EHS Induction
Your Passport to JO

Do it Safely Or not at all There is always time to do it right


EHS Induction Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Induction Training is mandatory for all


personnel
It is mandatory to issue gate pass
It is available in 3 languages
It provides various, general information
of EHS & JO basic Rules

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
2
Gas Utilization Project
Do it Safely Or not at all There is always time to do it right
Ground Rules Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

EHS Induction Program


Main Hall All attendees should sign or write
Date & time their names if not mentioned.
Session Language Instructor ...................
S Name Company Division Signature
Copies of the sheet can be collected
after the session from the EHSD.
1 All Attendees are requested to turn
2
off their cell phones or adjust it on
silent mode.
3
Side discussions are not preferred
4 for the best session benefits to all.
5

10

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
3
Gas Utilization Project
JO- Mission Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Joint Operations explores for, produces &


delivers hydrocarbon reserves of the
Divided Zone for the benefit of our
stakeholders non-operators, employees,
business partners, the State of Kuwait and
the Kingdom of Saudi Arabia.

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
4
Gas Utilization Project
Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Joint Operations Major Projects Division


5
Gas Utilization Project
JO- Vision Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Our Vision is to be a World Class Operation


We will provide a safe and healthful workplace
and will protect the environment.

Achieve the next level of Workforce Safety


Achieve Environmental Leadership
Improve Reliability & Efficiency

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
6
Gas Utilization Project
TENETS of OPERATIONAL
EXCELLENCE Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

1.
1.
Always Two Key Principles:
Always
operate within
operate within -Do it safely or not at all.
designand
design and -There is always time to do it right.
environmental
environmental
limits.
limits.
3.
2. 3.
2. Alwaysensure
ensure
Alwaysoperate
operate Always
Always safetydevices
devices
ininaasafe
safeand
and safety
controlled are in place
controlled are in place
condition. and
condition. and
functioning.
functioning.
6.
4. 5. 6.
4. 5. Always
Alwaysfollow
follow Alwaysmeet
meetoror Always
Always Always maintain
safework
work exceed maintain
integrity ofof
safe exceed integrity
practices and customers dedicated
practices and customers dedicated
procedures. requirements. systems .
procedures. requirements. systems .
10.
9. 10.
9. Alwaysinvolve
involve
7. 8. Alwaysfollow
follow Always
7. 8. Always theright
rightpeople
people
Alwayscomply
comply Always written the
Always Always written in decisions that
with all address proceduresforfor in decisions that
with all address procedures affect
applicable abnormal high risk or affect
applicable abnormal high risk or procedures and
rulesand
and conditions. unusual procedures and
rules conditions. unusual equipment.
regulations . situations. equipment .
regulations . situations.

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
7
Gas Utilization Project
EHS Induction Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

What is EHS ? S = Safety H = Health


E = Environment

What is the Incident/ Accident & Nearmiss?


Incident = Event that had an impact or effect on a person, property or environment.
Nearmiss = Unplanned event that had the potential to be an incident. A close call.

What is Hazards & Risk?


Hazard = Unsafe conditions that might expose a person, property or environment
Risk = Unsafe condition, action or a hazard that exposed a person, property or
environment but did not cause yet incident/accident or a nearmiss.

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
8
Gas Utilization Project
Smoking Policy Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Smoking is prohibited in all JO


fenced areas, offices, buildings and
other facilities, except in designated
smoking areas

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
9
Gas Utilization Project
Camera & Mobile Phone Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Photography is not allowed without the


permission of JO Authority
A special Camera Pass is required to
carry camera into JO area

Non-Intrinsically Safe mobile phones


must not be used in Hazardous areas
(MGC, Sub-Centers, PMP, SUG, Well
locations, near pipelines, near tanks,
drilling & work over locations)

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
10
Gas Utilization Project
Driving & Transportation Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Follow all traffic regulations


