GENERAL INFORMATION
Date of Plans Building Conditioned Floor Area Climate Zone
39,700 12
BUILDING TYPE NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the State Building Code. This
certificate applies only to a building using the performance compliance approach.
Documentation Author Signature Date Telephone
The Principal Designers hereby certify that the proposed building design represented in the construction documents and modeled for this permit application are consistent
with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy
efficiency requirements of the State Building Code. Title 24, Part 6.
ENV. LTG. MECH.
1. I hearby affirm that I am eligible under the provisions of Division 3 of theBusiness and Professions Code to sign this document as the
person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer (envelope &
mechanical only), or electrical engineer (lighting only) or I am a licensed architect.
2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this
document as the person responsible for its preparation; and that I am a licensed contractor performing this work.
3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure
or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business
and Professions Code are printed in full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures:
Telephone
Required Forms: ENV-1C, ENV-3C
Principle Designer Name Signature Lic. No. Date
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures:
Telephone
Required Forms: LTG-1C, LTG-2C
Principle Designer Name Signature Lic. No. Date
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures:
Telephone
Required Forms: MECH-1C, MECH-2C, MECH-3C, MECH-5C
Principle Designer Name Signature Lic. No. Date
BUILDING COMPLIES
GENERAL INFORMATION
OPAQUE SURFACES
U-
# Surface Type Appendix JA4 Reference Area Factor Az. Tilt Status Location (Space)
1 Above Grade Wall 4.3.3-A2, R10.0 Rigid 680 0.069 180 90 NEW EL1 South Perim Spc (G.S1)
2 Above Grade Wall 4.3.3-A2, R10.0 Rigid 227 0.069 90 90 NEW EL1 East Perim Spc (G.E2)
3 Above Grade Wall 4.3.3-A2, R10.0 Rigid 227 0.069 0 90 NEW EL1 NNE Perim Spc (G.NNE3)
4 Above Grade Wall 4.3.3-A2, R10.0 Rigid 453 0.069 270 90 NEW EL1 West Perim Spc (G.W4)
5 Above Grade Wall 4.3.3-A2, R10.0 Rigid 230 0.069 0 90 NEW EL1 North Perim Spc (G.N5)
6 Above Grade Wall 4.3.3-A2, R10.0 Rigid 720 0.069 180 90 NEW EL1 South Perim Plnm (G.S8)
7 Roof 4.2.6-A3, R20.0 Rigid 113 0.043 180 0 NEW EL1 South Perim Plnm (G.S8)
8 Above Grade Wall 4.3.3-A2, R10.0 Rigid 240 0.069 90 90 NEW EL1 East Perim Plnm (G.E9)
9 Roof 4.2.6-A3, R20.0 Rigid 675 0.043 90 0 NEW EL1 East Perim Plnm (G.E9)
10 Above Grade Wall 4.3.3-A2, R10.0 Rigid 240 0.069 0 90 NEW EL1 NNE Perim Plnm (G.NNE10)
11 Roof 4.2.6-A3, R20.0 Rigid 788 0.043 0 0 NEW EL1 NNE Perim Plnm (G.NNE10)
12 Above Grade Wall 4.3.3-A2, R10.0 Rigid 480 0.069 270 90 NEW EL1 West Perim Plnm (G.W11)
13 Roof 4.2.6-A3, R20.0 Rigid 338 0.043 270 0 NEW EL1 West Perim Plnm (G.W11)
14 Above Grade Wall 4.3.3-A2, R10.0 Rigid 240 0.069 0 90 NEW EL1 North Perim Plnm (G.N12)
15 Roof 4.2.6-A3, R20.0 Rigid 113 0.043 0 0 NEW EL1 North Perim Plnm (G.N12)
16 Roof 4.2.6-A3, R20.0 Rigid 675 0.043 90 0 NEW EL1 East Perim Plnm (G.E14)
17 Above Grade Wall 4.3.3-A2, R10.0 Rigid 55 0.069 180 90 NEW EL2 South Perim Spc (G.S1)
