BUILDING
Kitchen platform :
1 3.60 0.60 0.10 0.216
3.726 cum 3778.50 14078.69
4 154 HYSD bars reinforcement for RCC work
including straighthening, cutting, bending,
placing in position and binding all
complete. Qnty of
concrete
Foundation @ 100 kg/m3 of concrete 100
3.080 308.000
Column @ 180 kg/m3 of concrete 180
1.760 316.800
Beams @ 150 kg/m3 of concrete 150
3.510 526.500
Slab @ 100 kg/m3 of concrete 100
0.216 21.600
1172.900 kg
11.729 qtl 3342.10 39199.49
5 155 Centering and shuttering including
strutting, propping, etc. and removal of
form works in -
(a) 125 mm
4 No 17.00 68.00
(b) 100 mm 34 No 13.70 465.80
(c) 75 mm 2 No 10.30 20.60
33 282 Providing and fixing M.S. hooks and eyes.
(b) 150 mm 30 No 12.50 375.00
Providing and fixing bright finished M.S
34 283 two lever mortise door lock with necessary
screws, etc. complete.
(a) Union type. 3 No 436.60 1309.80
35 274 Providing and fixing MS round or square 75 1.20 90.00 Rm
bars without MS flats at required spacings 14
in wooden frames of windows and 1.80 25.20 Rm
clerestory windows. 6 0.90 5.40 Rm
Total 120.60 Rm
of 16mm bar @ 1.58 kg/m = 190.548 kg 39.20 7469.48
2 23.94 47.88
2
2.52 5.04
2 5.67 11.34
1 3.15 3.15
97.435 sqm 21.40 2085.11
Cost as per
2000 SOR 5143
% increase 26.23