Vous êtes sur la page 1sur 3

Transcom Beverages Limited.

Head Office: Gulshan Tower, 10 Floor, Plot# 31, Road # 53


Gulshan North C/A, Dhaka-1212,Phone:8834586, 9861932 Fax:8834584
DHK Factory:Telirchala,Mouchak,Kaliakoir,Gazipur,Bangladesh
Bagher bazar, baniarchala, mawna, Gazipur-1700, bangladesh
Tel: 031-670381, 031-670480 Fax: 880-31-672297
Work Order/ Purchase Order
Accaunts copy S.L No: 75/17
To : Innovation EME services Ltd. Our W.O/P.O. No:TBL/BP_Proj pet-01/EE//75/2017
Alba tower( 5th floor), plot no.2/6, pallabi section-11(mirpur 11.5 bus stand ), Date:4th june,2017
Dhaka-1216 Cell: 01711-834599 Your Quoation No:

Work order on Bagher Bazar plant syrup room siemens PLC Component
Unit Price Total Price
Sl.No Description Unit Qty
Tk. Tk.

Product details:
Industrial LED Flood light
Model: SMD 3030
Power: 100W
1.0 Lumen Efficiency: 110 Lm/watts
Light Distribution angle: 120'
Life Time: 56000 Hr
AC Voltage: 85 to 265V
Body Materials: Aluminium,IP65
Model: ILED-FL100W-009
Brand: Innovation LED
Warrenty: 3 years nos 15 7,200.00 108000.00

2.0 LED Flood light installetion, cable Laying and termination with
supply flexible cable 3Cx1.5/2.00mm2 SDB(PVC) Wall
mounted,MCB 6A PVC Tape and other fixing materials Set 15 1850 27750.00
0.00
Total(Tk) 135,750.00
VAT & AIT@15% 19,612.00
Discount 5,000.00
Grand Total(Tk) 150362.00

Inword: One lakh fifty thausand three hundred and sixty twoTaka only

Terms & Condition


Payment Terms:
No advance payment will be made. Final bill payment will be within 35 days from the final submission (without any error) of bill after formal hand over and
take over of the job.

Bagher
Supply and installetion/Job completion Date, Time & Place: The delivery must be completed by 10 days from the date W/O issuedbazar PlantPlant.
at Gazipur

VAT & Tax issue:AIT & VAT to be deducted from the bill as per relevant laws.

Warranty: To be reworked/redelivery at free of cost for any problem due to construction quality issues.

Penalty: In case of delay completion from specified date, 5% of total contract/ WO value will be deducted as penalty for every weeks delay but total
penalty will not exceeds over 25% of contract value. If causes of delay is beyond control of contractor or company, decision will be taken on mutual
understanding.
Others:
1. During the work, value of work order may change due to change of job volume. In that case value of actual bill will be based on actual
measurements and rates are on mutual understanding. If any change are necessary during the execution of work these will be done with
mutual aggrement.
2. The contractor's pepole must follow the industrial safety rules and regulations and best policies, if they not followed safety regulations
they will not be allowed to do the work. Contractor will be liable for all accidential loss caused by their activities. Contractor's people will
resides outside of the premises.

Initiated by Authorised by Approved by


Please sign & return the Duplicate Copy as taken of your acceptance,

Signature of the supplier


Transcom Beverages Limited.
Head Office: Gulshan Tower, 10 Floor, Plot# 31, Road # 53
Gulshan North C/A, Dhaka-1212,Phone:8834586, 9861932 Fax:8834584
DHK Factory:Telirchala,Mouchak,Kaliakoir,Gazipur,Bangladesh
Bagher bazar, baniarchala, mawna, Gazipur-1700, bangladesh
Tel: 031-670381, 031-670480 Fax: 880-31-672297
Work Order/ Purchase Order
Office Copy: S.L No: 75/17
To : Innovation EME services Ltd. Our W.O/P.O. No:TBL/BP_Proj pet-01/EE//75/2017
Alba tower( 5th floor), plot no.2/6, pallabi section-11(mirpur 11.5 bus stand ), Date:4th june,2017
Dhaka-1216 Cell: 01711-834599 Your Quoation No:

Work order on Bagher Bazar plant syrup room siemens PLC Component
Unit Price Total Price
Sl.No Description Unit Qty
Tk. Tk.