Drivers & Passengers must use seat belt
All passenger seats must have seat belt
Do not use phones while driving
Completely Stop at Stop Signs
Slow down, stop & put on your blinkers whenever camels cross the road.
Put on your head lights & drive carefully during dust storms, rainy
storms, fogy early winter mornings.
When you feel sleepy or fatigued STOP on the road side & take some
break till you feel refreshed again.
NEVER exceed speed limits & adhere to posted speed limits
20 kph inside plants & sub-centers
40 kph inside camps
80 kph on field roads - Adjust to weather conditions
Never tail gate/follow closely
Always drive defensively
Business Partners must train their personnel in Defensive Driving
Vehicles inside JO area are monitored by speed monitoring radars
Vehicles must be reverse parked (First move forward)
1. Disciplinary action will be taken against driving safety
violators
2. Repeated violation will result in cancellation of drivers gate
pass
Do it Safely Or not at all There is always time to do it right
Joint Operations Major Projects Division
11
Gas Utilization Project
Stop Work Authority Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

IF there is a need to report unsafe


conditions, near misses, incident/
accident pls. refer or contact JO
Dispatcher.
For any safety related inquires, advice,
or any related SWA cases pls. refer or
contact EHS Engineers on Phone #
66450002

This is JO Managements
commitment to You.
Do it Safely Or not at all There is always time to do it right
Joint Operations Major Projects Division
12
Gas Utilization Project
Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
13
Gas Utilization Project
General Safety Rules Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Type Of Hazard Basic equipments mandatory for


site:
H2S
H2S Monitor
Driving accidents
Required proper PPEs
Fire/ explosions
Bottle of Water
Heat exhaustion
JO Dispatcher Telephone Numbers
Dust (Sand blast)
To be accompanied with some one
Wild Animals experienced in JO sites and locations
Electrical hazards Required Passes
Mechanical hazards
Chemical hazards
Heavy Equipments
Type of Passes:
Falling Objects
Personnel Passes
Falling down during working On heights Vehicles Passes
Spills & leakages Camera Passes

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
14
Gas Utilization Project
PPE
Personal Protective Equipment Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

Proper Clothing & Protective Equipments are


required in all field areas all times
Safety Shoes mandatory in all JO field areas

Safety Helmet mandatory in all JO field areas

H2S Monitor mandatory in all JO field areas

Coveralls mandatory for JO field workers

Goggles & Eye Optional depending on Job


Protections
You must know:
Ear or Noise Optional depending on Job
protections What PPE is necessary
SCBA & Optional depending on Job
How to use PPE
Respiratory
Safety Mask Optional depending on Job Limitations of PPE
Safety Gloves Optional depending on Job Care & Maintenance of PPE
Body Harness Optional depending on Job How to inspect PPE

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
15
Gas Utilization Project
Hydrogen Sulfide (H2S) Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

H2S

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
16
Gas Utilization Project
Characteristics of H2S Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

H2S IS A HIGHLY POISONOUS GAS


H2S is a colorless gas
Smells like rotten egg at low
H2
S concentrations
Deadens sense of smell at high
Do
Yo
concentrations
still in u
sist
to wor
while
k It is heavier than air
Im
here n
ow
Forms explosive mixtures with
air or oxygen
Very soluble in water and oil
Highly corrosive to most metals

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
17
Gas Utilization Project
Effects of H2S Exposure on Humans Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

1 10 PPM Smells like rotten eggs.


20 100 PPM Deadens sense of smell
300 PPM Immediately Dangerous to
Life & Health (IDLH)
500 PPM Eye Irritation, Loss of
balance, disorientation &
unconsciousness
>700 PPM Immediate unconsciousness,
shut-down of respiratory
system, & death.

