Roles of the project manager

Types of management (Pinoy Style)

Lusot
Suyod

What kind of managers? It is obvious that for the phil sit


Entrepereuaniral and dynamic
Fully aware and commited to social justice
Professional capable of working for public or private
Roted to realities of environment

Where wll they come forom?


In various studies of filipino mangeerial origins,
First a vey large number of managers from mestizo families, Chinese Spanish or American
Second, the fthers of these mangers already occupied positions of great responsibility although a
ssignificant number did have fathers with unimportant positions
Third, come from high exonomic strat of society
Fourth, strongly oriented to families oforigin,
Fifth, from urban areas,
Sixth,

Styles of Filipino Managements

First, the realist managers. Who practice management by kayod. Kayod means working hard like an ant,
the type of manager who works da n and day out, fired by an inner zeal that does not make any
difference, between his working days and undays and holidays. His work is his pleasre. His life. Kayod ng
kayod

Secondly, the idealistmanager. Management by Libro. The idealist manager is highly trained professional
who prefers American type of managemety, with technical jargon and all the sophistiaceted tools of
management as if he were operating ibm or standard oil in the Philippines setiing. That is the idealist-
manager or management by libro.

This, opputunist manager. Management by Lusot. Shortchut, bribery, rulebreaker. This type of managers
always wants the least hardship and sweat, paying off problems and taking shortcuts. That is th
opportunist, management by lusot.

Fourth, the re=consider manager. Or Suyod Mangament. In atagalog a comb to take away liec rom the
hair. It strikes that hir precisely and neatly, taking awaly all lice and insects. In other version, we have
expanded this term to mean comprehensiveness, depth, thoroughness, such as suyruing natin ang
kanal, ot lets sweep the canal cean of all dirt, or suyurin natin ang problema. Thet is the reconsider
manager.

KAYOD, Realist Manager

Action agad, he immediately reacts to problems, he wants it solved right away


Always relies on his power, he is an autocrat.. He woes on the person with power, not the person with
titles.
He is sigurista. He yields to
May oldo, this means he has flashes of intuition.
He goes all the way
Marunong gumamit ng tao at resources, he knows the limitation of the sitatuion. He does not complain.
He works on what men and materials and money has.
He is practical, mabilis.
He cuts problems down to managaeable size. He does ot believe there is a problem that cannot be
solves. At least for today, if it cannot be solves, it is to be tackled later on.
He is apurado,
He is tusi, wise in a shrewd way.

MANAGEMENT BY LIBRO, IDEALIST

He is palaisip, he reflects on problems first before notin g them,\


He is technocrat, he relis on the authority of facts
He is mabusisi, he tends to be process oriritended and so he checks on everything.
Mahilig sa drawing-drawing, he is very planning oriented, and turns to PERT/CPMMay Sistema, he has
sysetems in his style.
He attacks the ttal problem, not just the parts, and therefore appear to be magbagal or slow, his
cautions his critics,
Isip muna bago decide, he deferes all decisios until all the facts are in, he waits for the marketing
analysis,
Matigas ang ulo, he has a definite way of working, he insistson value, procedres
Mataas ang manginip, pangarap.
Per quality yata iyan ESQ. he seeks quality results

MANAGEMENT BY LUSOT

He is galwgawm since he has no definite philosophy or commitments in life, he vacilitates between


people and managaeres, always clingin to the man in the power seat. His loyalty shifts like grains of san
Walang konsensya
Mahilig sa lusot
Mahili sa ayusan, solves problem through compromise, shady deals
Ayaw ng sakit ng ulo , seeks to reduce pressure
Kung walang atik, walang performance
Ang laagay ba

Finally, lets exam


Manager by Suiyod

May balance, accepts and works to integrate idealist and realist manager and wed them to iproducitve
styles
Contingency Mangament style
He is solid
Marunong pumili, he is manmaker, maker of manager, as he
Tatlong mata, parang periscope ng submarine.
Pambihira talaga like Rufina paties

Where are most of us?

