Rectified
Sl. Description of snags Action by Volf Remarks
no due Valley
date Yes No
A Gas Pump Room ( Left & Right Side Block)
Internal Finish
4 Ceiling found with chipped off for fixing of Bowl bolts should
Be repaired with grouting with approved rcc grout material.
Page 1 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
INTERNAL PLASTER
9 Electrical boxes edges not plastered with finishing and not at right
angle
10 Cut out in block work for Louvers found with shabby finish at
edges
11 Plaster found with nail marks and peel off to be repaired
Internal Floor
15 Floor concrete found with cracks and should be repaired with
approved material.
Page 2 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Water feature
32 Bottom ledge / stub wall junction of plaster and bitumen
waterproofing not properly finished and found with shabby
junction
Page 3 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
38 Two cut pieces at center of top of ledge wall not acceptable should
be replaced with full piece.
39 Any chipped off stone is not acceptable and should be replaced.
42
As per approved shop drawing quartz stone tiles to be continued
on top surface bellow the bowl.
43 Coping stone MAS not approved.
Page 4 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Page 5 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Photo 1 Photo 2
RCC wall not in plumb, RCC wall found with loose material and
Grinding and repairs is required undulated surface to be made smooth with
grinding
Repair work not in level, RCC wall repairs Wall found with loose material to be
to be done with approved RCC repair cleaned and clear all loose mortar
material only
Page 6 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
All electrical joints are open and not Plaster not in level, 10 to 15 mm level
secured with any means. difference in plaster surface should be
repaired
All bolts for fixing top bowl are exposed All electrical conduits are open not
not secured by any means also water secured for DB.
leakage found at bottom of slab, repair and
rectify with approved materials.
Page 7 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Electrical boxes not in level should be All louver cut outs found with shabby
recessed only cover to be project out from finish, should be repaired and rectify
wall plaster, around box finishing plaster
required.
Page 8 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Plaster with patchwork and major Floor drain location is near steps but
undulations and cracks found in plaster. slopes in floor are not provided towards
drain, make desired slope in floor finish.
Electrical DBs not concealed or recessed Slab found with loose mortar, undulations
in wall, all pipes and conduits are exposed. should be repaired and rectify.
Page 9 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Slope in flooring to be made towards the Aluminium louver frames not aligned with
floor drain. jam, plaster to be repaired.
Floor finishing not provided, floor drain All corners found with damaged plaster
found at higher level than other floor, also should be repaired and rectify corner
found undulated concrete surface to be plaster.
repair and rectify. Page 10 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Door lintel inside found with damaged Door lintel inside found with damaged
plaster to be repaired also frame sealant plaster to be repaired also frame sealant
spill over to be rectified. not consistent to be rectified.
External plaster found with cracks at Bottom of basin wall and ground should
corners to be repaired and rectify. be with groove detailing for tucking
waterproofing membrane.
Page 13 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
External plaster found with cracks and Louver cut out openings not finished from
undulation to be repaired with approved internal side should be repaired
material should be rectified.
External plaster found with cracks and External plaster found with cracks
undulation near louver opening to be vertically to be repaired with approved
repaired with approved material should be material should be rectified.
rectified.
Page 14 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Coping stone found broken and of not Coping stone found with different stone
approved thickness to be replaced, also thickness to be replaced
bottom of basin wall and ground should be
with groove detailing for tucking
waterproofing membrane.
Coping stone found broken and of not Coping stone found with major colour
approved thickness to be replaced variation which is not acceptable, stones to
be replaced.
Page 15 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Coping stone found with major colour Coping stone found with size variation so
variation which is not acceptable, stones to not consistent and uniform such pieces to
be replaced also joints not consistent be replaced
Glass mosaic tiles found with inconsistent Glass mosaic tiles found with shabby
joints also found broken edges to be finish for cutting around water drain in
replaced. basin should be rectified
Page 16 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish
Coping stone joints not even and Mosaic tiles found broken at many places
consistent found broken at corners at bottom and at hunching of basin
Mosaic tiles found not in level at many Mosaic tiles found not in level at all
places also not in plumb should be corners s also not in plumb as well as joint
repaired and rectify. thickness not consistent should be repaired
and rectify.