Vous êtes sur la page 1sur 19

CANTIDADES DE OBRAS

CALCULO DE CANTIDADES PARA CONSTRUCCION DE VIVIENDA DE 42,00 MTS 2

MUNICIPIO
NOMBRE DEL PROYECTO

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL
EJE (S) CON Y/O ENTRE EJE (S) BASE ALTURA
AyD 1Y3 6.00 7.00 42.00
AREA M2

TOTAL ITEM 42.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL GRAFICA
EJE (S) CON Y/O ENTRE EJE (S) BASE ALTURA
AyD 1Y3 6.00 7.00 42.00
LOCALIZACION Y REPLANTEO M2

TOTAL ITEM 42.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) BASE ALTURA
AyD 1Y3 6.00 7.00 42.00 Retiro de capa vegetal
DESCAPOTE M2

TOTAL ITEM 42.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL
EJE (S) CON Y/O ENTRE EJE (S) BASE ALTURA
NIVELACION Y ADECUACION DE AyD 1Y3 6.00 7.00 42.00
M2
TERRENO

TOTAL ITEM 42.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
LONGITUDES
33.78 x 0,25 x 0,22 1.68
CIMENTACION 0.17
8,70 x 0,10 x 0,20
EXCAVACIONES M3 INSTALACION TUBERIAS 6,00 x 0,10 x 0,20 0.12

TOTAL ITEM 1.97

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL
EJE (S) CON Y/O ENTRE EJE (S) LONGITUDES
A 1y3 6.00 6.00
B 1y3 6.00 6.00
C 1y3 6.00 6.00
1 AyB 2.63 2.63
VIGA DE CIMENTACION 0.20 X 0.25 ML 1 ByC 2.63 2.63
2 AyB 2.63 2.63
2 ByC 2.63 2.63
3 AyB 2.63 2.63
3 ByC 2.63 2.63

TOTAL ITEM 33.78

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL
EJE (S) CON Y/O ENTRE EJE (S) LONGITUDES
1 CyD 0.90 0.90
2 CyD 0.90 0.90
VIGA DE CIMENTACION 0.10 X 0.20 ML 0.90
3 CyD 0.90
D 1y3 6.00 6.00

TOTAL ITEM 8.70

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL GRAFICA
EJE (S) CON Y/O ENTRE EJE (S) LONGITUDES
A 1y2 2.82 2.82
A 2y3 2.82 2.82 h a
B 1y2 2.82 2.82
C 1y2 2.82 2.82
VIGA DE CONFINAMIENTO 2.82 b
ML C 2y3 2.82
SUPERIOR 0.18 X 0.12
1 AyD 6.90 6.90
2 AyD 6.90 6.90 Longitudes inclinadas se
3 AyD 6.90 6.90 calculan por Pitgoras
CANTIDADES DE OBRAS
CALCULO DE CANTIDADES PARA CONSTRUCCION DE VIVIENDA DE 42,00 MTS 2

MUNICIPIO
NOMBRE DEL PROYECTO

TOTAL ITEM 34.80

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) LONGITUDES
2' A y A' 1.83 1.83
En muros divisorios de
VIGA CINTA 0.18 X 0,12 ML cocina y bao
A' 2y3 2.82 2.82

TOTAL ITEM 4.65

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD ALTURA
C 1y3 3 2.03 6.09
COLUMNAS DE CONFINAMIENTO EN 7.20
ML B 1y3 3 2.40
CONCRETO SECCION DE 0.12 X 0.18
A 1y3 3 2.77 8.31

TOTAL ITEM 21.600

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD
1 AyB 1 1.25
1 ByC 1 1.25
2 AyB 1 1.01 Sobre ventanas y puertas
DINTELES DE 0.10 X 0.12 ML 2 ByC 1 1.01 que no inician en viga de
A' 2 y 2' 1 0.80 confinamiento superior
A' 2' y 3 1 1.00
A 2' y 3 1 0.90

