PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LAS PRINCIPALES CALLES DE LA LOCALIDAD DE TAPAIRIHUA DEL DISTRITO DE TAPAYRIHUA, PROVINCIA AYMARAES - APURIMAC
TERCER MES =
ITEM PARTIDAS PRIMER MES =25 DIAS MAYO PRIMER MES =30 DIAS JUNIO PRIMER MES =31 DIAS JULIO SEGUNDO MES =31 DIAS AGOSTO SEGUNDO MES =30 DIAS SETIEMBRE 3 DIAS
OCTUBRE
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 8.50X3.60M S/.
900.37 P
0.00 E ###
01.02 ALQUILER DE ALMACEN/OFICINA S/.
1,694.95 P
0.00 E ###
01.03 SEALIZACION DE OBRA S/.
847.46 P
0.00 E ###
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPO S/.
46,991.53 P
0.00 E ###
02 PAVIMENTO
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL S/.
6,363.20 P
0.00 E ###
02.01.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION S/.
14,435.91 P
0.00 E ###
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION C/ MAQUINA A NIVEL DE SUB RASANTE S/.
45,985.98 P
0.00 E ###
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE(CARGUIO) REND.= 360 M3/DIA S/.
105,081.86 P
0.00 E ###
02.03 MEJORAMIENTO DE SUB RASANTE
02.03.01 PERFILADO Y COMPACTADO DE LA SUB RASANTE S/.
48,149.32 P
0.00 E
02.04 SUB BASE E=0.15 m.
02.04.01 EXTRACCION Y APILAMIENTO MATERIAL SUB-BASE S/.
9,773.97 P
0.00 E ###
02.04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA S/.
27,004.82 P
0.00 E ###
02.04.03 EXTENDIDO, RIEGO Y COMPACTADO DE SUB BASE S/.
35,939.80 P
0.00 E
02.05 BASE E=0.20 m.
02.05.01 EXTRACCION Y APILAMIENTO MATERIAL BASE S/.
15,124.31 P
0.00 E ###
02.05.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA S/.
36,006.25 P
0.00 E ###
02.05.03 EXTENDIDO, RIEGO Y COMPACTADO DE BASE S/.
36,691.16 P
0.00 E ###
02.06 PISTAS
02.06.01 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO S/.
39,547.87 P
0.00 E ###
02.06.02 CONCRETO F'C=210 KG/CM2 PARA LOSAS DE PAVIMENTO S/.
358,512.35 P
0.00 E ###
02.06.03 ACERO DE REFUERZO FY=4200 KG/CM2 S/.
7,321.90 P
0.00 E ###
02.06.04 TUBERIAS PVC SAP D=1/2" S/.
5,309.76 P
0.00 E ###
02.06.05 CURADO DE CONCRETO EN LOSAS DE PAVIMENTO S/.
10,581.58 P
0.00 E ###
02.06.06 JUNTA DE DILATACION CON TECNOPORT Y SELLADO CON ASFALTO E= 1" S/.
16,808.27 P
0.00 E ###
03 MURO DE CONTENCION
03.01 OBRAS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION S/.
682.81 P
0.00 E ###
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL PARA ESTRUCTURAS S/.
17,815.25 P
0.00 E ###
03.02.02 RELLENO CON MATERIAL PROPIO S/.
13,245.06 P
0.00 E ###
CRONOGRAMA P R O G R A M A D O VS E J E C U T A D O DE OBRA
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LAS PRINCIPALES CALLES DE LA LOCALIDAD DE TAPAIRIHUA DEL DISTRITO DE TAPAYRIHUA, PROVINCIA AYMARAES - APURIMAC
TERCER MES =
ITEM PARTIDAS PRIMER MES =25 DIAS MAYO PRIMER MES =30 DIAS JUNIO PRIMER MES =31 DIAS JULIO SEGUNDO MES =31 DIAS AGOSTO SEGUNDO MES =30 DIAS SETIEMBRE 3 DIAS
OCTUBRE
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21
TERCER MES =
ITEM PARTIDAS PRIMER MES =25 DIAS MAYO PRIMER MES =30 DIAS JUNIO PRIMER MES =31 DIAS JULIO SEGUNDO MES =31 DIAS AGOSTO SEGUNDO MES =30 DIAS SETIEMBRE 3 DIAS
