GASTOS GENERALES(10.00%)
157,208.26
UTILIDAD(5%)
78,604.13
SUB TOTAL 1,807,894.99
I.G.V.(19.00%) 343,500.05
TOTAL PRESUPUESTO 2,151,395.04
FONDO ITALO PERUANO
MUNICIPALIDAD DISTRITAL DE TABACONAS
METRADO Y PRESUPUESTO
0BRA : MINI CENTRAL HIDROELECTRICA URUMBA
UBICACIN : DISTRITO: TABACONAS PROVINCIA: SAN IGNACIO REGIN: CAJAMARCA
PARTE : OBRAS CIVILES
FORMULA : 01
94.00
PUENTE VEHCULAR
COSTO DIRECTO 69,969.99 69,969.99
GASTOS GENERALES 10% 6,997.00 3,498.50 5%
UTILIDAD 5% 3,498.50 1,749.25 2.50%
SUB TOTAL 80,465.49 75,217.74
IGV 19% 15,288.44 14,291.37
95,753.93 89,509.11
acero
21,509.33
4.43 Precio Unitario
2.5
4855.37923
12138.4481
ZARANDA 3.00 2.50 (ZARANDA MANUAL)
LISTADO DE INSUMOS
TRIPLAY 2.45 1.2 10
4.9 2.4 10
7.3 6
26
COSTO DIRECTO:
Metrado Precio Parcial
1,478,236.03 1,340,529.40
137,706.63
FONDO ITALO PERUANO
MUNICIPALIDAD DISTRITAL DE TABACONAS
METRADO Y PRESUPUESTO
SUMINISTRO, TRANSPORTE, MONTAJE Y PRUEBAS DE TUBERIA DE PRE
0BRA : MINI CENTRAL HIDROELECTRICA URUMBA
UBICACIN : DISTRITO: TABACONAS PROVINCIA: SAN IGNACIO REGIN: CAJAMARCA
PARTE : OBRAS CIVILES
FORMULA : 01 K=0.117(Ar/Ao) + 0.180(Cr/Co) + 0.103(Dr/Do) + 0.348(Ir/Io) + 0.182(M
555,070.02
MINI CENTRAL HIDROELECTRICA LOS COCOS
* Tubera de Aereacin
P3= 7,850.00 x 3.1415 x 0.005 (0.1016 + 0.005) * 3.2
P3= 42.00 Kg
TOTAL DE CONO DE ADMISIN = 378.50 Kg
3 X 599.20
P= 1,797.60 Kgs.
* PANTALN DE DISTRIBUCIN
* PERNOS/TUERCAS/ARANDELAS CANT.
UNIONES EMBRIDADAS
- BRIDAS EXTERMAS 3 P/3JD
- UNIONES INTERMEDIAS 3 P/3JD
- UNIONES EN VALVULA DE INGRESO 2
- DIAMETRO DE PASO DE AGUJEROS = 0.88
- N ESTIMADOS DE PERNOS 60 = 42
- N ESTIMADOS DE PERNOS 40 = = 28 PERNOS
LONGITUD ROSCADA MNIMO = 12 CM.
DIAMETRO DE PERNO = 3/4"
PESO PERNO 3/4" X 12 = 0.27 Kgs.
TUERCAS Y CABEZAS DE PERNOS(40%) = 0.11 Kgs.
ARANDELAS PLANAS Y PRESIN(4)(20%) = 0.055 kgs.
TOTAL 1 = 6 x 42 x(0.27 + 0.11 + 0.055) = 109.62
TOTAL 2 = 2 x 28 x(0.27 + 0.11 + 0.055) = 24.36
TOTAL = 133.98 Kgs.
APROXIMANDO LONGITUDES 14 - 16 [(14 + 16)/2]/12 = 1.25
TOTAL = (133.98 x 1.25 = 167.48
% DE ADICIONALES 10 - 12 % = 184.23 Kgs.
ASUMIMOS P TOTAL = 184.23 Kgs.
Segn anlisis de precios unitarios del proyectista, el transportista ha de efectuar 3 viajes, con un costo unitario d
S/. 5,750/ viaje.
PROYECTO ORIGINAL POR 3 VIAJES S/.
199.39 Kg.
100 Kg
150.00 Kgs.
300.00 Kgs.
74.60 Kgs.
74.60 Kgs.
599.20
219.40
671.40
281.54
2349.90
96.53
1007.10
99.88
4725.75
0
iametro equivalente
28 PERNOS
ON UN ESPESOR DE 0.005mm
1.50 metros
7.5 x 104 m3
94.25
28.87 Kgs
17,250.00
AMPLIACIN CENTRAL HIDROELECTRICA EL PORVENIR
P= 145 KW
ANCLAJE N 03
CLCULOS JUSTIFICATIVOS DE DISEOS
A) PREMISAS DE DISEO
DIMETRO INFERIOR 0.291 m
DIMETRO EXTERIOR 0.400 m
ESPESOR 54.700 mm
CAUDAL DE DISEO 0.150 m3/s
COTA DEL PELO DE H2O 1339.82 msnm
COTA DEL ANCLAJE N 3 1208.66 msnm
* ANGULO DE LA INTERSECCIN DE LA HORIZONTAL CON LA LINEA DEL EJE DEL TUBO AGUAS
ARRIBA
1 = 194"16.43" 19.07
ANGULO DE LA INTERSECCIN DE LA HORIZONTAL CON LA LINEA DEL EJE DEL TUBO AGUAS
* ABAJO
2 = 613" 21" 0 0.00
PESO DEL VOLUMEN OCUPADO POR EL TUBO A SER DESCONTADO POR EL PESO TOTAL DEL
* ENCLAJE
P = Concreto x V ocupado
P = 2,400 kg/M3 x m62
P = 1146.02 Kg
Fr = 23226.88 Kg
Fy = -10474.15 Kg
Fr = 23226.88 Fx = 20731.14 Kg
m m
Mo Fy
Mo. W del anclaje
La= 3.4 m
W Total 48755.95
VN = 20.31 m3
Mo = 84713.02 Kgf m
My = M0 + My = -106708.74 Kgf m
Mx = 36279.49 Kgf m
M Total = -70429.25 Kgf m
G = -856.87