palta 500

CEDULA DE CULTIVO SIN PROYECTO

Cultivo Area (Ha) ENE FEB MAR ABR MAY


MAIZ 22.00 22 22 22 22 22
FREJOL 10.00 10 10 10 10 10
PAPA 13.00 13 13 13 13
TRIGO 15.00 15 15 15 15
CEBADA 18.00 18 18 18 18
ALFALFA 10.00 10 10 10 10
FRUTALES 12.00 12 12 12 12
HORTALIZAS 0.00
Total 100 100 100 100 100 32

FACTOR DE CULTIVO Kc-PONDERADO SIN PROYECTO

Cultivo Area (Ha) ENE FEB MAR ABR MAY


MAIZ 22.00 0.9 0.9 0.55 0.42 0.35
FREJOL 10.00 0.6 0.24 0.21 0.54 0.65
PAPA 13.00 0.45 0.35 0.3 0.25
TRIGO 15.00 0.45 0.35 0.3 0.25
CEBADA 18.00 0.45 0.65 0.55 0.45
ALFALFA 10.00 0.45 0.65 0.55 0.45
FRUTALES 12.00 0.26 0.23 0.53 0.56
HORTALIZAS 0.00
Total 100 100 100 100 100 32
Kc Ponderado 0.28 0.51 0.48 0.43 0.42 0.50

CEDULA DE CULTIVO CON PROYECTO

Cultivo Area (Ha) ENE FEB MAR ABR MAY


MAIZ 22.00 22.00 22.00 22.00 22.00 22.00
FREJOL 10.00 10.00 10.00 10.00 10.00 10.00
PAPA 13.00 13.00 13.00 13.00 13.00 13.00
TRIGO 15.00 15.00 15.00 15.00 15.00 15.00
CEBADA 18.00 18.00 18.00 18.00 18.00 18.00
ALFALFA 10.00 10.00 10.00 10.00 10.00 10.00
FRUTALES 12.00 12.00 12.00 12.00 12.00 12.00
HORTALIZAS 0.00
Total 100.00 100 100 100 100 100

FACTOR DE CULTIVO Kc-PONDERADO CON PROYECTO


Cultivo Area (Ha) ENE FEB MAR ABR MAY
MAIZ 22.00 0.9 0.9 0.55 0.42 0.35
FREJOL 10.00 0.6 0.24 0.21 0.54 0.65
PAPA 13.00 0.45 0.35 0.3 0.25 0.45
TRIGO 15.00 0.45 0.35 0.3 0.25 0.45
CEBADA 18.00 0.45 0.65 0.55 0.45 0.45
ALFALFA 10.00 0.45 0.65 0.55 0.45 0.45
FRUTALES 12.00 0.26 0.23 0.53 0.56 0.26
HORTALIZAS 0.00
Total 100.00 100.00 100.00 100.00 100.00 100.00
Kc Ponderado 0.47 0.51 0.48 0.43 0.42 0.44

CALCULO DE LA DEMANDA DE AGUA Y MODULO DE RIEGO SIN PROYECTO

VARIABLES ENE FEB MAR ABR MAY JUN


Area (has) 100 100 100 100 32 0
Eto (mm/mes) 111.43 105.32 115.35 118.97 120.00 105.79
Kc ponderado 0.51 0.48 0.43 0.42 0.50 0.00
Etc (mm/mes) 56.67 50.70 49.27 49.63 60.00 0.00
Pe (mm/mes) 17.00 32.61 21.40 1.77 0.00 0.00
Def hum (mm/mes) 39.67 18.09 27.87 47.86 60.00 0.00
Req. neto (m3/ha/mes) 396.71 180.94 278.71 478.56 599.99 0.00
Efic. de riego (%) 40% 40% 40% 40% 40% 40%
Req. bruto (m3/ha/mes) 991.78 452.34 696.78 1196.41 1499.96 0.00
Dias del mes 31.00 28.00 31.00 30.00 31.00 30.00
Req. bruto (m3/ha/dia) 31.99 16.15 22.48 39.88 48.39 0.00
Tiempo (horas) 24.00 24.00 24.00 24.00 24.00 24.00
Mr (lit/seg/ha) 0.37 0.19 0.26 0.46 0.56 0.00
19.73 Q requerido (lit/seg) 37.03 18.70 26.01 46.16 17.92 0.00
Q requerido (m3/seg) 0.04 0.02 0.03 0.05 0.02 0.00
Vol. (MMC/mes) 0.10 0.05 0.07 0.12 0.05 0.00
Vol. proyecto(MMC) 0.62

CALCULO DE LA DEMANDA DE AGUA Y MODULO DE RIEGO CON PROYECTO

VARIABLES ENE FEB MAR ABR MAY JUN


Area (has) 100 100 100 100 100 100
Eto (mm/mes) 111.43 105.32 115.35 118.97 120.00 105.79
Kc ponderado 0.51 0.48 0.43 0.42 0.44 0.50
Etc (mm/mes) 56.67 50.70 49.27 49.63 52.46 53.35
Pe (mm/mes) 17.00 32.61 21.40 1.77 0.00 0.00
Def hum (mm/mes) 39.67 18.09 27.87 47.86 52.46 53.35
Req. neto (m3/ha/mes) 396.71 180.94 278.71 478.56 524.56 533.50
Efic. de riego (%) 40% 40% 40% 40% 40% 40%
Req. bruto (m3/ha/mes) 991.78 452.34 696.78 1196.41 1311.40 1333.76
Dias del mes 31.00 28.00 31.00 30.00 31.00 30.00
Req. bruto (m3/ha/dia) 31.99 16.15 22.48 39.88 42.30 44.46
Tiempo (horas) 24.00 24.00 24.00 24.00 24.00 24.00
Mr (lit/seg/ha) 0.37 0.19 0.26 0.46 0.49 0.51
44.28 Q requerido (lit/seg) 37.03 18.70 26.01 46.16 48.96 51.46
Q requerido (m3/seg) 0.04 0.02 0.03 0.05 0.05 0.05
Vol. (MMC/mes) 0.10 0.05 0.07 0.12 0.13 0.13
Vol. proyecto(MMC) 1.40

DEMANDA DE AGUA DE RIEGO CON PROYECTO (Lit/seg)

Proyecto Alternativo 1 y 2 2017 2018 2019 2020 2021 2022


NFamilias Beneficiarias 50 50 50 50 50 50
NHas demandantes 100 100 100 100 100 100
Demanda agua LPS 59.40 59.40 59.40 59.40 59.40 59.40

Deman
Aforo de la da de Balance
Meses captacion(Lit/ agua Hidrico
seg) (Lit/seg
)

Enero 150 37.03 112.97


Febrero 150 18.70 131.30
Marzo 150 26.01 123.99
Abril 150 46.16 103.84
Mayo 150 48.96 101.04
Junio 150 51.46 98.54
Julio 150 49.37 100.63
Agosto 150 59.40 90.60
Septiembre 150 49.43 100.57
Octubre 150 54.01 95.99
Noviembre 150 40.04 109.96
Diciembre 150 50.85 99.15
INCREME
SIN PROYECTO NTO DE
LA
PRECIPIT
JUN JUL AGO SEP OCT NOV DIC ACION
(mm)
22 22 5
10 10 30
13.00 13 65
15.00 15
18.00 18
10.00 10 80
12.00 12 105
130
0 0 0 0 0 100 100 155
MAS DE 155
ERADO SIN PROYECTO

JUN JUL AGO SEP OCT NOV DIC


0.55 0.75
0 0 0 0 0 0.45 0.4
0.27 0.35
0.27 0.35
0.65 0.55
0.65 0.55
0.53 0.56

0 0 0 0 0 100 100
0.00 0.00 0.00 0.00 0.00 0.48 0.50

CON PROYECTO

JUN JUL AGO SEP OCT NOV DIC


22.00 22.00 22.00 22.00 22.00 22.00 22.00
10.00 10.00 10.00 10.00 10.00 10.00 10.00
13.00 13.00 13.00 13.00 13.00 13.00 13.00
15.00 15.00 15.00 15.00 15.00 15.00 15.00
18.00 18.00 18.00 18.00 18.00 18.00 18.00
10.00 10.00 10.00 10.00 10.00 10.00 10.00
12.00 12.00 12.00 12.00 12.00 12.00 12.00