TOTAL ITEM 7.220

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL GRAFICA
MURO # CON Y/O ENTRE EJE (S) LONGITUDES
M1 C ENTRE 1 Y 2 2,82 x 2,02 5.70
M2 C ENTRE 2 Y 3 (2,82 x 2,02) - (1,00ventana+1,77Puerta) 2.92
M3 2 ENTRE B Y C (2,76 x (( 2,03+2,39)/2) -1,83Puerta) 4.27
M4 B ENTRE 1 Y 2 2,40 x 2,75 6.60
b h a
M5 2 ENTRE A Y B (2,76 x ((2,41+2,79)/2-1,83Puerta) 5.34
M6 A ENTRE 1 Y 2 2,82 x 2,79 7.87
M7 A ENTRE 2 Y 3 (2,82 x 2,78) - 1,70Puerta-0,18Calaos 5.99
MAMPOSTERIA BLOQUE No. 5 M2 L= longitud
M8 2' ENTRE A Y A' (1,83 x (( 2,62+2,85)/2)) 5.01
M9 A' ENTRE 2 Y 3 (2,60 x 2,82) - (1,38Puerta+1,60Puerta) 4.34
M10 3 ENTRE A Y B (2,73 x (( 2,42+2,76)/2)) 7.07 NOTA 1: En muros no rectangulares
se toman las alturas medias h=(a +
M11 3 ENTRE B Y C (2,73 x (( 2,02+2,39)/2)) 6.01 b)/2 NOTA 2: Las
cnatidades negativas correponden a
M12 1 ENTRE B Y C (2,73 x (( 2,02+2,39)/2)) - 1,06Ventana 4.95 vanos y se deben descontar
M13 1 ENTRE A Y B (2,73 x (( 2,42+2,76)/2)) - 1,05Ventana 6.02

TOTAL ITEM 72.09

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) LONGITUDES
1y3 AyD ((2.62x2,62)x4)+(.90x2.77)+(.90x2.63) 32.53
El rea del piso no
PISO E= 7 Cms M2 incluye el rea de las
vigas de cimentacin

TOTAL ITEM 32.53

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) ANCHO LARGO
1y3 AyD 6.10 7.57 46.18 Teja de fibro cemento
CUBIERTA EN TEJA M2

TOTAL ITEM 46.18

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) DIMENSIONES LARGO
1y3 A y A' (0.04 x 0.08) 6.00 6.00
B 2y3 (0.04 x 0.08) 3.00 3.00
CORREAS METALICAS ML 1y3 ByC (0.04 x 0.08) 6.00 6.00
1y3 CyD (0.04 x 0.08) 6.00 6.00
CANTIDADES DE OBRAS
CALCULO DE CANTIDADES PARA CONSTRUCCION DE VIVIENDA DE 42,00 MTS 2

MUNICIPIO
NOMBRE DEL PROYECTO
TOTAL ITEM 21.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL OBSERVACIONES
DIMENSIONES
PISO (1.40 + 0.20 + 1.50) 3.10 Tubera PVC 1/2"
RED HIDRAULICA DE PISO ML

TOTAL ITEM 3.10

DESCRIPCION UNIDAD UBICACIN CALCULO TOTAL


SANITARIO 1.00 1.00
DUCHA 1.00 1.00
PUNTO HIDRAULICO P.V.C. UNIDAD LAVAMANOS 1.00 1.00
LAVADERO 1.00 1.00
LAVAPLATOS 1.00 1.00

TOTAL ITEM 5.00

DESCRIPCION UNIDAD UBICACIN CALCULO TOTAL


HABITACION 1 3.00 3.00
HABITACION 2 3.00 3.00
PUNTO ELECTRICO gl SALON COMEDOR 3.00 3.00
COCINA 3.00 3.00
BAO 3.00 3.00

TOTAL ITEM 15.00

DESCRIPCION UNIDAD UBICACIN CALCULO TOTAL


1.00
RED ELECTRICA INTERNA GL

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
CANTIDAD
DUCHA 1.00 1.00
LAVADERO 1.00 1.00
PUNTO SANITARIO 2" UNIDAD LAVAPLATOS 1.00 1.00
LAVAMANOS 1.00 1.00

TOTAL ITEM 4.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
DIMENSIONES
PISO 1.00 1.00
RED SANITARIA DE PISO 2" GL

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
CANTIDAD
SANITARIO 1.00 1.00
PUNTO SANITARIO 4" UNIDAD

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
DIMENSIONES
1.00
RED SANITARIA DE PISO 4" GL

