Académique Documents
Professionnel Documents
Culture Documents
Describe, with examples, the way in which a defects in software can cause harm to a person, to the
environment or to a company.
ARYA DWI UTOMO The Ariane 5 rocket launches continue the Ariane 4 module without making changes
BUDI or testing, it turns out that when the Ariane 5 launch failure caused an error the
software so that the rocket exploded. According to you, who is aggrieved over this
081211632005 incident?
1 a. Human
RAHAYU TRI b. the company
WAHYUNI
c. Environment
081311633001
d. human, environmental and company
SITI MAULIDA AISIYAH Who is the most responsible for the failure of the software due to negligence in
testing?
081311633002
a. System Designer
n1
2 b. Programmer
AISHA SHOFIYYAH
ASTHMA c. Manager Manufacturing
081311633003 d. Investors
PRINCESS DWI In making a piece of software, often found many mistakes made by programmers that
KURNIATI resulted in a piece of software into error. How can this be happening?
081311633004 a. The Programmer is just a human being who did not escape the errors
b. Lack of funds so that the programmer is not serious in making the software
3
IRSANDHA BAKTI c. The Programmer experienced pressure like deadline, the complexity of the
PRATAMA system, and technological change
081311633005 d. Complex systems
D. Nodes, Edges, The Branch Nodes. Cause the addition cost Regression bugs,
testing, Terbuangnya the time of the impact the cost of replacing the
Chapter 1
Kinanti Gerald Crawford In the workmanship of a project in need of a test against the feasibility of the system
081311633017 to be built. There are several test expression in a process that needed to perform
testing, one American testing. Planning testing at consider important, except ...
Elegant faiqotul a. Can integrate testing
8 081311633016
b. Knowing what is in use
c. When will the testing be stopped
3 d. Knowing the layout of the location of the company
good prakoso Why does the existence of a very common failure happened and what factors affect
081311633012 mountains the failure so that the need for testing?
9 (IV) The lack of charges which caused the lack of fervor in the
developer.
a. (I), (II), and (IV).
b. (II), (III) and (IV).
c. (I), (II) and (III).
d. (I), (III) and (IV)
Describe why testing is part of the quality assurance and give examples of how testing contributes to
higher quality.
Lydia Wijaya Below that is not a relationship between software quality testing is
4 081311633019
A. Testing can eliminate the damage and improve the quality of the system directly.
10 Shinta Dwi Rahmawati B. Testing can report the damage may be omitted so as to contribute to the
081311633020 improvement of the quality system.
Chapter 1
C. Testing is one of the components in all quality assurance activities that prevent a
serious damage to the system.
D. Testing can determine some aspects of the measurement of the quality of the
software.
Shinta Mey Linawati Please select the purpose of not testing that can improve quality assurance?
081311633021
a. To ensure that the system complies with the service up and running without
Indah Sovitasari any defects
11 081311633022
b. To measure the quality of a system
c. To find out the impact of the risk that would be caused by the system
d. To give confidence to users
BEAUTIFUL DWI This brought a true statement about the relationship between testing and quality?
CAHYANI a. Quality Software is software that objectively error free, timely and appropriate
081311633024 funds according to needs and wants of the users as well as maintenance. The
objective here is defined as a structured process with proof that planned and
ANA YUSHNTA recorded and well-documented
TRIWATI b. Testing does not function as a tool for measuring all the factors factors that are
12 081311633023 related because each factor has no special difference between one application
with another application.
c. Testing is the measurement of the quality of
d. Testing cannot ensure the quality of the software but may give trust or security
against software in a certain level.
Recall the terms error, defects, fault, failure and the corresponding terms mistake and bugs. (K1)
Susmiandri The system works in yg or undue departures yg occurs when the program is run by the
081311633025 enduser called ...
A. Errors
13 Ibadillah Ibn B. Defects
081311633026 C. Failure
D. Bugs
Vina Rosalia The bugs introduced by programmer inside the code are known as:
5 081311633031 A. Errors
14 B. Mistake
Hansel Sindu C. Defects
081311633034 D. Failure
Rio Ramadan D All of the statements below is true, EXCEPT ...
081311633027 A. Defects is an error caused by the fault of the program.
B. Irregularities that occurred at the time the program is run and seen by end-users is
15 Rivanda Son P called Failure.
081311633030 C. Failure seen by end-users are caused because of the weak quality of the software.
D. To prevent the occurrence of Failure we must avoid the occurrence of the Error and
the Fault or find and fix it.