* Maximum permissible limit of H2S is 5 PPM

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
18
Gas Utilization Project
Locations where H2S is
likely to be present Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

SAMPLING WELLS GAUGE HATCHES


POINTS

POSSIBLE H2S
EMISSION
SOURCES

FLARE STACKS &


PIPELINES

EVAPORATION
PONDS

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
19
Gas Utilization Project
PERSONAL H2S MONITORS Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Personal H2S Monitors are required for entering


JO (Except Administration Camp)
The Monitor must be Turned On & Working
properly
Must be worn on outside of clothing
Must be worn in a level lower than the respiratory
system (nose and/or mouth)
The Sensor must not be blocked

Personal H2S monitors must be used


even in locations where fixed H2S
detectors are installed

FIXED H2S DETECTORS USUALLY


INSTALLED NEAR GROUND LEVEL

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
20
Gas Utilization Project
Initial Response to H2S
Alarm & Exposure Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

Alarm
When alarm (fixed detectors or personal monitor) sounds at 5 ppm., stop work and evacuate
to a safe area immediately
Call for help, horn, whistle or call by phone or radio
Move up wind if release is downwind of you or move cross wind if release is upwind of you
Move to higher ground if possible.
Assess
Do a head count & Consider other hazards
Protect
NEVER return to the hazardous environment without proper PPE or without assuring that
workplace recovered to the acceptable exposure limits.
Rescue
Do not attempt to rescue any victim without calling for help.
Put on breathing apparatus (BA) & proper PPEs before attempting rescue
Remove the victim to a safe area.
Medical Aid
Call Fire & Security Dispatcher for Ambulance and/or arrange transport of the victim.

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
21
Gas Utilization Project
Joint Operations Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

10 minutes
Break

Do it Safely Or not at all There is always time to do it right


Joint Operations Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

General Safety
Rules

Do it Safely Or not at all There is always time to do it right


JSA
Job Safety Analysis Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

JSA must be performed for all activities


Method of performing JSA:
- Break the job into steps
- Identify potential hazards or concerns in each step
- Eliminate or control each hazard or concern
JOB NAME: Installation of nozzle on Tank # 5 DIVISION/SECTION: MMD DATE: 24th March, 2004 New Revised

JOB LOCATION: Tank # 5 MGC ASSET OWNER CONTACT (Name & Tel. No.): 2409 (MGC Supervisor)
PERSONAL PROTECTIVE EQPT REQUIRED: Safety helmet, safety boots, safety OTHER SAFETY/EMERGENCY EQUIPMENT REQUIRED: H2S monitor, Multi gas
gas detector, fire extinguisher, water
glasses & safety harness hose and first aid kit

Sequence of Job components / Tasks Potential Hazard Recommendation to Eliminate/Reduce Hazards

A) Marking location for nozzle installation 1) Fall from scaffold 1) Use scaffold platform with guard rails and toe boards (Scaffold
must be inspected and tagged for use)
2) Tools falling down
2) Barricade drop area

B) Removal of paint from the cutting area by 1) Eye / face injury due to flying particles 1) Use face shield
grinding / buffing
2) Electric shock from power tools 2) Use double insulated electric tools
3) Fire hazard due to sparks 3) Gas test prior to hot work
4) Remove all flammable & combustible material from the area
5) Keep Fire extinguishers ready

C) Cutting tank shell using oxy-acetylene torch 1) Fire Hazard 1) Keep fire extinguishers and water hose
2) Burn injury due to cutting spark 2) Use face shield, leather gloves and apron
3) Cutting sparks / hot slag falling down, causing 3) Assign a fire watch and spray water below cutting area
fire
4) Remove flammable and combustible material from the area

Do it Safely Or not at all There is always time to do it right


PTW
Permit To Work Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

A written Permit to Work is required PTW Process Requirements?