Project Construction management


Objective: Always look for the success of building construction

The art of directing and coordinating human and material resources throgough the lfeof a project by
using modern managemet techniques to achieve predetermined objctives of scope, cost, time quality
and participation satisfaction

Management Function and Resources

Need for Construction Project

Project size and number of roject acitvies


>When erecting a
Project type and a manager background
Certain types of construction tends to have more complex activity relationships toand
dependencies that
Contract Requirements
>The owner funding a construction roject can either be public or private. While written
contracts are not always used in priate projects

Owner/Customer Appeal

Resource Analysis
>The analysis of resources, particulary time, materials, labor, and equipment, is key to good
project management.

Risk Assessment
>all activies within a construction project carry some level of risk or uncertainty in terms of cost
and time.

Organizational Structure of Constructon Project

>Traiditional architect/ engineer (A/E) Contract


The owner usually engages the services of an architect/engineer to perform planning and design
services, including preparation of plan, specif

>Design/Construction manager (D/CM) Contract


Fully responsibl to the owner during both th design and planning phases as well as the entire
construction phase to provide for all project, needs. This includes all scheduling, const control, long lea
purchasing, letting of single or multiple contracts and coordinationg of the work.

>Professional Constrction Managament Contract


Performs no deisng or consturciton with its own force, but acts solely in the capacity of an
owners respresntative during the life of the project.

>Design-Build Contract
Sometimes called the turnkey construction

Engineering definition of the Professional Construction managements


Works with the owner and design organization form the beginning of the design through
copleting of construction
Propose construction alternatives to be studied by the mangemet team during the planning
phase and ppredicts the effect of these alternative on the roject cost and schedule.
Advises on and coordinates procurement of material and equipment and the work of all
construction contractor.

Project Manager
Responsible for all te phases of the project
May pariciapate in architect/engineer selection
Serves as the representative of the owner in connection with any business convering the project
I s in complete charge of his or her project and is sometimes termed as a superintendent.

Professional Construction Manager


Participation in determining the bidding stragtegy involved in fashioned multiple prime contract
project as to avoid condlicts during the letting of the separate contracts
Design phase review, including review of formal design submittal, reviews of contract
odcuments and overall constructability analysis.
Cost managemet, including estimates of the construction cost and development of the project
budget.
Scheduling for all the phases of aproject, generally incorporating critivcal path techniques
Bid opening and evaluation and assistance in construction selections.
Onsite construction phase management to provide contract administion, inspection,
coordination, and feield management.

QUalit Control Represntative


Not facored by much of the construction industry.
Maintains and inspection system within the system to assure that the work performed by th
contractor and the subcontracto forces confrms to the contract requirements.

Resident Project Repesrentiative, Residnert Engineer, Resident Inspector, resindet Manager, Project
Represtenati
These titles usually refer to on-site full time project representative to whom has been delegated
the authority and resonibiliy of administering field operation of aconstruction project as the
representative of the owner or the deseign firm.
INsperctor, field engier, quality assurance, supervisor.
Usually refer to a stagg-level, on site represenativ of the owner, deisgn firm or contractors who
has the responsibility of observing the work being performed and of any variations formt he
plans and specs or other contract documents.

Contractors Engineering Section


An imortat tool for assisting the contractors management forces in analyzing construction and
engineering problems.

Consturciton Adminsitation Task List


It is recommended that all anticipated tasks be listed and included in any construction contract
exceude with the owner. A checklist of some of the tasks that may be involved follros:
o Conceptual phases
o Program planning phase
o Design phase
o Construction phase.
o CLoseup and Startup phase

Management Techniques
Define the task
Know what total resources are required to perform te task
Know the timescale in terms of all activites, events, and resoureves
What quality and reliability has to be chieveed
Know the product vsot
Make contniious conscious , deisciplined approach to optimize calue
Measure project performance.