18 Above Grade Wall 4.3.3-A2, R10.0 Rigid 633 0.069 180 90 NEW EL2 South Perim Spc (G.S1)
19 Above Grade Wall 4.3.3-A2, R10.0 Rigid 20 0.069 90 90 NEW EL2 East Perim Spc (G.E2)
20 Above Grade Wall 4.3.3-A2, R10.0 Rigid 230 0.069 90 90 NEW EL2 East Perim Spc (G.E2)
21 Above Grade Wall 4.3.3-A2, R10.0 Rigid 35 0.069 0 90 NEW EL2 North Perim Spc (G.N3)
22 Above Grade Wall 4.3.3-A2, R10.0 Rigid 403 0.069 0 90 NEW EL2 North Perim Spc (G.N3)
23 Above Grade Wall 4.3.3-A2, R10.0 Rigid 10 0.069 90 90 NEW EL2 East Perim Spc (G.E4)
24 Above Grade Wall 4.3.3-A2, R10.0 Rigid 115 0.069 90 90 NEW EL2 East Perim Spc (G.E4)
25 Above Grade Wall 4.3.3-A2, R10.0 Rigid 20 0.069 0 90 NEW EL2 North Perim Spc (G.N5)
26 Above Grade Wall 4.3.3-A2, R10.0 Rigid 230 0.069 0 90 NEW EL2 North Perim Spc (G.N5)
27 Above Grade Wall 4.3.3-A2, R10.0 Rigid 30 0.069 270 90 NEW EL2 West Perim Spc (G.W6)
28 Above Grade Wall 4.3.3-A2, R10.0 Rigid 346 0.069 270 90 NEW EL2 West Perim Spc (G.W6)
29 Above Grade Wall 4.3.3-A2, R10.0 Rigid 660 0.069 180 90 NEW EL2 Plnm (G.8)
30 Above Grade Wall 4.3.3-A2, R10.0 Rigid 240 0.069 90 90 NEW EL2 Plnm (G.8)
31 Above Grade Wall 4.3.3-A2, R10.0 Rigid 420 0.069 0 90 NEW EL2 Plnm (G.8)
32 Above Grade Wall 4.3.3-A2, R10.0 Rigid 120 0.069 90 90 NEW EL2 Plnm (G.8)
33 Above Grade Wall 4.3.3-A2, R10.0 Rigid 240 0.069 0 90 NEW EL2 Plnm (G.8)
34 Above Grade Wall 4.3.3-A2, R10.0 Rigid 360 0.069 270 90 NEW EL2 Plnm (G.8)
35 Roof 4.2.6-A3, R20.0 Rigid 900 0.043 180 0 NEW EL2 Plnm (G.8)
36 Above Grade Wall 4.3.3-A2, R10.0 Rigid 50 0.069 180 90 NEW EL3 South Perim Spc (G.S1)
37 Above Grade Wall 4.3.3-A2, R10.0 Rigid 576 0.069 180 90 NEW EL3 South Perim Spc (G.S1)
38 Above Grade Wall 4.3.3-A2, R10.0 Rigid 20 0.069 90 90 NEW EL3 East Perim Spc (G.E2)
39 Above Grade Wall 4.3.3-A2, R10.0 Rigid 230 0.069 90 90 NEW EL3 East Perim Spc (G.E2)
40 Above Grade Wall 4.3.3-A2, R10.0 Rigid 30 0.069 0 90 NEW EL3 North Perim Spc (G.N3)
41 Above Grade Wall 4.3.3-A2, R10.0 Rigid 346 0.069 0 90 NEW EL3 North Perim Spc (G.N3)
42 Above Grade Wall 4.3.3-A2, R10.0 Rigid 10 0.069 90 90 NEW EL3 East Perim Spc (G.E4)
43 Above Grade Wall 4.3.3-A2, R10.0 Rigid 115 0.069 90 90 NEW EL3 East Perim Spc (G.E4)
44 Above Grade Wall 4.3.3-A2, R10.0 Rigid 20 0.069 0 90 NEW EL3 North Perim Spc (G.N5)
45 Above Grade Wall 4.3.3-A2, R10.0 Rigid 230 0.069 0 90 NEW EL3 North Perim Spc (G.N5)
46 Above Grade Wall 4.3.3-A2, R10.0 Rigid 30 0.069 270 90 NEW EL3 West Perim Spc (G.W6)
47 Above Grade Wall 4.3.3-A2, R10.0 Rigid 346 0.069 270 90 NEW EL3 West Perim Spc (G.W6)
48 Above Grade Wall 4.3.3-A2, R10.0 Rigid 600 0.069 180 90 NEW EL3 Plnm (G.8)
OPAQUE SURFACES
U-
# Surface Type Appendix JA4 Reference Area Factor Az. Tilt Status Location (Space)
49 Above Grade Wall 4.3.3-A2, R10.0 Rigid 240 0.069 90 90 NEW EL3 Plnm (G.8)
50 Above Grade Wall 4.3.3-A2, R10.0 Rigid 360 0.069 0 90 NEW EL3 Plnm (G.8)
51 Above Grade Wall 4.3.3-A2, R10.0 Rigid 120 0.069 90 90 NEW EL3 Plnm (G.8)
52 Above Grade Wall 4.3.3-A2, R10.0 Rigid 240 0.069 0 90 NEW EL3 Plnm (G.8)
53 Above Grade Wall 4.3.3-A2, R10.0 Rigid 360 0.069 270 90 NEW EL3 Plnm (G.8)
54 Roof 4.2.6-A3, R20.0 Rigid 10,800 0.043 180 0 NEW EL3 Plnm (G.8)
55 Above Grade Wall 4.3.3-A2, R10.0 Rigid 110 0.069 90 90 NEW EL4 NE Perim Spc (G.NE1)
56 Above Grade Wall 4.3.3-A2, R10.0 Rigid 256 0.069 45 90 NEW EL4 NE Perim Spc (G.NE1)
