit mate the disastrous effects of a fire, not just on forced consultants from those countries into the
doors are not locked, and so on. It is not lives but also on property, loss of business and GCC markets to look for work. These consult-
interruptions to operations, he adds. ants often arent familiar with the codes and
This is a young code Soleimani believes ont thing that will have a
positive impact is the UAE Fire and Life Safety
requirements adopted here, so we end up seeing
designs that loosely fit their home countries,
thats attempting to Code of Practice, which was launched in July with some small tokens to local requirements
2011. Often referred to as the Civil Defence thrown in, he observes.
address a lot of issues Code, it was established to integrate internation- These are usually poorly implemented due to
in the first place, while ally recognised fire and life safety codes and the
needs of the local environment.
a lack of understanding and experience behind
the intent of these requirements, Todd warns.
the more mature model The code draws reference from well estab- The other issue is that developers and end
lished international regulations, including the clients are also facing extreme financial pres-
codes seen in other National Fire Protection Association (NFPA) sures. So the attractiveness of some of the
countries have had time standards; British standards; and the Gulf
Cooperation Council Code of Practice.
smaller firms lower fees, based on the basic
scope of services, is quite high. Theres a say-
to mature and develop However, the predominant influence on the ing thats appropriate in this circumstance,
code is from the NFPA standards, which can and thats what is cheap, will end up costing
more organically clearly be seen in the references to NFPA 101: you, he concludes.

www.thebigprojectme.com | 17
IN PROFILE | MASKAN ARABIA

The wrong project


Since his last interview with The Big Project, Maskan Arabia CEO Engineer Hossam Al
Rashoudi, says little has changed to tackle the quality, supply and legislative issues in Saudi
Arabias real estate market, but that it wont stop the developer expanding its operations
across the entire Kingdom. Melanie Mingas reports

C
reated to address a gap in the market for Rashoudi relays, explaining the business is struc-
trustworthy developers and quality tured to assign dedicated teams to research,
developments, Maskan Arabia was product development and engineering, as well as
somewhat of a personal mission for the busi- the more abstract quality and excellency.
nessmen who established it. But in the grand scheme of Saudi Arabias
Entering the market four years ago with a housing demands Al Rashoudi says these pro-
clear remit to build smaller, easier to manage jects are far from enough to house a population
and affordable villas and apartments, its an that is predicted to hit 31.6 million by 2020. Its
approach that is paying off with a track record an issue not even $15bn of state spending looks
of 100% lease rates on all its projects to date. likely to solve.
We were not happy about the quality of We do observe a lot of projects coming in,
development, so we create Maskan to fill in the but even with all these projects there is still a
gap, says company CEO Engineer Hossam Al huge shortage of supply.
Rashoudi, who today runs the company along- Also, most of what is supplied today in the
side chair Waleed Abdulaziz Al Saghyr. market does not meet the demand in terms of
We understand that individual buyers do the project type and the price. Up to date, the
not have a trust in developers because they are final resolutions of the mortgage law have not
not up to standard, once you have a gap in any been announced, but at least, introducing this
business, it is very smart to take the opportu- law is part of regulating the market, and any
nity and work on exploiting that, and focus on regulations should have a positive impact in the
the basic needs to meet the consumers future, he adds.
ABOVE: Engineer Hossam Al Rashoudi.
demands, continues Al Rashoudi, who worked
as a consultant designing residential units
There is no limit before the business was established.
Today the developer is working on a string of
Growth
Harnessing the opportunities while they still
to our ambitions; residential projects including a 300 unit project
north of Riyadh financed by an award win-
exist, Maskan is planning to expand into the
countrys lucrative Eastern province in Q1 of
we want to be in ning SAR600m fund while aiming to create a
brand synonymous with trust and aligned to
next year with major and secondary cities next
on its radar.

every single city in both its commercial and social responsibilities.


In reality, this is a very complicated job. It
But despite the massive opportunities to be
had on the back of rapid population growth,

the Kingdom and requires a lot of skills, starting from under-


standing what todays market needs are and
challenges remain. Practically, building in sec-
ondary cities is still nigh on impossible as there

beyond then developing different products that will


cater to the different market segments, Al
is little or no provision for quality utilities
infrastructure.

20 | www.thebigprojectme.com
IN PROFILE | MASKAN ARABIA
It is very competitive industry and what developers need
to understand is the residential market is very limited in
the kingdom

Additionally, municipality regulations approve


only five housing typographies for construction,
Maskans project pipeline may be a drop in
the ocean when compared to the 500,000 units Right now we
whereas worldwide there is closer to 15.
For Al Rashoudi, who lives by the mantra
by 2013 target set by the housing ministry, but it
is market awareness that has seen the developer are working on
that nothing is impossible in engineering, these grow from start up to dramatic prosperity in
challenges too will have an effect on the price of four years. developing new
any completed development. We worked very hard and built on our inter-
Right now we are working on developing nal and external procedures to create a team of products, such as
new products, such as rural housing and successful members and employees in the com-
other different kinds of residential units, but
these would require municipality approval.
pany, Al Rashoudi says.
It is very competitive industry and what
rural housing and
The main challenge is presenting this kind of
development to the municipality and trying
developers need to understand is the residential
market is very limited in the kingdom, he adds.
other different kinds
to get approval for these kinds of develop-
ment. This will definitely have a tremendous
Yet his observations are far from a white flag to
the Kingdoms challenges.
of residential units,
effect on the pricing per unit, he predicts,
and he would know. Graduating from
There is no limit to our ambitions; we
want to be in every single city in the Kingdom
but these would
KFPUM with a major in architectural engi-
neering, Al Rashoudi wrote a thesis on value
and beyond. Our company name is Maskan
Arabia and we would like to be in the GCC
require municipality
engineering and begin his career in project
management.
area and then the rest of the world within the
coming decade. approval

www.thebigprojectme.com | 21
LEGAL | Fareya Azfar
Jurisdiction clauses of arbitration
- hitting the ball in the right court
Following the recent decision by the Dubai Real Estate Court which rejected a lawsuit by
investors in Victory Tower in Business Bay, Dubai, that both the plaintiff and the defendant will
lose their right to proceed if they had agreed to an arbitration clause in the contract before the
dispute, Fareya Azfar, head of arbitration at TLG The Legal Group, looks at the background

T
he United Arab Emirates have always expressly agreed to a different jurisdiction for
adopted a pro freedom-of-contract atti- commercial and civil matters.
tude when it comes to formation of con-
tracts, including the freedom to decide the Arbitration clauses and
governing law and jurisdiction, provided that jurisdiction of the court
such is not prohibited by law or is contrary to
public order or morals. The parties to a contract With the rise of alternative methods of dispute
usually decide upon the jurisdiction of a body resolution, conferring the jurisdiction of arbi-
to hear any dispute arising from the contract in tration to hear disputes has become a popular
the jurisdiction clause. practice in commercial and real estate con-
Book one of Federal Law No.11 of 1992 (as tracts. It is mandatory that the parties agreeing
amended) (the Civil Procedure Code) deals to a jurisdiction of arbitration have expressly
with the jurisdiction of the UAE Courts to hear agreed so in writing in order for it to be
all civil, commercial and administrative dis- binding.
putes. However, Article 23 of the Civil Where parties have agreed to resolve any
Procedure Code also provides, If the dispute in arbitration, they are said to have
Defendant does not appear and the court does waived the jurisdiction of the court to hear the
ABOVE: Fareya Azfar.
not have jurisdiction to hear the action in dispute. In these cases, the jurisdiction of the
accordance with the foregoing article, the court court is ousted and the Dubai Courts have
The courts are also shall rule of its own motion that it does not rejected cases for want of jurisdiction, provided
have jurisdiction. This Article demonstrates that the parties have expressly signed an arbi-
allowed to rule on that the courts should reject hearing cases, tration agreement contracting out of the
issues of jurisdiction on where it does not have jurisdiction. While it is
true that the Dubai Courts jealously guard their
national courts.
Article 203 (5) of the UAE Civil Procedure
their own motion, even jurisdiction for matters of a public nature such Code says: If the parties to a dispute agree to
if neither party has as criminal matters or cases relating to personal
status, it has been quite meticulous in uphold-
refer the dispute to arbitration, no suit may be
filed before the courts
raised an objection ing the principle of freedom to contract by The Dubai Courts have demonstrated a posi-
refusing to hear matters, where parties have tive stance in honoring the arbitration

www.thebigprojectme.com | 23
LEGAL | Fareya AzfaR

BELOW: Business Bay, Dubai, where Victory Tower is based. clause is to be considered as acceptance of the
jurisdiction of the court, since the parties may
not resort to the courts if they had agreed that
disputes between them should be resolved by
arbitration.
There may be instances when the other party
did not have the chance to raise an objection in
the first hearing by reason of absence or by not
being notified of the proceedings in the proper
manner. Secondly, if the party raises an objec-
tion in subsequent hearings, this demonstrates
they have not accepted the jurisdiction of the
court, and in the absence of a clear and une-
quivocal intention of the party to waive the
arbitration clause or agreement, the courts
must reject to hear the suit, which was wrongly
filed.
As lawyers, we have on numerous occasions
raised objections to the jurisdiction of the
court, where the contract contained an arbitra-
tion clause and have found the judges rejecting
the cases for lack of jurisdiction.
The Courts have decided that where the par-
agreement and stepping down where the parties Moreover, the courts are also allowed to rule ties have expressly agreed to refer the matter to
have agreed to refer the dispute to arbitration. on issues of jurisdiction on their own motion, arbitration, they have waived their right to refer
In the Dubai Court of Decision 192/2007, the even if neither party has raised an objection. the dispute to litigation and therefore the right
judge stated that arbitration is exceptional The Dubai courts have rigorously upheld jurisdiction to hear the matter lies in arbitra-
mode of dispute resolution and has regarded it these provisions and further, went on to state tion. Therefore, the Courts are steadfast in pre-
to be a departure from the general rule that it that an appeal on a question of jurisdiction, serving the sanctity of the contract and the
is the courts that have jurisdiction over all dis- whether raised by the parties or not, is deemed principle of freedom of contract by upholding
putes save those are excepted by a special provi- to exist as matter of question within the scope the jurisdiction of the governing body agreed
sion of the law The Courts have construed the of the appeal before the court In Decision between the parties.
arbitration clause narrowly and are alert to see 256/2008, the Dubai Court of Cassation stated:
anything that may amount to a waiver of it. Questions of jurisdiction of authority and Conclusion
jurisdiction by category are matters of public As seen above, the rejection of the suit filed in
Raising objections to the order, and are always deemed to be in existence the courts, in the presence of an express agree-
jurisdiction of Court in the in litigation before the court. The court is ment to arbitrate, is not a new practice and this
obliged to deal with such matters of its own approach has been adopted by the Dubai
presence of arbitration motion, and the parties may rely on lack of Courts for some time. This stance derives from
agreement jurisdiction of authority or jurisdiction by cate- the provisions of the UAE Civil Procedure
Having strongly upheld the jurisdiction of arbi- gory at any stage of the proceedings Code, which clearly provides that the parties to
tration in the presence of an express arbitration a contract cannot file the case in the court,
agreement, the UAE Civil Procedure Code also Non-objection to the where they have expressly agreed to the juris-
provides instances where a dispute can be heard diction of arbitration by way of an arbitration
before the court if the other party does not
jurisdiction of Courts by clause or a separate arbitration agreement. The
object to the filing at the first hearing. Most implicit acceptance Courts have retained the power to intervene
people would believe that a party can only rely Article 203 (5) of the UAE Procedural Code only in certain instances. The Courts have also
on the arbitration clause if they object to the allows the issue to be heard in court if the other shown flexibility in hearing objections as to the
filing of the case in the first hearing, but this party does not object to the jurisdiction in the jurisdiction at any stage of the proceedings as
interpretation would lessen the significance and first hearing by taking it as an implicit accept- provided in the Civil Procedure Code as non-
purpose of the arbitration agreement and for ance. However, given that the parties have the objection to the jurisdiction of the Court has to
this reason the courts must be cautious of right to raise objections on jurisdiction at any be clearly demonstrated. It is also worth noting
deciding so. It is also worth noting that the time during the proceedings by law, the non- that the courts also have the right to decide the
provisions of the UAE Civil Procedure Code objection of filing the suit in the court is not to issue of jurisdiction on its own motion and this
also provides that any party can raise the be taken lightly. encourages them to adopt a pro-contract
defence of the court having no jurisdiction at The Dubai Courts have been wary of con- approach even where the parties have not raised
any stage of the proceedings. cluding that a non-objection to an arbitration any objections to the jurisdiction.

