CONTROL DIARIO DE EQUIPOS PE

ALQUILER
CAMION
EQUIPO PROPIETARI GRUPO GERCAR
PLATAFOR
MA
PLACA DOH-836 TARIFA S/.
HORAS MN. 8
FECHA TURNO ELEMENTO PEP HM-INICIO HM-FINAL HM DIAS OP HMIN
07/09/2016 DIA 02.41.01 3,450.00 3,456.00 6.00 OK 8.00
08/09/2016 DIA 02.41.01 3,456.00 3,464.00 8.00 OK 8.00
09/09/2016 DIA 02.41.01 3,464.00 3,470.00 6.00 OK 8.00
10/09/2016 DIA 02.41.01 3,470.00 3,476.00 6.00 OK 8.00
11/09/2016 DIA 02.41.01 3,476.00 3,484.00 8.00 OK 8.00
12/09/2016 DIA -- 3,484.00 3,491.00 - 8.00
13/09/2016 DIA -- 3,491.00 3,494.00 - 8.00
14/09/2016 DIA 99.05.02 3,494.00 3,499.00 5.00 OK 8.00
15/09/2016 DIA 02.41.01 3,499.00 3,506.00 7.00 OK 8.00
16/09/2016 DIA -- 3,506.00 3,506.00 - 8.00
17/09/2016 DIA 02.41.02 3,506.00 3,511.00 5.00 OK 8.00
18/09/2016 DIA 02.41.06 3,511.00 3,518.00 7.00 OK 8.00
19/09/2016 DIA 02.41.06 3,518.00 3,521.00 3.00 OK 8.00
20/09/2016 DIA 02.41.06 3,521.00 3,529.00 8.00 OK 8.00
21/09/2016 DIA 3,529.00 3,529.00 - 8.00

69.00 HORAS TRABAJADOS


10.50 DIAS TRABAJADOS
CONTROL DIARIO DE EQUIPOS PESADOS

(HORA)

DISPONIBILIDAD OPERADOR
OPERATIVO G.HUERTAS
OPERATIVO G.HUERTAS
OPERATIVO G.HUERTAS
OPERATIVO G.HUERTAS
OPERATIVO G.HUERTAS
INOPERATIVO G.HUERTAS
INOPERATIVO G.HUERTAS
OPERATIVO G.HUERTAS
OPERATIVO G.HUERTAS
INOPERATIVO G.HUERTAS
OPERATIVO D. QUICARA
OPERATIVO D. QUICARA
OPERATIVO D. QUICARA
OPERATIVO D. QUICARA
INOPERATIVO D. QUICARA

TRABAJADOS
ADOS

OBSERVACIN PARTE 26-Aug-16

UNIDAD PASO REVISON TECNICA EN HUARAZ , NO TRABAJO


UNIDA NO OPERO POR FALTA DE AUTORIZACION DEL EQUIPO.
UNIDAD EMPEZO A TRABAJAR AL MEDIO DIO POR LA AUTORIZACION DEL EQUIPO.

UNIDAD NO OPERO POR FALTA DE OPERADOR.

EQUIPO SE DETUVO A LAS 17.00 POR RUTURA DE BOMBA HUDRAHULICA


RUPTURA DE BOMBA HIDRAHULICA