TOTAL ITEM 1.00


CANTIDADES DE OBRAS
CALCULO DE CANTIDADES PARA CONSTRUCCION DE VIVIENDA DE 42,00 MTS 2

MUNICIPIO
NOMBRE DEL PROYECTO

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
CANTIDAD
LAVAPLATOS 1.00 1.00
DUCHA 1.00 1.00
REGISTRO DE PASO UNIDAD LAVADERO 1.00 1.00
ENTRADA RED 1.00 1.00

TOTAL ITEM 4.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD DIMENSIONES
SALON MULTIPLE 1.00 0,88 x 2,00 1.00 Incluye chapa
PUERTA METALICA UNIDAD

TOTAL ITEM 1.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD DIMENSIONES
PUERTA METALICA UNIDAD ACCESO PATIO LAVADERO 1.00 0,74 x 2,03 1.00 Incluye pasador

TOTAL ITEM 1.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD DIMENSIONES
PUERTA MADERA UNIDAD ACCESO BAO 1.00 0,65 x 2,00 1.00 Incluye pasador

TOTAL ITEM 1.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD DIMENSIONES
HABITACION 1 1.00 1,09 x 0,86 1.00 No incluye vidrios
VENTANA METALICA UNIDAD HABITACION 2 1.00 1,09 x 0,86 1.00
SALON MULTIPLE 1.00 1,09 x 0,92 1.00

TOTAL ITEM 3.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL OBSERVACIONES
CANTIDAD
BAO 1.00 1.00 Incluye accesorios y
SANITARIO UNIDAD
tapas

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
ANCHO ALTO
BAO PARED 2.40 1.80 4.32
ENCHAPES DE MUROS M2 BAO PISO 1.20 0.60 0.72

TOTAL ITEM 5.04

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
CANTIDAD DIMENSIONES
COCINA 1.00 0,50 x 1.00 1.00
MESON DE COCINA UNIDAD

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL OBSERVACIONES
CANTIDAD
PARTE POSTERIOR DE LA CASA 1.00 1.00 Se puede trasladar al
LAVADERO UNIDAD momento de la
ampliacin
CANTIDADES DE OBRAS
CALCULO DE CANTIDADES PARA CONSTRUCCION DE VIVIENDA DE 42,00 MTS 2

MUNICIPIO
NOMBRE DEL PROYECTO
TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL OBSERVACIONES
CANTIDAD DIMENSIONES
UNIDAD SANITARIA 1.00 0,68 x 0,68 x 0,75 1.00 Interna de la casa
CAJA DE INSPECCIN UNIDAD
Hay alcnatarillado

TOTAL ITEM 1.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL OBSERVACIONES
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD ALTURA
D 1y3 6.00 CANAL 6.00 En lmina galvanizada
BAJANTES Y CANALES ML
D 1y3 3.00 BAJANTE 3.00

9.00

UBICACIN CALCULO
DESCRIPCION UNIDAD TOTAL
EJE (S) CON Y/O ENTRE EJE (S) CANTIDAD
1' CyD 1.00 1.00
CAJA DE CIRCUITOS UNIDAD

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
CANTIDAD
BAO 1.00 1.00
LAVAMANOS UNIDAD

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
CANTIDAD
BAO 1.00 1.00
DUCHA UNIDAD

TOTAL ITEM 1.00

CALCULO
DESCRIPCION UNIDAD UBICACIN TOTAL
CANTIDAD
MESON DE COCINA 1.00 1.00
LAVAPLATOS UNIDAD

TOTAL ITEM 1.00


CANTIDADES DE OBRA

DEPARTAMENTO ###
MUNICIPIO ###

PROYECTO #REF!

REA DE CONSTRUCCIN

LARGO X ANCHO

7 X 6.00 TOTAL = 42.00 M2

01 OBRAS PRELIMINARES

Replanteo:

LARGO X ANCHO

7 X 6.00 TOTAL = 42.00 M2

Nivelacin del terreno a mano:

LARGO X ANCHO

7 X 6.00 TOTAL = 42.00 M2

Descapote a mano:

LARGO X ANCHO

7 X 6.00 TOTAL = 42.00 M2


CANTIDADES DE OBRA

DEPARTAMENTO ###
MUNICIPIO ###

PROYECTO #REF!