Recall the common objectives of testing. (K1)
Noor Iksan s. D When found the failure on software when testing and left, then it can have an impact
081311633035 on:
a. human, company
16 Faiz Mohammed a. b. human, environment
6 081311633036 c. the environment, company
d. human, corporate, environment
Resin Dananjaya Which of the statements is an advantage of using the technique of static?
08131633037 a) Defective performance of less
17
Ramadhana Abraham b) Increased productivity in the process of development
081311633038
Chapter 1
Dony Prasetiyo Approach to testing to find out whether all functions of the software has been running
081211633017 properly in accordance with functional requirements have been defined is testing
using methods ... ... ... ... ....
a. White Box Testing
18
b. Acceptance Testing
c. Black Box Testing
d. Module Testing
Provide examples for the objectives of testing in different phases of the software life cycle.
Bahana Sukma Gods You As A Manager For The Developer. Team Developer you already run the stages of
081311633037 design, analysis, and stage Design. From some of the stages below, the part where you
choose to shorten the time?
Fadil Harris a) Implementation-> Testing-> Maintenance
19 081311633038 b) Testing-> Implementation-> Maintenance
c) Implementation-> Testing-> Implementation-> Maintenance
d) Testing-> Implementation-> Testing-> Maintenance
Grand Ivennes M There is a case in which 4 teams perform activities of Planning, Analysis, Design,
081311633039 Implementation and Maintenance (Software life Cycle). then they do the testing on
each activity. all teams have their own respective testing purposes. Here the goal of
Efrandi Arjadana each team in Software Life Cycle testing.
081311633040 Note: (P lanning,:P A: D: Analysis, Design, Implementation, I: M: Maintenance)
1. Team A
P: To ensure that the software's intended has the right goals.
A: To make sure that the software created meets the user requirements.
D: To prevent defects.
I: To find defects.
M: To gain confidence of users by providing them quality product.
2. Team B
P: To make sure that the software created meets the user requirements.
7 A: To ensure that software satisfies the BRS (Business Requirement
Specification) and SRS (System Requirement Specifications).
D: To find defects.
I: To gain confidence of users by providing them quality product.
M: To establish the software's level of quality.
20
3. Team C
P: To make sure that the software created meets the user requirements.
A: To ensure that software satisfies the BRS (Business Requirement
Specification) and SRS (System Requirement Specifications).
D: To prevents defects.
I: To establish the software's level of quality.
M: To gain confidence of users by providing them quality product.
4. Team D
P: To ensure that the software's intended has the right goals.
A: To ensure that software satisfies the BRS (Business Requirement
Specification) and SRS (System Requirement Specifications).
D: To find defects
I: To prevent defects.
M: To gain confidence of users by providing them quality product
Which team have the right purpose of software testing life cycle?
A. Team B
Chapter 1
B. Team A
C. Team A, B, and C
D. Team B, and D
E. Team A, B, C, D
Rizal Khalis A b. Run the test can tell when there is a problem of the object we are testing, and the
081311633053 test should be designed to look for the problem a little bit maybe.
23 c. Document Checking to make sure that no error is one part of the technique of
Early testing.
d. It is impossible to do the test as a whole, therefore the risk and priorities must be
set.
9
Ivan Ghazyan Solanki The following is the notion of testing can find defects in software is
081311633050 a. Checking and the discovery of defects in the software will be useless if the
manufacture of the software not in accordance with the expectations of users
FaizSatriani Adli b. Testing can show the presence of defects, but you can't prove that software is free
081311633051 from defects. Minimize the possibility of not testing finds defects remaining in the
software but, even if it is not found the flaw in it, does not mean it is proven
24 software already running correctly.
c. Perform testing as early as possible to find a flaw in the software maker and focus on
the part that is in testing
d. Do the whole testing (the entire combination of possible inputs and prekondisi) it is
not possible except for simple cases. Instead, risk analysis and prioritization can be
used to determine the focus of software testing.
Recall the five fundamental activities and respective test tasks from planning to test a closure.
Lisa Jaya Prime If the failure occurred on the final evaluation of what should be done?
081311633054 a. Rearrange the planning and control
b. Do re-testing analysis and design
25 MOCH. Revelation c. Look for the error that occurred
10 Prasetya 081311633055 d. Report to the developer
e. Fix it yourself
Ayu Rosalina W from the tasks test the following process, which contains the duty "to evaluate the
081311633056 completion criteria and reporting"
26 a. Compare actual results with the expected results of the testing that has been done
Rihan Desy Fafi Ruli b. Write the result of the activity of testing has been done to give to the business
Chapter 1
30 iv. Because of the time in the development of the system will be faster
The most appropriate reasons are:
a. (i), (ii) and (iii)
b. (i) and (iii)
c. (ii) and (iv)
d. (i), (ii), (iii) and (iv)