100 100 100 100 100 100 100

ERADO CON PROYECTO


JUN JUL AGO SEP OCT NOV DIC
0.4 0.33 0.65 0.55 0.4 0.55 0.75
0.6 0.6 0.45 0.21 0.54 0.45 0.4
0.65 0.55 0.3 0.3 0.45 0.27 0.35
0.65 0.55 0.3 0.3 0.45 0.27 0.35
0.5 0.55 0.65 0.5 0.45 0.65 0.55
0.5 0.55 0.65 0.5 0.45 0.65 0.55
0.23 0.53 0.56 0.26 0.23 0.53 0.56

100.00 100.00 100.00 100.00 100.00 100.00 100.00


0.50 0.52 0.51 0.37 0.42 0.48 0.50

ULO DE RIEGO SIN PROYECTO

JUL AGO SEP OCT NOV DIC MES Ppr(mm) DESC


0 0 0 0 100 100 ENE 22.90 5.00
101.17 125.13 136.93 136.37 120.37 121.99 FEB 39.85 5.00
0.00 0.00 0.00 0.00 0.48 0.50 MAR 27.53 5.00
0.00 0.00 0.00 0.00 57.95 61.17 ABR 6.86 5.00
0.00 0.00 0.00 0.00 16.44 6.69 MAY 0.00 0.00
0.00 0.00 0.00 0.00 41.51 54.48 JUN 0.00 0.00
0.00 0.00 0.00 0.00 415.10 544.81 JUL 0.00 0.00
40% 40% 40% 40% 40% 40% AGO 0.00 0.00
0.00 0.00 0.00 0.00 1037.74 1362.03 SET 0.00 0.00
31.00 31.00 30.00 31.00 30.00 31.00
0.00 0.00 0.00 0.00 34.59 43.94
24.00 24.00 24.00 24.00 24.00 24.00
0.00 0.00 0.00 0.00 0.40 0.51 OCT 0.00 0.00
0.00 0.00 0.00 0.00 40.04 50.85 NOV 22.31 5.00
0.00 0.00 0.00 0.00 0.04 0.05 DIC 12.04 5.00
0.00 0.00 0.00 0.00 0.10 0.14

ULO DE RIEGO CON PROYECTO

JUL AGO SEP OCT NOV DIC


100 100 100 100 100 100
101.17 125.13 136.93 136.37 120.37 121.99
0.52 0.51 0.37 0.42 0.48 0.50
52.90 63.64 51.25 57.86 57.95 61.17
0.00 0.00 0.00 0.00 16.44 6.69
52.90 63.64 51.25 57.86 41.51 54.48
528.96 636.38 512.50 578.60 415.10 544.81
40% 40% 40% 40% 40% 40%
1322.41 1590.94 1281.25 1446.50 1037.74 1362.03
31.00 31.00 30.00 31.00 30.00 31.00
42.66 51.32 42.71 46.66 34.59 43.94
24.00 24.00 24.00 24.00 24.00 24.00
0.49 0.59 0.49 0.54 0.40 0.51
49.37 59.40 49.43 54.01 40.04 50.85
0.05 0.06 0.05 0.05 0.04 0.05
0.13 0.16 0.13 0.14 0.10 0.14

OYECTO (Lit/seg)

2023 2024 2025 2026 2027


50 50 50 50 50
100 100 100 100 100
59.40 59.40 59.40 59.40 59.40
% DE LA
PRECIPITACION
EFECTIVA
0 0
95 0.95
90 0.9

82 0.82
65 0.65
45 0.45
25 0.25
5 0.05
DESCOMPOSICION DE LA PRECIPITACION (Metodo WPRS - USA) PE (mm)
17.90 0.00 0.00 0.00 0.00 0.00 0.00 17.00
25.00 9.85 0.00 0.00 0.00 0.00 0.00 32.61
22.53 0.00 0.00 0.00 0.00 0.00 0.00 21.40
1.86 0.00 0.00 0.00 0.00 0.00 0.00 1.77
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


17.31 0.00 0.00 0.00 0.00 0.00 0.00 16.44
7.04 0.00 0.00 0.00 0.00 0.00 0.00 6.69
COSTO DE MANTENIMIENTO EN LA SITUACION SIN PROYECTO, APRECIOS PRIVADOS

COSTO COSTO
UND VECES AL CANTIDAD UNITARIO
ITEM PARTIDAS TOTAL
AO MENSUAL (S/.) ANUAL (S./)
1 Limpieza y Desbroce 2900
1.1 Remuneracion 2000
1.1.1 Peones dia 1 40 50 2000
1.2 Insumos 900
1.2.1 Lampas und 1 15 25 375
1.2.2 Machetes und 1 10 15 150
1.2.3 Picos und 1 15 25 375
2 Limpieza de derrumbes menores 1125
2.1 Remuneracion 750
2.1.1 Peones dia 1 15 50 750
2.2 Insumos 375
2.2.1 Lampas und 1 10 25 250
2.2.2 Picos und 1 5 25 125
3 SUB TOTAL (S./) 4025
4 GASTOS GENERALES 10.00% 402.5

COSTO TOTAL DE MANTENIMIENTO EN LA SITUACION "SIN PROYECTO" A 4427.5


PRECIOS PRIVADOS (S./)
COSTO DE MANTENIMIENTO EN LA SITUACION SIN PROYECTO, A PRECIOS SOCIALES

COSTO
VECES AL CANTIDAD
ITEM PARTIDAS UND UNITARIO FC
AO MENSUAL (S/.)
1 Limpieza y Desbroce
1.1 Remuneracion
1.1.1 Peones dia 1 40 50 0.41
1.2 Insumos
1.2.1 Lampas und 1 15 25 0.85
1.2.2 Machetes und 1 10 15 0.85
1.2.3 Picos und 1 15 25 0.85
2 Limpieza de derrumbes menores
2.1 Remuneracion
2.1.1 Peones dia 1 15 50 0.41
2.2 Insumos
2.2.1 Lampas und 1 10 25 0.85
2.2.2 Picos und 1 5 25 0.85
3 SUB TOTAL (S./)
4 GASTOS GENERALES 10.00%

COSTO TOTAL DE MANTENIMIENTO EN LA SITUACION "SIN PROYECTO" A PRECIOS SOCIALES


(S./)
OS SOCIALES

COSTO
TOTAL
ANUAL (S./)
1585
820
820
765
318.75
127.5
318.75
626.25
307.5
307.5
318.75
212.5
106.25
2211.25
221.125

2432.375
COSTO DE OPERACIN Y MANTENIMIENTO,PARA LA ALTERNATIVA DE SOLUCION N01 A
PRECIOS PRIVADOS EN LA SITUACION CON PROYECTO

UNIDADES COSTO COSTO


ITEM ACTIVIDAD /DESCRIPCION UNITARIO TOTAL (S./)
(S./)
N TIPO
1 OPERACIN 18100
1.1 Material nacional 100
1.1.1 Material de escritorio 1 Modulo 100 100
1.2 Remuneraciones 18000
1.2.1 Tecnico Especialista 12 mes 1500 18000
2 MANTENIMIENTO DE CANAL 910
2.1 Material nacional 607.5
2.1.1 Arena Gruesa 60 latas 5 300
2.1.2 Piedra Chancada 3/4" 30 latas 6 180
2.1.3
2.1.4 Cemento portland Tipo I 15 bolsas 20.5 307.5
2.2 Desgaste de herramientas 0.05 %MO 450 22.5
2.3 Remuneraciones 280
2.2.1 Peon (No calificada) 14 dia 20 280
COSTO TOTAL DE OPERACIN Y MANTENIMIENTO , A PRECIOS PRIVADOS 19010.0

