Académique Documents
Professionnel Documents
Culture Documents
UP TO
200
200 400
STARTER BARS TO STARTER BARS TO
MATCH VERTICAL SLAB, REFER PLAN MATCH VERTICAL SLAB, REFER PLAN
REINFORCEMENT. FOR REINFORCEMENT. REINFORCEMENT. FOR REINFORCEMENT.
600 MAX.
4/N12 'Z'
600
600
BARS
500
SCHEDULE
SCHEDULE
REINFORCEMENT. REINFORCEMENT.
REFER
1/N16 CORNER BAR, TOP
REFER
500
REFER PAD FOOTING REFER STRIP FOOTING AND BOTTOM. 4/N12 'Z'
1/N16 CORNER BAR, TOP
SCHEDULE. SCHEDULE. MAX. BARS
AND BOTTOM. 1
STRIP FOOTING STRIP FOOTING
REQUIRED BEARING 10
REQUIRED BEARING CAPACITY MATERIAL.
CAPACITY MATERIAL. 600
REFER
REFER SCHEDULE CONCRETE BLINDING
MIN.
100
CONCRETE BLINDING SCHEDULE AT CORNER AT 'T' INTERSECTION 200 MAX. STEP 200 TO 600 MAX. STEP
MIN.
100
LAYER IF REQUIRED.
LAYER IF REQUIRED.
TYPICAL PAD FOOTING DETAIL TYPICAL STRIP FOOTING DETAIL TYPICAL STRIP FOOTING INTERSECTION DETAILS TYPICAL FOOTING STEP DETAILS
200mm
51 TO
UP TO
50mm
REFER
PLAN
AT 400 MAX. CRS. BETWEEN.
HORIZONTALLY - N12 AT 400 CRS.
50 MAX. STEP 200 MAX. STEP - LAP 600 WITH STARTER BARS FROM SLAB.
- CONCRETE FILL ALL CORES. N16 AT 200 STARTERS
- PROVIDE 2/N16 HORIZONTAL BARS IN LINTEL BLOCKS OVER ALL
TYPICAL SLAB STEP DETAILS OPENINGS GREATER THAN 1200. 60
COVER
WALL TO BE PROPPED
12x12mm MASTIC SEALANT. IF BACKFILL IS PLACED
600 600 PRIOR TO POURING
BASEMENT 1 SLAB.
OPEN CELL POLYURETHANE
FOAM BACKING ROD.
60
TOOL JOINT AT TIME OF CASTING OR 1/R16 DOWEL BAR EVERY 2ND COVER
6
BOUNDARY
SAW JOINT AS SOON AS POSSIBLE COURSE. COAT HALF LENGTH WATERPROOFING INSTALLED
AFTER CASTING. FILL WITH AN WITH BONDBREAKER. BY SPECIALIST CONTRACTOR
REFER
PLAN
APPROVED MASTIC SEALANT. CUT EVERY SECOND WIRE 1/N16 CORNER BAR. 1/N16 CORNER BAR. TO MANUFACTURER`S 190
20
C.J.
N16 AT 200 VERTICAL.
CORNER JUNCTION 60 COVER TO FACE OF
60 BLOCKWORK.
SAWN JOINT - SJ1 BLOCK WALL INTERSECTION DETAILS BLOCK WALL CONTROL COVER
SPOON DRAIN 50 MAX. DEEP. SPOON DRAIN 50 MAX. DEEP.
JOINT DETAIL N16 AT 200 STARTERS SLAB, REFER PLAN SLAB, REFER PLAN
FOR REINFORCEMENT. FOR REINFORCEMENT.
8/N20 VERTICAL
AG. DRAIN WITH
GRAVEL SURROUND
300
R10 LIGS AT
300 MAX. 190
BLOCK SF2 SF1
800
SECTION A SECTION B
100 MAX.
SPECIFICATIONS.
60 STARTER BARS TO GRATED DRAIN
COVER MATCH VERTICAL
N16 AT 200 REINFORCEMENT.
LIGS
LIGS
300
STARTER BARS TO MATCH STARTER BARS TO MATCH SF1 SF1
NUMBER AND SIZE OF VERTICALS. NUMBER AND SIZE OF VERTICALS.
LIFT PIT SUMP IF REQUIRED. REFER
150
LAP REFER
LAP REFER
TABLE
N16 AT 200
150 150
EACH WAY.
WHERE COLUMNS ALIGN WHERE COLUMNS DON'T ALIGN
SECTION C SECTION D SECTION E
TYPICAL COLUMN ELEVATIONS S101 S101 S101
1:20 PROPOSED RESIDENTIAL DEVELOPMENT MULTI UNIT DEVELOPMENT BASEMENT 1
D AMENDMENTS AS CLOUDED 05.07.17 P.D.
D.T. W.J. FOOTING AND SLAB SECTIONS AND
C CONSTRUCTION ISSUE 23.06.17 P.D.
16157 S111 D