24 | www.thebigprojectme.com
XXXXXXXX
Business

BELOW: A luxury yacht project designed by the firm.


Brief
| XXXXXXXXXX
| Best interiors

Beyond luxury
Interior designer for Best Interiors, Johann Kruger, explains
how to break out beyond the niche and the value of hard work

A
s far as business plans go, luxury in the approached to help buyers of the smaller, single
Middle East seems a fairly safe bet. But storey, apartments; many of whom were buying a
when your core market experiences a second property or holiday home and therefore
crash and need replaces want, it soon becomes could not commit to their own fit out project.
necessary to broaden horizons. From there, the projects grandeur and
Its always very difficult to get your first investor packages were put together, ranging
chance at something you havent done before, from a customised small apartment design to
says Best Interiors Johann Kruger. furniture and fabrics only.
The challenge is actually breaking beyond We have done high end luxury residential
your niche market, because the minute some- palaces, private yachts, private planes, all things
body likes your approach and they have the associated with royalty, in a market few can
faith and courage to give you a shot, that is it. afford, but we are now tailoring solutions to a
From there on if you can prove yourself the market that isnt so high end and maybe just
door is open. You work and work and dont wants to fit out a second home in the region,
look back, he adds. Kruger explains.
For Best Interiors that break came with the Its about making luxury a little bit more
contract for Marina 23; a 93 storey residential accessible, but at the same time not compromis-
tower project located at Dubai Marina, to which ing the chance to get involved in larger projects,
Best Interiors was introduced as the interior he adds. As the portfolio continues to diversify,
ABOVE: Johann Kruger.
designer of choice by the projects architect. other projects currently include large office
Once assigned to the project, three fully cus- developments in Qatar and residential and hos-
tomisable pre-designed packages were created pitality projects in India.
for the 48 duplex apartments in the tower With one finger remaining firmly on the lux-
which all have private pools and the show ury pulse, the higher end of the current portfolio
apartment. It was through the show apartment includes a VIP residence in Fujairah; a high end
design that demand then saw the company residential project in Thailand; and an

26 | www.thebigprojectme.com
Business Brief | Best interiors
When the economy
went south it filtered
out a lot of people
who didnt want to
ride out the storm.
When I came to
Dubai 12 years ago
it was the only city
in the world where
even bad designers
could get work, but
the people who are
here now are the
strong design firms
and for that reason
they are bringing
the cream of design
ABOVE: This Indian residential project drew inspiration from local culture.
talent to the UAE
architecture, interior design and landscaping Reaching out geographical expansion and with even more
project Kruger describes as a very exclusive Beyond the diversity in target project budgets projects in India, the far east and north Africa,
villa in Angola. The work in your portfolio comes a diversity in commercial focus, which Best Interiors has established one office in Delhi
shows your diversity and we want to set ourselves will be operated under a newly established and will support this with another in Mumbai.
apart, he asserts. umbrella company Best Networks. When the economy went south it filtered out
I see challenges everywhere but I dont shy We are assuming that sooner or later we will a lot of people who didnt want to ride out the
away from them. We have been able to break into branch out beyond interiors, into for example storm. When I came to Dubai 12 years ago it
a market with which we have no previous associ- into architectural consultation and maybe our was the only city in the world where even bad
ation, for example changing our majority clients own line of custom made branded furniture for designers could get work, but the people who
from high luxury residential and palaces to cor- hotels. Then its good to have a mother company are here now are the strong design firms and for
porate hotel developments and high rise build- over those brands, Kruger says of the initiative. that reason they are bringing the cream of
ings, he adds. In line with the market expansion comes a design talent to the UAE.

www.thebigprojectme.com | 27
XXXXXXXX
Business Brief
| XXXXXXXXXX
| Best interiors

I think the
In addition people are capitalising on the moving more towards modern technology, not
fact that while previously they may have been so much for the fact that its a design trend, but
able to get a better deal from somebody else, the its a comfort trend. Technology I would say is

eyes of Dubai quality of the product would have been sub-


grade, Kruger observes.
always going to be at the forefront of design and
it will shape the future of it, he says.

have been
They are still tight on budgets, but they Predicting that locally developed design
know that any one of the designers in the UAE trends will soon spread beyond the region,
that is still here will provide a substantial prod- Kruger says this will all depend on the con-

opened up to uct that is worth their money, he adds, saying


the melting pot of talent currently in the mar-
tinuation of a trend that is seeing local stu-
dents nurtured to study the arts as much as

world-wide
ket has changed the mentality of design. they are sciences.
I think the eyes of Dubai have been opened What is happening here is something that
up to world-wide design trends and what is hasnt been seen before and it hasnt been dupli-

design trends considered to be on the cutting edge globally,


Kruger adds.
cated that much either.
Sooner or later the Middle East will become

and what is
the hub of design and architecture for the world.
Design quality We have good overseas talent and I feel the
Citing the main lifestyle influences on design UAE is investing a lot into cultivating an ambi-

considered to as technology, local culture and sustainabil-


ity, Kruger predicts the sectors future success
tion among the young people to study the arts
as well as sciences and that is the best way to

be cutting edge
will depend on how much and how well inno- infuse the local essence and culture into the
vation can be integrated into a project, as well design, he adds, concluding: As the markets
as how projects can be designed into their start recovering now and confidence comes

globally Middle Eastern surroundings, rather than


contradicting them.
back in regards to building, development and
decoration, I think things will only become
even better than they are now.
Its the nature of the beast. Design is definitely

28 | www.thebigprojectme.com
AD

GYPFINE.
THE ULTIMATE SKIM PLASTER
FOR A PERFECT FINISH.
Register for an information pack at www.gyproc.ae/register or call free on 800 GYPROC (497762).
GypFine is a superior gypsum-based plaster range for interior walls and ceilings, where the highest level of finish is essential.
Specially formulated for easy application combined with excellent coverage, GypFine plasters offer the ultimate finish in fewer
coats. So unlike other powder products and ready-mixed putties you can save time and effort in achieving perfection. Whether its
GypFine - Board Skim for skimming plasterboard, GypFine - Multi Skim for skimming cement render, fair face concrete and precast
panels, or GypFine - Ultra Skim for skimming all surfaces without the need for primers, your projects will be sure to take centre stage.

Like us on
ICONIC STRUCTURES | UAE HOTELS

ABOVE: Kingdom of Sheba.

Harsco Hotel
Formwork supplier Harsco has supplied more than 20 hotel projects in the UAE. But
increasingly complex architecture and higher demands from luxury brand clients, bring
their own challenges to each project. With the countrys hotel building boom still in full
swing, The Big Project takes a look at the most difficult projects in the firms portfolio

Fairmont Hotel, Sheikh Zayed devised three systems: Nation Towers, Abu Dhabi
Road, Dubai
- Ground up scaffold for larger voids in Building size: Two towers of 64 and
Building size: 34 storey the distinctive recesses 51 storeys
Building type: Mixed use hotel, office - Mark II Soldiers beamed across Building type: Mixed use
and retail narrower inserts, which were themselves Materials: ID15 / H20 Tables / MANTO
Materials: Mark II Soldiers supported with diagonal raking shores panels/ Mark II Soldiers Cuplok
- Lift shaft and stair core walls used Frame time: 15 months
Frame time: 18 months
special steel formwork panels that can be Challenge: Provide support for a steel
Challenge: Complete formwork
re-used on complex geometric shapes. truss for an aerial sky bridge connecting
solutions using standard and special
Standard support and decking systems the towers
material to tackle complex architectural
shapes and construction methods were used to construct all typical floors
This two tower project features a
and transfer beams with a depth of 6m connecting sky-bridge for which the steel
This Dubai-based new build project is were constructed using a mix of standard truss had to be supported from ground
one of Harscos best known and over the innovative construction techniques level. Harsco engineered the support to
18 months spent onsite, the company agreed with the contractor enable the entire truss to be assembled

30 | www.thebigprojectme.com
ICONIC STRUCTURES | UAE HOTELS
News
$260m
The value of the Nation Towers
project, Abu Dhabi

BELOW: Bridgeway Hotel.

ABOVE: Ibn Battuta Gate.

before lifting. The wall formwork was repetitive nature of the project helped There is really no limit to
speed up construction.
designed to take self-compacting concrete
and used shutters reaching 10 metres in
the type of architectural
height for the construction of the walls at Landmark Tower, Abu Dhabi design you may receive,
the basement and lower level.
Building size: 72 storey
but this puts pressure
Kingdom of Sheba, The Palm Building type: Mixed use on the formwork
Jumeirah, Dubai Materials: Cuplok / Tube &Fittings /
suppliers to deliver
Mark II Soldiers
Plot size: 141,500m Frame time: 10 months solutions to achieve an
Building type: Mixed use Challenge: Providing the equipment
and personnel to erect complex
iconic structure. For
Materials: Cuplok / Metriform / Rapid
Column Arms / S150 Beams geometric scaffolding example hotels often
Frame time: Drawings produced by to support structural steelwork for two
steel and glass canopies
have big void atriums
Harsco between September 2008 and
February 2010 which require the use
Challenge: More than 500 drawings
were completed for various villas plus
Located on Abu Dhabi corniche,
this 330m project will be the tallest
of advanced scaffolding
three blocks of main building consisting building on Abu Dhabi Island. During and formwork solutions,
of 12 storeys and roof. construction of the canopies fixed
above the north and south entrances, a
Stuart Bland, senior
Another project for Fairmont Hotels, grid of complex scaffolding designed, scaffolding and
supplied and erected by Harsco
Kingdom of Sheba is composed of four
and five bedroom beach villas, health Infrastructure was used to support the
formwork consultant,
clubs and a private residential club. The structures. Harsco.

www.thebigprojectme.com | 31
ICONIC STRUCTURES | UAE HOTELS

$500m
value of Landmark Tower, Abu Dhabi

BELOW: Formwork in place at Ibn Battuta Gate, Dubai.

Conrad Dubai, Sheikh Zayed Challenge: Construction of a 60m arch and the castellated feature at the top of
Road, Dubai way, larger than Arc de Triomphe, Paris the bridge.
- Almost 26 months later the work
Project size: 46451m The arch is in fact, a bridge between to, and above the bridge, was
Building type: Mixed use two buildings. The project, described completed and the top sections of the
by Harsco as being wrought with support scaffold were removed. The
Materials: ID15 / Lightshore tables /
complexity began with the gantry Contractor was thus provided with a
Cuplok / Mark II Soldiers / Special Steel
arrangement over the main road by the working platform at 38m for finishing
Formwork
contractor. Harsco then: works to be completed and to erect
Frame time: 36 months - Built supports reaching a height of the top section of the pre-fabricated
Challenge: Client expectations for a 38m to provide a workable platform architectural archway.
newly introduced luxury branded hotel height for the top of the final archway
chain in the later stages. Wind load calculations were completed
- Erected 4.7m high supports and for each element of the design to take
This 559 room hotel is a flagship for shutters of 4.8m,to form the four main into account the tall buildings on each
Hiltons luxury brand, Conrad. beams creating the bridge between the side of the structure, which had the
two buildings. potential to cause a tunneling effect on
Movenpick, Ibn Battuta Gate, - A third level of 4.8m high supports the temporary support scaffolding and
Dubai were erected to form the top slab the formwork.
linking the bridge beams and creating The final leg load calculations were
Building size: 400,000 sq ft the main walkway between the two complicated because of the various
Building type: Mixed use residential, pre-constructed buildings. erection stages, differing grid sizes and
offices and hotel - Columns were built, further supports differing heights involved, self-weight of
Frame time: 26 months added to form the roof of the walkway the system and high wind loads.