Product details:
Industrial LED Flood light
Model: SMD 3030
Power: 100W
1.0 Lumen Efficiency: 110 Lm/watts
Light Distribution angle: 120'
Life Time: 56000 Hr
AC Voltage: 85 to 265V
Body Materials: Aluminium,IP65
Model: ILED-FL100W-009
Brand: Innovation LED
Warrenty: 3 years nos 15 7,200.00 108000.00

2.0 LED Flood light installetion, cable Laying and termination with
supply flexible cable 3Cx1.5/2.00mm2 SDB(PVC) Wall
mounted,MCB 6A PVC Tape and other fixing materials Set 15 1850 27750.00
0.00
Total(Tk) 135,750.00
VAT & AIT@15% 19,612.00
Discount 5,000.00
Grand Total(Tk) 150362.00

Inword: One lakh fifty thausand three hundred and sixty twoTaka only

Terms & Condition


Payment Terms:
No advance payment will be made. Final bill payment will be within 35 days from the final submission (without any error) of bill after formal hand over and
take over of the job.

Bagher
Supply and installetion/Job completion Date, Time & Place: The delivery must be completed by 10 days from the date W/O issuedbazar PlantPlant.
at Gazipur

VAT & Tax issue:AIT & VAT to be deducted from the bill as per relevant laws.

Warranty: To be reworked/redelivery at free of cost for any problem due to construction quality issues.

Penalty: In case of delay completion from specified date, 5% of total contract/ WO value will be deducted as penalty for every weeks delay but total
penalty will not exceeds over 25% of contract value. If causes of delay is beyond control of contractor or company, decision will be taken on mutual
understanding.
Others:
1. During the work, value of work order may change due to change of job volume. In that case value of actual bill will be based on actual
measurements and rates are on mutual understanding. If any change are necessary during the execution of work these will be done with
mutual aggrement.
2. The contractor's pepole must follow the industrial safety rules and regulations and best policies, if they not followed safety regulations
they will not be allowed to do the work. Contractor will be liable for all accidential loss caused by their activities. Contractor's people will
resides outside of the premises.

Initiated by Authorised by Approved by


Please sign & return the Duplicate Copy as taken of your acceptance,

Signature of the supplier


Transcom Beverages Limited.
Head Office: Gulshan Tower, 10 Floor, Plot# 31, Road # 53
Gulshan North C/A, Dhaka-1212,Phone:8834586, 9861932 Fax:8834584
DHK Factory:Telirchala,Mouchak,Kaliakoir,Gazipur,Bangladesh
Bagher bazar, baniarchala, mawna, Gazipur-1700, bangladesh
Tel: 031-670381, 031-670480 Fax: 880-31-672297
Work Order/ Purchase Order
Customer Copy: S.L No: 07/17
To : Innovation EME services Ltd. Our W.O/P.O. No:TBL/Husky-7 Proj /07/2017
Alba tower( 5th floor), plot no.2/6, pallabi section-11(mirpur 11.5 bus stand ), Date:13th june,2017
Dhaka-1216 Cell: 01711-834599 Your Quoation No:

Work order on Fabrication of cooling tower pipe line for husky-07


Unit Price Total Price
Sl.No Description Unit Qty
Tk. Tk.
1.0 Fabrication & Installetion of cooling tower pipe line works Lot 1 189,365.00 189365.00
Total(Tk) 189,365.00
VAT & AIT@15% 28,404.75
Discount
Grand Total(Tk) 217769.75

Inword: Two lakh seventeen thausand seven hundred & sixty nineTaka only

Terms & Condition


Payment Terms:
No advance payment will be made. Final bill payment will be within 35 days from the final submission (without any error) of bill after formal hand over and
take over of the job.

Bagher
Supply and installetion/Job completion Date, Time & Place: The delivery must be completed by 10 days from the date W/O issuedbazar PlantPlant.
at Gazipur

VAT & Tax issue:AIT & VAT to be deducted from the bill as per relevant laws.

Warranty: To be reworked/redelivery at free of cost for any problem due to construction quality issues.

Penalty: In case of delay completion from specified date, 5% of total contract/ WO value will be deducted as penalty for every weeks delay but total
penalty will not exceeds over 25% of contract value. If causes of delay is beyond control of contractor or company, decision will be taken on mutual
understanding.
Others:
1. During the work, value of work order may change due to change of job volume. In that case value of actual bill will be based on actual
measurements and rates are on mutual understanding. If any change are necessary during the execution of work these will be done with
mutual aggrement.
2. The contractor's pepole must follow the industrial safety rules and regulations and best policies, if they not followed safety regulations
they will not be allowed to do the work. Contractor will be liable for all accidential loss caused by their activities. Contractor's people will
resides outside of the premises.

Initiated by Authorised by Approved by


Please sign & return the Duplicate Copy as taken of your acceptance,

Signature of the supplier

Vous aimerez peut-être aussi