COSTO DE OPERACIN Y MANTENIMIENTO,PARA LA ALTERNATIVA DE SOLUCION N02 A


PRECIOS PRIVADOS EN LA SITUACION CON PROYECTO

UNIDADES COSTO COSTO


ITEM ACTIVIDAD /DESCRIPCION UNITARIO TOTAL
N TIPO (S./)
(S./)
1 OPERACIN 18250
1.1 Material nacional 250
1.1.1 Material de escritorio 1 Modulo 250 250
1.2 Remuneraciones 18000
1.2.1 Tecnico Especialista 12 mes 1500 18000
2 MANTENIMIENTO DE CANAL 910
2.1 Material nacional 607.5
2.1.1 Arena Gruesa 60 latas 5 300
2.1.2 Piedra Chancada 3/4" 30 latas 6 180
2.1.3 Cemento portland Tipo I 15 bolsas 20.5 307.5
2.2 Desgaste de herramientas 0.05 %MO 450 22.5
2.3 Remuneraciones 280
2.2.1 Peon (No calificada) 14 dia 20 280
COSTO TOTAL DE OPERACIN Y MANTENIMIENTO , A PRECIOS PRIVADOS 19160.0
COSTO DE OPERACIN Y MANTENIMIENTO,PARA LA ALTERNATIVA DE SOLUCION N01 A PRECIOS
SOCIALES EN LA SITUACION CON PROYECTO

UNIDADES COSTO
ITEM ACTIVIDAD /DESCRIPCION UNITARIO FC
(S./)
N TIPO
1 OPERACIN
1.1 Material nacional
1.1.1 Material de escritorio 1 Modulo 100 0.85
1.2 Remuneraciones
1.2.1 Tecnico Especialista 12 mes 1500 0.41
2 MANTENIMIENTO DE CANAL
2.1 Material nacional
2.1.1 Arena Gruesa 60 latas 5 0.85
2.1.2 Piedra Chancada 3/4" 30 latas 6 0.85
2.1.3
2.1.4 Cemento portland Tipo I 15 bolsas 20.5 0.85
2.2 Desgaste de herramientas 0.05 %MO 450 0.85
2.3 Remuneraciones
2.2.1 Peon (No calificada) 14 dia 20 0.41
COSTO TOTAL DE OPERACIN Y MANTENIMIENTO , A PRECIOS SOCIALES

COSTO DE OPERACIN Y MANTENIMIENTO,PARA LA ALTERNATIVA DE SOLUCION N02 A PRECIOS


SOCIALES EN LA SITUACION CON PROYECTO

UNIDADES COSTO
ITEM ACTIVIDAD /DESCRIPCION UNITARIO FC
N TIPO (S./)
1 OPERACIN
1.1 Material nacional
1.1.1 Material de escritorio 1 Modulo 250 0.85
1.2 Remuneraciones
1.2.1 Tecnico Especialista 12 mes 1500 0.41
2 MANTENIMIENTO DE CANAL
2.1 Material nacional
2.1.1 Arena Gruesa 50 latas 5 0.85
2.1.2 Piedra Chancada 3/4" 30 latas 6 0.85
2.1.3 Cemento portland Tipo I 15 bolsas 20.5 0.85
2.2 Desgaste de herramientas 0.05 %MO 450 0.85
2.3 Remuneraciones
2.2.1 Peon (No calificada) 14 dia 20 0.41
COSTO TOTAL DE OPERACIN Y MANTENIMIENTO , A PRECIOS SOCIALES
ON N01 A PRECIOS COSTO DE CAPACITACION Y ORGANIZACION PARA LAS ALTERNATIVAS DE SOLUCIO

COSTO ITEM ACTIVIDAD /DESCRIPCION


TOTAL (S./)

7465 1 FORTALECIMIENTO DEL COMIT DE REGANTES


85 1.1 Materiales de origen nacional
85 1.1.1 Material de escritorio
7380 1.2 Remuneraciones
7380 1.2.1 Ingeniero Agricola
803.3 2 DISEO DE LA CAPACITACION
669.375 2.1 Materiales de origen nacional
255 2.1.1 Modulo de capacitacion
153 2.2 Remuneraciones
2.2.1 Ingeniero Agricola
261.375 3 EXPERIENCIA DE CAMPO
19.125 3.1 Materiales de origen nacional
114.8 3.1.1 Material de escritorio
114.8 3.2 Remuneraciones
8268.3 3.2.1 Extencionista Agricola
3.2.2 Agricultores Beneficiarios
COSTO TOTAL POR CAPACITACION Y ORGANIZACIN A PRECIOS PRIVADOS (S./)
ON N02 A PRECIOS

COSTO
TOTAL (S./)
7592.5
212.5
212.5
7380
7380
760.8
626.875
212.5
153
261.375
19.125
114.8
114.8
8353.3
RA LAS ALTERNATIVAS DE SOLUCION A PRECIOS PRIVADOS COSTO DE CAPACITACION Y ORGANIZACION PARA LAS ALT

UNIDADES COSTO COSTO ITEM ACTIVIDAD /DESCRIPCION


UNIT. (S.) TOTAL (S./)
TIPO N
GANTES 2400.0 1 FORTALECIMIENTO DEL COMIT DE REGANTES
400.0 1.1 Materiales de origen nacional
Modulo 1.00 400.00 400 1.1.1 Material de escritorio
2000 1.2 Remuneraciones
Persona 1.00 2000.00 2000 1.2.1 Ingeniero Agricola
3200.0 2 DISEO DE LA CAPACITACION
1200 2.1 Materiales de origen nacional
Curso 4.00 300.00 1200 2.1.1 Modulo de capacitacion
2000 2.2 Remuneraciones
Persona 1.00 2000.00 2000 2.2.1 Ingeniero Agricola
4960.0 3 EXPERIENCIA DE CAMPO
2400.0 3.1 Materiales de origen nacional
Modulo 4.00 600.00 2400.0 3.1.1 Material de escritorio
2560.0 3.2 Remuneraciones
Persona 4.00 140.00 560.0 3.2.1 Extencionista Agricola
Persona 40.00 50.00 2000.0 3.2.2 Agricultores Beneficiarios
N A PRECIOS PRIVADOS (S./) 10560.0 COSTO TOTAL POR CAPACITACION Y ORGANIZACIN A PRECIO
GANIZACION PARA LAS ALTERNATIVAS DE SOLUCION A PRECIOS SOCIALES

UNIDADES COSTO UNIT. COSTO


FC
(S.) TOTAL (S./)
TIPO N
COMIT DE REGANTES 2160.0
cional 340.0
Modulo 1.00 400.00 0.85 340
1820
Persona 1.00 2000.00 0.91 1820
ACION 2840.0
cional 1020
Curso 4.00 300.00 0.85 1020
1820
Persona 1.00 2000.00 0.91 1820
O 4249.6
cional 2040.0
Modulo 4.00 600.00 0.85 2040
2209.6
Persona 4.00 140.00 0.91 509.6
Persona 40.00 50.00 0.85 1700
Y ORGANIZACIN A PRECIOS SOCIALES (S./) 9249.6
COSTOS DE INVERSION A PRECIOS PRIVADOS,PARA LA ALTERNATIVA DE COSTOS DE INVERSION A PRECIO
SOLUCION N01

ITEM DESCRIPCION INVERSION PARCIAL (S./) ITEM

01 COSTOS EN ESTUDIOS DEFINITIVOS 5,000.00 01


1.01 Expediente Tecnico 5,000.00 5,000.00 1.01
02 COSTO EN OBRAS CIVILES 33,570.91 33,570.91 02
2.01 CANAL MOTALE ALTO 33,570.91 33,570.91 2.01
COSTO CAPACITACION Y ORGANIZACIN DEL COMIT
03 2.02
DE RIEGO 4,000.00
04 COSTO DE MITIGACION DE IMPACTO AMBIENTAL 5,000.00 2.03
05 COSTO DIRECTO 42,570.91 42571 2.04
06 GASTOS GENERALES (15%CD) 6,385.64 03
07 SUB TOTAL DE COSTOS - SIN IGV 48,956.54 04
08 IGV (18%) 8,812.18 05
09 SUB TOTAL DE COSTOS - CON IGV 57,768.72 06
10 SUPERVISION (CON IGV) 5,000.00 COSTO TOTAL DEL PROYECTO , APR

