Vous êtes sur la page 1sur 8

Work Assigned

Sl.No Date Name


(HR NAME)

Parmesh
1 15/12/2014 Shruthi Shivanand
Manthesh
Parmesh
2 16/12/2014 Shruthi GP
Manthesh
Parmesh
3 17/12/2014 Shruthi GP
Parmesh
Parmesh
4 18/12/2014 Shruthi
Parmesh

Parmesh
6 19/12/2014 Shruthi
Parmesh

Parmesh
7 20/12/2014 Shruthi
Parmesh

Parmesh
8 22/12/2014 Shruthi
Parmesh
Shivanand
GP
9 23/12/2014 Shruthi
GP
Shivanand
10 24/12/2014 Shruthi
GP
11 25/12/2014 Shruthi Parmesh

Gp
12 26/12/2014 Shruthi
Parmesh
Parmesh

13 27/12/2014 Shruthi Parmesh

Parmesh

14 29/12/2014 Shruthi Parmesh


Parmesh
15 30/12/2014 Shruthi
Parmesh
15 30/12/2014 Shruthi
Parmesh
Parmesh
16 31/12/2014 Shruthi Gp
Parmesh

17 2/1/2015 Shruthi Parmesh

Office Work
18 3/1/2015 Shruthi GP
Parmesh
SUNDAY
Parmesh
Shruthi Parmesh
19 5/1/2015
Parmesh
Balesh & Akshay GP
Parmesh
Parmesh
Shruthi
GP
20 6/1/2015
Parmesh
GP
Balesh & Akshay GP
Parmesh
Shruthi
21 7/1/2015 Parmesh
Balesh & Akshay GP
Parmesh
22 8/1/2015 Shruthi Parmesh
Parmesh

23 9/1/2015 Shruthi Parmesh

24 10/1/2015 Shruthi Punith

GP
25 12/1/2015 Shruthi
26 13/1/2015 Shruthi
27 14/1/2015 Shruthi GP
MAKARA SANKRANTHI
28 16/1/2015 Shruthi
Balesh GP
29 17/1/2015 Akshay Parmesh
Shruthi GP
SUNDAY
GP
Shruthi
30 19/1/2015
Punith
Shruthi
30 19/1/2015 GP
GP
Akshay GP
31 20/1/2015 Shruthi GP
32 21/1/2015 Shruthi GP
33 22/1/2015 Shruthi GP
GP
34 23/1/2015 Shruthi
Parmesh
35 24/1/2015 Shruthi GP
SUNDAY
36 26/1/2015 Shruthi
37 27/1/2015 Shruthi
Parmesh
38 28/1/2015 Shruthi Gp
Parmesh
Parmesh
39 29/1/2015 Shruthi Parmesh
GP
40 30/1/2015 Shruthi Gp

41 31/1/2015 Shruthi Gp

42 2/2/2015 Shruthi Gp

43 3/2/015 Shruthi Gp

44 4/2/2015 Shruthi Gp
Parmesh
45 5/2/2015 Shruthi
Gp
Shruthi Parmesh
46 6/2/2015
Gp
47 7/2/2015 Shruthi Gp

48 9/2/2015 Shruthi

10/2/2015 Shruthi Parmesh

11/2/2015 Shruthi Gp
12/2/2015 Shruthi Parmesh

13/2/2015 Shruthi

14/2/2015 Shruthi
16/2/2015 Shruthi Gp
17/2/2015 Shruthi
GP
19/2/2015 Shruthi
Parmesh

2/3/2015 Akshay Parmesh


3/3/2015 Akshay Parmesh
Balesh g.p
4/3/2015 Akshay& balesh parmesh
balesh
5/3/2015 balesh& akshay parmesh
balesh gp
6/3/2015 akshay parmesh
balesh gp
Time
Work Name Remarks
Morning Afternoon
(am) (pm)
Estimation 10.30
3d Elevation 2.00
Estimation 3.00
Estimation 10.30
2d Drawing (Bandipalya) 12.00
Estimation Corection 4.30
2d Drawing (Manhole) 10.30
Discharge Calculation (Typing) 11.00
2d Drawing (Septic tank) 2.00
Estimation(Dambar) 10.30
Rangamantapa Estination(Anand
12.00
moortthy)
Anganawadi estimation(Anand
10.15
moortthy)
Saligrama Estination
correction(Anand moortthy)
High school Estimation(Anand
10.15
moortthy)