32 | www.thebigprojectme.com
ICONIC STRUCTURES | UAE HOTELS
News
$194m
value of Conrad Dubai

ABOVE: Conrad Hotel.

UAE project name Contractor


Burj Khalifa - Dubai SIXCO / Samsung / Arabtec
Emirates Towers Hotel SIXCO
Fairmont Hotel Palm Jumeirah, Dubai DCC
Fairmont Hotel Sheikh Zayed Road, Dubai DCC / Arabtec
Ibn Batutta Gate Hotel Dubai Higgs & Hill
Kingdom of Sheba Palm Jumeirah DCC
Conrad Dubai Arabtec/ DCC JV
Dusit Hotel, Dubai Al Habtoor Eng.
Bab Al Qasr Hotel Abu Dhabi NUROL contracting
Bridgeway Hotel & Resort - Abu Dhabi Al Husam / OEC
Dubai Marriott Harbour Hotel & Suites Al Naboodah Building
Khaladiyah Palace Hotel Abu Dhabi NUROL Contracting
Rotana Hotel Yas Island Abu Dhabi J&P
Sadiyat Island HLGMR
Laguna Beach Hotel Ajman SEDICO
Madinat Jumeriah ALEC / Bu Haleebah
Ritz Carlton Hotel DIFC, Dubai Bouyges

ABOVE:The Fairmont Hotel, Dubai. Meridien Al Aqua Dibba, Fujairah FNC

www.thebigprojectme.com | 33
FOAMGLAS Insulation

Tapered roof and void former on metal deck


New Doha International Airport (NDIA) is slated to replace the old Doha International Airport
as Qatars only international airport in 2011. It was expected to be the first airport worldwide
to fully handle Airbus A380, the worlds biggest commercial aircraft. Qatar has witnessed a
high growth in passenger and cargo traffic in the recent years, so the old terminal suffered
from overcapacity. The FOAMGLAS roof system is used on the metal roofs of the 54 roofs
of the jet bridges. The build up comprises on the corrugated metal deck a dense deck to
span the gap between the big support. The gypsum board is mechanically fixed. The first
layer of FOAMGLAS is used instead of light weight concrete because of the high rigidity
without compression, non combustibility and the light weight. Above the FOAMGLAS
TAPERED ROOF SYSTEM with integrated slope is used to create the slope and provide thermal
protection. FOAMGLAS contains 66% recycling glass content and is environmentally sound
in its manufacturing, usage and eventual disposal.

AD

New Doha International Airport, Qatar


Architect Bechtel / HOW Engineering Bechtel
Construction 2007 2012
FOAMGLAS Roof Insulation 11000 m2 as TAPERED ROOF SYSTEM (54 jet bridge roofs)

6
5 Build-up
1 Metal Deck
4
2 Substrate board
3 FOAMGLAS T4 180 mm flat
4 FOAMGLAS T4 TAPERED ROOF SYSTEM
50 350 mm laid in hot bitumen
3
5 Roof cover board
6 Two layers of bituminous waterproofing
2 membranes, top layer UV-resistant

Light, rigid, safe and durable. The most simple system on metal deck.
Web: www.foamglas.ae Email: info@foamglas.ae Dubai office Tel: +9714 434 7140 Doha office Tel: +974 465 5360
COVER STORY | AECOM
By royal
appointment
Last year, the Kingdom of Saudi Arabia announced a US$4.4bn Royal Decree for the development
of four major tertiary care Medial Cities across the Kingdom. On July 10 it was announced via the
New York Stock Exchange that the design consultancy services for the largest of these, the $1.24bn
King Khalid Medical City, will be completed by AECOM. Vice president of buildings for the Middle
East, Anthony McCarter, tells The Big Project about coordinating, building and future-proofing
the Kingdom's largest healthcare mega-project

H
owever successful a company is, its King Khalid Medical City will be built who was personally responsible for finalis-
not every day a project with a total on a 700,000m greenfield site and will ing the contract and who will now steer
phase one built up area of comprise a 1500 bed hospital; six Centres the execution stage, liaising between the
1,000,000m is awarded by a government of Excellence; research offices; residential Kingdoms Ministry of Health, project
ministry based in one of the most lucrative staff accommodation; gardens; a commu- managers and other project partners.
construction markets in the world. But on nity centre; and its own utilities plant. Clients look for the best interna-
July 10, that is exactly the announcement This phase, the first of two planned to tional expertise, coupled with local
AECOM shared with the world. date, will be functional by 2017 but is due knowledge, and AECOM has been in the
Following nine months of feasibility to reach full capacity by 2022. When that Kingdom for more than 45 years in one
studies and masterplanning, multidisci- happens the city will grow again to form or another.
plinary global construction powerhouse include additional housing; a hospice; Far from replacing existing medical
AECOM announced its appointment to a medical education facilities; and a hotel. A facilities, King Khalid Medical City
$1.24bn project with a contract value of third phase has not been ruled out. (KKMC) will support its neighbouring
$27.85m, to undertake consultancy design This is a very important project for hospitals and clinics while providing the
services for the largest health care project AECOM, says vice president of buildings specialist tertiary care they cannot, with a
in both Saudi Arabias and its own history. for the Middle East, Anthony McCarter, remit to set new standards for the

www.thebigprojectme.com | 35
COVER STORY | AECOM

A number of different concepts were developed in terms of look but function


has driven the whole planning of the project

delivery of complex health care for residents of provide outdoors facilities for those patients AECOMS responsibilities
the Eastern region. able to enjoy them, and similar features Master planning
Now in the schematic design stage, tenders brought inside through the channelling of
for the enabling works will be awarded before natural light to entrances and public spaces. Medical planning
the end of this year with construction con- The buildings are designed to be attrac- Architecture
tracts awarded, and beginning, early 2013. tive and to create a statement, but equally its
I am excited to be continually involved in a healthcare facility very much designed with Interior design
this project because it is such a high profile the patient and end user in mind. There will
Medial equipment planning
and high quality development, he adds with be very attractive buildings and there will be
an air of excitement that is measured yet evi- very appealing spaces, but their purpose is Engineering services (civil, structural, mechanical,
dent as he explains that while AECOMs other that they are designed to be very efficient, electrical, public health/ plumbing)
regional flagship healthcare project says McCarter.
Landscape
Clevelend Clinic, Abu Dhabi may be more Aside from the efficient and aesthetic ele-
expensive than KKMC, this far exceeds it in ments of design, KKMC is also planned to be Cost consultancy
terms of built up area. self sufficient in terms of utilities provision,
AECOMs contract commenced on March 3 with full onsite power and safety infrastruc-
this year and will last 24 months a tight ture covering electricity, water, fire prevention,
deadline, but one McCarter reassures will district cooling, waste water treatment, waste
need nothing but expertise, global support transfer, medical gases and steam generation.
and collaborative technology.
Having already hit the ground running, he
comments: It will be a challenge but luckily
were a large company with a lot of resources
and we will draw on those, getting the teams
to work very efficiently. We will utilise BIM
platforms that were specified in the tender but
are used as an AECOM standard. This will
allow us to draw on the significant experience
and expertise of our staff who have worked on
healthcare projects around the world.

Design
The centre piece of it all is the main hospital
facility, housing 1500 beds and six Centres of
Excellence, which will specialise in cardiovas-
cular, neuroscience, metabolic and genetic
diseases, oncology, multi organ transplants
and ophthalmology.
The Ministry of Health was very clear in
terms of wanting to ensure the medical city
has an identity, rather than being a large hos-
pital. So it has been carefully planned to
achieve that level of character, McCarter says,
explaining that design is based on function,
rather than form.
A number of different concepts were devel-
oped in terms of look but function has driven
the whole planning of the project, he adds,
naming efficiency and future maintenance of
the built asset as key aesthetic drivers.
The curved and coloured roof is one such
demonstration of the character specified as
essential to the project, and master planning
has ensured the built environment is punctu-
ABOVE: A rendering of the completed plaza area.
ated with healing gardens, landscaped to

36 | www.thebigprojectme.com
COVER STORY | AECOM
The Ministry of Health
was very clear in terms
of wanting to ensure
the medical city has an
identity, rather than
being a large hospital,
so it has been carefully
planned to achieve that
level of character

Project stats
US$4.4bn total project budget for all four
planned Medical Cities across Saudi Arabia

US$1.24bn budget value for King Khalid


Medical City, the biggest of these projects and
the largest health case project in the history of
the Kingdom

$27.85m the value of AECOMs contract

1,000,000m total build up space

700,000m Greenfield site in Dammam

1500 beds across six Centres of Excellence


and supporting facilities planned for phase one

4.1 million people living in Easter region


catchment zone

Project owner/ sponsor: Ministry of


Health, Saudi Arabia

Client: King Fahad Specialist Hospital


Dammam (KFSH-D).

March 3 2012, AECOMs contract


commencement date
Despite the complexities of coordinating a all achieved through the use of evidence
construction project of such scale, it is these based design. 24 month contract duration
elements that present the greatest challenges Building services need to be very well
during the execution of healthcare projects; planned, as do power services in terms of 2012 site preparation to begin
along with building services designed to uninterruptable supply. The challenges are, in 2013 main works to tender in Q1
prevent the spread of bacteria and disease; addition to the medical and equipment plan-
and the future proofing of facilities in order ning, future proofing the design and being 2017 planned opening
to accommodate the next generation of able to incorporate the latest equipment tech-
2222 estimated year phase two will be required
medical equipment: considerations that are nology within that design, comments

www.thebigprojectme.com | 37
COVER STORY | AECOM

We are seeing a greater emphasis on these types of projects now, for


example healthcare, schooling and housing, particularly in places like
Saudi. Those are very strong growth areas and that is why this is such a
great project for us

ABOVE: One of the early stage development drawings.

McCarter, exemplifying the recent develop- build its individual components and the feasi-
ments in bedside technology used by patients bility of that building programme as a whole.
that is more akin to an inflight entertainment While the feasibility study itself identified
system than a hospital ward. the main facilities KKMC would require to
Equally significant is the move towards serve the local population (see box), further
electronic records because those IT systems studies took into account travel distances
need to be very carefully designed. Healthcare between facilities, the materials used to build
projects do present many interesting chal- the facilities in particular, facades and the
lenges for the design team. orientation of them. Well rehearsed steps that
when combined, could in future contribute
Healthy outlook towards a LEED certification.
While the building systems themselves are the Its a subject for which McCarter is an advo-
underlying factor in achieving a sustainable cate, having spoken publically on everything
development, the sustainability of KKMC isnt from the frequency of lifts in a building to the
solely about the technology that will be used importance of modern engineering tech- ABOVE: Anthony McCarter.
within the city, but the technology used to niques, in order to promote sustainability.

38 | www.thebigprojectme.com
COVER STORY | AECOM
In a statement AECOM
said it is: Working
collaboratively with
the Client and project
stakeholders to achieve
this ambitious project
within a challenging
schedule using best
international healthcare
planning and design
expertise from our
US based business
in association with
our regionally based
healthcare experts and
designers in the Middle
East and our locally
knowledgeable resources
in Saudi Arabia
ABOVE: Planned interior design for the South Lobby area.

Recruited by AECOM two years ago, he first Hospital facilities identified AECOMS healthcare
arrived in the region in 1994, initially for a two during feasibility studies highlights
year period, but ended up staying due to the 30 operating theatres Dubai Healthcare City and Partners Harvard Medical
continuity of once in a career projects. International Dubai, UAE
Radiography suite
The region has great opportunities from a
projects perspective and also from an overall Nuclear medicine The City Hospital, Dubai UAE
economic perspective, he comments.
Radiation therapy University of Sharjah Teaching Hospital, Sharjah
But the ambition is what is appealing. It is
the scale and the nature of the projects and Emergency departments American Hospital of Dubai, UAE
from a personal point of view I thought the
project I initially came here for back in 1994 In and out-patient beds and wards MDHC Hospital, Sharjah, UAE
would be the pinnacle of my career. RAK Private Hospital, Ras Al Khaimah, UAE
Procedural rooms
Thats the benefit to our staff and for us as a
company. The scale of the projects does pro- Diagnostic and treatment areas Sidra Hospital, Doha, Qatar
vide an opportunity to bring that talent to Creek Hospital, Dubai, UAE
Logistics support, including a central utility plant
them, he says.

www.thebigprojectme.com | 39
COVER STORY | AECOM

Building services
need to be very well
planned, as do power
services in terms
of uninterruptable
supply. The challenges
are, in addition to
the medical and
equipment planning,
future proofing the
design

ABOVE: Another of AECOM's concept stage renderings.

