Back to Menu IPA09-E-079

PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION


Thirty-Third Annual Convention & Exhibition, May 2009

INTEGRATED RESERVOIR STUDY AND SIMULATION WORKFLOW OF LOWER SIHAPAS


SANDSTONE IN KURAU FIELD, SUMATRA, INDONESIA

Tri Firmanto* Diana Ong*


Iman Suripto Suyatno* Bondan Asmara*
Ezzat Gomaa* Irvan Rahmawan*
Jati Priyantoro* Henry Septiawan*
Benny Sidik* Eppy Gustiawan*
Andry Pujiriyanto* Arif Wibowo*

ABSTRACT able to yield an additional 1000 bopd to Kurau field,


as previously predicted.
This paper describes all best practices of successful
study with all G&G and engineering aspects An integrated study from Engineering & G&G
integrated into one workflow by one team. The Department was required when we attempted to
objective of this study is to build a complete build a reservoir model. Such a model can be used
reservoir model from an integrated study involving to determine infill well potential, work over result
all aspects of engineering & G&G, such as data estimation and also the EOR project. Achieving an
review, G&G modeling, reservoir characterization, increment of the oil recovery factor is the most
reservoir modeling and prediction, in order to beneficial result from this reservoir simulation.
optimize the development of Kurau Field. The
milestone starts from interpreting the 3D seismic INTRODUCTION
data, structural or zonation model, petrophysics
analysis, reservoir characterization, static modeling, Nowadays, reservoir simulations play an important
dynamic modeling, and proceeds until it reaches the role in the petroleum industry. Geological
development and performance prediction of Kurau modeling, reservoir characterization, well
Field. performance analysis, infill well proposal and even
EOR methods simulation can be applied. While it
More than just a simple model, Kurau reservoir would seem to be more complicated than
model resulted from all data and results from G&G conventional techniques, reservoir simulation can
such as interpretation of 3D seismic, G&G on the other hand achieve or at least a yield
modeling (static model), environmental correction preliminary pictures of the entire reservoir. With so
for well logs from Petrophysical Software analysis many software releases available at present, the user
together with reservoir engineering works such as just picks whichever is most suitable, depending on
rock and fluid properties analysis, rock needs, compatibility with currently used software
characterization and also production engineering and also, of course, on the budget. The important
aspects. Geomodeling software was used to build rule to be borne in mind is that garbage in,
3D seismic to reservoir modeling, with additional garbage out.
Simulation Software to complete the simulation.
Kurau Field in the EMP-Malacca Strait has been
The history matching analysis shows a satisfactory generated into a reservoir simulation. Within a 9
level of production profile comparison results of months integrated study, a team can achieve a
model performances with actual production data. reliable reservoir simulation. Beginning with a 3D
Several infill wells and even EOR potential can be seismic interpretation and then combining this with
identified from this reservoir simulation model. a geological interpretation and reservoir
Using an integrated study workflow from G&G, characterization, the team can also generate a
Petrophysic and Reservoir Engineering work had reasonable history matching. Geomodeling
greatly improved the reliability of this reservoir Software and Simulation Software were exploited to
model. Recently updated, those infill wells proved generate and run the model. Kurau Field itself has
never been modeled before. The structure was quite
* EMP - Malacca Strait
Back to Menu

complicated. Even it was only from the Lower support from Reservoir Simulation. After defining
Sihapas Formation, reservoir characterization plays several development cases for realization, the
an important role when a model is built. The new economics of the project was evaluated. The drilling
geophysics interpretation to define faults was operation became the next step of the workflow.
carried out. Further, sand correlation was involved, Then the circle came back to geophysics and
along with reinterpretation due to new data from geological re-interpretation, due to the new data
previous infill wells. input from infill wells.

Apart from the technical background, the choice of a. Geophysical


the study team also becomes a critical decision. A After retrieval of high frequency restoration 3D
harmonious and conducive team was put together seismic data, Geophysics began to interpret and
when the study was initially launched. carried out a seismic inversion. The
interpretation included structural and
METHODS stratigraphical factors. To obtain a velocity
model and depth horizon, the co-krigging
The Team method was employed to process well markers
and sonic logs, along with seismic time
In the Kurau study, the important aspect from all of horizons and the stacking velocity. By inverting
the workflow is defining an appropriate and the seismic amplitude data to conform acoustic
comfortable team. Just like an asset team, this team impedance (AI) properties, a better reservoir
emerged from various specialties within G&G and model could be built after integrating well log
the Engineering Department. The team consisted of data into seismic. Geophysics also performed a
geophysicists, geologists, petrophysicists, reservoir correlation between seismic attributes and
engineers and production engineers. Each division porosity to get the preliminary trend and
(for example for reservoir engineering) was characteristic of sand in the Kurau Field. Figure
composed of a senior staff member and some junior 2 shows the 3D PSTM volume in this study.
staff. This meant the study would provide support
and encouragement for junior staff and would also b. Geological
signify new experience for senior staff to work with The geological-reservoir study of the Kurau
junior staff from a variety of divisions. The study field was conducted by reviewing all available
team leader worked in cooperation with a co-team data, such as several seismic lines, well logs,
leader. In the Kurau study, the team leader was structural cross sections and depth structure
from Reservoir Engineering and the co-team leader maps of the Lower Sihapas Formation.
was from Geophysics. In addition to the team Additional information, such as conventional
assembled from G&G and the Engineering core and side wall core descriptions, evaluation
Department, the study also included a Reservoir of micropaleontology palynology and a study
Engineering consultant to assist in a quality check of the depositional environment (including
of study results. The representative from the Board sand-shale distribution and lithofacies
of Directors and the Company also played an identification) defined the geological and
important part in this study. The peer review & depositional model of the Lower Sihapas
technical meetings were held over a period of time Formation around the Kurau Field. The original
as well. This was very useful to obtain a matching amount of oil in place at the Kurau field was
perspective, both from the team and its peers. Also, estimated using volumetric method
the team conducted a technical meeting with a hydrocarbon pore volume maps. Proven oil in
government representative, BPMIGAS, for approval place was estimated based on the reservoir
of study results. closure confined by the original oil water
contact (OWC).
The Workflow
c. Petrophysical
Figure 1 represents the workflow used for this Petrophysical analysis was run to obtain
study. The study begins with a 3D seismic reservoir properties such as porosity, water
geophysics re-interpretation, followed by a new saturation, clay volume and permeability from
geological interpretation, with well and core data. A well log data. Validation of well log data and
petrophysicist also carried out a reservoir environmental correction has been carried out
characterization, collaborating with reservoir before doing petrophysical analysis. This
engineers. A reservoir model was then built, with petrophysical analysis result was then checked
Back to Menu

