PURPOSE:
3.0 INPUTS:
OUTPUTS:
5.0 INSTRUCTIONS:
b) Verify the details furnished on process card are related to the card/ sub-system/
Maave Electronics Pvt Limited
WORK INSTRUCTIONS No.: WI/ PROD / 1/ 08
PRODUCTION Prepared By: Rev. No.: 1 Page No
TESTING OF PCB's, Approved By: Page 2 of 6
Date:18/06/2008
SUB-SYSTEMS& SYSTEMS
j) Start testing the given PCBs / sub-systems / systems according to the test
procedure & check the parameters one by one.
k) Adjust the respective variable components if any to get the required measurement
values as per the given format by using the tuning tool. Verify the other
related parameters when tuning is carried out (In certain cases some parameters
may be disturbed when tuning is carried out).
l) Change the test selects component values where ever necessary to get the parameters
as per the format (use always the test selects values, which are given in parts list only).
m) Verify all the parameters once again after testing / tuning is carried out and record
all the readings / results in the given test format.
n) If any problems / faults noticed during testing, keep them away for time being
and continue the testing.
o) Do the sign with date on the process card and test format.
q) Attend all the problem / faulty cards and sub-systems one by one after completion
of testing activity. Identify the problem and rectify with the help of schematic
and trouble shooting procedure.
t) Return all the faulty and test select components on MATERIAL RETURN
NOTE (MRN) to the stores through QAD.
u) Raise the MIR against material return note (MRN) to draw the material for
replaced components or test select values.
v) If any non-conformances are noticed during testing, record the same in process card.
b) If any sub-contracted modules/items are found faulty during testing, return the
same to stores through QAD on MATERIAL RETURN NOTE.
c) Offer the sub-systems/modules to the QAD inspection after completion of testing.
d) Furnish all the details of inspection memo and send to the QAD for offering of
sub- systems/modules with signature and date.
e) Keep ready the test set-up before calling QAD inspector for inspection.
f) The person who is tested the sub- systems/modules must be accompanied with
QAD during inspection.
g) Arrange all QAD accepted sub-systems / modules in the racks in order, So that
the can be utilised during the system testing. If any wiring has to be done with the
system, then hand over the QAD accepted sub-systems / modules to the assembly
supervisor for further process.
TESTING OF SYSTEM:
a) Follow the same instructions as above (5.1) to test the final systems.
c) Arrange the test set-up as per system (final) test set-up drawing.
Maave Electronics Pvt Limited
WORK INSTRUCTIONS No.: WI/ PROD / 1/ 08
PRODUCTION Prepared By: Rev. No.: 1 Page No
TESTING OF PCB's, Approved By: Page 4 of 6
Date:18/06/2008
SUB-SYSTEMS& SYSTEMS
c) Arrange the test set-up as per system (final) test set-up drawing.
d) Ensure the systems having all sub-assemblies and verify the inter connections as
per system assembly drawing before starts testing and prepare the configuration sheet.
e) If any non-conformances are noticed rectify them and record on process cards.
Bring all non -conformances to the knowledge of your incharge for necessary action.
f) On completion of testing keep the systems under aging / burn-in test as
per QUALITYPLAN /SYSTEM SPECIFICATIONS.(If the system is combination
of individual modules, then perform the aging / burn-in test at sub-system level).
g) Monitor all the systems every day at regular time, which are under aging / burn-in test.
Check all the parameters as per format on completion of aging/ burn-in test. Offer
the systems to QAD / customer for inspection. If any deviations are noticed attend
h) Furnish all the details of INSPECTION MEMO and send it to QAD for offering of
final systems with signature and date.
i) For stock orders raise the INSPECTION MEMO on receipt of INSPECTION ADVICE
from P.P.C. (P.P.C issues the INSPECTION ADVICE for stock orders) .
j) Keep ready the test set-up before calling the QAD/customer inspector for inspection.
n) Hand over the copies inspection memo and configuration details to P.P.C
on acceptance of systems and get the signature s on production copies.
o) Hand over the accepted systems (finished goods) to the stores for packing and
dispatch (Stores staff collects the finished goods as per DELIVERY SET LIST on
receipt of DISPATCH ADVICE).
NOTE: If any of the sub-system/modules, systems are need to under go for
VIBRATION TEST, follow the instructions given below.
p) After testing of sub-systems / modules, systems send them to QAD batch wise
on intimation through IOC to perform the vibration test. In case of systems send
them to QAD before keeping in aging / burn-in test.
e) Don't hide any type of non-conformances noticed during the process. Non-conformances
Maave Electronics Pvt Limited
WORK INSTRUCTIONS No.: WI/ PROD / 1/ 08
PRODUCTION Prepared By: Rev. No.: 1 Page No
TESTING OF PCB's, Approved By: Page 6 of 6
Date:18/06/2008
SUB-SYSTEMS& SYSTEMS
are Component failures, parameter deviations due to dry- solders, components mounted in
wrong orientation, mounting of wrong components and mistakes in wiring e.t.c.
f) Check the supply voltage (230V A.C) every day at 9.00 am. The ground to
neutral voltage must be less than 5V. If it is high means improper earthling and
it may damage the test equipment's.
h) Set the required voltage of regulated power supplies before making connections.
i) Check the wrist strap, connecting wires before working on ESD workstations
and record on format. QAD personal checks the resistivity of ESD mats once in a week
and records it on same format. Follow the ESD sensitive devices
handling instructions while handling the ESD sensitive devices.
j) Keep all the connections must be made tight and avoid projections of bare supply
wires when the systems are kept under aging / burn-in test. Otherwise it may cause
the supply short circuits and fire accidents.
k) Care must be taken to avoid the scratches / damages while handling the
sub-systems /systems.
l) Don't disturb the test set-up when production activity running in shifts and
brief the status of testing to next person before leaving.
m) Keep the test equipment's, test jig's and all records at their respective places.
n) Avoid over writings on process cards and test reports and counter sign if any.
7.0 RESPONSIBILITIES: