8m x 12m
Standard Pool with Kiddie Pool
AMERICAN STANDARD
Hayward Motor
Refer to your original plot plan and make sure you match the permitted
location. This spot was carefully chosen, considering setbacks, utility locations,
easements and other physical right of ways, and also safety, drainage and
access factors.
The first markings we made were for the Overall Pool Size, and that is the first
phase of excavation of an inground pool, is to dig the overall pool width and
length.
Mark the shallow and deep areas to excavate the pool, making sure to leave a
level lip for the setting of exterior forms.
The setting of the all-concrete pool starts with the chb in the perimeter of
the pool. All the chb are set starting at the step (when applicable).
Each pool can be squared using the Swim-crete pool prints. The pool then
should be leveled using a laser or transit. The highest point of the pool is
established. Start at the opposite end of the pool, use shims to level toward the high point until the pool
is level.
After the exterior concrete forms are squared and leveled, steel should be
placed in a grid following local codes. Rebar works 10mm and 12mm steel
bars space at 8 inches (0.20m) both ways.
Spray gunite onto the steel rebar grid using a power sprayer, creating the
actual pool basin.
Coping is the term used to identify the stone or concrete material used to
cap the pool shell wall.