Event Analysis Report Sap-

Unit No:-4 I TPS:- Parli-V Unit Capacity:- 210 MW


1. HO Code Station Time:- 15:25 Date:- No of days from last
Code: - LBIO2-120L5 svnc. :- 41 davs
2.Operating condition at the time of Event:-
Load Coal cycle in service I Oil support
MW=02 NIL cD-L,2,3 ,4
3. Nature of Event: - Forced withdrawl.

4.Name of protection (first up)and other Main Protections operated:-


1) Turbine tripped 2) Boiler tripped 3) Generator main breaker tripped. 4) Master trip Relay 86G
& 86TT operated.

5. Observations:-
Turbine bearing No-6 vibration were on higher side.(H=ttO/22,V=100/15,A=t30123 ).
Hence unit withdrawn for tightening wedges.

Shift In charge

6. Remedial Action/ Work done:- 1.TG Bearing No.6 Wedges tightened. Additional one
wedge fitted.

Section head ( Maint.)


7. Root Cause Analysis:- Turbine bearing No-6 vibration are on higher side due to gap
between packer plate & LP cylinder foot.

Section head ( Maint.)


B. Preventive Action (ShortTerm):- Additional Tapered wedges to be placed between
packer plate & LP cylinder rear foundation frame. Monitor the position of tapered
wedges regularly .Monitor vibration of Bearing No.5,6,7 regularly.

Section head ( Maint.)


9. Preventive Action (Long Term):- Permanent solution in consultation with OEM is to
be sought. Tender for rectifying vibration problem during AOH, is in process.

Section head ( Maint.)


10. Similar Event NIL
Occu rred last time: -

l0A.Implimentation Status of Long Term/ ShortTerm Measure Stated at Sr.No 10:-NIL

,+*
Section n(ad (POG/MPD)
11.Boiler Light up:- Time :-02:30 hrs. Date:- 19/0212015
t2.TA Set Synchronized Time :-O7:40 hrs. Date:- 79/O2/2Ot5
13. Remarks:-

Dy, Chie

tfu,
chler b{gtneer

14,Recommendation of work section :

1. Procurement/ Replacement Plan : -


2. Operational error:-
3.Delay in Maintenance:-
4. Delay in bring back the Unit:-
5.Training of Staff :-

CElDy.CE