1.0 ASSEMBLING

I Removepacking.
Ensulethat machineunits areintact atrdthattheyhave
not beendamagedduring transpod.
If damagesto nachine pafs arefound, thesemustbe
irrrmediatelyrotifed to LM.S. INTERNAZIONALE
MEDICO SCIENTIFICA bf refening to the spare-
patscatalogueandindicatingthemachineserialnumber n" 4 M12 bolts
alongwith a photographof the damagedpat.
2 Fix the standto thefloor by meansof thepatssupplied
with the unit.
3 kvelling
4 Shouldthe floor installationnot beeliableenough,flx
the unit to the wall by meansof the partssuppliedwith
theunit.
5 Fit tbegantryro thestand( Fig. l-l ).
6 Visually inspectthe unit conditon,checkfo any
transportdamagesor otherprcblems.
Fig. 1-1
7 Assemblingof the H.T. Generatoritrto its seatin the Ftthe ganttytothe
unitbase. stand.
Usethe two scewslocatedat the baseof the unit.
I Loosen,but do not remove,the oil vent scewon the
H.T. geneator( Fig. 1-2 ).
9 Connectthe thrce wies andthe terminal of the cable
connectedto the H.T. tansformeto the appopiate
terminal boadofl the inverte.
The conductorsl/2 haveto be mountedon the ilverter
power teminal board. Loosenslightly
The cablewith the plug hasto be fit in the appopiate
seaton the inverter card.
10Fit the lateral cover on the glassside
11Ft thereacover. ooooo.lE.-ol
12 Openthe electric boardby meansof the two fixing
bolts. H.T. transformer
13Fix the ray protectionglassusingthe two specialbolts Top view
suppliedwith the unit.
14Inset the tansmissioncableRS232fo the X-my
consoletkough the lateal cover, on the glassside.
Fig.l-2
H.Tgenetol

-20-
Mt
15 Fix the X-ray keyboardto the glasstboughthe tfuee
holes( Fig 1-3).

X-ray console. 3 Holes X-raykeyboard


17Fit the socketwith the plug (CN2/CN3)for the gantry
wiring. This cablecomesout from the supportwhich
conectsthe gantryto the stand.
18 Fix the conneatof the cablefor the signalof the
iodzafio chamberfor the electonic AEC.
19Fit theHigh Voltagecablewith grcatcareinto thestand glassfitting
tbrcugh the appropriatehole. Height adju
20 Fit the appopriateholdiog andwiing batrds,supplied prctectionglass
with the unit, whererequired.
21 AJerwiring the High Voltagecable,iNert its endinto
the specialadaptorin the high-voltagetransformer.
22Install the X-Iay tubein the appropiatetubecarying
backet.
\ 23 Connectthe coDectioncablesto the X-ray tube. Fig.1-g
24 Insef the CPU JP8X-ray cardin its seatin the X-ray X-tay keyboad
ck.
25Install the Front Coveron the stand
26 Carry out the connectionsto the mainspreviously
aanged.

A TTENTION:The unit is supped only with 220

A Volts Single-phase50160EzIf
not this is specifredsolely by the
manufacturer.

27 Ensurethat the safetyswitch otr the panel (I.E.P.)is


positionedall outwards.
28 Make suethatcardsarepfoperly insertedin their ack.
_ 29 Supplypower to the Giotto Unit.
30 A red led appearson the control table
\' It indicatesthat the unit is connectedto the mains.
31Prcss"OI\r' buttonon theX-rayconsole

ATTENTION: Ifafter pressingthe ON button, the


unit doesnot switcheson anil the

A red led starts blinking, possible


carsesare:
a) traNmission failure betweetrthe
two CPU. One located in the X.ray
consoleand the otler in fhe X.ray
rack. Check for the proper
connectionof thetraDsmissioncable
RS232and for proper fitting ofthe
X-ray CPU in its rack.
b) Asynchronous transmission
betweenthe two CPU.
Turn the unit OFF and repeat the
operation.
-21-
rM5
32 Verify alJmoYemenis
Fhst, manuallycheckif limit switchesae wotking
properly,then checkfor movements.
33 Startthe X-y tests.
34 All unit settingshaveto be effectedasPerinstuctions
in chapter"Procedure for movement section
aqiustement"
35 Onceall testsandsettingsa caied out,completethe
urit istallation by fitting the covesof the gantry,the
tube andthe stand.
36 For any unit operatiflgpoblem,rcfer to the chapterin
the use'smanual.
In the tecbnicalmaoual,you cantrd all technical
iDfomation otr the unit.

After completingthe installation,the installe hasto take


careof andcleanthe unit aswell asthe oom.
IMS ecofNlend to perform all opemtionswith utmost
care and that at the time of delivery aod test, pefect
workins conditionsaremet.