COSTO TOTAL DEL PROYECTO , APRECIOS PRIVADOS (S./) 67,768.72

COSTOS DE INVERSION A PRECIOS PRIVADOS,PARA LA ALTERNATIVA DE


SOLUCION N02
COSTOS DE INVERSION A PRECIO
ITEM DESCRIPCION INVERSION PARCIAL (S./)

01 COSTOS EN ESTUDIOS DEFINITIVOS ITEM


5,000.00
1.01 Expediente Tecnico 5,000.00 5,000.00 01
02 COSTO EN OBRAS CIVILES 49,523.88 49,523.88 1.01
2.01 CANAL MOTALE ALTO 49,523.88 49,523.88 02
COSTO CAPACITACION Y ORGANIZACIN DEL COMIT
03 2.01
DE RIEGO 4,000.00
04 COSTO DE MITIGACION DE IMPACTO AMBIENTAL 5,000.00 2.02
05 COSTO DIRECTO 49,523.88 2.03
06 GASTOS GENERALES (15%CD) 7,428.58 2.04
08 SUB TOTAL DE COSTOS - SIN IGV 56,952.46 03
09 IGV (18%) 10,251.44 04
10 SUB TOTAL DE COSTOS - CON IGV 67,203.90 05
11 SUPERVISION (CON IGV) 5,000.00 06
COSTO TOTAL DEL PROYECTO , APRECIOS PRIVADOS (S./) 77,203.90 COSTO TOTAL DEL PROYECTO , APR
COSTOS DE INVERSION A PRECIOS SOCIALES,PARA LA ALTERNATIVA DE SOLUCION N01

Factor
DESCRIPCION INVERSION PARCIAL (S./)
Correccion
COSTOS EN ESTUDIOS DEFINITIVOS 4,545.50
Expediente Tecnico 5,000.00 0.91 4,545.50 ###
COSTO EN OBRAS CIVILES 42,570.91 32,664.02 ###
MANO DE OBRA CALIFICADA 4,257.09 0.91 3,870.12 ###
MANO DE OBRA NO CALIFICADA 8,514.18 0.41 3,490.81

MATERIALES 19,156.91 0.85 16,283.37


EQUIPOS Y HERRAMIENTAS 10,642.73 0.85 9,019.71 #REF!
COSTO DIRECTO 32,664.02
GASTOS GENERALES (15%CD) 6,385.64 0.85 5,411.83
SUB TOTAL DE COSTOS 38,075.84
SUPERVISION (CON IGV) 5,000.00 0.91 4,545.50
COSTO TOTAL DEL PROYECTO , APRECIOS SOCIALES (S./) 42,621.34

COSTOS COMULANAL 4000 0.91 3640

COSTO DE IMPACTO AMIENTASL 5000 0.91 4550


COSTOS DE INVERSION A PRECIOS SOCIALES,PARA LA ALTERNATIVA DE SOLUCION N02
###
Factor
DESCRIPCION INVERSION PARCIAL (S./)
Correccion ###
COSTOS EN ESTUDIOS DEFINITIVOS 4,545.50 ###
Expediente Tecnico 5,000.00 0.91 4,545.50
COSTO EN OBRAS CIVILES 58,438.18 44,838.74 ###
0.91
MANO DE OBRA CALIFICADA 5,843.82 5,312.61
MANO DE OBRA NO CALIFICADA 11,687.64 0.41 4,791.93
MATERIALES 26,297.18 0.85 22,352.60
EQUIPOS Y HERRAMIENTAS 14,609.54 0.85 12,381.59
COSTO DIRECTO 44,838.74
GASTOS GENERALES (15%CD) 8,765.73 0.85 7,428.95
SUB TOTAL DE COSTOS 44,838.74
SUPERVISION (CON IGV) 5,000.00 0.91 4,545.50
COSTO TOTAL DEL PROYECTO , APRECIOS SOCIALES (S./) 53,929.74

10
20
45
100
25
mano de obra
materiales y herramientas

mano de obra
materiales y herramientas

mano de obra no calificada


FLUJO DE COSTOS DE INVERSION A PRECIOS PRIVADOS, PARA EL PROYECTO ALTE
AO CALENDA
ITEM RUBRO 2017 2018 2019 2020
0 1 2 3

I 67,768.72 23,010.00 19,010.00 19,010.00


COSTO TOTAL "CON PROYECTO"
A COSTOS DE INVERSION 67,768.72 0.00 0.00 0.00
a.1 Expediente Tecnico 5,000.00
a.2 Costo directo de Obras Civiles
(CD) 42,570.91
a.3
Gastos Generales (15%CD) 6,385.64
a.4
Sub Total de Costos Sin IGV 48,956.55
a.5 IGV (18%) 8,812.18
a.6 Total de Costos 57,768.72
a.7 Supervision 5,000.00
a.8 Costos de capacitacion del comit 4,000.00
de riego
a.9
Costos por mitigacion ambiental 5,000.00

B COSTO DE MANTENIMIENTO 0.00 19,010.00 19,010.00 19,010.00


CON "PROYECTO"

b.1 0.00 910.00 910.00 910.00


Mantenimiento de canal
b.2 Operacin 0.00 18,100.00 18,100.00 18,100.00

II COSTO TOTAL "SIN PROYECTO" 0.00 4,427.50 4,427.50 4,427.50


II.1 0.00 4,427.50 4,427.50 4,427.50
Operacin y Mantenimiento
TOTAL DE COSTOS INCREMENTALES 67,768.72 18,582.50 14,582.50 14,582.50

FLUJO DE COSTOS DE INVERSION A PRECIOS PRIVADOS, PARA EL PROYECTO ALTE


AO CALENDA
ITEM RUBRO 2017 2018 2019 2020
0 1 2 3

I 77,203.90 23,160.00 19,160.00 19,160.00


COSTO TOTAL "CON PROYECTO"
A COSTOS DE INVERSION 77,203.90 0.00 0.00 0.00
a.1 Expediente Tecnico 5,000.00
a.2 Costo directo de Obras Civiles
(CD) 49,523.88
a.3
Gastos Generales (15%CD) 7,428.58
a.4
Sub Total de Costos Sin IGV 56,952.46
a.5 IGV (18%) 10,251.44
a.6 Total de Costos 67,203.90
a.7 Supervision 5,000.00
a.8 Costos de capacitacion del comit 4,000.00
de riego
a.9
Costos por mitigacion ambiental 5,000.00

B COSTO DE MANTENIMIENTO 0.00 19,160.00 19,160.00 19,160.00


CON "PROYECTO"
b.1 0.00 910.00 910.00 910.00
Mantenimiento de canal
b.2 Operacin 0.00 18,250.00 18,250.00 18,250.00

II COSTO TOTAL "SIN PROYECTO" 0.00 4,427.50 4,427.50 4,427.50

II.1 0.00 4,427.50 4,427.50 4,427.50


Operacin y Mantenimiento
TOTAL DE COSTOS INCREMENTALES
77,203.90 18,732.50 14,732.50 14,732.50
PRIVADOS, PARA EL PROYECTO ALTERNATIVO DE SOLUCION N01
AO CALENDARIO
2021 2022 2023 2024 2025 2026 2027
4 5 6 7 8 9 10

19,010.00 19,010.00 19,010.00 19,010.00 19,010.00 19,010.00 19,010.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00

19,010.00 19,010.00 19,010.00 19,010.00 19,010.00 19,010.00 19,010.00

910.00 910.00 910.00 910.00 910.00 910.00 910.00

18,100.00 18,100.00 18,100.00 18,100.00 18,100.00 18,100.00 18,100.00

4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50


4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50

14,582.50 14,582.50 14,582.50 14,582.50 14,582.50 14,582.50 14,582.50

PRIVADOS, PARA EL PROYECTO ALTERNATIVO DE SOLUCION N02


AO CALENDARIO
2021 2022 2023 2024 2025 2026 2027
4 5 6 7 8 9 10

19,160.00 19,160.00 19,160.00 19,160.00 19,160.00 19,160.00 19,160.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00
19,160.00 19,160.00 19,160.00 19,160.00 19,160.00 19,160.00 19,160.00