Now heading the AECOM division currently talent working specifically on healthcare and the fact that these countries are growing very
working on Yas Mall and Etihad Towers, Abu equipment planning has been tapped from quickly. We are seeing a greater emphasis on
Dhabi; UAE University, Al Ain; healthcare pro- American offices, with engineering drawn from these types of projects now, for example health-
jects in Sharjah; Barwa City and Barwa throughout AECOMs network and project care, schooling and housing, particularly in
Commercial Avenue, Qatar; he rightly describes overview provided by the global healthcare places like Saudi. Those are very strong growth
the team as active and diverse. leader in Australia. areas and that is why this is such a great project
The talent required to execute this project In turn, these people then support the 3500 for us, McCarter concludes.
will be drawn from almost every AECOM office workers already based regionally, who are
globally, with architects in America and engi- working directly on AECOMs other current
The other cities outlined
neers in the Middle East. Combined, this net- projects, including the Jeddah stormwater
work of offices employs around 50,000 drainage project, designed to prevent another
by Royal Decree in 2011
King Fahd Medical City-Riyadh
personnel who are connected via Revit, the BIM occurrence of the floods that have caused doz-
platform used in every AECOM project. ens of casualties and deaths over recent years. King Abdullah Medical City-Makkah
King Khalid Medical City is a multi-loca- Other active projects include Doha Port and
tion project, which presents a challenge, but all Saadiyat Island; the experience of which will King Faisal Medical City-Southern Region
our skills come from the international AECOM be used to leverage new, similar contracts in Prince Muhammad Bin Abdul Aziz Bin Abdul
network, so its a truly international collabora- the region. Rahman Al Saud Medical City -Northern Region.
tion, McCarter says, continuing to explain that I think the scale of the development reflects

40 | www.thebigprojectme.com
AD
AD
CAREER LADDER
SUPPLIER
Supplier news

| NEWS | Coryn Hellewell


A round-up of the latest news and announcements

Summertown Interiors Jotun Powder Coatings DuPont


Carbon neutrality on track for 2020 STAND Reveal Tempo launched Surfacing materials provided in Romania

Sustainable fit-out contractor, Summertown A new generation of low temperature curing prod- Global surfacing supplier DuPont has provided
Interiors, has announced it is due to achieve car- uct has been introduced to global markets by Jotun its Corian product for a Romanian project exe-
bon neutrality by 2020. Power Coatings. cuted for the Petrom headquarters in
The target will be achieved through the com- The new coating product is designed to address Bucharest, Romania, as part of its modernisa-
panys Eco-Leaders Green Committee, an inter- the demand for a faster curing product that does tion programme.
nal body established one year ago to implement not require high temperatures in order to be effec- The south east European oil and gas producer
and track the nine year plan. tive, currently seen in the OEM market. Developed specified DuPont Corian in order to create a
As a green fit-out partner, the Eco-Leaders Green for both wet and dry applications, the coating unique office environment and align the com-
Committee forms an integral part of our CSR strat- reduced energy costs and can cover more heat pany with international standards.
egy, commented MD, Marcos Bish. sensitive objects, allowing for wider applications Based on the Working Environmental
The plan will be used as case study by Dubai on products such as fixtures and furniture. Branding (WEB) concept, Petrom City is a five-
Chambers Centre for Responsible Business to We are very excited to launch this innovative building complex. Between two of the buildings,
educate other UAE businesses on Integrating product to the global market. Reveal Tempo is DuPont has supplied organic shaped furnishing
CSR into Business Strategy. According to studies our answer to the OEM markets growing elements that guide visitors to a primary
conducted by the chamber, only 28% of Dubai demands for a low temperature cure powder atrium area. DuPont Corian was also used to
companies have an environmental policy. coating that is highly productive, energy effi- create a 14 metre reception desk, signage panels,
The UAEs Vision 2021 aims to further the cient, and meets the corrosion, chemical and benches and flower pot containers in two of the
position of the country as a sustainable nation mechanical requirements of the industry, said buildings atria. Each furnishing element is
and our goal to become carbon-neutral is in Olaf Conreur, industrial category manager for based on the same concept: natural stone for the
accordance with this. It is just as important for Jotun Powder Coatings. base and a DuPont Corian organic skin for the
companies in the private sector to integrate sus- The call for a highly efficient and eco- functional upper part.
tainability into their business strategies as it is for friendly low curing product has long been a key The project was realised in collaboration with
government entities. focus area for the powder coating industry. The Bucharest-based Square One Studio.
However, a company cannot fully achieve its release of Reveal Tempo demonstrates our abil- We had to choose a material that could be
sustainable goals if they do not secure their ity to meet these requirements, Conreur added. curved and twisted to thermoform the parts,
employees commitment to these and develop an The product can cure at temperatures ranging Square One GM, Adrian Cancer, said.
environmentally-conscious culture both within from 130C/20min, to 180C/3min. Because it Also, we had a strict deadline to finish the
and outside of the workplace. can be applied at a thickness of 55 m or lower work and for this reason we did not use tradi-
Summertown, which has a LEED certified when applied on an organic primer such as an tional architectural sketches that would have
showroom in Dubai, focuses on executing green e-coat, its efficiency increases the number of goods taken too long to implement. Instead, we sent
projects for its clients, of which it has completed three that can be coated. the 3D files of our project to the fabricator that
in 2012. The committee will now ensure that all pro- The product reduces energy use by 25%; contrib- made the molds very quickly, helping us save
jects undertaken by the company will achieve such utes towards coating heat sensitive objects; facilitates considerable time. The entire process from vir-
objectives, whether specified by the client or not and the curing of pre-assembled materials, or even com- tual shapes to the physical implementation on
green products are being developed at the companys bine several of these benefits, resulting in a mix of site was incredibly smart and quick, with great
joinery facility. increased productivity and energy savings. results, he added.

www.thebigprojectme.com | 43
SUPPLIER | NEWS

It is just as important for companies in the


private sector to integrate sustainability 25%
into their business strategies as it is for potential energy savings can be made

government entities through application of the new Jotun


Reveal Tempo

Danube Schck ME FZE Dow Corning


Regional expansion yields 20% growth Bent GFRP Bars launched New colours added to glazing sealant range

Compared to H1 2011, Danube has registered A new high strength glass fibre bent bar, Bent The construction division of Dow Corning has
sales growth of 20% over the same period in GFRP, has been added to the Schck ComBAR announced the introduction of new colours for a
2012, due to regional expansion that has ser- portfolio by its German producer Schck. string of its sealant and glazing products.
viced growing demand in Middle East and Designed specifically for use in the shaft Dow Corning 993 Silicone Structural
African markets. walls of tunnelling projects, the bent bar can Glazing Sealant, Dow Corning 3362 Silicone
Following the establishment of new branches achieve strengths similar to those of the Insulating Glass Sealant and Dow Corning 895
in Bahrain, Oman, Saudi Arabia and Qatar, the straight bars. Schck also says the bars Silicone Structural Glazing Sealant are now
UAE-based merchant is now planning to explore enhance the safety and speed at which projects available in black, white, light grey, middle
potential investment opportunities in Africa. are executed. grey and dark grey. Custom colours are also
This year is a landmark year for us and the Allowing tunnel boring machines (TBM) available on request.
expansion has not only strengthened our market to dig a tunnel without being interrupted The expansion increases the design versatility
presence in the region, but has also helped us by supporting steel rebar, steel reinforced of the products and will be targeted to architects,
reach a wider audience. The company is in excel- concrete diaphragm, or drilled pile walls, contractors, building owners, consultants, for-
lent position to meet its target for the annual year the use of the new generation Bent GFRP mulators and design specifiers and is compli-
with record volumes and sound profitability, Bars reduces project timescales and creates mented with a colour matching service.
said Danube chairman Rizwan Sajan. a more cost effective design. The products have also been approved by the
In the last 12 months Danube has opened a The company is now eyeing the regions EOTA for structural applications: 993 Silicone
new 550,000 square feet warehouse in JAFZA massive infrastructure projects for intro- Structural Glazing Sealant approved ETA-
South, Dubai and Sajan has accepted the Dubai ductory applications of the bars in the 01/0005; and 3362 Silicone Insulating Glass
Quality Appreciation Award, The Mohammad Middle East. These projects include sub- Sealant approved ETA-03/0003.
Bin Rashid Al Maktoum Business Award ways, sewers and tunnels, all of which are They are accompanied by a range of compat-
(MRM) and the Businessman of the Year Award. constructed with use of the TBM. ible, proven silicone weatherproofing sealants
I think businesses should take calculated The development of high strength Glass and also the one part structural sealant 895
risks and learn to be more aggressive. You should Fibre Reinforced Polymer rebars brought the Silicone Structural Glazing Sealant in match-
learn to be more aggressive and always be on the solution to this problem. The GFRP bars are ing shades.
lookout for opportunities, regardless of being big installed in that portion of concrete shaft walls Dow Corning also last month announced a
or small, Sajan told The Big Project last year. which the TBM has to penetrate, the so called new to market cost-effective cleaning material to
Danube was founded in Deira, Dubai in 1993 soft-eye. Even though the material is more its 7000 product catalogue. Engineered to flush
and began as a single store operation, led by expensive than steel rebar, the overall savings the catalyst elements of manual and automatic
Sajan. In 2010 the company reported annual in construction time and cost are substantial, two-component pump dispensing equipment,
turnover of AED 1.25billion, with a growth rate a statement from the company read. the Dow Corning 3535 Catalyst Cleaner offers a
of 25%; the target for the coming years was then Like its parent company, Schck ME FZE, quick and easy cleaning solution, particularly
to achieve the same growth rate and revenues of the Middle East freezone subsidiary of Schck when a fast switch over of different colour cata-
US $1bn by 2015 at the latest. AG, specialises in the reinforcement of indus- lysts is needed.
Today the company sells 25,000 products to trial flooring, facade, bridge engineering, A video demonstrating the new colour range
international markets and is planning a SAR marine and harbour construction, and coastal and how the products can be used can be viewed
300m investment in Saudi Arabia alone. protection, amongst other project types. via http://tinyurl.com/bun4hgs .

