PROJECT NAME
Academy Cooling Tower
and Pump Retrofit

PROJECT LOCATION
Atlanta, Georgia

PROJECT TEAM
Owner: College-preparatory
School
Contractor: McKenneys, Inc.

SPECIALIZATIONS
Pipe Shop Prefab

MARKETS
Education

M
cKenneys replaced a cooling the installation, project management and worked together seamlessly to complete
tower, boiler and pump at engineering teams to ensure the project the installation and start up quicklywithout
the Atlanta campus of a was completed on time and on budget. any safety incidents.
long-standing college-preparatory school.
THE SOLUTION THE RESULTS
THE CHALLENGE To modernize the system at the academys In addition to being more energy-efficient, the
The McKenneys team needed to remove science building, the McKenneys team low-profile cooling tower improved the view
1980s HVAC equipment and install a more installed a new high-efficiency, low-profile of the building. The academy now has modern
energy-efficient system while the school was variable frequency drive (VFD) cooling tower, HVAC system that administrators can count on
on break. Safety and productivity were a boilers, a condenser and tempering loop to heat and cool classroomswhile consum-
primary concern as they collaborated with pumps with VFD speed control. The teams ing less power and reducing energy costs.

404-622-5000 704-357-1200
info@mckenneys.com info@mckenneys.com
1056 Moreland Industrial Boulevard 3601 Performance Road
Atlanta, Georgia 30316 www.mckenneys.com Charlotte, North Carolina 28214
2017 McKenneys, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenneys, Inc. and the McKenneys, Inc. logo are registered trademarks of McKenneys, Inc. All other trademarks are the property of their respective owners.