Toilet(Anand moortthy)

Estimation Face sheets, Reports 10.15


Anganawadi 2d drawing
3d Elevation
2d drawing (Lohith) 10.15
2d drawing (LS)
3d drawing 11.30
2d drawing (LS)
Estimation Park & Inter Locking
10.15
(Soft copy)
2d drawings 10.15
Estimation 12.00
2d drawings (Roads drawings for
10.15
Visit )
2d drawing(Kempidanahundi) 12.00
Park Estimation (Sharadevi
3.00
Nagar)
Estimation (UGD ) 10.15
Estimation (Drain & Roads ) 11.15
Estimation (Ananth Moorthy ) 1.30 3.30
Estimation (Ananth Moorthy
4.00
Toilet )
Estimation (Drain & Roads ) 10.15
2d drawing (Lohith sir) 11.00
Estimation(Hassana) 2.30
Estimates Roads/Drains 19 Estimates Complete.. & 3
9.00 6.00
( MUDA Mahesh Sir ) Estimates Pending

File Seperation 10.30


2d drawing (Lohith sir) 12.30
Estimation Roads 2.00
SUNDAY
Estimate soft copy (UGD 1) 10.30
Estimation 12.00 2 Estimates Complete
Estimate soft copy (UGD 1) 3.00
Site
Estimation (UGD Soft copy) 10.30
Estimation (Hassan) 11.00
2d drawing (Kesare ) 11.30
Estimation (Hassan) 3.00 5.30
2d drawing (Kesare ) 6.00 7.00
Site
10.00
Estimation (Hassan) 11.30
Site 7.30
2d Drawing 9.00 10.00
Estimations ( Nanjundaia
10.30
Drain,Road, Drain &Road)
Estimation (Hassan)
Office Cleaning & Pooja 10.00
Estimation (roads) 11.00
Estiomation (Soft Copy Parks) 11.30
Puneeth sir (2d Drawing)
Drawings (Kalavadi))
2 drawing (SC colony)
L
Drawing (Vishwanath) 2d Plans
ARA SANKRANTHI
Drawing (Vishwanath) 3d
BILL
Survey
Drawing (Vishwanath) 3d
SUNDAY
Drawing (Vishwanath) 3d 10.30
2D Drawing 12.00
Plan Final 12.30
Kalavadi (Manhole Numbers) 2.00
Drawing (Hulimavu & ) 10.30
Kalavadi (SC Colony &
10.30
Doddahundi)
Doddahundi 10.30
Hulimavu SC Colony Drawing 10.30
Immavu Drawing 10.30
Estimation (Drain) 2.30
Immavu Drawing 10.30
SUNDAY
L
L
Estimation (Drain ) 10.30
Hulimavu SC Colony (Some
11.30
Correction)
Estiomation (Pipe Line,Roads) 3.30
Estiomation (Pipe Line,Roads) 3.3
2d drawing(Kadkola) 10.30
Drawing Corrections 10.30
Drawing (Kalavadi Corrections) 10.30

Drawing (Kalavadi Corrections) 10.30


Drawings(Immavu) 2.30

Drawing(Immavu & Immavu Sc


10.30 `
colony)
Immavu SC colony 10.30
Estimation Correction 2.30
Hulimavu SC colony &
10.30
Doddahundi
Hassan Estimation Correction 10.30
Drawing(Hulimavu) 12.30
Estimation Corrections & Road
10.30
Estimates(2)
Drawing (Hulimavu) 4.00
Estimations (Corrections) 10.3
Immavu corrections
Corrections &
Drawing( Doddahundi)
Estimations mail &
Correction(Bhavani Layout & 10.30
Other Estimates)
2d Drawings 1.00
Scale Adjustment for Prints
(Hulimavu & Immavu)Other
drawings
All drawing (Grids &
Alignments)
Udbur Drawing (Corrections)
Udbur Drawing (Corrections)
Udbur Drawing (Corrections)
Drawing 10.30
Plan 12.00

S.W.D (survey@Arvind nagar)


S.W.D. Drwng
Out door work
salundi drwng
Out door work
salundi drwng
final bill
salundi drwng & cadd stn.
final bill

Vous aimerez peut-être aussi