44 | www.thebigprojectme.com
AD
CAREER LADDER | Ammad Naser

Specialist subject
The Legal Groups head of real estate, Ammad Naser, tells
Melanie Mingas about his new employers expansion drive
in the face of the UAEs developing real estate regulation

T
he figures speak for themselves. be there because of what happened in 2008,
Earlier in 2012, statistics showed real but because there is now more movement on
estate transactions in Dubai to be up the transactional side, and with foreign invest-
9% on the previous quarter with the total ments coming in to buy distressed projects,
number of transactions up 5% year on year. there needs to be somebody there who can
While the Emirates emerging residential handle the transactional side, Naser adds.
locations, such as IMPZ, Sports City Silicon The changes are being driven by the intro-
Oasis and Jumeirah Village, still struggle to duction of a number of laws and regulations,
attract tenants ahead of the completion of vital covering property and local and interna-
infrastructure, the market is also witnessing tional investment.
an increase in foreign investors willing to buy We have actually seen a reduction in ser-
distressed assets. vice charges since the Strata Law was intro-
The partners here have realised that the duced and there are more transactions as a
market is gaining traction again and that they result. Also investors can actually see a differ-
require the diversity and ability to handle ence with regards to the development they live
transactional work as well as the disputes that in or have invested in, Naser observes, fur-
are going on, explains The Legal Group ther commenting that the impact on the mar-
(TLG) recently appointed head of real estate, ket has been fantastic.
ABOVE: Ammad Naser.
Ammad Naser, who has been brought in by It was whilst working for Bangash Holdings
TLG to do just that, in light of observations of that Naser had his first opportunity to be
the changing market dynamics. involved in the development of Dubais new
Disputes unfortunately are always going to real estate legislation; restructuring the JOPD

46 | www.thebigprojectme.com
XXXXXXXX
CAREER
News LADDER
| XXXXXXXXXX
| Ammad Naser
prior to obtaining disclosure for his client. I didnt see myself finishing my career in the The laws that are being implemented at
As opposed to outsourcing the work, it was UK. I wanted to move abroad, take the skills the moment in regards to the protection of
decided to keep the work in house, thus provid- I had honed in the UK and export them to a investors have actually been emailed across to
ing Naser opportunity to draft and prepare all place like Dubai that was and still is grow- all lawyers through West Law providing a
documentation required by RERA. ing as a legal entity, he says. medium for them to pass comments.
Recalling the work was stressful, he Now that Dubai is his home, Naser says For a lawyer its fantastic to have that
says the regulations introduced by the body the best opportunity is to be involved in the involvement because you can actually have a
are integral to the continuous improvement development of the Emirates laws and has say in the laws that are being created, whereas
of investor confidence. completed the DEIR owner association man- if you are back in the UK, its all done much
It will take time and personally I think it agement programme, since moving to Dubai higher in the echelons of government and by
will be about five years before the market sees a in order to gain the bigger picture overview the lobbyists that are dealing with the laws
steady incline; not to the same levels as pre- of how various legislations interlink. that are being passed, he concludes.
2008, but I do see Dubai in five to ten years
time at the same levels as New York and Paris,
where you always have an increment in the Disputes unfortunately are always going to
prices and values of properties, he predicts,
saying the upturn in the market will be com- be there because of what happened in 2008,
pletely dependent on new laws, specifically to
protect investors.
but because there is now more movement
The trust account was a fantastic move,
albeit a little late, but these sorts of small
on the transactional side, and with foreign
nuances are helping the market regain its trac-
tion, he continues.
investments coming in to buy distressed
Criticism of Dubai law has been levied from
all corners; but mostly disgruntled investors and
projects, there needs to be somebody there
overseas business people, but Naser responds: who can handle the transactional side
One thing everybody has to remember is that
Dubais legal system is still in its early stages.
The powers that be realise new laws need to be CAREER Close up
implemented and it will be a slow process.
Its not a case of not wanting to evolve, they
want to become the hub of business trading in Head of Real Estate - The Legal Group, Dubai
the Middle East, the next Singapore or New
York, and it will get there, he adds.
Ammad specialises in legislative and regulatory issues for investors, owners and
developers particularly advising on the 2007 Jointly Owned Property Law or Strata Law.
He advises Owners Associations and managers on mixed use, sub division, acquisition,
Dubai bug sale and compliance with Strata legislation. Ammad also focuses on portfolio
Born and raised in Manchester, UK, Naser management, acquisitions and sales, contract drafting and negotiation.
initially studied accountancy and finance
before realising that his interests lay in law. A Associate Director Bangash Holdings, Dubai
graduate of the University of Central
Lancashire, Nasers career began with a vol- In house legal director responsible for all legal and commercial contracts for parent and
untary internship at Wolstenholmes, south associated companies, reporting to the Board
Manchester, which then led to three and a
half years paid work with the firm, during Property Lawyer Ross Coates, Solicitors, UK
which time Naser worked his way through
the ranks to the position of non-executive, Property solicitor representing UK corporate and private clients on commercial and
associate director. residential property transactions.
Naser has also acted as external counsel
for Main Finance, HBOS and Santander Property Lawyer Wolstenholmes LLP, Solicitors, UK
where independent counsel was required in
Real estate solicitor acting for national & international investors on commercial &
addition to the lawyers working on transac-
tions. Naser recalls that is was after this he residential transactions, advised lenders such as HBOS plc, Santander (UK) plc and
caught the Dubai bug. Blemain Finance plc on high value development facilities.
To be honest with you, even at law school
ABOVE: Henrik Ulrich.

www.thebigprojectme.com | 47
Passive fire protection

AD

RENITHERM intumescent coatings AUDAX-Keck GmbH


Germany
for steel, wood and cables. Phone +49 70 51/16 25-0
fire@audax.de
INTUMEX sealants, seal, collars, www.renitherm.com
mortar and more.
Saving time for more safety!
MENA PROJECTS | TenderS
TenderS Tenders provided by

Saudi Arabia earthworks package on this scheme.


Client has set a deadline of August 13,
Client Rayadah Investment Company
(Saudi Arabia)
exploration of new mining reserves at
Al Khabra mining deposit in Umm Waal
2012 for the tender. Local Saud Consult City Riyadh 11564 near North East Tarif in Saudi Arabia.
has been appointed as the infrastructure Phone (+966-1) 205 9911 Project will cover an area of 150 square
consultant on this scheme. Fax (+966-1) 205 9922 kilometres and it would add 1.5-milliomn
Project name King Infrastructure Consultant Saudi Web http://www.raid.com.sa t/y of phosphorous oxide to clients
Khalid International Consulting Services (SaudConsult) - Saudi Email info@raid.com.sa planned phosphate capacity. Measured
Airport Expansion Project Arabia Description Design and construction of reserves o the mine are estimated at
Territory Saudi Arabia Project Manager KEO International a 2.4 million square metre mixed-use 234-million tons of phosphate with
Client General Authority of Civil Aviation Consultants (Saudi Arabia) development in Obhur, which includes low heavy metal content. It include
- GACA (Saudi Arabia) Tender categories Construction (240 Nos.) residential towers, (1,200 Nos.) construction of (10) production plants, 7
Address Bin Malek Street, Old Airport & Contracting, Hotels, Medical & villas, a five-star hotel, hospital, clinics, of which will be built in Waad El Shammal
Area Healthcare mosques, commercial district, schools and Industrial City and 3 will be built in Ras Al
City Jeddah municipal buildings. Khair. Client is carrying out an in-house
Postal/zip 21421 Project name Riyadh Status New Tender pre-feasibility study on this scheme.
Country Saudi Arabia Monorail Project Remarks This project is at Jeddah Project completion is expected in the
Phone (+966-2) 640 5000 Territory Saudi Arabia in Saudi Arabia. Client has received fourth quarter of 2016.
Fax (+966-2) 640 1477 Client High Commission for the prequalification entries for an Client has appointed UKs HSBC to act as
Web http://www.gaca.gov.sa Development of ArRiyadh infrastructure package on the residential financial adviser on this scheme. Project is
Email gaca-info@gaca.gov.sa City Riyadh 11614 scheme and is planning to issue expected to start production in late 2016
Description Country Saudi Arabia tender documents for the contract and banks are expected to be approached
Status New Tender Phone (+966-1) 488 3331 by July 2012. Local office of KEO to finance the scheme in 2013.
Remarks This project is in Northern Fax (+966-1) 482 9331 International Consultants has been FEED Consultant Jacobs Engineering
Region of Saudi Arabia. The complex Web http://www.arriyadh.com appointed as the project manager on this (Saudi Arabia)
will have academic and clinical centres, Email info@arriyadh.com development. Financial Consultant HSBC Ltd. (Saudi
as well as research centre, office Description Construction of monorail Client has invited contractors to submit Arabia)
buildings, service station and car system with six main routes covering a bids for the first infrastructure and Project Manager Jacobs Engineering
parking. Client has invited companies to total length of about 175-kilometre in earthworks package on this scheme. (Saudi Arabia)
submit bids by March 12, 2012 for the Riyadh. Client has set a deadline of August 13, Tender categories Industrial & Special
project management contract on this Remarks This project is in Saudi Arabia. 2012 for the tender. Local Saud Consult Projects
scheme. The network will be the backbone of has been appointed as the infrastructure
US Hill International has been awarded the public transport system in Riyadh, consultant on this scheme.
the project management consultancy covering densely populated areas in Infrastructure Consultant Saudi Project name King
(PMC) contract on this scheme. the city center, government facilities, Consulting Services (SaudConsult) - Saudi Abdulaziz International
Tender categories Construction & commercial centers and link to King Arabia Airport Expansion Project
Contracting, Airport Khalid International Airport, King Project Manager KEO International
Consultants (Saudi Arabia) Territory Saudi Arabia
Abdullah Financial Districts and major Client General Authority of Civil Aviation
universities. It will relieve pressure on the Tender categories Construction
Project name Mixed- roads and also ease traffic congestion, & Contracting, Hotels, Medical & - GACA (Saudi Arabia)
Use Development Project Healthcare Address Bin Malek Street, Old Airport
especially during peak hours. It will use Area
- Obhur District state-of- theart technology to help its
Territory Saudi Arabia City Jeddah
integration with a network of buses and Postal/zip 21421
Client Rayadah Investment Company other modes of transport. Trains will Project name Umm
(Saudi Arabia) Waal Phosphate Mine Country Saudi Arabia
operate without driver. Air conditioning Phone (+966-2) 640 5000
City Riyadh system will work both inside the trains Development Project
Postal/zip 11564 Territory Saudi Arabia Fax (+966-2) 640 1477
and also at the stations. Communication Web http://www.gaca.gov.sa
Country Saudi Arabia system has been designed to cater people Client Saudi Arabian Mining Company
Phone (+966-1) 205 9911 (MAADEN) Email gaca-info@gaca.gov.sa
with special needs. Train stations are also Description Expansion of King Abdulaziz
Fax (+966-1) 205 9922 designed to facilitate easy movement City Riyadh 11537
Web http://www.raid.com.sa Postal/zip International Airport involving construction
between train and other means of of two new passenger terminals,
Email info@raid.com.sa transport through public parking facilities Country Saudi Arabia
Description Design and construction of Phone (+966-1) 874 8000 passenger gangways, car parks, etc.
to cars as well as supporting facilities
a 2.4 million square metre mixed-use for the network such as maintenance Fax (+966-1) 874 8300
development in Obhur, which includes and warehouse stations, offices and Web http://www.maaden.com.sa
(240 Nos.) residential towers, (1,200 Nos.) depots for the trains and control centers. Email info@maaden.com.sa Budget $7,200,000,000
villas, a five-star hotel, hospital, clinics, The client is examining the bids from Description Engineering, procurement
mosques, commercial district, schools and number of consortiums vying for a and construction (EPC) contract for the
municipal buildings. contract to implement the scheme. (391) development of Umm Waal phosphate Remarks This project is in Jeddah. Scope
Status New Tender Companies from (50) countries applied mine including construction of 10 of work includes construction of two new
Remarks This project is at Jeddah during the prequalification process. A plants to produce 16-million tonnes a passenger terminals, refurbishment of
in Saudi Arabia. Client has received shortlist of consortiums will be drawn-up year (t/y) of phosphate concentrate, the existing terminal, a new concourse
prequalification entries for an once the prequalification process is sulphuric acid, phosphoric acid, calcium with 25 contact gates, three connector
infrastructure package on the residential completed. mono-phosphate and calcium di- buildings, additional parking facilities and
scheme and is planning to issue Tender categories Public Transportation phosphate. a new access road. The upgrade of both
tender documents for the contract Projects Status New Tender landside and airside infrastructure and
by July 2012. Local office of KEO utilities is also planned. The expansion
International Consultants has been will relieve growing pressure on KAIA and
appointed as the project manager on this Project name Mixed- Budget $5,600,000,000 will also push capacity from 13 million to
development. Use Development Project 21 million passengers a year. The client is
Client has invited contractors to submit - Obhur District Remarks Client is planning to increase expected to issue an international tender
bids for the first infrastructure and Territory Saudi Arabia its phosphate production through the in early 2002 for the contract. Work is

