Vous êtes sur la page 1sur 1

BOQ - Air Conditioning

Heat Load
Desc ROOM Qty Remarks
(KW)
A 5 VTA H : 50%, T : 24 C
B 15.74 VTA H : 50%, T : 24 C
C 10.17 VTA H : 50%, T : 24 C
Admin Building
D 10.17 VTA H : 50%, T : 24 C
E 2.65 VTA H : 50%, T : 24 C
F 2.65 VTA H : 50%, T : 24 C
Control Room 31 VTA H : 40%, T : 20 C, AHU
Electrical Building Battery Room 12 VTA H : 50%, T : 24 C
Electrical Room 26.26 VTA H : 50%, T : 24 C
CEMS 2.2 VTA H : 50%, T : 24 C
Mosque 10.1 VTA H : 50%, T : 24 C
Warehouse 5.94 VTA H : 50%, T : 24 C
Workshop 7.82 VTA H : 50%, T : 24 C
R. Kepala Lab 4.25 VTA H : 50%, T : 24 C
Labotarium R. Adm Staff Lab 4.3 VTA H : 50%, T : 24 C
Building Laboratorium 9.15 VTA H : 50%, T : 24 C
Gudang Sample 2.07 VTA H : 50%, T : 24 C
TOTAL 161.47
BOQ Ventilating

Cap
Desc ROOM Qty Remarks
(m3/hr)
Toilet A 704 VTA Wall type
Admin Building Toilet B 704 VTA Wall type
Pantry 240 VTA Wall type
Toilet A 72 VTA Roof type
Electrical Building Toilet B 72 VTA Roof type
Mosque Toilet A 105 VTA Roof type
Toilet B 105 VTA Roof type
Warehouse 21056 VTA Wall type
Workshop &
Workshop 21560 VTA Wall type
Warehouse
Toilet 448 VTA Wall type
Labotarium Toilet A 72 VTA Roof type
Toilet B 72 VTA Roof type
Power House Engine Room 47520 VTA Roof Type
TOTAL 92730

Vous aimerez peut-être aussi