02 CIMENTACIN

Excavacion a mano M3

EJES ENTRE LONG. ALTO ANCHO VOL.


ML
A 1Y3 6.00 x 0.20 x 0.25 = 0.30 M3
B 1Y2 6.00 x 0.20 x 0.25 = 0.30 M3
C 1Y3 6.00 x 0.20 x 0.25 = 0.30 M3
1 AYB 2.63 x 0.20 x 0.25 = 0.13 M3
1 BYC 2.63 x 0.20 x 0.25 = 0.13 M3
2 AYB 2.63 x 0.20 x 0.25 = 0.13 M3
2 BYC 2.63 x 0.20 x 0.25 = 0.13 M3
3 AYC 5.50 x 0.20 x 0.25 = 0.28 M3
SUBTOTAL = 1.70 M3

ANCHO LARGO ALTO VOL.

ANDEN= 0.10 x 8.70 x 0.2 = 0.17 M3

POZO SPTICO = 1.00 x 2.00 x 1.1 = 2.20 M3

TRAMPA DE GRASA = 0.60 x 0.60 x 0.6 = 0.22 M3

CAJA REPARTICION = 0.60 x 0.60 x 0.4 = 0.14 M3

TOTAL = 4.44 M3

Viga de Cimentacin ml 0.25 X ### MTS

EJES LONG.

1 6.00 ML
2 6.00 ML
3 6.00 ML
A 5.26 ML
B 5.26 ML
C 5.26 ML
TOTAL = 33.78 ML
CANTIDADES DE OBRA

DEPARTAMENTO ###
MUNICIPIO ###

PROYECTO #REF!

Viga de Anden Fachada ### x 0.2 MT

6 + 0.9 * 3 = 8.70 ML

03 ESTRUCUTRAS

Viga de confinamiento superior ### x ### MT

EJES LONG.

1 6.66 ML
2 6.66 ML
3 6.66 ML
A 5.64 ML
B 2.82 ML
C 5.64 ML
TOTAL = 34.08 ML

Viga cinta (Muros Baos) ### x 0.1 MT

1.92 + 1.24 = 3.16 ML

Columnas de confinamiento 0.18 X 0.12

EJE ML
A -1 2.77
A-2 2.77
A-3 2.77
B-1 2.42
B-2 2.42
B-3 2.42
C-1 2.04
C-2 2.04
C-3 2.04
CANTIDADES DE OBRA

DEPARTAMENTO ###
MUNICIPIO ###

PROYECTO #REF!
21.69 ML

Dinteles 0 X 0.1 MTS

3 ventanas 1.4 3 ###


3 puertas 1.2 3 ###
7.80 ML

04 MAMPOSTERIA

Mamposteria en Bloque # 5

MURO M2 REA
1 = 2.82*2.02 5.70 M2

2 = 2.82*2.02-2.02*0.9-1.09*0.96 2.83 M2

3 = 2.76+(2.04+2.39)/2-2.02*0.9 3.16 M2

4 = 2.75*2.42 6.66 M2

5 = 1.86*(2.42+2.77/2-2.02*0.90 3.01 M2

6 = 1.92*2 3.84 M2

7 = 0.6*2 1.20 M2

8 = 2.82*2.79 7.87 M2

9 = 2.82*1.79-0.75*2.02 3.53 M2

10 = 2.73*(2.42+2.77)/2-1.09*0.96 6.04 M2

11 = 2.73*(2.04+2.39)/2-1.09*0.96 5.00 M2

12 = 2.73*(2.04+2.39)/2 6.05 M2

13 = 2.73*(2.42+2.77)/2 7.08 M2

61.97 M2
CANTIDADES DE OBRA

DEPARTAMENTO ###
MUNICIPIO ###

PROYECTO #REF!