910.00 910.00 910.00 910.00 910.00 910.00 910.00


18,250.00 18,250.00 18,250.00 18,250.00 18,250.00 18,250.00 18,250.00

4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50

4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50 4,427.50

14,732.50 14,732.50 14,732.50 14,732.50 14,732.50 14,732.50 14,732.50

5,248,640.41

alternativa 2
-30 -37750.816
-20 -43143.7897 alternativa 1

-10 -48536.7635 -30


53,929.74 -20
10 -59,322.71 -10
20 -64,715.68
30 -70,108.66 10
-59,322.71 -37750.816 20
118,833.54 118,833.54 30
129970.6371 129970.6371 -29834.9403
129970.6371 129970.6371 119,207.54
129970.6371 129970.6371 130,344.64
129970.6371 129970.6371 130,344.64
129970.6371 129970.6371 130,344.64
129970.6371 129970.6371 130,344.64
129970.6371 129970.6371 130,344.64
129970.6371 129970.6371 130,344.64
129970.6371 129970.6371 130,344.64
-64,715.68 -43143.7897 130,344.64
118,833.54 118,833.54 130,344.64
129970.6371 129970.6371 -34097.0746
129970.6371 129970.6371 119207.5371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
-70,108.66 -48536.7635 130344.6371
118,833.54 118,833.54 130344.6371
129970.6371 129970.6371 -38359.2089
129970.6371 129970.6371 119207.5371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
129970.6371 129970.6371 130344.6371
130344.6371
130344.6371
FLUJO DE COSTOS DE INVERSION A PRECIOS SOCIALES, PARA

ITEM RUBRO 2017 2018 2019


0 1 2

I COSTO TOTAL "CON 42,621.34 11,908.30 8,268.30


PROYECTO"
A COSTOS DE INVERSION 42,621.34 0.00 0.00
a.1 Expediente Tecnico (4%) 4,545.50
a.2 Costo directo de Obras
Civiles (CD) 32,664.02
a.3
Gastos Generales (15%CD) 5,411.83
a.4 Sub Total de Costos Sin
IGV 38,075.84
a.5 IGV (18%)
a.6 Total de Costos 38,075.84
a.7 Supervision 4,545.50
a.8 Costos de capacitacion del 3,640.00
comit de riego
a.9 Costos por mitigacion
ambiental 4,550.00
COSTO DE
B MANTENIMIENTO CON 0.00 8,268.30 8,268.30
"PROYECTO"

b.1 0.00 803.30 803.30


Mantenimiento de canal
b.2 Operacin 0.00 7,465.00 7,465.00

COSTO TOTAL "SIN


II
PROYECTO" 0.00 2,432.38 2,432.38
II.1 Operacin y 0.00 2,432.38 2,432.38
Mantenimiento
TOTAL DE COSTOS INCREMENTALES 42,621.34 9,475.93 5,835.93

FLUJO DE COSTOS DE INVERSION A PRECIOS SOCIALES, PARA

ITEM RUBRO 2017 2018 2019


0 1 2

I COSTO TOTAL "CON 53,929.74 11,993.30 8,353.30


PROYECTO"
A COSTOS DE INVERSION 53,929.74 0.00 0.00
a.1 Expediente Tecnico (4%) 4,545.50
a.2 Costo directo de Obras
Civiles (CD) 44,838.74
a.3
Gastos Generales (15%CD) 7,428.95
a.4 Sub Total de Costos Sin
IGV 52,267.69
a.5 IGV (18%)
a.6 Total de Costos 52,267.69
a.7 Supervision 4,545.50
a.8 Costos de capacitacion del 3,640.00
comit de riego
a.9 Costos por mitigacion
ambiental 4,550.00
COSTO DE
B MANTENIMIENTO CON 0.00 8,353.30 8,353.30
"PROYECTO"
b.1 0.00 760.80 760.80
Mantenimiento de canal
b.2 Operacin 0.00 7,592.50 7,592.50

COSTO TOTAL "SIN


II PROYECTO" 0.00 2,432.38 2,432.38

II.1 Operacin y 0.00 2,432.38 2,432.38


Mantenimiento
TOTAL DE COSTOS INCREMENTALES
53,929.74 9,560.93 5,920.93

Alternativa N02

Costos
Costo de Inversion beneficios
incrementales

53,929.74 -53,929.74

9,560.93 531149 521,588.04


5,920.93 531149 525,228.04
5,920.93 531149 525,228.04
5,920.93 531149 525,228.04

5,920.93 531149 525,228.04


### 5,920.93 531149 525,228.04
5,920.93 531149 525,228.04
5,920.93 531149 525,228.04
5,920.93 531149 525,228.04
5,920.93 531149 525,228.04

Analisis de sensibilidad

%DE VARIACION DE LA PROYECTO ALTERNATIVO N01


VARIABLE CRITICA
%DE VARIACION DE LA
alternativa 1 VARIABLE CRITICA VAN TIR B/C

-29834.9403 -30% 3,338,104.89 406.9% 8.57


-34097.0746 -20% 3,333,842.76 356.8%
-38359.2089 -10% 3,329,580.62 317.7%
42,621.34 0% 3,325,318 1224.6%
-46,883.48 10% 3,321,056.35 260.8%
-64,715.68 20% 3,303,224.15 190.1%
-70,108.66 30% 3,297,831.17 175.8%
-46,883.48
119207.5371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
-64,715.68
119207.5371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
-70,108.66
119207.5371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
130344.6371
E INVERSION A PRECIOS SOCIALES, PARA EL PROYECTO ALTERNATIVO DE SOLUCION N01
AO CALENDARIO
2020 2021 2022 2023 2024 2025
3 4 5 6 7 8

8,268.30 8,268.30 8,268.30 8,268.30 8,268.30 8,268.30


0.00 0.00 0.00 0.00 0.00 0.00

8,268.30 8,268.30 8,268.30 8,268.30 8,268.30 8,268.30

803.30 803.30 803.30 803.30 803.30 803.30

7,465.00 7,465.00 7,465.00 7,465.00 7,465.00 7,465.00

2,432.38 2,432.38 2,432.38 2,432.38 2,432.38 2,432.38


2,432.38 2,432.38 2,432.38 2,432.38 2,432.38 2,432.38

5,835.93 5,835.93 5,835.93 5,835.93 5,835.93 5,835.93

E INVERSION A PRECIOS SOCIALES, PARA EL PROYECTO ALTERNATIVO DE SOLUCION N02


AO CALENDARIO
2020 2021 2022 2023 2024 2025
3 4 5 6 7 8

8,353.30 8,353.30 8,353.30 8,353.30 8,353.30 8,353.30


0.00 0.00 0.00 0.00 0.00 0.00
8,353.30 8,353.30 8,353.30 8,353.30 8,353.30 8,353.30

760.80 760.80 760.80 760.80 760.80 760.80


7,592.50 7,592.50 7,592.50 7,592.50 7,592.50 7,592.50

2,432.38 2,432.38 2,432.38 2,432.38 2,432.38 2,432.38

2,432.38 2,432.38 2,432.38 2,432.38 2,432.38 2,432.38

5,920.93 5,920.93 5,920.93 5,920.93 5,920.93 5,920.93

Alternativa N01

Costo de
Inversion

42,621.34

VAN= S/. 3,313,464.59


TIR= 967.8%

ALTERNATIVA
INDICADORES ALTERNATIVA N01 N02
VAN 3,325,318.49 3,313,464.59
TIR 1224.6% 967.8%
B/C 8.57 8.45

PROYECTO ALTERNATIVO N02 BENEFICIOS


VAN TIR B/C COSTOS

3,329,643.51 321.8% 8.45


3,324,250.54 282.2%
3,318,857.57 251.4%
3,313,465 967.8%
3,308,071.62 206.4%
3,302,678.64 189.6%
3,297,285.67 175.3%
2026 2027
9 10