ESTIMATING
AND PROJECT CONTROL

www.thebigprojectme.com | 49
MENA PROJECTS | TenderS

VIEW MORE TENDERS AT


WWW.THEBIGPROJECTME.COM

expected to commence in the middle of about 24 million passengers from the $77-million Contractors, Italy's Impregilo and local/
2002. Netherlands Airport Consultants current 14 million. It is understood that US Parsons Brinckerhoff submitted Malaysian Riyad Bank. The International
(NACO) is carrying out a review of the bids have been submitted for the main $84-million Finance Corporation, part of Washington-
original master plan on this scheme. construction contract. Local Al-Mabani Lebanons Dar Al Handasa submitted based World Bank, has been appointed as
Design Consultant Aeroports de Paris - General Contractors has submitted the $89-million the financial and legal advisor.
AdP (France) lowest bid of $58.5 million. Other bidders UKs Halcrow / US CH2M Hill / Bahrains It is understood that key documents
Financial Consultant International include a joint venture of Turkey's TAV Projacs submitted $93-million. has been signed with banks and
Finance Corporation - IFC (USA) and local Al-Arrab Contracting at $76 Tender categories Construction & investors. The documents included the
Financial Consultant-1 Gulf International million; local Unimac at $60 million; Contracting, Airport build, transfer and operate agreement
Bank - GIB (Bahrain) local Shibh Al-Jazira at $73 million; local (BTOA) and direct credit agreement with
Main Consultant Khatib & Alami Al-Khodari at $91 million; and local Al- Project name Medina banks that are to finance the project.
Consolidated Engineering Company Yamama, with Nassir Hazza al-Subaei at International Airport New airport will have a capacity to
(Saudi Arabia) $75 million. Evaluation of bids is expected Expansion Project - Phase accommodate eight million passengers
Master Plan Consultant Netherlands to take about two months before the 1 in the first phase, which will be ready in
Airport Consultants - NACO contract is awarded. Netherlands Airport Territory Saudi Arabia three years. The capacity will be increased
(Netherlands) Consultants (Naco) is acting as the Client General Authority of Civil Aviation by 12-million in the second phase, which
Project Manager Dar Al Handasah (Shair consultant on this scheme. - GACA (Saudi Arabia) will be completed in 2020.
& Partners) - Saudi Arabia Local Al-Mabani General Contractors has Address Bin Malek Street, Old Airport TAV Airports Holding Company has
Specialist Consultant-1 Hill International been awarded an estimated $58.5-million Area reached financial close on this scheme.
Middle East Ltd. (Saudi Arabia) main contract on this scheme. City Jeddah The deal has been financed by the local
Contractors Almabani General Main Consultant Netherlands Airport Postal/zip 21421 National Commercial Bank (NCB), SABB
Contractors (Saudi Arabia), Saudi Consultants - NACO (Netherlands) Country Saudi Arabia and Arab National Bank after Japans
Binladin Group (Saudi Arabia), Aquatech Main Contractor Al-Mabani General Phone (+966-2) 640 5000 Sumitomo Mitsui Banking Corporation
International Corporation (USA), WTD Contractors (Saudi Arabia) Fax (+966-2) 640 1477 pulled out of the deal in the final stages.
(Italy), Huta-Sete Marine Works Ltd. Tender categories Construction & Web http://www.gaca.gov.sa NCB is the largest lender to the project,
(Saudi Arabia), Contracting, Airport Email gaca-info@gaca.gov.sa and also acted as documentation
Al-Shaer Engineering (Saudi Arabia), Description Expansion of Medina bank.
Bong Kyung Construction Company Ltd. International Airport to develop airside Financial Consultant International
(Saudi Arabia), Consolidated Contractors Project name King and landside facilities, including the Finance Corporation - IFC (Saudi
International Company - CCC (Saudi Khalid International construction of a new terminal with Arabia)
Arabia), Saudi Oger Limited (Saudi Airport Expansion Project capacity of 14 million passengers a year, Main Contractor TAV Airports Holding
Arabia) Territory Saudi Arabia renovation of an existing runway and Company (Turkey)
Specialist Contractor-1 Lakesmere Ltd. Client General Authority of Civil Aviation construction of a second runway. Main Contractor-1 Saudi Oger Limited
(UK) - GACA (Saudi Arabia) (Saudi Arabia)
Tender categories Water Works, Address Bin Malek Street, Old Airport Main Contractor-1 Al Rajhi Saudi Group
Roads, Bridges & Infrastructure, Airport, Area (Saudi Arabia)
Sewerage & Drainage, Power Plants & City Jeddah Budget $1,500,000,000 Tender categories Roads, Bridges
Alternative Energy, Communications/ Postal/zip 21421 & Infrastructure, Construction &
Telecommunications, Construction & Country Saudi Arabia Contracting, Airport
Contracting Phone (+966-2) 640 5000 Remarks This project is in Saudi Arabia. Tender products
Fax (+966-2) 640 1477 It will be developed in two phases on a
public-private partnership (PPP) basis.
Project name Apron
Web http://www.gaca.gov.sa
Email gaca-info@gaca.gov.sa The airport currently handles about 3.5 UAE
Construction Project - Description Carrying out expansion of million passengers a year. Later expansion
King Khalid International King Khalid International Airport. plans involve the construction of a new
Airport Remarks This airport is located about 35 passenger terminal, the renovation of
Territory Saudi Arabia kilometres North of Riyadh in Saudi Arabia. existing runway, the possible construction Project name Khalifa
Client General Authority of Civil Aviation Expansion will increase the airports annual of a second runway. Client has pre- Port & Industrial Zone
- GACA (Saudi Arabia) capacity to about 24 million passengers qualified eight consortiums to bid for the Project - Phase 1
Address Bin Malek Street, Old Airport from the current 14 million. Scope of work main contract. They include: Territory Abu Dhabi
Area involves construction of a new terminal, - South Africa's Airports Company Client Abu Dhabi Ports Company
City Bin Malek Street, Old Airport Terminal 5, including renovation of the - Turkey's YDA, Spain's Aena Desarrollo (ADPC)
Area existing Terminal 3 and Terminal 4, as well Internacional and OHL Address Mina Zayed
Country Saudi Arabia as adding (4) new concourses A, B, C - Badr Consortium comprising local City Abu Dhabi
Phone (+966-2) 640 5000 and D. Preliminary studies and design work Integrated Transportation Company, Country United Arab Emirates
Fax (+966-2) 640 1477 for this development has been completed. South Korea's Incheon International Phone (+971-2) 673 0600 / 673 2600 /
Web http://www.gaca.gov.sa Construction is expected to commence Airport Corporation, Central Japan 673 0051
Email gaca-info@gaca.gov.sa within six months and completed by International Airport and South Korea's Fax (+971-2) 673 1023 / 697 5174
Description Construction of a new apron November 2013. Client has invited Samsung. Web http://www.portzayed.gov.ae
at King Khalid International Airport. companies to submit bids for the project - Local Saudi Binladin Group, France's Email minazayd@emirates.net.ae
Status Current Project management consultancy (PMC) contract Aeroports de Paris and Bouygues. Description Construction of Khalifa
on this scheme. Firms have until June 16, - The Saudi airplex consortium comprising Port & Industrial Zone comprising a
2012 to submit bids. local El-Seif Engineering, Canada's container handling terminal and piers to
MMM Group, US' Airport Development handle raw and bulk cargo, as well as an
Budget $60,000,000 At least seven groups have been submitted
Corporation & Houston Airport System industrial area serving basic and heavy
bids for the project management
consultancy (PMC) contract on this and UAE's Emirates NBD. industries.
scheme. US Parsons International is - Turkey's Limak Investment, India's
Remarks This project is in Riyadh. Scope GMR Infrastructure and Turkey's Mapa
of work involves construction of an apron understood to be submitted the lowest
Construction.
at the existing Terminal 3 and the future price of $72-million for the contract. Other
- The Tibah consortium comprising Budget $7,000,000,000
Terminal 4. Terminal 3 is currently used bidders and prices include:
Turkey's TAV, local Saudi Oger, Al Rajhi
for domestic flights by national carrier US Aecom submitted a price of Holding Group and Athens-based
Saudi Arabian Airlines and budget airlines $76-million Consolidated Contractors Company. Remarks This project will be located
Sama Air and Nas Air. The contract is part South Koreas Incheon International - The Saudi-Malaysian consortium near Taweelah in Abu Dhabi. It will be
of an overall expansion plan for Riyadh Airport Corporation submitted comprising local Bakri International built on a public-private partnership
airport. This expansion is expected to $76-million Energy Company, Malaysia Airports basis. The scheme will eventually replace
increase the airport's annual capacity to US Hill International submitted Holdings Berhad, local Almabani General Mina Zayed port, which will in turn be

ESTIMATING
AND PROJECT CONTROL

50 | www.thebigprojectme.com
MENA PROJECTS | TenderS
VIEW MORE TENDERS AT
WWW.THEBIGPROJECTME.COM

