Contractors Submittal Review Comments

(CSRC form)

This form is to be used for describing the review comments related to Contractor post contract award submittals of
management plans, procedures, method statements, inspection test plans, risk assessments, Pre-qualification,
materials, mock ups, test reports, drawings, etc. that can lead to one of the following outcomes.

A : Reviewed C : Revise and Resubmit


B : Reviewed as noted D: Cancelled

Contractor Submittal Details


ePM Submittal Reference & Rev.: 3850-CDC-ACM-026581_0
Contractor submittal Ref.: NPP0047-MEC-MS-00100_0_CSRC
Submittal Title: Method Statement for Installation of Sanitary Fixture, Fittings, and Accessories
Date of Submission: 17-Oct-2016

PMC Review Outcome


Review Status: C: Revise and Resubmit
Response
Review Status issued by: Suresh Chockalingam / Marlon Perez/ Hadi Hamidou 27-Oct-2016
Date:
Quality Check prior to ePM
Rique Samson Date: 27-Oct-2016
(prior to SRE sign off)

Specification Reference: Project Requirements

Related to Originator Contractors Response to Review


Comments
No section / (Dept. & PMC Comments Status
(PMC)
chapter / etc Initials) PMC
1 Submittal This Method Statement is reviewed for PMC- NOTE
Installation of Sanitary Fixture, Fittings, SC/MPz
and Accessories.
2 In 6.2.4 Please provide in the installation, clear PMC- C
section detail drawing of installation SC/MPz
including dimensions for all sanitary
fixtures (ex: wall hung water closets,
urinals, lavatories, etc.) matching actual
site and architectural requirements.
3 In 4.3 Provide a table of reference material PMC- B
submittals in approved status. SC/MPz
4 General Clarify for testing & commissioning PMC- B
procedures. SC/MPz
5 General No comment 26-10-2016: PMC/SH&E A
HH

Note that when additional review rounds are performed, the revision is updated in the Submittal Reference and
the existing comments / responses remain with follow up comments / responses inserted within the same row
as a new paragraph in order to keep a full review history summarised within the same form. The PMC is also
allowed to make comments in the form of a note, which is a remark that does not require amendment to the
submittal (hence counts as a status A). When requesting acknowledgement from the contractor this receives a
status B and turns status A when the Contractor acknowledgement is given.

Acceptance of this submittal does not alter in any way whatsoever the Contractors contractual or common obligations and
responsibilities. Where the submittal is any way a variance with the specification or contract drawings, such variations
must be identified and brought to the attention of the Consultant in the submittal. The Consultant's acceptance and
Engineer's approval will be invalidated if such variations are not identified. The Contractor should review the submittal
comments in accordance with QCS 2010, Section 1, Part 7.3.6.

NP00100-ACM-PRO-1201-CSRC