8,268.30 8,268.30
0.00 0.00

8,268.30 8,268.30

803.30 803.30

7,465.00 7,465.00

2,432.38 2,432.38
2,432.38 2,432.38

5,835.93 5,835.93

2026 2027
9 10

8,353.30 8,353.30
0.00 0.00
8,353.30 8,353.30

760.80 760.80
7,592.50 7,592.50

2,432.38 2,432.38

2,432.38 2,432.38

5,920.93 5,920.93

ernativa N01

Costos
incrementale beneficios
s

9,475.93 531149
5,835.93 531149 -42,621.34
5,835.93 531149 521,673.04 VAN= S/. 3,325,318.49
5,835.93 531149 525,313.04 TIR= 1224.6%

5,835.93 531149 525,313.04


5,835.93 531149 525,313.04
5,835.93 531149 525,313.04
5,835.93 531149 525,313.04
5,835.93 531149 525,313.04
5,835.93 531149 525,313.04
525,313.04
525,313.04

5311490 BENEFICIOS
61,999.25 COSTOS

5311490
62,849.25
INGRESOS POR LA VENTA DE AGUA (S./) A PR

DESCRIPCION
0 1 2 3
50.85 50.85 50.85
DEMANDA DE AGUA (LIT/SEG)
0.00 439365 439365 439365
VOLUMEN DE AGUA ANUAL EN M3

TARIFA DE AGUA POR M3 DE AGUA 0.00 0.0051 0.0051 0.0051

INGRESOS POR LA VENTA DE AGUA EN 0.00 2227.58 2227.58 2227.58


LA SITUACION "SIN PROYECTO"

59.40 59.40 59.40


DEMANDA DE AGUA (LIT/SEG)
0.00 513206 513206 513206
VOLUMEN DE AGUA ANUAL EN M3
TARIFA DE AGUA POR M3 DE AGUA 0.00 0.0051 0.0051 0.0051

INGRESOS POR LA VENTA DE AGUA EN 0.00 2601.95 2601.95 2601.95


LA SITUACION "CON PROYECTO"

BENEFICIO INCREMENTAL POR LA


VENTA DE TARIFA DE AGUA A PRECIOS 374.37 374.37 374.37
PRIVADOS

INGRESOS POR LA VENTA DE AGUA (S./) A PR

DESCRIPCION
1 2 3
DEMANDA DE AGUA (LIT/SEG) 50.85 50.85 50.85
VOLUMEN DE AGUA ANUAL EN M3 0.00 439365 439365 439365

0.00 0.0028 0.0028 0.0028


TARIFA DE AGUA POR M3 DE AGUA
INGRESOS POR LA VENTA DE AGUA EN 0.00 1247.80 1247.80 1247.80
LA SITUACION "SIN PROYECTO"

59.40 59.40 59.40


DEMANDA DE AGUA (LIT/SEG)
0.00 513206 513206 513206

VOLUMEN DE AGUA ANUAL EN M3


0.00 0.0028 0.0028 0.0028
TARIFA DE AGUA POR M3 DE AGUA
INGRESOS POR LA VENTA DE AGUA EN 0.00 1457.51 1457.51 1457.51
LA SITUACION "CON PROYECTO"

BENEFICIO INCREMENTAL POR LA


VENTA DE TARIFA DE AGUA A PRECIOS 209.71 209.71 209.71
SOCIALES

INGRESOS POR LA VENTA DE LOS TERRENOS AGRICOLAS

DESCRIPCION
0 1 2 3
NHECTAREAS BAJO RIEGO 100.00 100.00 100.00 100.00

0.00 1000.0 1000.0 1000.0


PRECIO DEL TERRENO POR HECTAREA

INGRESOS POR VENTA DE TERRENO EN 0.00 100000.00 100000.00 100000.00


LA SITUACION "SIN PROYECTO"

NHECTAREAS BAJO RIEGO 100.00 100.00 100.00 100.00

0.00 1500.0 1500.0 1500.0


PRECIO DEL TERRENO POR HECTAREA

INGRESOS POR LA VENTA DE AGUA EN 0.00 150000.00 150000.00 150000.00


LA SITUACION "CON PROYECTO"

INGRESO INCREMENTAL POR VENTA DE 50000.00 50000.00 50000.00


TERRENO A PRECIOS PRIVADOS

INGRESOS POR LA VENTA DE LOS TERRENOS AGRICOLAS

DESCRIPCION
0 1 2 3
FACTOR DE CORRECION 0.8475
NHECTAREAS BAJO RIEGO 100.00 100.00 100.00 100.00
0.00 1000.0 1000.0 1000.0
PRECIO DEL TERRENO POR HECTAREA

INGRESOS POR VENTA DE TERRENO EN 0.00 110175.00 110175.00 110175.00


LA SITUACION "SIN PROYECTO"

NHECTAREAS BAJO RIEGO 100.00 100.00 100.00 100.00

0.00 1500.0 1500.0 1500.0


PRECIO DEL TERRENO POR HECTAREA

INGRESOS POR LA VENTA DE AGUA EN 0.00 127125.00 127125.00 127125.00


LA SITUACION "CON PROYECTO"

INGRESO INCREMENTAL POR VENTA DE 16950.00 16950.00 16950.00


TERRENO A PRECIOS SOCIALES

INGRESOS POR EL INCREMENTO EN LA PRODUCCION AGR

DESCRIPCION
0 1 2 3

0.00 90856.00 90856.00 90856.00


INGRESO PRODUCCION AGRICOLA

0.00 89678.0 89678.0 89678.0


COSTO POR PRODUCCION AGRICOLA

BENEFICIO POR PRODUCCION


AGRICOLA EN LA SITUACION "SIN 0.00 1178.0 1178.0 1178.0
PROYECTO"

0.00 708000.00 708000.00 708000.00


INGRESO PRODUCCION AGRICOLA

0.00 100345.0 100345.0 100345.0


COSTO POR PRODUCCION AGRICOLA

BENEFICIO POR PRODUCCION 0.00 607655.00 607655.00 607655.00


AGRICOLA EN LA SITUACION "CON
PROYECTO"

BENEFICIO INCREMENTAL POR EL


INCREMENTO DE LA PRODUCCION 0.00 606477.00 606477.00 606477.00
AGRICOLA

INGRESOS POR EL INCREMENTO EN LA PRODUCCION AGR

DESCRIPCION
DESCRIPCION
0 1 2 3
FACTOR DE CORRECCION 0.8475
INGRESO PRODUCCION AGRICOLA 0.00 77000.46 77000.46 77000.46
COSTO POR PRODUCCION AGRICOLA 0.00 76002.1 76002.1 76002.1

BENEFICIO POR PRODUCCION


AGRICOLA EN LA SITUACION "SIN 0.00 998.4 998.4 998.4
PROYECTO"

INGRESO PRODUCCION AGRICOLA 0.00 600030.00 600030.00 600030.00


COSTO POR PRODUCCION AGRICOLA 0.00 85042.4 85042.4 85042.4

BENEFICIO POR PRODUCCION


AGRICOLA EN LA SITUACION "CON 0.00 514987.6 514987.6 514987.6
PROYECTO"

BENEFICIO INCREMENTAL POR EL


INCREMENTO DE LA PRODUCCION 0.00 513989.26 513989.26 513989.26
AGRICOLA
VENTA DE AGUA (S./) A PRECIOS PRIVADOS

AOS
4 5 6 7 8 9 10
50.85 50.85 50.85 50.85 50.85 50.85 50.85

439365 439365 439365 439365 439365 439365 439365

0.0051 0.0051 0.0051 0.0051 0.0051 0.0051 0.0051

2227.58 2227.58 2227.58 2227.58 2227.58 2227.58 2227.58

59.40 59.40 59.40 59.40 59.40 59.40 59.40

513206 513206 513206 513206 513206 513206 513206


0.0051 0.0051 0.0051 0.0051 0.0051 0.0051 0.0051

2601.95 2601.95 2601.95 2601.95 2601.95 2601.95 2601.95

374.37 374.37 374.37 374.37 374.37 374.37 374.37

VENTA DE AGUA (S./) A PRECIOS SOCIALES

AOS
4 5 6 7 8 9 10
50.85 50.85 50.85 50.85 50.85 50.85 50.85
439365 439365 439365 439365 439365 439365 439365

0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028

1247.80 1247.80 1247.80 1247.80 1247.80 1247.80 1247.80

59.40 59.40 59.40 59.40 59.40 59.40 59.40


513206 513206 513206 513206 513206 513206 513206

0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028

1457.51 1457.51 1457.51 1457.51 1457.51 1457.51 1457.51

209.71 209.71 209.71 209.71 209.71 209.71 209.71

OS TERRENOS AGRICOLAS (S./) A PRECIOS PRIVADOS

AOS
4 5 6 7 8 9 10
100.00 100.00 100.00 100.00 100.00 100.00 100.00

1000.0 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0

100000.00 100000.00 100000.00 100000.00 100000.00 100000.00 100000.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00