used for real estate. The project will Phone (+971-4) 331 1022 pipeline linking Bu Hassa, Bab and qualification briefing, which will be held
eventually have capacity of 8 million Fax (+971-4) 332 2311 Thamamma. on June 25, 2009 at 11am in the Site
20-foot equivalent units (TEUs), 8 million Web http://www.imgaladari.com Status New Tender Office (Marrakech St) where the necessary
tonnes a year (t/y) of break bulk and Email info@imgaladari.com Remarks This project is at Habshan in documents will be issued and explained.
15 million t/y of bulk cargo. It will be Description Development of Restless Abu Dhabi. Invitation to Bid (ITB) for the Any queries shall be directed to:
made up of an eight-square-kilometre Planet Theme Park comprising a fully EPC contract is expected to be issued The procurement Manager,
offshore port, connected to the mainland air-conditioned indoor resort and theme by the end of July 2012, with an award ALEC L.L.C
by a 4.5-kilometre-long causeway. park, including three rides and more expected in the first quarter of 2013. E-mail: prequal@alec.ae
A new authority, the Committee for than (100) life-like, real-size robotic Project completion is expected in the first Applicants must submit in person 4 hard
the Restructuring of Abu Dhabi Port dinosaurs. quarter of 2014. copies and 4 CD copies of their pre-
Sector, is overseeing this project. The Tender categories Gas Processing & qualification documents to:
authority includes representatives from Distribution Project Procurement Manager,
Abu Dhabi Seaport Authority, Mubadala Budget $165,000,000 ALEC
Development Company and the Higher Project name Site Office, Marrakech Street,
Corporation for Specialised Economic Expansion Joints - Dubai Dubai, UAE.
Zones. Remarks This project will form a part International Airport Local Al Naboodah Contracting has
It is understood that client has announced of City of Arabia development, located Expansion (Phase II) been awarded the main contract on this
the arrival of first ever commercial adjacent to Global Village in Dubailand, Territory Dubai scheme.
container vessel to call at the Khalifa Port, off Emirates Road. The park will cover Client Al-Jaber L.E.G.T Engineering & Main Consultant Aeroports de Paris
which is schedule to open on September an area of approximately 0.5 million Contracting - ALEC (Dubai) International - ADPi (Dubai)
01, 2012. The vessel Ever Dynamic from square feet (including a 90-metre-high Address 3rd Floor, Bldg. 1, Dubai Main Contractor Al Naboodah
Evergreen Line sailed from Shanghai and translucent dome) of which built-up area Industrial City, Emirates Road Contracting Company L.L.C. (Dubai)
reached port on July 18, 2012. will be about 42,000 square metres. City Dubai MEP Contractor Emirates Trading Agency
Design Consultant Halcrow International Thirty-four species of dinosaurs will be Country United Arab Emirates L.L.C. - ETA-Ascon (Dubai)
Partnership (Abu Dhabi) on display and be able to move, roar Phone (+971-4) 429 0599 Tender categories Construction &
Financial Consultant HSBC Bank Middle and walk. Invitation to bid for the main Fax (+971-4) 429 0216 Contracting, Airport
East Limited (Abu Dhabi) contract is expected in May 2007. An Web http://www.alec.ae
Financial Consultant-1 National Bank of award for the main contract is anticipated Email dubaioffice@alec.ae
by December 2007, with construction
Abu Dhabi
expected to commence in January
Description Procurement and Project name Alumina
Master Plan Consultant Han Padron
2008. Bidders for the piling contract
construction of Expansion Joints, Refinery Project
Associates (Dubai) including all backing; priming; metal Client Mubadala Development Company
Master Plan Consultant-1 GHD Global include Bauer, Swissboring, Middle East strips; accessories and protections - MDC (Abu Dhabi)
Pty. Ltd. (Abu Dhabi) Foundations and local NSCC. An award is of works as per the tender drawings Address Mubadala Development
Project Manager Bechtel (International) expected shortly. The package, worth $80 and in accordance with the applicable Company - MDC (Abu Dhabi)
Company Limited (Abu Dhabi) million, will take six months to complete specifications and within the designated City Abu Dhabi
Specialist Consultant-1 Injazat Data and involve the sinking of 26,500 piles timeframe, as part of an international Country United Arab Emirates
Systems (Dubai) covering a 20 million square feet area. airport expansion project. Phone (+971-2) 413 0000
Specialist Consultant-2 Arcadis Gulf Dubai-based Palmer & Turner Architects Status Current Project Fax (+971-2) 413 0001
(Abu Dhabi) (P&T) is acting as the engineering and Remarks This tender is in pre-qualification Web http://www.mubadala.ae
Specialist Consultant-3 EC Harris design consultant. Japan's Kokoro stage - Package Ref. No. AX124/DOM16. Description Engineering, Procurement
International Limited (Abu Dhabi) Company will construct the dinosaur The project is part of the continuing and Construction (EPC) contract to build
Aluminium Products Supplier Alumco replicas. US' Jack Rouse Associates is development of Dubai International an alumina refinery with capacity of at
L.L.C (Dubai) acting as project manager for the theme Airport expansion (Phase II). Local Al least 1.5 million tonnes a year (t/y).
Cables Supplier Tratos Group (Italy) park. Local Wade Adams Contracting Jaber L.E.G.T Engineering & Contracting Status New Tender
CCTV & Access Control Systems has commenced grading and excavation LLC (ALEC), being the Main Contractor
Supplier Al Jaber GIS Establishment works. Completion is expected by the for construction, completion and
(Abu Dhabi) beginning of June 2005. maintenance of the civil, architectural,
Communication Systems & Equipment The client is busy with advanced MEP, SAS and signage works of Budget $1,500,000,000
Supplier Al Jaber GIS Establishment (Abu negotiations for the piling contract. Concourse 3 at Dubai International
Dhabi) Local Middle East Foundations is the Airport, has invited interested specialist
Crane Supplier Konecranes Plc front-runner. Specifications for the sub-contractors to pre-qualify for this Remarks This project will be build next to
(Finland) piling contract have been modified, with package, which will form part of the the Emirates Aluminium (Emal) Smelter
Electrical Contractor Larsen & Toubro reduction of the number of piles from Main Contractor Scope of Works. The at Taweelah in Abu Dhabi and will be
Ltd. (Abu Dhabi) 26,500 to 16,000. new Concourse 3 is to accommodate the first upstream aluminium plant of
Main Contractor Archirodon It is understood that work on this scheme 20 Aircraft Contact Gates, out of which its type to be built in the UAE. Client
Construction (Overseas) Company - Abu has been restarted. Project completion is 18 are for A-380, in addition to 6 gates has received bids from international
expected in December 2013. for Remote Stands. The footprint of engineering consultancies to conduct
Dhabi
Tender categories Leisure & a feasibility study on this scheme.
Main Contractors Boskalis Westminster Concourse 3 is 90 metres wide and 645
Entertainment, Construction & metres long, and its built-up area is Engineering consultancies that have bid
Middle East Ltd. (Abu Dhabi), Hyundai
Contracting, Agriculture & Irrigation approximately 528,000 square metres, on the scheme include: US Bechtel,
Engineering & Construction Company
Limited (Abu Dhabi), Ed Zublin AG including in addition to the arrivals Flour Corporation; Canadas Hatch, SNC
(Abu Dhabi), Al Jaber Transport & Project name Bu Hassa, and departure floors, Emirates Airline Lavalin; Frances Technip and Australias
General Contracting Establishment (Abu Bab & Thamamma Pipeline lounges, four and five-star hotels, and a WorleyParsons. Project is still in early
Dhabi) Construction Project large Duty Free shopping area. Interested stage, exact scope of the work has not
Territory Abu Dhabi Sub-contractors must have the necessary yet been formulated.
Client Abu Dhabi Gas Industries Limited capacity and experience of undertaking Canadas Hatch and SNC Lavalin have
(GASCO) the above works on this project. The Sub- been appointed to carry out feasibility
Project name Restless Address Tower H, Corniche, Near Al Ain studies on this scheme. The two
Planet Theme Park contractor will be appointed by the Main
Palace Hotel Contractor (ALEC). The selected Sub- engineering firms will carry out separate
Project - City of Arabia City Abu Dhabi studies for the project, with Hatch looking
Development - Dubailand contractor will be required to co-ordinate
Phone (+971-2) 603 0000 his works with the Main Contractor and at the core technology and SNC Lavalin
Territory Dubai Fax (+971-2) 603 7414 responsible for other proponents such as
other Associated Contractors and Sub-
Client I & M Galadari Group (Dubai) Web http://www.gasco.ae utilities and offsites. Separate studies will
contractors. In order to be considered for
Address 10th Floor, Capricorn Tower, Email info@gasco.ae be conducted over the coming months
participation, applicants are to provide
Sheikh Zayed Road Description Engineering, procurement and when the studies are completed a
a fully completed Pre-qualification
City Dubai and construction (EPC) contract to build decision regarding the scheme will be
Questionnaire for assessment. Applicants
Country United Arab Emirates a 50-kilometre, 24 inch in diameter made.
are requested to attend a pre-

ESTIMATING
AND PROJECT CONTROL

www.thebigprojectme.com | 51
MENA PROJECTS | TenderS

VIEW MORE TENDERS AT


WWW.THEBIGPROJECTME.COM

Specialist Consultant-1 Hatch (Abu It is understood that level-9 construction Budget $3,000,000,000 to take (10) months.
Dhabi) work is currently underway on this Tender categories Gas Processing &
Specialist Consultant-2 SNC-Lavalin scheme Distribution
International Inc. (Abu Dhabi) Main Architect Leigh & Orange (L&O) Ltd. Remarks This project is in Iraq. Client is
(Hong Kong) planning to build the integrated power
Main Consultant Meera Engineering and steel complex in two or three phases, Project name Crude
Project name Fujairah Consultancy Bureau (Abu Dhabi) with the first phase costing $730-million, Oil Production Facilities
Oil Refinery Project Main Contractor Chun Wo Building including a 500MW gas-thermal power Rehabilitation Project -
Territory Northern Emirates Construction Ltd. (Abu Dhabi) plant and electric furnace. The power Majnoon
Tender categories Leisure & plant will supply 300MW to the steel mill
Entertainment, Construction & and rest to the city of Basra. Ministry of
Contracting Industry & Minerals is currently evaluating Budget $100,000,000
Budget $1,400,000,000 the seven bids to build the scheme. The
Project name Ras Al bidders are from Turkey, Korea, Italy and
Khaimah International German- Egyptian consortium, with the Territory Iraq
Client International Petroleum Investment Airport Expansion Project Client Shell Group (Netherlands)
Turkish bid is understood to be most
Company - IPIC (Abu Dhabi) Address 5201 AN The Hague
likely to win the scheme. An award will
Phone (+971-2) 633 6555 Country Netherlands
be announced before December 2012
Fax (+971-2) 633 6555 Phone (+31-70) 377 9111
Budget $50,000,000 and work on plant construction will
Web http://www.ipic.ae Description Carrying out rehabilitation of
commence in early 2013.
Description Construction of a refinery crude oil processing facilities at Majnoon
Tender categories Industrial & Special
consisting eight reservoirs to store crude Oilfield.
Client Department of Civil Aviation (Ras Projects, Power Plants & Alternative
oil in Fujairah. Status Current Project
Al Khaimah) Energy
Status New Tender Remarks This project is in Iraq. Client
Remarks This project is in United Arab City Ras Al Khaimah
has invited companies to submit
Emirates (UAE). It will have (8) reservoirs, Country United Arab Emirates
Project name Zubair proposals for the rehabilitation of crude
each with capacity to accommodate over Phone (+971-7) 244 9111
- Fao Field Onshore Gas oil processing facilities. In addition to
8-million barrels of oil. Client is planning Fax (+971-7) 244 8861
Pipeline Project rehabilitation work, the contractor will
to conduct technical and technological Web http://www.rakdca.com
Client South Oil Company (Iraq) debottleneck the two degassing stations
studies to set up the biggest oil refinery Email dcaservice@rakdca.com
Address South Oil Company Complex, to increase the capacity to 120,000 b/d.
in the region. Work on this scheme is Description Carrying out expansion of
Bab Al Zubair Area There are currently (12) producing wells,
expected to commence in the second half Ras Al Khaimah International Airport
City Basrah some of which will require work-over
of 2013. involving the installation of flight
Phone (+964-40) 319 310 to improve their technical integrity.
information display system (FIDS), a new
Web http://www.soc-basrah.com The existing facilities do not have a
cargo hangar covering an area of 600
Email info@soc-basrah.com functional emergency shutdown system.
Project name Reem square metres, landscaping, renovation
Description Lump sum turnkey The facilities will be integrated into new
Diamond Tower Project - of VIP and passenger boarding halls,
(LSTK) engineering, procurement and central processing facilities. Client had
Shams Abu Dhabi - Al Reem the arrival hall, expansion of the duty
construction (EPC) contract to build a invited five engineering and construction
Island Development free area, including modernisation of air
105-kilometre-long, 18-inch-diameter firms in May 2012 to submit bids for the
Client Sorouh Real Estate (Abu navigation equipment and runway.
onshore carbon steel gas pipeline to construction deal, they include: Indias
Dhabi) Design Consultant Aeroports de Paris
transport 100 million cubic feet a day Punj Lloyd, Dubai-based Dodsal; Italys
Address Abu Dhabi Mall, 5th Floor, East International - ADPi (Abu Dhabi)
of gas from Zubair field to the Fao Saipem; Athens-based Consolidated
Tower, Tourist Club Area Main Architect Khatib & Alami
field. Construction Company and Turkeys Enka.
City Abu Dhabi Consolidated Engineering Company
Status New Tender UKs Petrofac has been awarded the
Country United Arab Emirates (Dubai)
engineering, procurement, construction
Phone (+971-2) 444 0006 / 697 Main Contractor Siemens L.L.C. (Abu
and management (EPCM) deal and has
8888 Dhabi)
carried out the engineering studies and
Fax (+971-2) 444 0066 Main Contractor-1 Al Hamra Budget $150,000,000 detailed designs.
Web http://www.sorouh.com Construction Company (Ras Al
Main Contractor Petrofac International
Email customerservices@sorouh.com Khaimah)
(UK)
Description Design and construction of Status Current Project Remarks This project is in Iraq. Scope of Tender categories Oilfields &
12-storey Reem Diamond Tower, including Remarks This project is in Ras Al work involves construction of an onshore Refineries
duplex and penthouse, two basement Khaimah. The scheme is part of an overall pipeline, including:
roofs and associated facilities such as 20-year master plan for the airport. - Execution of a 10-metre-wide service
swimming pool, Jacuzzi and smart home Tender categories Construction & road along the pipeline route.
systems. Contracting, Airport, Roads, Bridges & - Dredging of pipeline route. Kuwait
Status Current Project Infrastructure - Welding and boring procedure for the
Remarks This project will be located at road, railway and cable crossings.
Sector 6, Plot No. S6-C05 at Shams Abu
Dhabi in Al-Reem Island development.
Iraq - Excavations of the pipeline trench.
- Hydrostatic testing and creating
Project name Kuwait
Metro Project
The tower will have a height of 39.67 collaboration between the Zubair and Territory Kuwait
metres. The plot is being developed by Fao fields. Client Partnerships Technical Bureau
local Smartwill Asia Ltd. a subsidiary of - Tie-in works with the Zubair and Fao
Project name Basra depots.
(Kuwait)
Hong Kongs Chun Wo Development Power & Steel Plant Address Touristic Enterprises Co. Bldg.,
Holdings Ltd.. Abu Dhabi-based Chun Invitation to bid (ITB) has been issued for
Project the EPC contract.
2nd Floor, Al-Jahra Street
Wo Building Construction Ltd. has been Client State Company for Iron & Steel City Shuwaikh
awarded the main contract to carry out (Iraq) It is understood that the client has issued Country Kuwait
this scheme. Local Meera Engineering City Al Basra another re-tender for the EPC contract on Phone (+965) 2496 5901
Consultancy is acting as the main Country Iraq this scheme. This is the sixth re-tender for Web http://www.ptb.gov.kw
consultant. Hong Kongs Leigh & Orange Phone (+964-770) 904 5628 the deal. At least seven firms have been Email infor@ptb.gov.kw
is the main architect. It is understood that Web http://www.steel-iraq.com submitted the technical proposals in early Description Implementation of Kuwait
parking and ground level work has been Email steelbasra@yahoo.com May 2012. Some of the bidders include: Metro scheme spanning more than 160
completed. Formwork is in progress.It is Description Construction of a power and Italys Saipem and Dubai-based Dodsal. kilometres comprising (69) stations
understood that level 5-construction work steel plant in Basra. Commercial proposals are duel on July Budget $7,000,000,000
has been completed. Status New Tender 22, 2012. Construction work is expected Status New Tender