against available core data. Having these f. Development Scenario Evaluation


reservoir properties and core description, the The history matching for Kurau Field reveals
lithofacies classification was defined, together acceptable matching for oil production and
with the geologist. water cut. This becomes an important point
before the next step: forecasting. Base case
d. Reservoir Engineering forecasting (as it is) was implemented to secure
The static model from the G&G side has been a base line for the development strategy. Then
created. The reservoir engineer is responsible infill wells potential were analyzed. This
for creating the dynamic model of the field with signifies that the development scenarios will
a reservoir simulation. A geomodeling software achieve additional recovery not just
reservoir simulator is used to build the model acceleration. Ten points of location were
from seismic interpretation, preceding the field identified, five of which were scheduled to be
performance prediction. Routine and SCAL drilled first. From these infill wells, it was
data have been processed to get relative expected that there would be an additional five
permeability for each facies, connate water percent of additional oil recovery compared to
saturation transform, permeability transform, the base case scenario. An EOR potential also
transition zone analysis and also J-function can be seen from this model. The sweep spots
analysis with additional data and interpretation can be identified and modeled with the
the from G&G side. All of these rock simulation.
properties, along with the PVT analysis, are
then input to Geomodeling software as reservoir g. Updating the Model
properties. Throughout 2008 five infill wells proposed
from the study were drilled. From this drilling
operation additional data of Kurau Field were
e. Reservoir Simulation secured. The actual well information, such as
The simulation begins with input of horizon well tops, sand to sand correlation and pressure
data from geophysics, while well information data were then gathered to update the model.
such as well deviation, well markers, well logs, Re-interpretation of seismic means Geophysics
and well production are also prepared. may reselect the new horizon of sand tops. Re-
Combining all of the G&G parts, the static interpretation of sand correlation & faults also
model was created. When defining the static has to be performed. Finally, a re-history
model, the reservoir characterization from matching process will complete the updating of
petrophysics and reservoir engineer analysis the model. All of that works will be objectives
support fashions a home for a reservoir. for the Kurau Integrated Study 2009.
Geostatistic analysis also serves to distribute the
properties, guided by seismic attributes and core
data. Then the upscaling process for all RESULTS
properties is enacted. Reservoir engineering
then inputs the results from SCAL data (relative The completed model of Kurau Field has delivered
permeability & capillary pressure), reservoir proof of the quality from five infill wells. The
fluid analysis and other engineering data to increase of oil recovery becomes an actual result
create the dynamic model. Well history from this integrated study. Initial oil production for
becomes an important part for the next step. infill wells matches with the previous prediction. A
This is why in the team there is also a total additional 1000 bopd from five infill wells
production engineer to perform a quality check proved the model was reliable. Of course, there
on the model. After the coarse grid is were some adjustments needed according to the
completed, the history matching begins. The actual geological and engineering data received.
model has 5 flow units, 34 wells in 750,000 The depth shifted for well tops, sand correlation and
cells. The history matching process takes 2 flow unit pressure are examples.
weeks to obtain satisfying results, with 30 times
run. The liquid rate control was used in this The Kurau model was also used to predict the work
process. The realization for the models defined over or well service scenario, such as rezoning, and
the G&G data with analyses such as sand to to define a few cases that would serve to estimate
sand correlation, fault interpretation and results. From this model the pressure maintenance
channel identifying. Figure 3 and 4 display an program and even Enhanced Oil Recovery (EOR)
example of fine grid and coarse grid. candidates can also be simulated.
Back to Menu

CONCLUSIONS 3. A reservoir simulation model can be useful in


determining the development scenario,
The results from this study can be summarized as production enhancement program and also the
follows: long-term plan for a field.

1. All aspects of G&G and engineering must be ACKNOWLEDGEMENT


involved in the integrated reservoir study.
The authors greatly acknowledge the help and
2. Reservoir simulation can be used for new support from Kurau Team 2007. The authors also
development fields or mature fields such as convey sincere thanks to EMP Malacca Strait for
Kurau Field. permission to publish this paper.
Back to Menu

Figure 1 - The workflow for study. The workflow starts from geophysics interpretation, geological model,
petrophysical analysis, reservoir characterization, reservoir simulation, development strategy
until economic evaluation and execution. The circle then back to geophysical part indicate that
the study will always being updated.

Figure 2 - 3D PSTM volume use in Kurau Study.


Back to Menu

Figure 3 - Fine grid for Kurau structure . In the picture the facies definition distributed for entire of cells.

Figure 4 - Hydrocarbon ditribution coarse grid for Kurau structure.