Gas test results must be entered in the All jobs must have a JSA
permit
General work Permit must be issued for all
The work cannot be started until the activities require permit.
permit is fully completed, signed, and Types of certificates for specific activity attached
issued to general permit:
Permit holder must be present at job site. Hot Work
Confined Space Entry
Permit is valid till the end of that shift Excavation
and it must be closed at the end of the LO/TO
work
Radiation
Permit must be available at job site Checklist attached to permit (if required)
Description of work must be written Vehicle Entry
clearly in the permit Scaffolding
And all precautions/conditions specified Critical lift
in the permit must be strictly followed Hot tapping

Do it Safely Or not at all There is always time to do it right


Scaffold Platforms Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Minimum Requirements

Scaffold must be erected by


experienced scaffolders on level
and strong ground
Top guard rails and mid rails shall
be installed on all open sides
Toe boards shall be provided on
open-sided scaffolds. No base
Platform shall be closely planked. plate & sole
Planking shall be secured. plate
Must be properly braced and tied.
Scaffold pipes, clamps and planks
must be in good condition.
Employees shall not work on
scaffolds during storms or high
winds.
Scaffolding shall be inspected and
tagged by scaffold supervisor
Scaffold Platforms Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company
Opening in the
Minimum Requirements
platform
Scaffold must be erected by
experienced scaffolders on level
and strong ground
Top guard rails and mid rails shall
be installed on all open sides
Toe boards shall be provided on
open-sided scaffolds.
Platform shall be closely planked.
Planking shall be secured.
Must be properly braced and tied.
Scaffold pipes, clamps and planks
must be in good condition.
Employees shall not work on
scaffolds during storms or high
winds.
Scaffolding shall be inspected and
tagged by scaffold supervisor
Scaffold Platforms Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Minimum Requirements

Scaffold must be erected by


experienced scaffolders on level
and strong ground
Top guard rails and mid rails shall
be installed on all open sides
Toe boards shall be provided on
open-sided scaffolds.
Platform shall be closely planked.
Planking shall be secured.
Must be properly braced and tied.
Scaffold pipes, clamps and planks
must be in good condition.
Employees shall not work on
scaffolds during storms or high
winds.
Scaffolding shall be inspected and
tagged by scaffold supervisor

Do it Safely Or not at all There is always time to do it right


Scaffold Platforms Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Closely boarded
Minimum Requirements Top & Mid rails
platform

Scaffold must be erected by


Toe
experienced scaffolders on level board

and strong ground Ledger

Top guard rails and mid rails shall


be installed on all open sides
Toe boards shall be provided on
open-sided scaffolds.
Platform shall be closely planked.
Planking shall be secured.
Must be properly braced and tied. Post

Scaffold pipes, clamps and planks


must be in good condition.
Employees shall not work on
scaffolds during storms or high
Base plate
winds.
Scaffolding shall be inspected and
tagged by scaffold supervisor Cross
Longitudinal
Sole plate
bracing
bracing
Scaffold Platforms Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Minimum Requirements

Scaffold must be erected by


experienced scaffolders on level
and strong ground
Top guard rails and mid rails shall
be installed on all open sides
Toe boards shall be provided on
open-sided scaffolds.
Platform shall be closely planked.
Planking shall be secured.
Must be properly braced and tied.
Scaffold pipes, clamps and planks
must be in good condition.
Employees shall not work on
scaffolds during storms or high
winds.
Scaffolding shall be inspected and
tagged by scaffold supervisor

Do it Safely Or not at all There is always time to do it right


Ladder Safety Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Ladders used to climb scaffolds


shall be securely attached at the
top and bottom.

Where feasible, scaffolds shall be


secured to the building or tank for
added support.

Where a scaffold is erected above


a work/walk area, the area shall be
posted to warn employees of
overhead hazards.

Employees, equipment, tools, etc.


shall be removed from scaffolding
prior to moving a mobile
scaffolding.

Do it Safely Or not at all There is always time to do it right


Ladder Safety Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Ladders used to climb scaffolds


shall be securely attached at the
top and bottom.

Where feasible, scaffolds shall be


secured to the building or tank for
added support.

Where a scaffold is erected above


a work/walk area, the area shall be
posted to warn employees of
overhead hazards.

Employees, equipment, tools, etc.


shall be removed from scaffolding
prior to moving a mobile
scaffolding.