52 | www.thebigprojectme.com
MENA PROJECTS | TenderS
VIEW MORE TENDERS AT
WWW.THEBIGPROJECTME.COM

Remarks This project is in Kuwait. Fax (+974) 435 5219 in Doha. Description Construction of 22-storey
Line 1 will connect Kuwait's southern Web http://www.udcqatar.com Remarks This project will be located Nile Towers consisting a five-star hotel
metropolitan area with the centre and Email info@udcqatar.com in Kuwait. It will be carried out in two tower and a residential tower.
also run through the main university, Description Construction of (2 Nos.) phases, each with a capacity of 50 Status Current Project
a total of 25.8 kilometres. Line 2 will 40-story Abraj Towers. million g/d. Stage one which includes Remarks This project is in Egypt. The
contain 25 stations along 20.9 kilometres Design Consultant Webb Zerafa Menkes construction of 50-million g/d unit in scheme will have a total built up area of
and connect the main business district Housden (Canada) Status addition to the infrastructure for stage 105,000 square metres. First tower will
with the main residential areas of Remarks This project will be located at two, will be commissioned by 2016. be a fiver star hotel managed by Hilton
Salmiya and Hawally. Line 3 will be Abraj Quartier Development on Pearl Phase two will be commissioned by 2017. International, with a total of (256) rooms
18.5 kilometres and connect the city Qatar real estate in Qatar. Client has Client has issued request for qualification and the second will be for residential use
to Kuwait International Airport and invited contractors to submit bids for the to contractors to submit statements of and will consist (114) hotel apartments.
connect residential areas and Shuwaikh main contract on this scheme. It has set a qualification until July 09, 2012. A joint venture of Dubai-based Arabtech
Industrial Zone. 65% of the network will submission deadline for the first tower on It is understood that client has received Construction and local SIAC Industrial
be underground. Spain's Ingenieria y August 05, 2012 and for the other tower (31) statements of qualification (SOQs) Construction & Engineering Company
Consultoria S.A is expected to complete is on August 13, 2012. Canadas Webb from contractors for the main contract on has been awarded the main construction
feasibility by the end of January 2008. A Zerafa Menkes Housden (WZMH) is acting this scheme. contract on this scheme. Work is
conference will be held in January 2008 as the design consultant. Tender categories Water Works scheduled to commence in 2012 and
or February 2008 inviting all interested completion expected in 2015.
parties to consider the study's findings. Main Contractor Arabtec Construction
After the conference, the operator - Oman L.L.C (Dubai)
Kuwait Overland Transport Union - will Budget $1,000,000,000 Main Contractor-1 SIAC Industrial
begin planning a tendering process. Construction & Engineering Company
Financial Consultant Ernst & Young (Egypt)
(Kuwait)
Remarks This refinery is located in Project name Gypsum Tender categories Hotels, Leisure &
Legal Consultant Ashurst Morris Crisp
the north of Qatar. The 140,000-b/d Board & Plaster Board Entertainment, Prestige Buildings
(UK)
refinery started production in September Plant Development
Master Plan Consultant Atkins &
2009 and is Qatar's first to process Project
Partners Overseas (Kuwait)
condensates. The proposed expansion Territory Oman Libya
would make it one of the largest Client Zawawi Minerals (Oman)
Master Plan Consultant-1 Parsons
condensate refineries in the world. City Muscat
Brinckerhoff Middle East Ltd.
The scheme will enable the complex to Country Oman
(Kuwait)
process 147,000 b/d of condensate from Phone (+968) 2449 3808 Project name Nafoora
Master Plan Consultant-2 Gulf Consult
North Field into liquefied petroleum gas Web www.zawawiminerals.com & Amal Fields Crude Oil
(Kuwait)
(LPG), naphtha, kerosene and gas-oil. It Description Carrying out development of Pipeline Construction
Specialist Consultant-1 Kuwait Technical
is understood that the client has entered a plant with capacity to produce 8-million Project
Consultant Bureau (KTCB)
into talks with French oil major Total square metres of gypsum board a year
Specialist Consultant-2 Al Dashti
over plans to expand this refinery. Total and 200,000 tonnes a year (t/y) of Plaster
International Group General Trading &
already has a 10% stake in the Laffan of Paris.
Contracting Company (Kuwait) Budget $38,000,000
Refinery Company joint venture along
Technical Consultant Atkins & Partners
with US' ExxonMobil and four Japanese
Overseas (Kuwait)
firms - Cosmo Oil Idemitsu, Marubeni
Tender categories Industrial & Special
Corporation and Mitsui. A tender for the Budget $60,000,000 Territory Libya
Projects, Public Transportation Projects, Client National Oil Corporation - NOC
EPC contract is expected to be launched
Tender products (Libya)
in second half of 2012. France's Technip
is currently working on the front-end Remarks This project is will be located Address Bashir Saadawi Street
Qatar engineering and design (FEED), which at Salalah Free Zone in Dhofar Region
in Oman. It is being implemented in
City Tripoli
Country Libya
is expected to be completed in early
2012. joint venture with US USG Corporation. Phone (+218-21) 46180
Client has invited companies to submit Oman-office of SNR Denton is acting as Description Construction of a 24-inch,
the legal advisor for the scheme. The 55-kilometre crude oil pipeline with a
Project name Laffan bids for the EPC contract on this scheme.
plant is being developed to meet the
Refinery Expansion It is expected to select a contractor capacity of 100,000 barrels per day (bpd)
growing demand for USGs building to connect Nafoora and Amal Fields.
Project for the condensate facility within two
products in the Middle East and
Territory Qatar months. Status Current Project
FEED Consultant Technip (Qatar) Africa. Remarks This project is in Libya.
Client Qatar Petroleum (QP)
Tender categories Gas Processing & Legal Consultant SNR Denton & It will connect Nafoora and Amal
Phone (+974) 4440 2000
Distribution, Oilfields & Refineries Company (Oman) fields in the Sirt Basin east of Tripoli.
Fax (+974) 4483 1125/ 4449 1400/ 4483
1995 Germanys Wintershall has been signed
Web http://www.qp.com.qa Project name Doha Egypt an agreement with client to build the
pipeline. The 140,000 barrels a day (b/d)
Email contracts.services@qp.com.qa RO Desalination Plant
Description Engineering, Procurement Nafoora filed is operated by Arabian Gulf
and Construction (EPC) contract for Project Oil Company (AGOCO), while 30,000 b/d
expansion of Laffan Refinery, which Client Ministry of Electricity & Water of Amal field is operated by Harouge Oil
(Kuwait) Project name Nile Operations Company. Engineering studies
currently processes 140,000 barrels a day Towers Project
(b/d) of condensates Address Ministry of Electricity & Water for the scheme has been completed. A
Bldg., South Al Surra Street, Ministries material supply contract has been signed
Area and first shipment of pipes has been
Project name Abraj City Safat 13001 Budget $153,000,000 received. Installation and construction
Towers Project - Abraj Country Kuwait is set to commence in August 2012.
Quartier Development Phone (+965) 2537 1000 Name of the materials supplier has not
Client United Development Company Fax (+965) 2537 1420 / 1421 / Territory Egypt been disclosed. The pipeline is due to be
q.s.c. (UDC) - Qatar 1422 Client Saudi Egyptian Construction handed over to the Agoco by the end of
Address 6th Floor, Office No. 62, Al Web http://www.energy.gov.kw Company (SECON) - Egypt March 2013.
Fardan Centre, Grand Hamad Street Email webadmin@energy.gov.kw Address Ganaklis Main Contractor Wintershall Holding
City Doha Description Construction of a reverse City Alexandria GmbH (Germany)
Country Qatar osmosis (RO) desalination plant with Country Alexandria Tender categories Oilfields &
Phone (+974) 436 1542 capacity of 100 million gallons a day (g/d) Phone (+22-03) 5820699/5827011 Refineries

www.thebigprojectme.com | 53
DIARY | INDUSTRY EVENTS

DIARY AUGUST 2012

GLOBAL TRENDS Expo Maquinas Green construct


Rio Grande do Sul, Brazil: August 1 4 Mall of Asia SMX, Manila, Philippines:
This infrastructure machinery event is August 16 18

4.5% growth
designed for professionals interested to learn Aimed at international engineers, this
about machinery and maintenance. The event will cover pollution control, project
event runs along side Contrusul, the largest management, project control and vegetative
in Saudi Arabias event in Southern Brazil. rooting, with networking and educational
sessions scheduled.
construction sector Construsul
between 2013 2017 Porto Alegre, Rio Grand Do Sul: August 1 4
The largest event in south Brazil , this
Turkmenistan Construction
Sergi Kosgi Exhibition Palace, Ashgabat:
event is for retailers and buyers of building
August 23 25

$8.8bn to be
materials and an important event for the
Construction machinery, building equipment,
housing sector and construction technology.
renovation tools, building materials
allocated to 15 new Break Bulk Africa machinery, accessories and components of
construction machinery are all featured in this
projects, commissioned Southern Sun Cape Town, South Africa:
show for both foreign and regional players in
August 7 8
by Saudi Energy Speakers will address the barriers to trade the sector.
and transportation challenges for South
Africa; one of the worlds most significant Been Egypt
$240m will be breakbulk/heavy-lift markets. New capital
projects, port and rail productivity, coastal
Cairo International Convention and
Exhibition Centre: August 30 Sept 2
spent on 450 new villas shipping and anti-fraud best practices, will Showcasing the latest achievements, best
also be discussed. practices, innovations in design, products,
across Saudi Arabia services and solutions for the infrastructure,
Sontha Veedu Expo construction and building industry, the
KPK Rathnabai Mahal, Kanchipuram, Tamil show provides the ideal forum for industry
$83.2m to be Nadu, India: August 10 12
This building and construction trade show is
professionals to forge business relationships
rooted in the implementation of the many
invested in emergency now in its fifth year and will feature builders new construction and development initiatives
and building materials. currently underway.
water storage
reservoirs in Muscat Nirmaan CityScape Global
West Bengal, India: August 13 16
Dubai World Trade Centre: October 2 4
A gathering of the leading companies
The real estate exhibition will run alongside

120.7 MT
designing and manufacturing the tools and
the World Architecture Congress, Retail City
machinery used by architects and builders.
Conference sessions and interactive talk Conference and Global Real Estate Summit.
predicted regional sessions are held alongside the exhibition. Speakers will include Sherif Anis, Thierry
Parret and Steven Miller.
cement capacity Interbuild Africa
increase by 2013: Johannesburg Expo Centre, Johannesburg, The Big 5
Gauteng, South Africa: August 15 18 Dubai World Trade Centre: November 5 8
A 13% increase on Interbuild Africa networks buyers and Returning to Dubai World Trade Centre
2011 figures suppliers to help create lasting relationships three weeks earlier than usual, this year The
for the benefit of the whole construction Big 5 will run alongside PMV Live, Middle
industry in the country. EastConcrete and FM Expo.

54 | www.thebigprojectme.com
IBC
AD

Vous aimerez peut-être aussi