Meson de Cocina = 1.0 Und

05 PISOS

Placa de Concreto 2.500 PSI. (E = 7 cm )

(2.85*2.85) *2 + (2.85*5.80) + (0.90*6)

= 16.245 + 16.53 + 5.4

Total = 38.18 M2

06 CUBIERTA

Cercha

3 cerchas de 6.40 Ml segn diseo 19.20 ML

Bajantes
h v
1 + 2
3 ML

Canales
h
6.60
6.60 ML

Cubierta de zinc
CANTIDADES DE OBRA

DEPARTAMENTO ###
MUNICIPIO ###

PROYECTO #REF!
ANCHO LARGO

7.37 X 6.6 = 48.642 M2

48.642 M2

#REF!

Punto Hidraulico Cantidad = 4.0 Und

Red Hidraulica Cantidad = 1.0 Gl

Lavadero Prefabricado Cantidad = 1.0 Und

Registro de paso Cantidad = 1.0 Und

Tanque de agua y accesorios Cantidad = 1.0 Und

#REF!

Caja de circuitos Cantidad = 1.0 Und

Red Electrica interna Cantidad = 1.0 Gl

Punto Electrico y Accesorios Cantidad = ### Punto

#REF!

Punto Sanitario de 2" Cantidad = 4.0 Punto

Red Sanitaria de 4" Cantidad = 1.0 Gl

Punto Sanitario de 4" Cantidad = 1.0 Punto


CANTIDADES DE OBRA

DEPARTAMENTO ###
MUNICIPIO ###

PROYECTO #REF!
Red Sanitaria Piso de 2" Cantidad = 1.0 Gl

### Cantidad = 1.0 Und

### Cantidad = 1.0 Und

### Cantidad = 1.0 Und

### Cantidad = 1.0 Und

### Cantidad = 1.0 Juego

#REF!

Enchape de Muros M2 6.00 M2


Enchape Mesn de la cocina M2 2.00 M2

#REF!

### Und 1.00


### Und 1.00
### Und 1.00
### Und 2.00

13 POZO SPTICO

Pozo Sptico artesanal 1.0 Und

EDUARDO MONTOYA DUQUE


Ing. Civil
ANALISIS DE PRECIOS UNITARIOS - PRINCIPAL
PROYECTO DE VIVIENDA DE INTERES SOCIAL

APU No.

DEPARTAMENTO MUNICIPIO LOCALIDAD

ACTIVIDAD: LOCALIZACION Y REPLANTEO LOTE UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES
DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

Madera (estantillos) Und 1.00 0.00

SUBTOTAL $0.00
2. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL


Ayudante 0 42.00 0.00

SUBTOTAL $0.00
3. OTRA MANO DE OBRA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL


Oficial 0.51 0.00 42.00 0.00

SUBTOTAL $0.00
4. OTROS

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

SUBTOTAL $0.00

TOTAL $0.00

GUSTAVO ADOLFO HENAO TROCHEZ


No. C.C.: 14.890.405
No. M.P. A250
BANCO AGRARIO DE COLOMBIA
PROGRAMA VIVIENDA RURAL

ANALISIS DE PRECIOS UNITARIOS

DEPARTAMENTO MUNICIPIO CATEGORIA

#REF! #REF! #REF!

ACTIVIDAD: ESMALTADO O AFINADO DE PISOS UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES
DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

CEMENTO KG 0.30 #REF! #REF!


PROMICAL KG 0.01 #REF! #REF!

SUBTOTAL #REF!

2. MANO DE OBRA COMUNITARIA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Ayudante #REF! 60.00 #REF!

SUBTOTAL #REF!

3. OTRA MANO DE OBRA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Oficial #REF! 0.50 #REF! 60.00 #REF!

SUBTOTAL #REF!

4. OTROS
DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL
Herramienta me 50.00

SUBTOTAL $50.00

TOTAL COSTOS DIRECTOS #REF!

07/03/2017359560433.xls72
ANALISIS DE PRECIOS UNITARIOS
PROYECTO DE VIVIENDA DE INTERES SOCIAL

DEPARTAMENTO MUNICIPIO LOCALIDAD

ACTIVIDAD: COLUMNETA Y PLACA TANQUE UNIDAD: UN


H=0,40, Seccin= .18mtsX.12mts, Placa de 0,5X0.50x,07

A. COSTOS DIRECTOS

I. MATERIALES
DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

Concreto 2500 psi m3 0.03 0.00


Hierro 3/8" kgr 8.29 0.00
Hierro 1/4" kgr 0.48 0.00
Formaleta ml 2.00 0.00
Alambre negro #18 kgr 1.00 0.00
Puntilla 1" lbr 1.00 0.00
0.00

