Location Equipment

1 Aboitiz Power Barges (TMI-Navotas) Current transformers

Voltage Transformer

2 Aleco Bushing Current Transformer


Bushing Current Transformer

69 kV Dead tank power circuit breaker


3 ATI Power transformer

CB

Power cables
Capacitor bank fuse cutout
Transformer overcurrent relay
Feeder Overcurrent relay

4 FEDCOR - Calaca Power Power transformer

Canoreco CB

Power transformer

Casureco Automatic voltage regulator

5 CBK (Caliraya, Botocan, Kalayaan) Generator protection relay


6 Cebu Energy Development Corporation Current transformers

Power transformer

7 Clark
Tests Conducted Year

CT ratio test 2011


CT saturation test
Winding resistance test
Insulation resistance test
Voltage Transformer Ratio and Polarity Test 2011
Insulation Resistance Test
Insulation Power Factor Test
Exciting Current Test by IPF Test Set
Current ratio test (Legazpi substation) 2010
CT ratio test 2011
CT saturation test
Insulation resistance test
Winding resistance test
Contact resistance test 2011
Insulation resistance test 2011
Ratio test
Winding resistance test
Contact resistance test
Insulation resistance test
Insulation resistance test
Thermographic scanning
Time overcurrent trip time
Time overcurrent trip time
Instantaneous overcurrent trip time
Winding resistance test 2011
Insulation Power Factor Test
DIRANA
SFRA
Contact resistance test 2011
Insulation Power Factor Test
Visual inspection
Insulation resistance test
Insulation Power Factor Test
Ratio test
Oil Test
Excitation test
Insulation Power Factor Test
Insulation resistance test
Ratio test
Harmonics Under Voltage (27TN 3rd Harmonics) 2011
Phase Diffential Current (87)
Reverse Power (32)
Loss of Field (40)
Frequency Relay (81)
Instantaneous Phase Overcurrent (50)
Negative Sequence Overcurrent (46DT & 46IT)
Neutral Over Voltage (59N)
Phase Over Voltage (59)
Phase Under Voltage (27)
Breaker Fail (50BF)
Inverse Time Overcurrent with Voltage Restraint (51V)
CT ratio test and polarity
CT saturation test
Winding resistance test
Insulation resistance test
Insulation Power Factor Test

Insulation resistance with polarization index test

Insulation Power Factor Test


Ratio and polarity test
Oil Test
Excitation test
Winding resistance test
Reason for test Other comments

For rehabilitation 4 different barges

TPE
Commissioning Different poles per phase

Commissioning
PMT

PMT of Unit1 excitation Xfrmer Dirana shows extremely wet


also performed to generator transformer, auxilliary transformer