Do it Safely Or not at all There is always time to do it right


Excavation/Trenching Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

All excavations deeper than 30 cm (1 foot) Excavation Permit must be obtained


require excavation permits in addition to prior to any excavation deeper than
Work Permit 30 CM

Underground utilities must be identified and


marked prior to excavation. Only hand
excavation is permitted close to utilities.

Adequate shoring or slopping of sides must


be provided to prevent collapsing of sides

Adequate barriers and warning signs must be


placed

Adequate ladders must be placed to enter


and exit from excavation.

Gas test must be conducted prior to entering


excavation

Do it Safely Or not at all There is always time to do it right


Excavation/Trenching Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

All excavations deeper than 30 cm (1 foot)


require excavation permits in addition to
Work Permit

Underground utilities must be identified and


marked prior to excavation. Only hand
excavation is permitted close to utilities.

Adequate shoring or slopping of sides must


be provided to prevent collapsing of sides

Adequate barriers and warning signs must be


placed

Adequate ladders must be placed to enter


and exit from excavation.

Gas test must be conducted prior to entering


excavation

Do it Safely Or not at all There is always time to do it right


Excavation/Trenching Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Excavation/Trenching Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Excavation/Trenching Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Shoring (trench box) built inside to


protect work area from unwanted
collapse possibility.

Benching or
Sloping
1.5
1
1.5
1
1.5
1
34 o 1

Do it Safely Or not at all There is always time to do it right


Excavation/Trenching Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and
gas freed
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if
necessary)
Standby Person (Entry
Attendant) must be present
Emergency response plan
Necessary PPE

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and
gas freed
COLUMNS
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if PROCESS VESSELS
necessary)
Standby Person (Entry
Attendant) must be present
Emergency response plan
Necessary PPE

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and
gas freed
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if
necessary)
Standby Person (Entry
Attendant) must be present
STORAGE TANKS
Emergency response plan
Necessary PPE

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and
gas freed
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if
necessary) HEATERS

Standby Person (Entry


Attendant) must be present
Emergency response plan
Necessary PPE

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and
gas freed
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if
necessary)
Standby Person (Entry
Attendant) must be present
MANHOLES
Emergency response plan
Necessary PPE

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and
gas freed
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if
necessary)
Standby Person (Entry
SEWERS
Attendant) must be present
Emergency response plan
Necessary PPE

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and PIT MORE THAN 1.2 M DEPTH
gas freed
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if
necessary)
Standby Person (Entry
Attendant) must be present
Emergency response plan
Necessary PPE

Do it Safely Or not at all There is always time to do it right


Confined Space Entry Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Gas test and Confined Space


Entry permit required
Must be isolated, drained and
gas freed
Continuous gas monitoring
(Gas test)
Adequate ventilation
Breathing apparatus (if
necessary)
Standby Person (Entry
Attendant) must be present UNDER GROUND PITS

Emergency response plan


Necessary PPE

Do it Safely Or not at all There is always time to do it right


Cranes & Lifting Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Cranes & Lifting Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Safe Lifting Practices


Crane, Slings & Shackles must have
Inspection & load test certificates
Operator must have license & experience
to operate the crane
Visually inspect all lifting & rigging
equipment before use
Know the weight of the load before lifting
Check for obstructions before lifting
Fully extend outriggers and place crane on
level, firm ground. Use spreader mats.
Choose correct boom length and radius for
the load after checking load chart of the
crane
Check for overhead power lines and
maintain required clearance.
Lift vertically and use tagline to control lifted
load
Always keep people away from lifting
radius. No one must stand/walk under
suspended load

Do it Safely Or not at all There is always time to do it right


Cranes & Lifting Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Electrical Safety Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Be familiar with the fundamentals of


electrical safety.
Distribution boxes must have ELCB / GFCI
Never lay cables on wet surfaces
Dont overload electric circuit
Inspect all electrical tools and equipment
Cut, broken wires or damaged junction boxes,
plugs etc.
grounding prong missing
improperly applied or missing strain relief
Portable power tools must be double
insulated type and with dead-man switch

Do it Safely Or not at all There is always time to do it right


Electrical Safety Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Electrical Safety Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Lockout/Tagout
(JOSOP-460) Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

Lockout / Tag out protects people during


maintenance/repair of equipment by
preventing unexpected startup or release of
energy
All energy sources must be identified,
switched off, locked and tagged

Tags must be easily readable and


placed at the energy isolating devise
(circuit breaker, valve etc.)

