Experimental Procedure: Put the main Switch on. Start the Condenser fan and wait for 5 minutes. Switch ON Compressor. Start the Evaporator fan. Wait for 45 minutes to achieve steady state condition. Meassure time for 10 flashes of enrgy meter for compresser. Note down the reading in observation table. REFRIGERATION TEST RIG Experimental Procedure: Put the main Switch on. Start the water pump. Start the Condenser fan and wait for 5 minutes. Switch ON Compressor. Wait for 45 minutes to achieve steady state condition. Meassure time for 10 flashes of enrgy meter for compresser. Note down the reading in observation table. ICE PLANT TEST RIG Experimental Procedure: Check the Brine in the tank. Fill the water in the ice can up to line mark. Load the ice can on the frame. Put the main Switch on. Start the water pump. Start the Condenser fan and wait for 5 minutes. Switch ON Compressor. Wait for 2-3 hours to achieve steady state condition. Meassure time for 10 flashes of enrgy meter for compresser. Note down the reading in observation table. AIR CONDITIONER TEST RIG. Experimental Procedure: Switch ON the power supply of unit and start the duct fan. Start the Condenser fan and wait for 5 minutes. Switch ON Compressor and the flow of liquid refrigerant will observed in the rotameter. Wait for 45 minutes to achieve steady state condition. Meassure time for 10 flashes of enrgy meter for compresser. Note down the reading in observation table. For different processes start different component and switch that after reading. VAPOUR ABSORPTION REFRIGERATION TEST RIG. Experimental Procedure: Put the main Switch on. Switch ON generator. Wait for 45 minutes to achieve steady state condition. Meassure time for 10 flashes of enrgy meter for Heater/Generator. Note down the reading in observation table.