57 Above Grade Wall 4.3.3-A2, R10.0 Rigid 110 0.069 0 90 NEW EL4 NE Perim Spc (G.NE1)
58 Roof 4.2.6-A3, R20.0 Rigid 1,037 0.043 90 0 NEW EL4 NE Perim Spc (G.NE1)
59 Roof 4.2.6-A3, R20.0 Rigid 1,764 0.043 270 0 NEW EL4 SW Perim Spc (G.SW2)
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new fenestration
is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered
a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In
addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications,
installation certificates, and operating and maintenance information meet the requirements of 10-103(b) of Title 24 Part 6. The
field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of
the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records.
39,394.9
Conditioned and Unconditioned space lighting shall not be combined for compliance
Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces
Watts Watts
Installed Lighting Installed Lighting
(from Conditioned LTG-1C Page 2) (from Unconditioned LTG-1C Page 2)
Lighting Control Credits Lighting Control Credit
Included in Performance Analysis? YES Unconditioned Spaces (from LTG-2C) -
Adjusted Installed
Lighting Power =
Complies if Installed <= Allowed Complies if Installed <= Allowed
Allowed Lighting Power Allowed Lighting Power
(from LTG-1C Installed Lighting Schedule) 39,395 Unconditioned Spaces (from LTG-3C)
Required Acceptance Tests:
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
LTG-2A and LTG-3A. The designer is required to check the acceptance tests and list all control devices serving the building or
space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a
certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the
Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this
section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire
controlled.Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The LTG-2A and LTG-3A forms are not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement
agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the
requirements of 10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before
the building can receive final occupancy. A copy of forms LTG-2A and LTG-3A for each different lighting luminaire control(s) must
be provided to the owner of the building for their records.
Enforcement Agency:
Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning
system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified
as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance. Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the
Acceptance Requirements.
The MECH-1C form is not considered a completed form and is not to be accepted by the building department unless the correct
boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor,
controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are
required for ALL newly installed and replaced equipment. In addition a Certificate of Acceptance forms shall be submitted to
the building department that certifies plans, specifications, installation certificates, and operating and maintenance information
meet the requirements of 10-103(b) and Title 24 Part 6. The building inspector must receive the properly filled out and signed
forms before the building can receive final occupancy.