1500.0 1500.0 1500.0 1500.0 1500.0 1500.0 1500.0

150000.00 150000.00 150000.00 150000.00 150000.00 150000.00 150000.00

50000.00 50000.00 50000.00 50000.00 50000.00 50000.00 50000.00

LOS TERRENOS AGRICOLAS (S./) A PRECIOS SOCIALES

AOS
4 5 6 7 8 9 10

100.00 100.00 100.00 100.00 100.00 100.00 100.00


1000.0 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0

110175.00 110175.00 110175.00 110175.00 110175.00 110175.00 110175.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00

1500.0 1500.0 1500.0 1500.0 1500.0 1500.0 1500.0

127125.00 127125.00 127125.00 127125.00 127125.00 127125.00 127125.00

16950.00 16950.00 16950.00 16950.00 16950.00 16950.00 16950.00

O EN LA PRODUCCION AGRICOLA A PRECIOS PRIVADOS

AOS
4 5 6 7 8 9 10

90856.00 90856.00 90856.00 90856.00 90856.00 90856.00 90856.00

89678.0 89678.0 89678.0 89678.0 89678.0 89678.0 89678.0

1178.0 1178.0 1178.0 1178.0 1178.0 1178.0 1178.0

708000.00 708000.00 708000.00 708000.00 708000.00 708000.00 708000.00

100345.0 100345.0 100345.0 100345.0 100345.0 100345.0 100345.0

607655.00 607655.00 607655.00 607655.00 607655.00 607655.00 607655.00

606477.00 606477.00 606477.00 606477.00 606477.00 606477.00 606477.00

O EN LA PRODUCCION AGRICOLA A PRECIOS SOCIALES

AOS
4 5 6 7 8 9 10

77000.46 77000.46 77000.46 77000.46 77000.46 77000.46 77000.46


76002.1 76002.1 76002.1 76002.1 76002.1 76002.1 76002.1

998.4 998.4 998.4 998.4 998.4 998.4 998.4

600030.00 600030.00 600030.00 600030.00 600030.00 600030.00 600030.00


85042.4 85042.4 85042.4 85042.4 85042.4 85042.4 85042.4

514987.6 514987.6 514987.6 514987.6 514987.6 514987.6 514987.6

513989.26 513989.26 513989.26 513989.26 513989.26 513989.26 513989.26


FLUJO DE BENEFICIOS TOTALES DEL PROYECTO A PRECIO

AOS
DESCRIPCION
0 1 2 3 4
BENEFICIOS
INCREMENTALES POR LA 0 374 374 374 374
VENTA DE AGUA
BENEFICIOS CON 0 2602.0 2602.0 2602.0 2602.0
PROYECTOS
BENEFICIOS SIN 0 2227.6 2227.6 2227.6 2227.6
PROYECTOS

BENEFICIOS
INCREMENTALES POR LA
VENTA DE TERRENO 0 50000 50000 50000 50000
AGRICOLA
BENEFICIOS CON 0 150000.0 150000.0 150000.0 150000.0
PROYECTOS
BENEFICIOS SIN 0 100000.0 100000.0 100000.0 100000.0
PROYECTOS

BENEFICIOS
INCREMENTALES POR LA 0 606477 606477 606477 606477
PRODUCCION AGRICOLA
BENEFICIOS CON 0 607655.0 607655.0 607655.0 607655.0
PROYECTOS
BENEFICIOS SIN 0 1178.0 1178.0 1178.0 1178.0
PROYECTOS

BENEFICIOS 656851 656851 656851 656851


INCREMENTALES TOTALES
A PRECIOS PRIVADOS

FLUJO DE BENEFICIOS TOTALES DEL PROYECTO A PRECIO

AOS
DESCRIPCION
0 1 2 3 4

BENEFICIOS 0 210 210 210 210


INCREMENTALES POR LA
VENTA DE AGUA
BENEFICIOS CON 0 1457.5 1457.5 1457.5 1457.5
PROYECTOS
BENEFICIOS SIN 0 1247.8 1247.8 1247.8 1247.8
PROYECTOS
BENEFICIOS
INCREMENTALES POR LA 0 16950 16950 16950 16950
VENTA DE TERRENO
AGRICOLA
BENEFICIOS CON 0 127125.0 127125.0 127125.0 127125.0
PROYECTOS
BENEFICIOS SIN 0 110175.0 110175.0 110175.0 110175.0
PROYECTOS

BENEFICIOS 0 513989 513989 513989 513989


INCREMENTALES POR LA
PRODUCCION AGRICOLA
BENEFICIOS CON 0 514987.6 514987.6 514987.6 514987.6
PROYECTOS
BENEFICIOS SIN 0 998.4 998.4 998.4 998.4
PROYECTOS

BENEFICIOS
INCREMENTALES TOTALES 531149 531149 531149 531149
A PRECIOS SOCIALES
ES DEL PROYECTO A PRECIOS PRIVADOS

AOS
5 6 7 8 9 10

374 374 374 374 374 374

2602.0 2602.0 2602.0 2602.0 2602.0 2602.0

2227.6 2227.6 2227.6 2227.6 2227.6 2227.6

50000 50000 50000 50000 50000 50000

150000.0 150000.0 150000.0 150000.0 150000.0 150000.0

100000.0 100000.0 100000.0 100000.0 100000.0 100000.0

606477 606477 606477 606477 606477 606477

607655.0 607655.0 607655.0 607655.0 607655.0 607655.0

1178.0 1178.0 1178.0 1178.0 1178.0 1178.0

656851 656851 656851 656851 656851 656851

ES DEL PROYECTO A PRECIOS SOCIALES

AOS
5 6 7 8 9 10

210 210 210 210 210 210

1457.5 1457.5 1457.5 1457.5 1457.5 1457.5

1247.8 1247.8 1247.8 1247.8 1247.8 1247.8


16950 16950 16950 16950 16950 16950

127125.0 127125.0 127125.0 127125.0 127125.0 127125.0

110175.0 110175.0 110175.0 110175.0 110175.0 110175.0

513989 513989 513989 513989 513989 513989

514987.6 514987.6 514987.6 514987.6 514987.6 514987.6

998.4 998.4 998.4 998.4 998.4 998.4

531149 531149 531149 531149 531149 531149


SUPERFICIE CULTIVADA POR CULTIVO, SEGN LA CEDULA ACTU

Cultivo Area (Ha)


0 1 2 3
(Ha)que 100.00 67.00 67.00 67.00
Demanda Agua
MAIZ 0.22 0.0 22.0 22.00 22.00
FREJOL 0.10 0.0 10.0 10.00 10.00
PAPA 0.13 0.0 13.0 13.00 13.00
ALFALFA 0.10 0.0 10.0 10.00 10.00
FRUTALES 0.12 0.0 12.0 12.00 12.00

0.0 0.0 0.00 0.00


HORTALIZAS 0.00

INGRESOS TOTALES GENERADOS POR LOS CULTIVO

Cultivos Costos/Kg (S./)


0 1 2 3
(Ha)que 100.00 67.00 67.00 67.00
Demanda Agua
MAIZ 5100.00 0.0 112200.0 112200.0 112200.0
FREJOL 2800.00 0.0 28000.0 28000.0 28000.0
PAPA 30300.00 0.0 393900.0 393900.0 393900.0
ALFALFA 5150.00 0.0 51500.0 51500.0 51500.0