SUBTOTAL $0.00

2. MANO DE OBRA COMUNITARIA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Ayudante 2.00 0.00

SUBTOTAL $0

3. OTRA MANO DE OBRA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Oficial 0.40 0.00 2.00 0.00

SUBTOTAL $0.00

4. OTROS
DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL
Herramienta meno gl 500.00

SUBTOTAL $500.00

TOTAL COSTOS DIRECTOS $500


ANALISIS DE PRECIOS UNITARIOS

DEPARTAMENTO MUNICIPIO CATEGORIA

ACTIVIDAD: HIERRO, FIGURACIN Y ARMADO UNIDAD: KG

A. COSTOS DIRECTOS

I. MATERIALES
DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL
Hierro 1/4 (2) y 3/8 (3) kg 1.00 0.00
Hierro 1/2 (4) kg 1.00 0.00
Hierro 5/8 (5) y 3/4 (6) kg 1.00 0.00
Hierro 7/8 (7) y 1 (8) kg 1.00 0.00
Alambre negro No. 18 para 2y3 kg 0.01 0.00
Alambre negro No. 18 para 4 kg 0.04 0.00
Alambre negro No. 18 para 5y6 kg 0.06 0.00
Alambre negro No. 18 para 7y8 kg 0.09 0.00

SUBTOTAL 2 y 3 $0.00
SUBTOTAL 4 $0.00
SUBTOTAL 5 y 6 $0.00
SUBTOTAL 7 y 8 $0.00

2. MANO DE OBRA COMUNITARIA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Ayudante 1 - 200.00 0.00
Ayudante 1 - 180.00 0.00
Ayudante 1 - 170.00 0.00
Ayudante 1 - 150.00 0.00

SUBTOTAL 2 y 3 $0
SUBTOTAL 4 $0
SUBTOTAL 5 y 6 $0
SUBTOTAL 7 y 8 $0

3. OTRA MANO DE OBRA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Oficial 0.40 0.00 200.00 0.00
Oficial 0.40 0.00 180.00 0.00
Oficial 0.40 0.00 170.00 0.00
Oficial 0.40 0.00 150.00 0.00

SUBTOTAL 2 y 3 $0.00
SUBTOTAL 4 $0.00
SUBTOTAL 5 y 6 $0.00
SUBTOTAL 7 y 8 $0.00
4. OTROS
DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL
Herramienta meno 10.00

SUBTOTAL $10.00

TOTAL COSTOS DIRECTOS 2 y 3 $10


TOTAL COSTOS DIRECTOS 4 $10
TOTAL COSTOS DIRECTOS 5 y 6 $10
TOTAL COSTOS DIRECTOS 7 y 8 $10

07/03/2017359560433.xlsHierro
ANALISIS DE PRECIOS UNITARIOS

DEPARTAMENTO MUNICIPIO CATEGORIA

#REF! #REF! #REF!

ACTIVIDAD: COLUMNAS DE CONCRETO ARMADO 20X15 UNIDAD: ML


COLUMNAS DE CONCRETO ARMADO 18X12
COLUMNAS DE CONCRETO ARMADO 15X15
A. COSTOS DIRECTOS

I. MATERIALES
DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL
Concreto 3000 PSI 20X15 + 5% despe m3 0.0330 0.00
Varilla 1/2" Kg 4.00 0.00
Hierro 1/4 (20x15) kg 1.05 0.00
Alambre negro N 18 Kg 0.18 0.00
Tabla chapa 3x0.30 metros Und 0.33 0.00
puntilla 2" Lb 0.01 0.00
Concreto 3000 PSI 20X10 + 5% despe m3 0.022 0.00
Hierro 1/4 (20x10) kg 1.00 0.00
Concreto 3000 PSI 15X15 + 5% despe m3 0.025 0.00
Hierro 1/4 (15x15) kg 0.90 0.00

SUBTOTAL 20 x15 $0.00


SUBTOTAL 18X12 $0.00
SUBTOTAL 15 x15 $0.00

2. MANO DE OBRA COMUNITARIA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Ayudante (20X15) 12.00 0.00
Ayudante (20X10) 14.00 0.00
Ayudante (15X15) 13.00 0.00