CHILLED WATER, HEATING HOT WATER & CONDENSER WATER CIRCULATION SYSTEMS ACCEPTANCE
Test Description MECH-8A MECH-9A MECH-10A MECH-11A MECH-15A
Hydronic Thermal
Supply System Automatic Energy
Valve Water Variable Demand Storage
# of Leakage Temperature Flow Shed (TES)
Equipment Requiring Testing units Test Reset Control Control Systems Test Performed By
Chilled Water Loop
Hot Water Loop
Condenser Water Loop
Domestic Hot Water Loop
PUMP ACCEPTANCE
Test Description MECH-10A MECH-11A MECH-15A
Hydronic Thermal
System Automatic Energy
Variable Demand Storage
# of Flow Shed (TES)
Equipment Requiring Testing units Control Control Systems Test Performed By
CHW Loop Pump 1
HW Loop Pump 1
CW Loop Pump 1
Boiler1 (HWNatDrft) Pump 1
CHILLER ACCEPTANCE
Test Description MECH-8A MECH-9A MECH-10A MECH-11A MECH-15A
Hydronic Thermal
Supply System Automatic Energy
Valve Water Variable Demand Storage
# of Leakage Temperature Flow Shed (TES)
Equipment Requiring Testing units Test Reset Control Control Systems Test Performed By
Chiller1 (Scroll)
BOILER ACCEPTANCE
Test Description MECH-8A MECH-9A MECH-10A MECH-11A MECH-15A
Hydronic Thermal
Supply System Automatic Energy
Valve Water Variable Demand Storage
# of Leakage Temperature Flow Shed (TES)
Equipment Requiring Testing units Test Reset Control Control Systems Test Performed By
Boiler1 (HWNatDrft)
SYSTEM FEATURES
Mechanical Systems
System Name EL1 Sys1 (VAVS) (G) EL2 Sys1 (VAVS) (G) EL3 Sys1 (VAVS) (G) Note to Field
Time Control S S S
Setback Control B B B
Isolation Zones 1 1 1
Heat Pump Thermostat? Y Y Y
Electric Heat? N N N
Fan Control Any Fan w/ VSD Any Fan w/ VSD Any Fan w/ VSD
VAV Minimum Position Control? Yes Yes Yes
Simulataneous Heat/Cool? y y y
Heating Supply Reset? No No No
Cooling Supply Reset? Yes Yes Yes
Ventilation Air Balance Air Balance Air Balance
Outdoor Damper Control? A A A
Economizer Type OA Temperature OA Temperature OA Temperature
Design O.A. CFM (Mech-3C, Column H) 2,075.927 1,918.804 1,771.203
Heating Equipment Type No Cntrl Htg No Cntrl Htg No Cntrl Htg
Heating Equipment Efficiency n/a n/a n/a
Cooling Equipment Type Ch Wtr Clg Ch Wtr Clg Ch Wtr Clg
Cooling Equipment Efficiency n/a n/a n/a
Make and Model Number
Heating Duct Location Ceiling Plenum Ceiling Plenum Ceiling Plenum
Heating Duct R-Value 7.000 7.000 7.000
Cooling Duct Location Ceiling Plenum Ceiling Plenum Ceiling Plenum
Cooling Duct R-Value 7.000 7.000 7.000
Duct Tape Allowed? 0 0 0
Pipe Type (Supply, Return, Etc...) - - -
Pipe Insulation R-Value
CODE TABLES: Enter code from table below into columns above.
Heat Pump Thermostat? Time Control Setback Isolation Fan Control
Control Zones
Electric Heat?
VAV Minimum Position Control? S: Prog Switch H: Heating Enter number I: Inlet Vanes
O: Occupancy Sensor C: Cooling of Isloation P: Variable Pitch
Simulataneous Heat/Cool? Y: Yes M: Manual Timer B: Both Zones V: VFD
Heat and Cool Supply Reset? N: No O: Other
Outdoor Damper Control? C: Curve
High Efficiency? Ventilation Outdoor Economizer Design O.A.
Duct Tape Allowed? Damper CFM
Pipe Insulation Required? B: Air Balance A: Auto A: Air Enter Design
C: Outside Air Cert. G: Gravity W: Water Outdoor Air CFM.
M: Out. Air Measure N: Not Required Note: This shall be
D: Demand Control no less than
N: Natural Column H on
MECH-3C.
SYSTEM FEATURES
Mechanical Systems
System Name EL1 Sys2 (SZRH) (G.N6) EL4 Sys2 (S...H) (G.NE1) EL4 Sys2 (...H) (G.SW2) Note to Field
Time Control S S S
Setback Control B B B
Isolation Zones 1 1 1
Heat Pump Thermostat? Y Y Y
Electric Heat? N N N
Fan Control Constant Volume Constant Volume Constant Volume
VAV Minimum Position Control? No No No
Simulataneous Heat/Cool? n n n
Heating Supply Reset? No No No
Cooling Supply Reset? No No No
Ventilation Air Balance Air Balance Air Balance
Outdoor Damper Control? A A A
Economizer Type OA Temperature OA Temperature OA Temperature
Design O.A. CFM (Mech-3C, Column H) 270.001 518.275 881.725
Heating Equipment Type Hot Water Hot Water Hot Water
Heating Equipment Efficiency n/a n/a n/a
Cooling Equipment Type Ch Wtr Clg Ch Wtr Clg Ch Wtr Clg
Cooling Equipment Efficiency n/a n/a n/a
Make and Model Number
Heating Duct Location Ceiling Plenum On Roof On Roof
Heating Duct R-Value 7.000 7.000 7.000
Cooling Duct Location Ceiling Plenum On Roof On Roof
Cooling Duct R-Value 7.000 7.000 7.000
Duct Tape Allowed? 0 0 0
Pipe Type (Supply, Return, Etc...) - - -
Pipe Insulation R-Value
CODE TABLES: Enter code from table below into columns above.
Heat Pump Thermostat? Time Control Setback Isolation Fan Control
Control Zones
Electric Heat?
VAV Minimum Position Control? S: Prog Switch H: Heating Enter number I: Inlet Vanes
O: Occupancy Sensor C: Cooling of Isloation P: Variable Pitch
Simulataneous Heat/Cool? Y: Yes M: Manual Timer B: Both Zones V: VFD
Heat and Cool Supply Reset? N: No O: Other
Outdoor Damper Control? C: Curve
High Efficiency? Ventilation Outdoor Economizer Design O.A.
Duct Tape Allowed? Damper CFM
Pipe Insulation Required? B: Air Balance A: Auto A: Air Enter Design
C: Outside Air Cert. G: Gravity W: Water Outdoor Air CFM.
M: Out. Air Measure N: Not Required Note: This shall be
D: Demand Control no less than
N: Natural Column H on
MECH-3C.