0.0 122400.0 122400.0 122400.0


FRUTALES 10200.00
HORTALIZAS 0.0 0.0 0.0 0.0
INGRESOS TOTAL POR 0.0 708000.0 708000.0 708000.0
PRODUCCION AGRICOLA

1.6 179520
3 84000
0.8 315120
4 206000
0.6 73440
0.45 0

858080
TIVO, SEGN LA CEDULA ACTUAL DE CULTIVO - SITUACION "SIN PROYECTO"
AOS
4 5 6 7 8 9 10

67.00 67.00 67.00 67.00 67.00 67.00 67.00

22.00 22.00 22.00 22.00 22.00 22.00 22.00


10.00 10.00 10.00 10.00 10.00 10.00 10.00
13.00 13.00 13.00 13.00 13.00 13.00 13.00
10.00 10.00 10.00 10.00 10.00 10.00 10.00
12.00 12.00 12.00 12.00 12.00 12.00 12.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

GENERADOS POR LOS CULTIVOS - SITUACION "CON PROYECTO"

AOS
4 5 6 7 8 9 10
67.00 67.00 67.00 67.00 67.00 67.00 67.00

112200.0 112200.0 112200.0 112200.0 112200.0 112200.0 112200.0


28000.0 28000.0 28000.0 28000.0 28000.0 28000.0 28000.0
393900.0 393900.0 393900.0 393900.0 393900.0 393900.0 393900.0
51500.0 51500.0 51500.0 51500.0 51500.0 51500.0 51500.0

122400.0 122400.0 122400.0 122400.0 122400.0 122400.0 122400.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0

708000.0 708000.0 708000.0 708000.0 708000.0 708000.0 708000.0


COSTO TOTAL DE PRODUCCION,POR CULTIVO Y POR RUBRO, A PRECIOS P
A
RUBRO
2018 2019 2020 2021

25109.84 25109.84 25109.84 25109.84


Mano de Obra
Calificada 5022.0 5022.0 5022.0 5022.0
No Calificada 20087.9 20087.9 20087.9 20087.9
Materiales y Maquinarias 64568.2 64568.2 64568.2 64568.2
Materiales y/o insumos 49071.8 49071.8 49071.8 49071.8
Maquinas y/o equipos 15496.4 15496.4 15496.4 15496.4
COSTO TOTAL PRECIOS DE 89678.0 89678.0 89678.0 89678.0
MERCADO

COSTO TOTAL DE PRODUCCION,POR CULTIVO Y POR RUBRO, A PR

RUBRO FC
2018 2019 2020
Mano de Obra 12801.00 12801.00 12801.00

0.909 4565.0 4565.0 4565.0


Calificada
No Calificada 0.41 8236.0 8236.0 8236.0
Materiales y Maquinarias 54689.2 54689.2 54689.2
Materiales y/o insumos 0.847 41563.8 41563.8 41563.8
Maquinas y/o equipos 0.847 13125.4 13125.4 13125.4

COSTO TOTAL PRECIOS SOCIALES 67490.2 67490.2 67490.2


POR RUBRO, A PRECIOS PRIVADOS -EN LA SITUACION "SIN PROYECTO"
AOS
2022 2023 2024 2025 2026 2027

25109.84 25109.84 25109.84 25109.84 25109.84 25109.84

5022.0 5022.0 5022.0 5022.0 5022.0 5022.0


20087.9 20087.9 20087.9 20087.9 20087.9 20087.9
64568.2 64568.2 64568.2 64568.2 64568.2 64568.2
49071.8 49071.8 49071.8 49071.8 49071.8 49071.8
15496.4 15496.4 15496.4 15496.4 15496.4 15496.4

89678.0 89678.0 89678.0 89678.0 89678.0 89678.0

TIVO Y POR RUBRO, A PRECIOS SOCIALES -EN LA SITUACION "SIN PROYECTO"

AOS
2021 2022 2023 2024 2025 2026 2027
12801.00 12801.00 12801.00 12801.00 12801.00 12801.00 12801.00

4565.0 4565.0 4565.0 4565.0 4565.0 4565.0 4565.0


8236.0 8236.0 8236.0 8236.0 8236.0 8236.0 8236.0
54689.2 54689.2 54689.2 54689.2 54689.2 54689.2 54689.2
41563.8 41563.8 41563.8 41563.8 41563.8 41563.8 41563.8
13125.4 13125.4 13125.4 13125.4 13125.4 13125.4 13125.4

67490.2 67490.2 67490.2 67490.2 67490.2 67490.2 67490.2


COSTO TOTAL DE PRODUCCION,POR CULTIVO Y POR RUBRO, A PRECIOS PRIVADOS -EN L
AOS
RUBRO
2018 2019 2020 2021 2022

28096.60 28096.60 28096.60 28096.60 28096.60


Mano de Obra
Calificada 5619.3 5619.3 5619.3 5619.3 5619.3
No Calificada 22477.3 22477.3 22477.3 22477.3 22477.3
Materiales y Maquinarias 72248.4 72248.4 72248.4 72248.4 72248.4
Materiales y/o insumos 54908.8 54908.8 54908.8 54908.8 54908.8
Maquinas y/o equipos 17339.6 17339.6 17339.6 17339.6 17339.6
COSTO TOTAL PRECIOS DE 100345.0 100345.0 100345.0 100345.0 100345.0
MERCADO

COSTO TOTAL DE PRODUCCION,POR CULTIVO Y POR RUBRO, A PRECIOS SOCIALE

RUBRO FC A
2018 2019 2020 2021
Mano de Obra 14323.65 14323.65 14323.65 14323.65

0.909 5108.0 5108.0 5108.0 5108.0


Calificada
No Calificada 0.41 9215.7 9215.7 9215.7 9215.7
Materiales y Maquinarias 61194.4 61194.4 61194.4 61194.4
Materiales y/o insumos 0.847 46507.7 46507.7 46507.7 46507.7
Maquinas y/o equipos 0.847 14686.7 14686.7 14686.7 14686.7

COSTO TOTAL PRECIOS SOCIALES 75518.0 75518.0 75518.0 75518.0


PRECIOS PRIVADOS -EN LA SITUACION "CON PROYECTO"
AOS
2023 2024 2025 2026 2027

28096.60 28096.60 28096.60 28096.60 28096.60

5619.3 5619.3 5619.3 5619.3 5619.3


22477.3 22477.3 22477.3 22477.3 22477.3
72248.4 72248.4 72248.4 72248.4 72248.4
54908.8 54908.8 54908.8 54908.8 54908.8
17339.6 17339.6 17339.6 17339.6 17339.6

100345.0 100345.0 100345.0 100345.0 100345.0

BRO, A PRECIOS SOCIALES -EN LA SITUACION "CON PROYECTO"

AOS
2022 2023 2024 2025 2026 2027
14323.65 14323.65 14323.65 14323.65 14323.65 14323.65

5108.0 5108.0 5108.0 5108.0 5108.0 5108.0


9215.7 9215.7 9215.7 9215.7 9215.7 9215.7
61194.4 61194.4 61194.4 61194.4 61194.4 61194.4
46507.7 46507.7 46507.7 46507.7 46507.7 46507.7
14686.7 14686.7 14686.7 14686.7 14686.7 14686.7

75518.0 75518.0 75518.0 75518.0 75518.0 75518.0


DESCRIPCION ALTERNATIVA N01 ALTERNATIVA N02
HORIZONTE DEL PROYECTO 10 aos 10 aos
EJECUCION DE OBRA 2 meses 2 meses
ACCIONES DE CAPACITACION 1 mes 1 mes
AO 1 AO 2
ACTIVIDADES
1 2 3 4 5 6 7 8 9 10 11 12 2 3 4 5 6
FASE DE PRE INVERSION
Estudios a nivel de perfil
FASE DE INVERSION
Expediente Tecnico
Etapa 1: Obras Civiles
Obras Provisionales
Canal Entubado
Camara Rompe presion
Obras de arte
Etapa 2: Supervision de Obras
Supervision de Obras
FASE DE POST INVERSION
Operacin y Mantenimiento
AO 2
7 8 9 10