OCTUBRE
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21
3,058.71 P
0.00 E ###
07.02.02 RELLENO CON MATERIAL DE PRESTAMO ESCALINATA S/.
3,678.78 P
0.00 E ###
07.02.03 ACARREO DE AGUA PARA LA OBRA DMX 50 M S/.
1,670.37 P
0.00 E ###
07.03 OBRAS DE CONCRETO
07.03.01 ENCOFRADO Y DESENCOFRADO PARA ESCALINATAS S/.
4,768.24 P
0.00 E ###
07.03.02 EMPEDRADO DE ESCALINATAS CON ROCAS DE 6'' S/.
10,678.31 P
0.00 E ###
07.03.03 CONCRETO f'c=175 kg/cm2 PARA ESCALINATAS S/.
36,656.62 P
0.00 E ###
07.03.04 JUNTAS ASFALTICAS Y BRUADO S/.
1,098.13 P
0.00 E ###
08 CUNETAS Y ALCANTARILLA
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL S/.
186.15 P
0.00 E ###
CRONOGRAMA P R O G R A M A D O VS E J E C U T A D O DE OBRA
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LAS PRINCIPALES CALLES DE LA LOCALIDAD DE TAPAIRIHUA DEL DISTRITO DE TAPAYRIHUA, PROVINCIA AYMARAES - APURIMAC
TERCER MES =
ITEM PARTIDAS PRIMER MES =25 DIAS MAYO PRIMER MES =30 DIAS JUNIO PRIMER MES =31 DIAS JULIO SEGUNDO MES =31 DIAS AGOSTO SEGUNDO MES =30 DIAS SETIEMBRE 3 DIAS
OCTUBRE
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21
TERCER MES =
ITEM PARTIDAS PRIMER MES =25 DIAS MAYO PRIMER MES =30 DIAS JUNIO PRIMER MES =31 DIAS JULIO SEGUNDO MES =31 DIAS AGOSTO SEGUNDO MES =30 DIAS SETIEMBRE 3 DIAS
OCTUBRE
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21
TERCER MES =
ITEM PARTIDAS PRIMER MES =25 DIAS MAYO PRIMER MES =30 DIAS JUNIO PRIMER MES =31 DIAS JULIO SEGUNDO MES =31 DIAS AGOSTO SEGUNDO MES =30 DIAS SETIEMBRE 3 DIAS
OCTUBRE
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21
GASTOS GENERALES 9.00% S/. 169,049.91 S/. 0.00 0.00 0.00 0.00 0.00 0.00
UTILIDAD 7.00% S/. 131,483.26 S/. 0.00 0.00 0.00 0.00 0.00 0.00
SUB TOTAL S/. 2,178,865.51 S/. 0.00 0.00 0.00 0.00 0.00 0.00
IGV 18.00% S/. 392,195.79 0.00 0.00 0.00 0.00 0.00 0.00
COSTO TOTAL 2,571,061.31 S/. 0.00 0.00 0.00 0.00 0.00 0.00
AVANCE MENSUAL (%) PROGRAMADO 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
AVANCE ACUMULADO (%) PROGRAMADO 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
ACTIVIDADES PROGRAMADA
LEYENDA:
ACTIVIDADES EJECUTADAS
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 8.50X3.60M
01.02 ALQUILER DE ALMACEN/OFICINA
01.03 SEALIZACION DE OBRA
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPO
02 PAVIMENTO
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL
02.01.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION C/ MAQUINA A NIVEL DE SUB RASANTE
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE(CARGUIO) REND.= 360 M3/DIA