MECHANICAL VENTILATION
A B C D E F G H I J K
AREA BASIS OCCUPANCY BASIS
Cond Min. No. CFM Min. Reg'd O.A. Design VAV Transfer
Area CFM CFM of Per CFM (Max. of Outdoor Min. Air
Zone Name (sf) per sf (BxC) People Person (ExF) D or G) Air CFM CFM CFM
EL1 South P... Zn (G.S1) 2,475 0.16 408 15 15.0 227 408 408 2,588.93 0
EL1 East Pe... Zn (G.E2) 675 0.16 111 4 15.0 62 111 111 789.09 0
EL1 NNE Pe... (G.NNE3) 788 0.16 130 5 15.0 72 130 130 554.04 0
EL1 West P... Zn (G.W4) 1,575 0.16 259 10 15.0 145 259 259 1,831.63 0
EL1 North P... Zn (G.N5) 788 0.16 130 5 15.0 72 130 130 543.31 0
EL1 East Pe... Zn (G.E7) 6,300 0.16 1,038 39 15.0 579 1,038 1,038 2,693.01 0
EL2 South P... Zn (G.S1) 2,250 0.16 366 14 15.0 203 366 366 2,286.02 0
EL2 East Pe... Zn (G.E2) 675 0.16 110 4 15.0 61 110 110 732.86 0
EL2 North P... Zn (G.N3) 1,575 0.16 256 9 15.0 142 256 256 992.88 0
EL2 East Pe... Zn (G.E4) 450 0.16 73 3 15.0 41 73 73 402.27 0
EL2 North P... Zn (G.N5) 675 0.16 110 4 15.0 61 110 110 484.84 0
EL2 West P... Zn (G.W6) 1,125 0.16 183 7 15.0 102 183 183 1,285.01 0
EL2 Core Zn (G.C7) 4,950 0.17 822 29 15.0 431 822 822 1,816.13 0
EL3 South P... Zn (G.S1) 2,025 0.16 330 12 15.0 183 330 330 2,094.73 0
EL3 East Pe... Zn (G.E2) 675 0.16 110 4 15.0 61 110 110 741.80 0
EL3 North P... Zn (G.N3) 1,350 0.16 220 8 15.0 122 220 220 876.61 0
EL3 East Pe... Zn (G.E4) 450 0.16 73 3 15.0 41 73 73 415.34 0
EL3 North P... Zn (G.N5) 675 0.16 110 4 15.0 61 110 110 501.47 0
EL3 West P... Zn (G.W6) 1,125 0.16 183 7 15.0 102 183 183 1,302.98 0
EL3 Core Zn (G.C7) 4,500 0.17 746 26 15.0 390 746 746 1,667.08 0
EL1 North P... Zn (G.N6) 1,800 0.15 270 5 15.0 70 270 270 - n/a - -0
EL4 NE Peri...Zn (G.NE1) 1,037 0.50 518 35 15.0 521 521 518 - n/a - 3
EL4 SW Per...n (G.SW2) 1,764 0.50 882 59 15.0 886 886 882 - n/a - 4
E Base on expected number of occupants or at least 50% of CBC occupant density for egress purposes.
Must be greater that or equal to H, or use Transfer Air. Design outdoor air includes ventilation from supply air system & exhaust
I fans which operate at design conditions.
K Must be greater than or equal to (H-I), and, for VAV, greater than or equal to (H-J).
CHILLER SUMMARY
CHILLER PUMPS
Eff. Total Pump
Name Circulation Loop Description Qty. (COP) Tons Qty. GPM BHP Motor Eff. Drive Eff. Control
Chiller1 (Scroll) Chilled Water Loop Scroll 1 4.45 175 0 n/a n/a n/a n/a n/a
BOILER SUMMARY
BOILER PUMPS
Tot Inp Pump
Name Circulation Loop Description Qty. Efficiency (kBtu/h) Qty. GPM BHP Motor Eff. Drive Eff. Control
Boiler1 (...NatDrft) Hot Water Loop HW Boiler 0.80 EtMax 1800 1 120 - 0.80 1.00 1 spd
VAV SUMMARY
VAV
Zone Name System Type Qty. Min. CFM Ratio Reheat Type Reheat Delta-T
EL1 South Perim Zn (G.S1) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL1 East Perim Zn (G.E2) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL1 NNE Peri...Zn (G.NNE3) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL1 West Perim Zn (G.W4) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL1 North Perim Zn (G.N5) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL1 East Perim Zn (G.E7) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL2 South Perim Zn (G.S1) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL2 East Perim Zn (G.E2) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL2 North Perim Zn (G.N3) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL2 East Perim Zn (G.E4) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL2 North Perim Zn (G.N5) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL2 West Perim Zn (G.W6) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL2 Core Zn (G.C7) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL3 South Perim Zn (G.S1) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL3 East Perim Zn (G.E2) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL3 North Perim Zn (G.N3) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL3 East Perim Zn (G.E4) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL3 North Perim Zn (G.N5) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL3 West Perim Zn (G.W6) Variable Air Volume 1 0.20 Hot Water Loop 45.0
EL3 Core Zn (G.C7) Variable Air Volume 1 0.20 Hot Water Loop 45.0