If more than one crew is working on


the same equipment, each crew must
place their lock and tag.

Do it Safely Or not at all There is always time to do it right


Machinery in Motion Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do not go near moving


machinery if you are not
authorized or required or
knowledgeable to do so.

Do it Safely Or not at all There is always time to do it right


Joint Operations Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Health

Do it Safely Or not at all There is always time to do it right


Biological Hazards Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
56
Gas Utilization Project
Heat Stress
& Exhaustion Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

Precautions
Assign strenuous work during
cooler parts of the day.
Rotate workers in strenuous, hot
jobs so no one is exposed too
long.
Shield or enclose sources of
heat (like furnaces) to minimize
radiant heat.
Drink a lot of cool water.
Take frequent breaks in an air-
conditioned or shaded area.
Any workforce who normally
perform jobs on sites must
adhere and comply with labor
law of Kuwait in switching
working hours to start early
in the morning and not to
exceed the afternoon during 3
months of summer.

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
57
Gas Utilization Project
Hazard Communication
(MSDS) Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

Definition: Under the OSHA (Occupational Labeling:


Safety Health Administration) 29.CFR states that:

Companies producing and using hazardous


materials must provide employees with
information and training on the proper Protective Measures:
handling and use of these materials There are a number of ways that you can
safeguard your health and physical safety
when using hazardous materials. These
measures include:
What do you need to Know?
Product Substitution
How can this material hurt me? Engineering Controls
Safe Work Practices
What can I do to protect myself? Personal Protective Equipment
Training and Communication
Where can I find the answers to the Environmental Monitoring
first two questions? Personal Monitoring

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
58
Gas Utilization Project
Chemical Handling
(JOSOP-505) Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

Typical Chemicals Present in JO


Crude oil, gas, H2S
Corrosion Inhibitors
Demulsifiers
Drilling muds
Acids and caustics
Cleaning solvents/agents

General Safety Tips for Handling Chemicals


Never eat or drink while handling chemicals
Use required PPE
Always read MSDS and follow instructions
Never smell or taste a chemical to identify it
Know all emergency procedures
Make sure all chemicals containers are properly labeled
Always wash up after using chemicals
Store chemicals as recommended by the manufacturer

Do it Safely Or not at all There is always time to do it right


Joint Operations Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Environment

Do it Safely Or not at all There is always time to do it right


Environmental Stewardship
Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Environmental Stewardship
JO works hard to continually improve environmental
performance and reduce significant impacts from our
operations.

These impacts include emissions to the air, produced


water management and disposal, disposal and
recycling of wastes, and evaluating the impacts of
capital projects to be executed to mitigate significant
negative impacts on the environment.

New projects are executed to ensure that they conform


to the standards of environment, health and safety of
JO and the Kuwait Environment Public Authority.

Do
Do it
it Safely
Safely Or
Or not
not at
at all
Joint Operations Major Projects Divisionall
There
There is
is always
always time
time to
to do
do it
it right
right 61
Gas Utilization Project
Housekeeping
Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Housekeeping is an
orderly arrangement of
operations, tools,
equipment, storage,
facilities and supplies.

A place for every thing,


&
Every thing in its place

Do it Safely Or not at all There is always time to do it right


Housekeeping
Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Stack all material correctly

Keep only required quantity

of materials at job site

Keep walkways and aisles

free of materials, tools etc.

Clean-up spills immediately

Empty waste containers

regularly

Do it Safely Or not at all There is always time to do it right


Housekeeping
Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

UNEXPECTED Conditions or Practices

Do it Safely Or not at all There is always time to do it right


Housekeeping
Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Stack all material correctly

Keep only required quantity

of materials at job site

Keep walkways and aisles

free of materials, tools etc.