02.03 MEJORAMIENTO DE SUB RASANTE
02.03.01 PERFILADO Y COMPACTADO DE LA SUB RASANTE
02.04 SUB BASE E=0.15 m.
02.04.01 EXTRACCION Y APILAMIENTO MATERIAL SUB-BASE
02.04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA
02.04.03 EXTENDIDO, RIEGO Y COMPACTADO DE SUB BASE
02.05 BASE E=0.20 m.
02.05.01 EXTRACCION Y APILAMIENTO MATERIAL BASE
02.05.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA
02.05.03 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
02.06 PISTAS
02.06.01 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO
02.06.02 CONCRETO F'C=210 KG/CM2 PARA LOSAS DE PAVIMENTO
02.06.03 ACERO DE REFUERZO FY=4200 KG/CM2
02.06.04 TUBERIAS PVC SAP D=1/2"
02.06.05 CURADO DE CONCRETO EN LOSAS DE PAVIMENTO
02.06.06 JUNTA DE DILATACION CON TECNOPORT Y SELLADO CON ASFALTO E= 1"
03 MURO DE CONTENCION
03.01 OBRAS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL PARA ESTRUCTURAS
03.02.02 RELLENO CON MATERIAL PROPIO
03.03 OBRAS DE CONCRETO
03.03.01 CONCRETO 1:10 PARA SOLADOS Y/O SUB BASES
03.03.02 ENCOFRADO Y DESENCOFRADO DE MURO CONTENCION
03.03.03 CONCRETO CICLOPEO FC=175 KG/CM2 + 70 % PG.
04 SARDINELES DE CONCRETO
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL PARA ESTRUCTURAS
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE(CARGUIO) REND.= 360 M3/DIA
04.03 OBRAS DE CONCRETO
04.03.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES
04.03.02 SARDINELES DE CONCRETO DE F'C=175 KG/CM2.
04.03.03 JUNTAS ASFALTICAS E=1"
05 VEREDAS, MARTILLOS Y RAMPAS
05.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
05.01.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION Y PERFILADO DE VEREDAS EN TERRENO NORMAL
05.02.02 CONFORMACION Y COMPACTACION DE SUBRASANTE EN VEREDAS
05.02.03 BASE COMPACTACION MANUAL PARA ACERAS DE 0.10 M.
05.02.04 ELIMINACION DE MATERIAL EXCEDENTE(CARGUIO) REND.= 360 M3/DIA
05.03 OBRAS DE CONCRETO SIMPLE
05.03.02 VEREDAS, MARTILLOS Y RAMPAS - C:H F'c= 175 kg/cm2 E=0.10m iINC. ACABADO Y BRUADO
6,363.20
14,435.91
45,985.98
105,081.86
48,149.32
9773.97
27,004.82
35,939.80
15,124.31
36,006.25
36691.16
39547.87
358,512.35
7,321.90
5,309.76
10,581.58
16,808.27
682.81
17,815.25
13,245.06
13,512.83
2,637.84
27,872.30
63.44
600.85
319.05
11,611.50
528.68
201.32
2,454.83
5,569.17
45,934.85
18,612.76
8,866.71
31,530.42
17,611.37
247,095.44
7,437.78
5,081.82
5,462.19
45627.45
244.03
553.63
3,058.71
3,678.78
1,670.37
4,768.24
10,678.31
36,656.62
1,098.13
186.15
422.30
12,833.03
1,921.18
5,355.96
2,755.98
17,968.21
48,571.33
8,363.15
2015.55
12,469.16
16,808.22
7,618.32
687.63
614.27
1,219.52
270.84
12,166.10
42,350.00
01 MURO DE CONTENCION
01.01 OBRAS PRELIMINARES
01.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION
01.02 MOVIMIENTO DE TIERRA
01.02.01 EXCAVACION MANUAL PARA ESTRUCTURAS
01.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO
01.01.03 ELIMINACION DE MATERIAL EXCEDENTE
01.01.04 ENROCADO DE MURO SECO CON PIEDRA GRANDE
01.03 OBRAS DE CONCRETO
01.03.01 CONCRETO CICLOPEO FC = 175 KG/CM2 + 70% PG
01.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION
17,265.38
4,103.95
9,243.95
3,211.51
53,488.58
41,106.62
489.34
109.55
248.52
5471.36
4,215.58
10,137.00
2,817.43
574.00
73.45
166.64
1834.25
948.39
4,997.55
6,668.10
5,584.55
218.02
77.18
175.10
2,891.29
2,904.56
1,494.58
5,908.03
21,293.57
5,029.63
305.28
8,465.31