SUBTOTAL 20 x15 $0.00


SUBTOTAL 18X12 $0.00
SUBTOTAL 15 x15 $0.00
3. OTRA MANO DE OBRA
TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Oficial (20X15) 0.40 0.00 12.00 0.00
Oficial (20X10) 0.40 0.00 14.00 0.00
Oficial (15X15) 0.40 0.00 13.00 0.00

SUBTOTAL 20 x15 $0.00


SUBTOTAL 18x12 $0.00
SUBTOTAL 15 x15 $0.00
4. OTROS
DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL
Herramienta meno

SUBTOTAL $0.00

TOTAL COSTOS DIRECTOS 20 X15 $0.00


TOTAL COSTOS DIRECTOS 18X12 $0.00
TOTAL COSTOS DIRECTOS 15 X15 $0.00

07/03/2017359560433.xlsCOLU CONCRETOREF
ANALISIS DE PRECIOS UNITARIOS

DEPARTAMENTO MUNICIPIO CATEGORIA

ACTIVIDAD: VIGA DE CIMENTACIN EN CONCRETO (25cm x UNIDAD: ML


20 cm), (CAPITULO E.5.2 NSR 98)

A. COSTOS DIRECTOS

I. MATERIALES
DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL
Concreto 3000 psi m3 0.0
Hierro 1/2" kgr 0
Hierro 1/4" E c/10 cm desde col
hasta 1 m y c/15 cm resto kgr 0
Tabla formaleta gl 0
Puntilla 2" lbr 0
0

SUBTOTAL $0.00

2. MANO DE OBRA COMUNITARIA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Ayudante ml/H/D 16.00 -

SUBTOTAL $0.00

3. OTRA MANO DE OBRA


TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Oficial 0.50 0.00 16.00 0.00

SUBTOTAL $0.00

4. OTROS
DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL
Herramienta meno 100.00

SUBTOTAL $100.00

TOTAL COSTOS DIRECTOS $100.00

07/03/2017359560433.xlsViga Ciment
ANALISIS DE PRECIOS UNITARIOS

DEPARTAMENTO MUNICIPIO CATEGORIA

SOBRECIMIENTO 20cm x 12cm (con paete impermeabilizado)


ACTIVIDAD:
SOBRECIMIENTO 25cm x 12cm (con paete impermeabilizado)
UNIDAD: ML
SOBRECIMIENTO 25cm x 15cm (con paete impermeabilizado)

A. COSTOS DIRECTOS

I. MATERIALES
DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL
Sika 1 Imp. Integral Kg 0.35 0.00
Cemento Gris kg 5.00 0.00
Arena m3 0.02 0.00
Ladrillo tolete 6 x 12 x 24,5
Tabique e=12, H=20 Und. 15.00 0.00
Ladrillo tolete 6 x 12 x 24,5
Tabique e=12, H=25 Und. 17.00 0.00
Ladrillo tolete 6 x 15 x 24,5
Tabique e=15, H=25 Und. 17.00 0.00

SUBTOTAL 20 X 12 $0.00
SUBTOTAL 25 X 12 $0.00
SUBTOTAL 25 X 15 $0.00
2. MANO DE OBRA COMUNITARIA
TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Ayudante 20.00 0.00


Ayudante 18.00 0.00

SUBTOTAL 20 X 12 $0.00
SUBTOTAL 25 X 12 $0.00
SUBTOTAL 25 X 15 $0.00
3. OTRA MANO DE OBRA
TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL
Oficial 0.50 0.00 20.00 0.00
Oficial 0.50 0.00 18.00 0.00

SUBTOTAL 20 X 12 $0.00
SUBTOTAL 25 X 12 $0.00
SUBTOTAL 25 X 15 $0.00
4. OTROS
DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL
Transporte M2

SUBTOTAL $0.00

TOTAL COSTOS DIRECTOS 20 X12 $0.00


TOTAL COSTOS DIRECTOS 25 X12 $0.00
TOTAL COSTOS DIRECTOS 25 X15 $0.00

07/03/2017359560433.xlsSobrecimiento