Clean-up spills immediately

Empty waste containers

regularly

UNEXPECTED Conditions or Practices

Do it Safely Or not at all There is always time to do it right


Waste Management
(JOSOP 602) Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

Waste dumping inside JO is PROHIBITED.


Disposal of industrial wastes at the Mina
Abdulla dump site is PROHIBITED.
All Industrial Wastes MUST BE DISPOSED at
the Shuaiba Industrial Waste Facility.

ONLY SC. 19:


ONLY used as Oily Sand Dumping Area
ONLY SC. 5:
ONLY used as Clean Sand Dumping Area
For any Environmental related issues inquiries it is preferred to refer and
contact one of the following Environmental Engineers:
1. Mark Chichester Ext. 2864 3. Saud Al-Harbi Ext. 2952
2. Dr. Suha Al-Yassin Ext. 2875
Do it Safely Or not at all There is always time to do it right
Joint Operations Major Projects Division
66
Gas Utilization Project
Joint Operations Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Emergency
Response

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
67
Gas Utilization Project
Joint Operations Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

1. Inform Fire & Security Dispatcher in case of any incident


2. Portable Fire Extinguishers are placed in different locations.
Use them if the fire is in inception stage
3. Automatic Fire Detection & Alarm system is available in
Administration Building
In case of alarm,
Evacuate quickly and orderly
Assemble in Assembly Points outside the building

In case of Fire, Accident, Oil Spill or Gas leak, call


DISPATCHER: 6471717 OR 3984444, Ext. 2222 or 2444

CLINIC
SAT 3985428 Ext 2338, 2365
KOC Ext 2488, 2833

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
68
Gas Utilization Project
Accident/Near miss
Notification & Reporting Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

If you dont have access to JO computer network, fill


this form and drop in the box to report Unsafe
Conditions Unsafe Behaviors or Near Misses

If you have
access to JO
intranet,
report Unsafe
Conditions
Unsafe
Behaviors
online

Do it Safely Or not at all There is always time to do it right


Accident/Near miss
Notification & Reporting Saudi Arabian
Texaco Inc.
Kuwait Gulf
Oil Company

To report all Incidents, Near misses call F&S dispatcher immediately at Tel. No. 3984444 or
Mobile No. 6471717.
To report an Unsafe Condition or Unsafe Act, call EHS at Tel. No. 6450002
Reporting applies to all Incidents, Near misses, Unsafe Conditions or Unsafe Acts:
All JO employees
After notifying F&S Dispatcher, employees immediately report to supervisors.
Supervisors immediately start a preliminary investigation and submit Incident Report based
upon reporting requirements

All contractors and subcontractors employees


After notifying F&S Dispatcher, immediately report to supervisors or JO representatives who
provide daily work direction
Supervisors or JO representatives immediately report with an Immediate Notification of
Incident Report based upon reporting requirements

Do it Safely Or not at all There is always time to do it right


Explosive Ordnance Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
71
Gas Utilization Project
Source of Information (1) Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

JO Safety Manual
Outlines the EHS rules and regulations
Available in English and Arabic
Can be used as a reference
JOSOPs
Contains detailed information
Available on the shared drive and in JO website
http://jopcontractors.chevron.com/
JO Contractor Safety Website
Contains detailed information, JOSOPs and others.
Shared lesson learned, incident/ accidents and partnership
ceremonies from JO, contractors and other companies.
JO Monthly Safety Bulletins & Safety Alerts

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
72
Gas Utilization Project
Source of Information (2) Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Do it Safely Or not at all There is always time to do it right


Joint Operations Major Projects Division
73
Gas Utilization Project
Joint Operations Saudi Arabian Kuwait Gulf
Texaco Inc. Oil Company

Thank
You

Do it Safely Or not at all There is always time to do it right